Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations, SOR/2024-26
Section 69
Casing and wellhead system
Cite as Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations, SOR/2024-26, s. 69 · current to September 21, 2026 · regulation last amended September 17, 2026
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) An operator must ensure that a casing and wellhead system is designed, taking into account the wellhead’s fatigue life, so that, throughout the life cycle of the well,
(a) the well can be drilled safely, targeted formations can be evaluated and developed and waste can be prevented;
(b) the maximum conditions, forces and stresses to which the casing and wellhead system may be subjected are withstood; and
(c) the integrity of gas hydrate and permafrost zones is protected.
(2) The operator must ensure that, during the design of the casing and wellhead system, if the annulus is to be used for fluid production or injection, a barrier analysis is conducted to confirm that two barrier envelopes can be maintained in place throughout the life cycle of the well.
(3) The operator must ensure that each casing is installed at a depth that provides for adequate kick tolerance and safe well control.
(4) The operator must ensure that well operations do not continue beyond the wellhead’s fatigue life.
(5) The operator must ensure that the cement slurry is designed and installed so that, throughout the life cycle of the well,
(a) the movement of formation fluids is prevented and, when required for safety, resource evaluation or waste prevention, the isolation of the petroleum and water zones is ensured;
(b) support for the casing is provided;
(c) corrosion of the casing over the cemented interval is minimized; and
(d) the integrity of gas hydrate and permafrost zones is protected.
(6) The operator must ensure that the cement integrity and placement are verified, subject to subsection (7), through pressure-testing and, if the cement is a common barrier element of the two barrier envelopes or if confirmation of zonal isolation is required, also through logging.
(7) The cement integrity and placement may be verified using other methods if the operator demonstrates that those methods provide a level of verification that is equivalent to those referred to in subsection (6).
(8) The operator must ensure that the cement design is subjected to comprehensive laboratory testing and pre-cementing quality control, under all foreseeable conditions that could have an impact on cementing, so that the cement provides the expected isolation and can be efficiently installed.
(9) The operator must ensure that, after cementing any casing or casing liner and before drilling out the casing shoe, the cement reaches the minimum compressive strength sufficient to support the casing and provide zonal isolation.
(10) The operator must ensure that, after any casing is installed and cemented and before the casing shoe is drilled out, the casing is pressure-tested to the value required to confirm its integrity for maximum anticipated operating pressure throughout the life cycle of the well.