International Bridges and Tunnels Regulations, SOR/2009-17

Section 12

Cite as International Bridges and Tunnels Regulations, SOR/2009-17, s. 12 · current to March 31, 2026 · regulation last amended March 25, 2026

Statute Watch

Get an alert when a bill in Parliament would change this section, and every time it moves.

The text

An owner of an international bridge shall ensure that an evaluation of the bridge’s capacity to carry traffic loads is conducted in accordance with the requirements set out in the Canadian Highway Bridge Design Code, the Manual for Condition Evaluation of Bridges or the Manuel d’évaluation de la capacité portante des structures when any of the following occur: (a) observed or suspected defects, deterioration or damage that may affect load capacity; (b) an anticipated increase in actual or permitted traffic loading or in loading effect; (c) a change in road classification; (d) a review of the load limit that is posted; (e) an alteration to the bridge that may affect its live load carrying capacity; (f) an application for a permit to allow a vehicle not conforming to the load limit to cross the bridge; or (g) an unsatisfactory performance of the bridge in respect of serviceability or fatigue.
Read the International Bridges and Tunnels Regulations on the Justice Laws Website ↗

Made under International Bridges and Tunnels Act, S.C. 2007, c. 1.

Bills in Parliament that would change this section 0

No bill we hold would amend or repeal this section.