Dominion Water Power Regulations, C.R.C., c. 1603
Section 10
Cite as Dominion Water Power Regulations, C.R.C., c. 1603, s. 10 · current to July 24, 2025 · regulation last amended August 28, 2019
Statute Watch
Get an alert when a bill in Parliament would change this section, and every time it moves.
The text
(1) An interim licensee shall, at a time fixed by the Director, supplement the general construction plans of the works by a plan of lands from an actual survey by a Canada Lands Surveyor acting under instructions from the Surveyor General of Canada.
(2) A plan of lands shall be certified by a Canada Lands Surveyor and shall show and describe by section, township and range or lot number if in surveyed territory, or by other accurate description if in unsurveyed territory, the lands that are required to be occupied or used in the construction, maintenance and operation of the proposed works, noting separately,
(a) public lands not covered by water required for main diverting works, powerhouses and other similar works;
(b) public lands covered by water required for the purposes referred to in paragraph (a);
(c) public lands required only to be flooded in connection with the storage or pondage of water;
(d) public lands required only for rights-of-way for water conduits, transmission lines and other similar works;
(e) public lands, if any, required for substations, distributing stations, terminal stations and other similar buildings;
(f) provincial Crown lands; and
(g) privately owned lands.
(3) The plan of lands shall be accompanied by a statement giving, with respect to each parcel of privately owned lands, the name of
(a) the registered owner in fee thereof;
(b) any registered mortgagee or lessee; and
(c) any claimant in actual possession other than a registered owner, mortgagee or lessee.
(4) When required by the Director, the surveys and investigations required by this section shall be made by the Legal Surveys Division of the Department of Energy, Mines and Resources and in such case an interim licensee shall reimburse Her Majesty for all salaries and expenses paid for such surveys upon the presentation to the interim licensee of accounts properly certified.
Read the Dominion Water Power Regulations on the Justice Laws Website ↗
Made under Dominion Water Power Act, R.S.C. 1985, c. W-4.
Bills in Parliament that would change this section 0
No bill we hold would amend or repeal this section.