SB2258 — THERMAL ENERGY JOBS ACT
Last action — Rule 3-9(a) / Re-referred to Assignments
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced February 07, 2025. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
-
Introduced
Current position in the legislative process.
-
6 sponsors
1 primary, 5 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (6 D).
-
Cleared a recorded vote
Passed 2 recorded votes so far.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
Summary
Provides that the amendatory Act may be referred to as the Thermal Energy Network and Jobs Acts. Sets forth a statement of legislative findings and intent. Amends the Public Utilities Act. Defines "thermal energy" and "thermal energy network". Requires the Illinois Commerce Commission to initiate a proceeding within 6 months after the effective date of the amendatory Act to support the development of pilot thermal energy networks. Provides that within 10 months after the effective date of the amendatory Act, every gas public utility, electric public utility, or combination public utility serving over 100,000 customers shall file with the Commission a petition seeking Commission-approval of at least one and no more than 3 proposed pilot thermal energy network projects. Requires every gas public utility, electric public utility, or combination public utility constructing or operating a Commission-approved pilot thermal energy network project to report to the Commission, on a quarterly basis and until completion of the pilot thermal energy network project, the status of each pilot thermal energy network project. Requires every gas public utility, electric public utility, or combination public utility constructing or operating a Commission-approved pilot thermal energy network project to demonstrate that it has entered into a labor peace agreement with a bona fide labor organization that is actively engaged in representing its employees. Requires the Commission to adopt specified rules within 4 years after the completion of the construction of all thermal energy network projects. Provides that a gas public utility, electric public utility, or combination public utility required to develop a pilot thermal energy network project shall be permitted to recover all reasonable and prudently incurred costs associated with the development, construction, and operation of one or more pilot thermal energy network projects through general rates or through rates set in a Multi-Year Rate Plan. Makes other changes. Effective immediately.
Bill Text
We don't have the full text on file for this bill yet.
Read SB2258 on the official Illinois source →Action History
-
Rule 3-9(a) / Re-referred to Assignments
-
Added as Co-Sponsor Sen. Mike Simmons
-
Added as Co-Sponsor Sen. Lakesia Collins
-
Rule 2-10 Third Reading Deadline Established As May 9, 2025
-
Added as Co-Sponsor Sen. Javier L. Cervantes
-
Senate Floor Amendment No. 2 Recommend Do Adopt Energy and Public Utilities; 009-004-000
-
Senate Floor Amendment No. 2 Assignments Refers to Energy and Public Utilities
-
Placed on Calendar Order of 3rd Reading April 10, 2025
-
Second Reading
-
Senate Floor Amendment No. 2 Referred to Assignments
-
Senate Floor Amendment No. 2 Filed with Secretary by Sen. Robert Peters
-
Placed on Calendar Order of 2nd Reading April 8, 2025
-
Do Pass as Amended Energy and Public Utilities; 009-005-000
-
Senate Committee Amendment No. 1 Adopted
-
Added as Chief Co-Sponsor Sen. Graciela Guzmán
-
Rule 2-10 Committee Deadline Established As April 4, 2025
-
Senate Committee Amendment No. 1 Assignments Refers to Energy and Public Utilities
-
Senate Committee Amendment No. 1 Referred to Assignments
-
Senate Committee Amendment No. 1 Filed with Secretary by Sen. Robert Peters
-
Added as Chief Co-Sponsor Sen. Rachel Ventura
-
Added as Co-Sponsor Sen. Rachel Ventura
-
Assigned to Energy and Public Utilities
-
Referred to Assignments
-
First Reading
-
Filed with Secretary by Sen. Robert Peters
Sponsors
- Robert Peters · Primary
- Rachel Ventura · Cosponsor
- Graciela Guzmán · Cosponsor
- Javier L. Cervantes · Cosponsor
- Lakesia Collins · Cosponsor
- Mike Simmons · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 5 co-sponsors · 177 not signed on · 4 voted No
Sponsors (1)
- Robert Peters Democrat
Co-sponsors (5)
- Rachel Ventura Democrat
- Graciela Guzmán Democrat
- Javier L. Cervantes Democrat
- Lakesia Collins Democrat
- Mike Simmons Democrat
Not signed on (177)
177 members have not signed on to this bill.
Show all 177 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Republican | 0 | 4 | 0 | 1 |
| Democrat | 9 | 0 | 0 | 1 |
| Total | 9 | 4 | 0 | 2 |
| % of votes cast | 60% | 27% | 0% | 13% |
How each member voted (15)
| Member | Party | Vote |
|---|---|---|
| Bill Cunningham | Democrat | Yea |
| Christopher Belt | Democrat | Not Voting |
| Cristina Castro | Democrat | Yea |
| David Koehler | Democrat | Yea |
| Javier L. Cervantes | Democrat | Yea |
| Napoleon Harris III | Democrat | Yea |
| Patrick J. Joyce | Democrat | Yea |
| Paul Faraci | Democrat | Yea |
| Robert Peters | Democrat | Yea |
| Steve Stadelman | Democrat | Yea |
| Dale Fowler | Republican | Not Voting |
| Erica Harriss | Republican | Nay |
| Neil Anderson | Republican | Nay |
| Sue Rezin | Republican | Nay |
| Terri Bryant | Republican | Nay |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Republican | 5 | 0 | 0 | 0 |
| Democrat | 9 | 0 | 0 | 0 |
| Unaffiliated | 0 | 0 | 0 | 1 |
| Total | 14 | 0 | 0 | 1 |
| % of votes cast | 93% | 0% | 0% | 7% |
How each member voted (15)
| Member | Party | Vote |
|---|---|---|
| Harris III, Napoleon | — | Not Voting |
| Bill Cunningham | Democrat | Yea |
| Cristina Castro | Democrat | Yea |
| David Koehler | Democrat | Yea |
| Javier L. Cervantes | Democrat | Yea |
| Linda Holmes | Democrat | Yea |
| Patrick J. Joyce | Democrat | Yea |
| Paul Faraci | Democrat | Yea |
| Robert Peters | Democrat | Yea |
| Steve Stadelman | Democrat | Yea |
| Dale Fowler | Republican | Yea |
| Erica Harriss | Republican | Yea |
| Neil Anderson | Republican | Yea |
| Sue Rezin | Republican | Yea |
| Terri Bryant | Republican | Yea |
Subjects
Frequently asked questions
- What does SB2258 do?
- Provides that the amendatory Act may be referred to as the Thermal Energy Network and Jobs Acts. Sets forth a statement of legislative findings and intent. Amends the Public Utilities Act. Defines "thermal energy" and "thermal energy network". Requires the Illinois Commerce Commission to initiate a proceeding within 6 months after the effective date of the amendatory Act to support the development of pilot thermal energy networks. Provides that within 10 months after the effective date of the amendatory Act, every gas public utility, electric public utility, or combination public utility serving over 100,000 customers shall file with the Commission a petition seeking Commission-approval of at least one and no more than 3 proposed pilot thermal energy network projects. Requires every gas public utility, electric public utility, or combination public utility constructing or operating a Commission-approved pilot thermal energy network project to report to the Commission, on a quarterly basis and until completion of the pilot thermal energy network project, the status of each pilot thermal energy network project. Requires every gas public utility, electric public utility, or combination public utility constructing or operating a Commission-approved pilot thermal energy network project to demonstrate that it has entered into a labor peace agreement with a bona fide labor organization that is actively engaged in representing its employees. Requires the Commission to adopt specified rules within 4 years after the completion of the construction of all thermal energy network projects. Provides that a gas public utility, electric public utility, or combination public utility required to develop a pilot thermal energy network project shall be permitted to recover all reasonable and prudently incurred costs associated with the development, construction, and operation of one or more pilot thermal energy network projects through general rates or through rates set in a Multi-Year Rate Plan. Makes other changes. Effective immediately.
- Who sponsors SB2258 ?
- SB2258 is sponsored by Robert Peters (Democrat), Rachel Ventura (Democrat), Graciela Guzmán (Democrat), Javier L. Cervantes (Democrat), Lakesia Collins (Democrat), and Mike Simmons (Democrat).
- What is the current status of SB2258 ?
- This bill has been introduced in the Senate. Introduced February 07, 2025. It must pass committee before a floor vote.
- Where can I track SB2258 ?
- Track SB2258 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB2258
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB2258
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →