SB 1003 — Permit Time Lines/Certain Wastewater Systems.
Last action — Senate Chamber: Ref To Com On Rules and Operations of the Senate
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill is in committee in the Senate. Introduced April 30, 2026. It must pass committee before a floor vote.
Next likely step: a committee vote, then a floor vote in the Senate.
In plain language
The bill relates to permit timelines for certain wastewater systems.
This legislation addresses the timelines for obtaining permits related to specific wastewater systems. The details of requirements are not available as the bill text is not provided.
Summary
To establish permitting deadlines for npdes permits to be issued for new or expanded wastewater treatment systems to be located in fast growing counties and to appropriate funds to the department of environmental quality to implement the expedited permitting requirements.
In the bill's own words, from its opening clause.
Bill Text
What changed in the latest version
10 added · 11 removedPlain-language change summary
The amendment to Senate Bill 1003 includes adjustments to how the bill identifies the session and bill number, clarifying its reference to the 2025 SESSION and updating its identifier. This matters because it ensures that the legislative text is accurately linked to the specific session and version of the bill, which can impact how it is processed and tracked within the legislative framework.
FILED SENATE GENERAL ASSEMBLY OF NORTH CAROLINA AprSESSION 30,2025 2026S S.B.1 SENATE BILL 1003 Short Title:
1003Permit SESSION 2025 PRINCIPAL CLERK S D SENATE BILL DRS35442-RIa-24 Short Title:Permit Time Lines/Certain Wastewater Systems.
Rules and Operations of the Senate May 4, 2026 A BILL TO BE ENTITLED AN ACT TO ESTABLISH PERMITTING DEADLINES FOR NPDES PERMITS TO BE ISSUED FOR NEW OR EXPANDED WASTEWATER TREATMENT SYSTEMS TO BE LOCATED IN FAST GROWING COUNTIES AND TO APPROPRIATE FUNDS TO THE DEPARTMENT OF ENVIRONMENTAL QUALITY TO IMPLEMENT THE EXPEDITED PERMITTING REQUIREMENTS.
The Commission may, however, respond to subsequent additional *DRS35442-RIa-24**S1003-v-1* General Assembly Of North Carolina Session 2025 information letters or electronic responses with a request for additional information limited to information missing from that subsequent additional information letter or electronic response.
Upon receipt of the required information from the applicant, the Commission shall have 30 calendar days to complete the technical review and issue the permit, issue the permit with modifications, deny the permit, or issue a letter or electronic response with a list of additional information required to continue processingprocessingthe the application, and the review process will proceed in accordance with sub-subdivision b.
Page 2 DRS35442-RIa-24Senate Bill 1003-First Edition
Compared against the N.C. General Statutes as published AI-generated reading aid — verify against the official bill.
The bill establishes new permitting deadlines and procedures for wastewater treatment systems in fast-growing counties.
-
G.S. 143-215.1
(f6) With respect to permits for new or expanded wastewater treatment systems to be located in a county with a projected population growth rate above two percent (2%) annually or is located in one of the top twenty percent (20%) of the fastest growing counties in the State, by population, permitting under the authority granted to the Commission by this section shall comply with the procedures and time lines set forth in this subsection. The Commission shall act on a permit application as quickly as possible. The following provisions apply: (1) The Commission shall perform an administrative review of a new application and of a resubmittal of an application determined to be incomplete under subdivision (2) of this subsection within 30 working days of receipt to determine if the information is administratively complete. If complete, the Commission shall issue a receipt letter or electronic response stating that the application is complete and that a 90-calendar day technical review period has started as of the original date the application was received. If required items or information are not included, the application shall be deemed incomplete and the Commission shall issue an application receipt letter or electronic response identifying the information required to complete the application package before the technical review begins. When the required information is received, the Commission shall then issue a receipt letter or electronic response specifying that it is complete and that the 90-calendar day review period has started as of the date of receipt of all required information. The Commission shall develop an application package checklist identifying the items and information required for an application to be considered administratively complete. After issuing a letter or electronic response requesting additional information based on the original submittal under this subdivision, the Commission shall not subsequently request additional information that was not previously identified as missing or required in that additional information letter or electronic response from the original submittal. The Commission may, however, respond to subsequent additional information letters or electronic responses with a request for additional information limited to information missing from that subsequent additional information letter or electronic response. (2) If, during the 90-calendar day technical review period, the Commission determines that additional information is required to continue processing the application, the Commission and the applicant shall comply with the following: a. The Commission shall issue a letter or electronic response with a list of the additional information required to issue the permit. b. The applicant shall have 30 calendar days from the date the letter or electronic response is sent to submit the additional information to the Commission. c. If the applicant fails to provide the required information within 30 calendar days, the Commission shall return the application to the applicant, the application is deemed denied, and the applicant must resubmit a complete application with a new application fee before the project may be reviewed. d. Upon receipt of the required information from the applicant, the Commission shall have 30 calendar days to complete the technical review and issue the permit, issue the permit with modifications, deny the permit, or issue a letter or electronic response with a list of additional information required to continue processing the application, and the review process will proceed in accordance with sub-subdivision b. of this subdivision. e. After issuing a letter or electronic response requesting additional information under this subdivision, the Commission shall not subsequently request additional information that was not previously identified as missing or required in that additional information letter or electronic response. The Commission may request additional information if required for the technical review based on any new information, changed circumstances, or changed designs provided by the applicant in the response under sub-subdivision b. of this subdivision. Where the Commission identifies information that should have been requested, the Commission may include conditions in or modifications to the permit upon issuance addressing this information but shall not deny the permit because of the missing information. This prohibition on permit denial shall not apply where an application was deemed denied under sub-subdivision c. of this subdivision. (3) In accordance with 40 C.F.R. § 124.12, prior to issuance of a permit, the Commission shall hold a public hearing whenever it finds, on the basis of requests, a significant degree of public interest in the permit. (4) The Department shall either approve or deny an application within (i) 90 days of the date the application is deemed complete if no public hearing is held or (ii) 120 days of the date the application is deemed complete if a public hearing is held.
This addition creates a new framework for expedited permitting processes specifically for wastewater treatment systems in rapidly growing counties.
Action History
-
Senate Chamber: Ref To Com On Rules and Operations of the Senate
-
Senate Chamber: Passed 1st Reading
-
Senate Chamber: Filed
Sponsors
- Chris Measmer · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 179 not signed on
Sponsors (1)
- Chris Measmer Republican
Co-sponsors (0)
None.
Not signed on (179)
179 members have not signed on to this bill.
Show all 179 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
Frequently asked questions
- What does SB 1003 do?
- To establish permitting deadlines for npdes permits to be issued for new or expanded wastewater treatment systems to be located in fast growing counties and to appropriate funds to the department of environmental quality to implement the expedited permitting requirements.
- Who sponsors SB 1003?
- SB 1003 is sponsored by Chris Measmer (Republican).
- What is the current status of SB 1003?
- This bill is in committee in the Senate. Introduced April 30, 2026. It must pass committee before a floor vote.
- Where can I track SB 1003?
- Track SB 1003 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 1003
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 1003
Last checked for changes 28 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →