SB 844 — Affordable Energy Omnibus.
Last action — Senate Chamber: Re-ref to Appropriations/Base Budget. If fav, re-ref to Rules and Operations of the Senate
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill is in committee in the Senate. Introduced April 27, 2026. It must pass committee before a floor vote.
Next likely step: a committee vote, then a floor vote in the Senate.
In plain language
The bill addresses issues related to affordable energy.
The Affordable Energy Omnibus aims to tackle matters of energy costs. Specific details and requirements are not available.
Summary
To reduce energy costs, to ensure fair cost allocation, to protect consumers, and to modernize north carolina's electric grid.
In the bill's own words, from its opening clause.
Bill Text
What changed in the latest version
20 added · 21 removedPlain-language change summary
The changes made to Senate Bill 844 include updates to the phrasing in lines regarding the application for a certificate to operate a large-load facility and the conditions under which the Utilities Commission may modify that certificate. Additionally, modifications were made to the text concerning the environmental effects associated with noise pollution from the facility. These amendments clarify the process and conditions under which large-load facilities are governed, which could impact how new facilities are permitted and operated in North Carolina.
FILED SENATE GENERAL ASSEMBLY OF NORTH CAROLINA AprSESSION 27,2025 2026S S.B.1 SENATE BILL 844 Short Title:
844 SESSION 2025 PRINCIPAL CLERK S D SENATE BILL DRS45473-NPa-34 Short Title:
Rules and Operations of the Senate April 28, 2026 A BILL TO BE ENTITLED AN ACT TO REDUCE ENERGY COSTS, TO ENSURE FAIR COST ALLOCATION, TO PROTECT CONSUMERS, AND TO MODERNIZE NORTH CAROLINA'S ELECTRIC GRID.
Whereas, electricityelectricitycosts costs for North Carolina households have increased substantially in recent years, placing financial strain on families;
*DRS45473-NPa-34**S844-v-1* General Assembly Of North Carolina Session 2025 (a) Application.
The application for a certificate to operate a large-load facilityfacilityshall shall be made in a form prescribed by the Commission.
(4) That the applicant will mitigate any adverse social, economic, and environmental effects resultingresultingfrom fromforeseeable foreseeablenoisepollutioncausedbythenoisepollutioncausedbythe large-load facility.
(5) In the case of large-load data centers, that the political subdivision with jurisdiction over the proposed facilityfacilityhas has consented by local referendum held in accordance with G.S.
62-133.16, and that large-load facilities will be responsible for the Page 2 DRS45473-NPa-34Senate Bill 844-First Edition General Assembly Of North Carolina Session 2025 entire cost of any capital investments or incremental operational expenses necessary for the electric public utility to serve large-load facilities, including anyanygeneration, generation, transmission,distribution,orinterconnection costs reasonably attributable to serving this class of customers.
DRS45473-NPa-34Senate Bill 844-First Edition Page 3 General Assembly Of North Carolina Session 2025 "Shall (the political subdivision) consent to the Utilities Commission issuing a certificate of operation to allow the construction and operation of (the large-load data center)? [ ] YES [ ] NO" If a majority of the votes cast on the proposition are in the affirmative, the political subdivision consents to the Commission issuing a certificate of operation to the large-load data center.
62-127.2,as enactedbyenactedbysubsection subsection(a)(a) ofthis section,shall be submitted by the electric public utility no later than July 1, 2028.
Page 4 DRS45473-NPa-34Senate Bill 844-First Edition General Assembly Of North Carolina Session 2025 (a) Each electric public utility shall submit to the Commission a proposed grid modernization plan to maintain and improve the adequacy, reliability, and resiliency of the electric grid to serve the people of the State or the area served by the utility.
DRS45473-NPa-34Senate Bill 844-First Edition Page 5 General Assembly Of North Carolina Session 2025 (5) That the environmental compatibility, public convenience, and necessity require the transmission line.
(b) If the Commission determines that the location of the proposed transmission line should be modified, it may condition its certificate upon modifications it finds necessarynecessaryto to make the findings and determinations set forth in subsection (a) of this section." 7 PART V.
APPROPRIATION SECTION 7.(a) There is appropriated from the General Fund to the Utilities Commission the sum of five million dollars ($5,000,000) in recurring funds beginning in the 2026-2027 fiscal year to be used for purposes consistent with this act, including administering the certification requirements for large-load customers, reviewing electric public utilities' grid modernization plans,plans,enforcing enforcing consumerprotectionlaws, and conducting dataanalysis onutility rates.
Page 6 DRS45473-NPa-34Senate Bill 844-First Edition
Action History
-
Senate Chamber: Re-ref to Appropriations/Base Budget. If fav, re-ref to Rules and Operations of the Senate
-
Senate Chamber: Withdrawn From Com
-
Senate Chamber: Ref To Com On Rules and Operations of the Senate
-
Senate Chamber: Passed 1st Reading
-
Senate Chamber: Filed
Sponsors
- Woodson Bradley · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 179 not signed on
Sponsors (1)
- Woodson Bradley Democratic
Co-sponsors (0)
None.
Not signed on (179)
179 members have not signed on to this bill.
Show all 179 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
Frequently asked questions
- What does SB 844 do?
- To reduce energy costs, to ensure fair cost allocation, to protect consumers, and to modernize north carolina's electric grid.
- Who sponsors SB 844?
- SB 844 is sponsored by Woodson Bradley (Democratic).
- What is the current status of SB 844?
- This bill is in committee in the Senate. Introduced April 27, 2026. It must pass committee before a floor vote.
- Where can I track SB 844?
- Track SB 844 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 844
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 844
Last checked for changes 28 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →