North Carolina 2025-2026 Session Status: In Committee Sponsors 5 R

HB 638 — Equit. Escalation of Electricity Demand Act.

Last action — House Chamber: Ref to the Com on Energy and Public Utilities, if favorable, Finance, if favorable, Rules, Calendar, and Operations of the House

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the House. Introduced April 01, 2025. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the House.

Summary

To assign the cost of new data centers, electric vehicle charging stations, and associated electricity demands to those who benefit directly from these power supplies.

In the bill's own words, from its opening clause.

Bill Text

What changed in the latest version

89 added · 87 removed

Plain-language change summary

The amended version of the bill modifies certain language concerning the definitions related to electric demand. Notably, the definition of "data center" has been removed from the text. This change means that there will no longer be a specific definition outlining what constitutes a data center within this portion of the legislation.

→
Previous
Latest
GENERAL ASSEMBLY OF NORTH CAROLINA H.B.
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2025 H 1 HOUSE BILL 638 Short Title:
638 Apr 1, 2025 SESSION 2025 HOUSE PRINCIPAL CLERK H D HOUSE BILL DRH30285-NJ-8 Short Title:
Representative Loftis.
Representatives Loftis, Ward, Tyson, and Greene (Primary Sponsors).
For a complete list of sponsors, refer to the North Carolina General Assembly web site.
A BILL TO BE ENTITLED AN ACT TO ASSIGN THE COST OF NEW DATA CENTERS, ELECTRIC VEHICLE CHARGING STATIONS, AND ASSOCIATED ELECTRICITY DEMANDS TO THOSE WHO BENEFIT DIRECTLY FROM THESE POWER SUPPLIES.
Energy and Public Utilities, if favorable, Finance, if favorable, Rules, Calendar, and Operations of the House April 2, 2025 A BILL TO BE ENTITLED AN ACT TO ASSIGN THE COST OF NEW DATA CENTERS, ELECTRIC VEHICLE CHARGING STATIONS, AND ASSOCIATED ELECTRICITY DEMANDS TO THOSE WHO BENEFIT DIRECTLY FROM THESE POWER SUPPLIES.
and Whereas, electric grid operators project a rapid increase in American electricity demand, up 4.7% between 2023 and 2028, caused by growth in data centers and electric vehicles;
and Whereas, electric grid operators project a rapid increase in American electricity demand, up 4.7% between 2023 and 2028, caused bygrowth in data centers and electric vehicles;
and Whereas, newly built data centers should be the first to have their power curtailed in the event that new dispatchable power is not added to the grid and electricity blackouts or brownouts occur;
and *H638-v-1* General Assembly Of North Carolina Session 2025 Whereas, newly built data centers should be the first to have their power curtailed in the event that new dispatchable power is not added to the grid and electricity blackouts or brownouts occur;
and *DRH30285-NJ-8* General Assembly Of North Carolina Session 2025 Whereas, those benefitting directly from new dispatchable power supplies, like EV and PHEV users and data centers, should have to cover the cost of the additional demand they are placing on the electric grid;
and Whereas, those benefitting directly from new dispatchable power supplies, like EV and PHEV users and data centers, should have to cover the cost of the additional demand they are placing on the electric grid;
Chapter 62 of the General Statutes is amended by adding a new Article to read:
Chapter 62 of the General Statutes is amended byadding a new Article to read:
– A vehicle that uses electricity stored in a rechargeable battery and an electric motor instead of a gasoline or other carbon-based fuel tank and internal combustion engine.
– A vehicle that uses electricitystored in a rechargeable battery and an electric motor instead of a gasoline or other carbon-based fuel tank and internal combustion engine.
(8) Plug-in hybridelectricvehicle(PHEV).– Anyvehiclethatuses acombination of gasoline or other carbon-based fuel and electric generation or storage;
(8) Plug-in hybridelectricvehicle (PHEV).– Anyvehiclethat uses acombination of gasoline or other carbon-based fuel and electric generation or storage;
The fee is separate and apart from any feelevied on EVs orPHEVs forinfrastructureconstructionand maintenance, andrather is dedicated to the construction of new dispatchable power supplies to meet expected demand, without socializing the cost across all ratepayers.
The fee is separate and apart from anyfeelevied on EVs orPHEVs forinfrastructureconstructionand maintenance, andrather is dedicated to the construction of new dispatchable power supplies to meet expected demand, without socializing the cost across all ratepayers.
(b) For charging stations installed and owned by the State, a fee shall be assessed to users of the charging station.
(b) For charging stations installed and owned bythe State, a fee shall be assessed to users of the charging station.
(c) New data centers requiring dispatchable power will be responsible for its provision, eitherby contracting directly with thelocal utility fortheconstructionofdispatchablepowerwith theapproval for new powersources having to go throughtheusual regulatoryprocess undertaken by the Commission, except for the price which will be negotiated between the utility and the Page 2 DRH30285-NJ-8 General Assembly Of North Carolina Session 2025 source of the new demand, with safeguards so any cost overruns are not borne by ratepayers in general.
Page 2 House Bill 638-First Edition General Assembly Of North Carolina Session 2025 (c) New data centers requiring dispatchable power will be responsible for its provision, eitherbycontractingdirectlywith thelocal utilityfortheconstructionofdispatchablepowerwith theapproval for new powersources havingto go through theusual regulatoryprocess undertaken by the Commission, except for the price which will be negotiated between the utility and the source of the new demand, with safeguards so any cost overruns are not borne by ratepayers in general.
(d) If any state, or political subdivision thereof, provides economic incentives for the construction, opening, or operations of a new data center, they shall enter into a memorandum of understanding orothersimilarinstrument regarding subsection (c)ofthis section suchthatfailure or refusal to meet the terms of the aforementioned memorandum of understanding, the Commission is authorized to notify the relevant state and local agencies to commence proceedings to recoup the current cash valueofthe economicincentives from theparent company of the data center.
(d) If any state, or political subdivision thereof, provides economic incentives for the construction, opening, or operations of a new data center, they shall enter into a memorandum of understandingorothersimilarinstrument regardingsubsection (c)ofthis section suchthat failure or refusal to meet the terms of the aforementioned memorandum of understanding, the Commission is authorized to notify the relevant state and local agencies to commence proceedings to recoup the current cash valueofthe economicincentives from theparent company of the data center.
DRH30285-NJ-8 Page 3
House Bill 638-First Edition Page 3
View plain text versions (2)

Action History

  1. House Chamber: Ref to the Com on Energy and Public Utilities, if favorable, Finance, if favorable, Rules, Calendar, and Operations of the House

  2. House Chamber: Passed 1st Reading

  3. House Chamber: Filed

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

4 sponsors · 1 co-sponsors · 175 not signed on

Sponsors (4)

Co-sponsors (1)

Not signed on (175)

175 members have not signed on to this bill.

Show all 175 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 638 do?
To assign the cost of new data centers, electric vehicle charging stations, and associated electricity demands to those who benefit directly from these power supplies.
Who sponsors HB 638?
HB 638 is sponsored by Donnie Loftis (Republican), Bill Ward (Republican), Steve Tyson (Republican), Dudley Greene (Republican), and Ben T. Moss, Jr. (Republican).
What is the current status of HB 638?
This bill is in committee in the House. Introduced April 01, 2025. It must pass committee before a floor vote.
Where can I track HB 638?
Track HB 638 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 638

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 638

Last checked for changes 29 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →