AB 313 — Revises provisions relating to mining reclamation. (BDR 46-590)
Last action — (No further action taken.)
-
✓Introduced
-
2In Committee
-
3Passed Assembly
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill died with 2023 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Bill Text
What changed in the latest version
523 added · 529 removed523 line(s) added, 529 removed.
EXEMPT (Reprinted with amendments adopted on April 21, 2023) FIRST REPRINT A.B.
requiring an operator of a mining operation to submit a revised plan for reclamation under certain circumstances;
requiring certain state agencies to prepare reports relating to certain impacts of pit lakes and mining;
(NRS 519A.210) Section 34 of this bill requires that if an operatoropen ofpit awill miningbe operationexcavated tobelow submitthe apremining revisedwater table, a plan for reclamation if:must, with certain exceptions, provide for the backfilling of the open pit to a level where no pit lake will form and no seasonal or permanent wetland will exist.
(1)Section the2 of this bill defines “pit lake.” from this requirement.s that an operator ismay renewingapply ato permitthe Division for thean controlexception ofSection water6 pollutionof orthis requestingbill makes a majorconforming modificationchange to aindicate permitthe toproper engageplacement of section 2 in athe miningNevada operation;Revised Statutes.
andSections (2)14 theand renewal15 or modification will impact the plan for reclamation requirements for a plan for reclamation.cation, the plan is not consistent with the Section 4 of this bill requiresmake thatconforming ifchanges anto openindicate pitthat willcertain beprovisions excavatedgoverning belowviolations theand preminingpenalties waterrelating table,to a plan for reclamation must,are withapplicable certainto exceptions, provide for the backfillingprovisions of thesections open2 pit to a level where no pit lake will form and no4. seasonal or permanent wetland will exist.
Sectionexploration 2project ofor thismining billoperation definesmust “pitagree lake.” Section 4 also provides that an operator may apply to theassume Divisionresponsibility for anthe exceptionreclamation froSection 6 of thisany billsurface makesarea aor conformingland, changerespectively, todamaged indicateas thea properresult placement of sectionthe 2exploration inproject theor Nevadamining Revisedoperation. Statutes.
(NRS 519A.190, 519A.210) Sections 149 and 1510 of this bill makerequire conformingsuch changesa person to indicatealso thatagree certainto provisionsassume governingresponsibility violationsfor andthe penaltiesreclamation relatingof toany asurface planwater forand reclamationgroundwater areaffected applicableas toa theresult provisions of sectionsthe 2,exploration 3project andor 4.mining operation.
UnderSection existing12 law,of athis personbill whorequires submitsa anplan applicationfor to- engage*AB313_R1* in– an2 exploration– projectreclamation or mining operation must agree to assumeprovide responsibility for the -reclamation *AB313*and –restoration 2of –affected explorationsurface projectwater orand mininggroundwater. operation.
(NRS 519A.190, 519A.210) Sections 9f the and 10 of this bill require such a person to also agree to assume responsibility for the reclamation of any surface water and groundwater affected as a result of the exploration project or mining operation.
Section 12 of this bill requires a plan for reclamation to provide for the reclamation and restoration of affected surface water and groundwater.
Section 8 of this bill revises the definition of the term “reclamation” to include actions performed during or after an exploration project or mining operationncludeoperation relating to surface water and groundwater.
Existing law requires the Division to develop a checklist to be completed by applicants for a permit to engage in a mining operation, which must include certain information relating to the plan for reclamation.
Existing law authorizes an operator of a mining operation to request that the Division grant an exception from reclamation requirements for open pits and rock facesthat whichan operator may notrequest bean feasibleexception for open pits and rock faces only if no pit lake is anticipated to reclaim.result from the mining operation.
(NRSExisting 519A.230)law Sectionrequires 12each providesoperator thatof a mining operation or exploration project to submit an annual report to the Administrator of the Division relating to the status and production of all mining operations and exploration projects in which the operator mayhas requestengaged anand exceptionidentifying foreach openacre pitsof land affected and rockland facesreclaimed onlyby ifthat nomining pitoperation lakeor isexploration anticipatedproject tothrough resultthe frompreceding calendar acre and include in the map all disturbances by such mining operation.operations andach such exploration projects to:
Under existing law, with certain exceptions, if a pit lake will have a predicted filled surface area of more than 200 acres, the plan for reclamation must provide for at least one point of public nonmotorized access to the water level of the pit lake when the pit in which the pit lake is located reaches at least 90 percent of its predicted maximum capacity.
(NRS 519A.230) Section 12 instead provides that the predicted filled surface area of more than 85 acres.cess if a pit lake will have a Existing law requires each operator of a mining operation or exploration project to submit an annual report to the Administrator of the Division relating to the status and production of all mining operations and exploration projects in which the operator has engaged and identifying each acre of land affected and land reclaimed by that mining operation or exploration project through the preceding calendar year.
(NRS 519A.260) Section 13 of this bill requires an operator to map each such acre and include in the map all disturbances by such mining operations and exploration projects to:
and (2) the quality and quantity of the surConsistent with the changes of sections 2-13 of this bill pertaining to reclamation of surface water and groundwater,groundwater. section 5 of this bill makes a conforming change to revise the legislative declaration to provide that proper reclamation is necessary to prevent undesirable land, surface water and groundwater conditions.
-Consistent *AB313*with –the 3changes –of THEsections PEOPLE2-13 OFof THEthis STATEbill OFpertaining NEVADA,to REPRESENTEDreclamation INof SENATEsurface ANDwater ASSEMBLY,and DOgroundwater, ENACTsection AS5 FOLLOWS:of this bill makes a conforming change to revise the legislative declaration to provide that proper reclamation is necessary to prevent undesirable land, surface water and groundwater conditions.
be submitted to the Joint Interim Standing Committee on Natural Resources by:
(1)t to the Division of Minerals of the Commission on Mineral Resources in coordination with the Division of Environmental Protection regarding certain impacts of pit lakes;
and (2) the Department of Wildlife regarding the impacts of mining on wildlife and habitats in this State.
THE PEOPLE OF THE STATE OF NEVADA, REPRESENTED IN SENATE AND ASSEMBLY, DO ENACT AS FOLLOWS:
Chapter 519A of NRS is hereby amended by adding thereto the provisions set forth as sections 2,2 3 and 4 of this act.
An(Deleted operatorby ofamendment.) a- mining*AB313_R1* operation– must3 submit– aSec. revised plan for reclamation if:
1.
The operator:
(a) Renews his or her permit for the control of water pollution issued pursuant to NRS 445A.300 to 445A.730, inclusive;
or (b) Requests a major modification to his or her permit to engage in a mining operation issued pursuant to NRS 519A.210;
and 2.
At the time of the renewal or modification of the permit, the plan for reclamation is:
(a) Impacted by the renewal or modification;
or (b) Not consistent with the requirements for a plan for reclamation set forth in NRS 519A.010 to 519A.280, inclusive, and sections 2, 3 and 4 of this act.
Sec.
An operator of a mining operation may apply to the submittingDivision an application for an exception,exception to the operatorrequirement mustof Insubsection demonstrate:1.
(a)In Forsubmitting aan newapplication permit to engage in a mining operation or a request for a major modification to an existingexception, permit to engage in a mining operation, by clear and convincing evidence that backfilling the openoperator pitmust isdemonstrate: technically not possible without indefinite long-term management to avoid groundwater degradation;
and(a) (b)For Ifan submittedapplication atfor thea timepermit ofto engage in a renewalmining ofoperation asubmitted permiton foror after January 1, 2025, by clear and convincing evidence that backfilling the controlopen ofpit wateris pollutiontechnically pursuantnot topossible sectionwithout 3indefinite oflong-term thismanagement act:to avoid groundwater degradation;
(1)or (b) By cleara andpreponderance convincingof the evidence, that backfilling the open pit iswould technicallyresult notin possibleundue withouthardship indefiniteon long-termthe managementoperator tobecause avoidthe groundwaterplan degradation;for the mining operation would be unprofitable.
or - *AB313* – 4 – (2) By a preponderance of the evidence, that backfilling the open pit would result in undue hardship on the operator.
Show all 75 changed lines (35 more)
and (b) May notcontract takewith thean economicsindependent ofconsultant theto operatorassist intoin considerationreviewing whenthe determiningapplication whetherfor toan approveexception orsubmitted denypursuant theto application.subsection 2.
519A.020 As used in this chapter, unless the context otherwise requires, the words and terms defined in NRS 519A.030 to - *AB313_R1* – 4 – 519A.130, inclusive, and section 2 of this act have the meanings ascribed to them in those sections.
519A.100 “Reclamation” means actions performed during or after an exploration project or mining operation to shape, stabilize, revegetate or otherwise treat the land , surface water and groundwater in order to return it to a safe, stable condition consistent with the establishment of a productive postmining use of - *AB313* – 5 – the land , surface water and groundwater and the abandonment of a facility in a manner which ensures the public safety, as well as the encouragement of techniques which minimize the adverse visual effects.
- *AB313_R1* – 5 – (b) Pay to the Division the application fee established in the regulations adopted by the Commission pursuant to NRS 519A.160.
(b) For an applicant who is a corporation or other business entity, any person who has a controlling interest in the corporation - *AB313* – 6 – or business entity has or previously had a controlling interest in another corporation or business entity that defaulted on any obligation relating to reclamation pursuant to this chapter, including, without limitation, by forfeiting a surety or failing to pay the full costs of reclamation or any penalty assessed pursuant to NRS 519A.280;
The Division may issue a permit to engage in an exploration project pursuant to this section to an applicant described in paragraph (c) of subsection 2 if the applicant demonstrates to the Division that the applicant or person who has a controlling interest in the corporation or business entity has remedied all issues related to the reclamation of the exploration project outside of this State and becomes in good standing with all agencies of the other state and - *AB313_R1* – 6 – federal agencies in relation to the reclamation of the exploration project.
The term does not include a person designated to act as a proxy, including, without limitation, an agent, bank, broker, nominee or custodian, for one or more persons who own voting stock unless the - *AB313* – 7 – proxy otherwise has the power to direct the management or determine the policy of the corporation or business entity.
- *AB313_R1* – 7 – (d) File with the Division a bond or other surety in a form and amount required by the regulations adopted by the Commission pursuant to NRS 519A.160.
(b) For an applicant who is a corporation or other business entity, any person who has a controlling interest in the corporation or business entity has or previously had a controlling interest in - *AB313* – 8 – another corporation or business entity that defaulted on any obligation relating to reclamation pursuant to this chapter, including, without limitation, by forfeiting a surety or failing to pay the full costs of reclamation or any penalty assessed pursuant to NRS 519A.280;
The Division may issue a permit to engage in a mining operation pursuant to this section to an applicant described in paragraph (c) of subsection 2 if the applicant demonstrates to the Division that the applicant or person who has a controlling interest in the corporation or business entity has remedied all issues related to the reclamation of the mining operation outside of this State and becomes in good standing with all agencies of the other state and - *AB313_R1* – 8 – federal agencies in relation to the reclamation of the mining operation.
- *AB313* – 9 – Sec.
- *AB313_R1* – 9 – 2.
- *AB313* – 10 – (c) For the reclamation of all land disturbed by the exploration project or mining operation to a stability comparable to that of adjacent areas.
Except as otherwise provided in this subsection, for a pit lake that will have a predicted filled surface area of more than [200]200 85 acres, a plan for reclamation must provide, in consultation with the operator and each landowner, including any federal land manager, and, if feasible, for at least one point of public nonmotorized access to the water level of the pit lake when the pit in which the pit lake is located reaches at least 90 percent of its predicted maximum capacity.
and - *AB313_R1* – 10 – (c) Does not alter any contract or agreement entered into before October 1, 2013, between an operator and a landowner, including any federal land manager.
The provisions of this - *AB313* – 11 – subsection do not confer any liability upon a protected person for any injury to any other person or property, whether actual or implied, or create a duty of care or ground of liability for any injury to any person or property.
- *AB313_R1* – 11 – Sec.
and - *AB313* – 12 – [(b)] (2) Five dollars and fifty cents for each acre of privately owned land, which has been disturbed by mining operations or exploration projects engaged in by the operator and not reclaimed.
519A.270 If the Division has reason to believe that any provision of NRS 519A.010 to 519A.280, inclusive, and sections 2,2 3 and 4 of this act, a plan for reclamation, any condition placed on a plan for reclamation or any regulation adopted by the Commission pursuant to NRS 519A.160, has been violated, the Division shall serve a notice of noncompliance upon the holder of the permit.
and - *AB313_R1* – 12 – 3.
Except as otherwise provided in NRS 445C.010 to 445C.120, inclusive, a person who violates any provision of NRS 519A.010 to 519A.280, inclusive, and sections 2,2 3 and 4 of this act or any regulation adopted by the Commission pursuant to NRS 519A.160, is guilty of a misdemeanor and, in addition to any criminal penalty, is subject to a civil penalty imposed by the Division at a hearing for which notice has been given, in an amount determined pursuant to the schedule adopted by the Commission pursuant to NRS 519A.160.
All interest earned on the - *AB313* – 13 – money credited pursuant to this section must be credited to the account to which the money was credited.
In addition to any other remedy provided by this chapter, the Division may compel compliance with any provision of NRS 519A.010 to 519A.280, inclusive, and sections 2,2 3 and 4 of this act or of any regulation adopted or permit or order issued pursuant to those sections, by injunction or other appropriate remedy.
ThentThe Division may institute and maintain in the name of the State of Nevada any such enforcement proceedings.
HSec. - *AB313*
16.
On or before August 1, 2025:
1.
The Division of Minerals of the Commission on Mineral Resources and the Division of Environmental Protection of the State Department of Conservation and Natural Resources shall coordinate to prepare and submit a written report to the Director of the Legislative Counsel Bureau for transmittal to the Joint Interim Standing Committee on Natural Resources, which must include, without limitation, an analysis of the impact of pit lakes on:
(a) Water in this State, including, without limitation, evaporative losses, surface water and groundwater and hydrologic impacts;
(b) Current and future land use and water use in this State;
and (c) In consultation with the Department of Wildlife, wildlife.
2.
The Department of Wildlife shall prepare and submit an analysis of the impacts of mining on terrestrial and aquatic wildlife and habitat in this State and any recommendations relating thereto, to the Director of the Legislative Counsel Bureau for transmittal to the Joint Interim Standing Committee on Natural Resources.
H - *AB313_R1*
Show all 75 changed rows (35 more)
View plain text versions (2)
- Reprint 1 View text Current pdf
- Introduced As Introduced pdf
AI-generated reading aid from the bill's amendatory text — verify against the official bill.
The bill requires mining operators to backfill open pits below the water table to prevent pit lakes, and increases responsibilities regarding surface water and groundwater reclamation.
-
NRS 519A.010
undesirable land , [and] surface water and groundwater conditions→ undesirable land, surface water and groundwater conditionsThis change clarifies that reclamation is necessary for both land and water conditions.
-
NRS 519A.040
the surface of the land ,→ the surface of the land, surface water or groundwater is or will be disturbed by mining, or that the land or water will be used:This amendment broadens the definition of 'affected' to include disturbances to surface water and groundwater.
-
NRS 519A.100
to shape, stabilize, revegetate or otherwise treat the land ,→ to shape, stabilize, revegetate or otherwise treat the land, surface water and groundwaterThis change expands the definition of 'reclamation' to incorporate surface water and groundwater treatment.
-
NRS 519A.190
for the reclamation of any surface area [damaged]→ for the reclamation of any surface area, surface water and groundwater affectedThis change increases the operator's responsibility to include surface water and groundwater in reclamation efforts.
-
NRS 519A.230
1. In addition to the requirements of NRS 519A.230, if an open pit will be excavated below the premining water table, a plan for reclamation must, except as otherwise provided in subsection 2, provide for the backfilling of the open pit to a level where no pit lake will form and no seasonal or permanent wetland will exist.
This addition establishes new reclamation requirements for open pits excavated below the premining water table.
Amendments
1 amendmentClick Show changes on an amendment above to see how it modifies the bill.
Action History
-
(No further action taken.)
-
From printer. To engrossment. Engrossed. First reprint. To committee.
-
Read second time. Amended. (Amend. No. 283.) Rereferred to Committee on Ways and Means. Exemption effective. To printer.
-
From committee: Amend, and do pass as amended.
-
Notice of eligibility for exemption.
-
From printer. To committee.
-
Read first time. Referred to Committee on Natural Resources. To printer.
Sponsors
- Sarah Peters · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 66 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (66)
66 members have not signed on to this bill.
Show all 66 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- Who sponsors AB 313?
- AB 313 is sponsored by Peters, Sarah.
- What is the current status of AB 313?
- This bill died with 2023 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track AB 313?
- Track AB 313 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on AB 313
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.