Nevada 2017 Regular Session Status: Enacted 5 D cosponsors

AB 405 — Establishes certain protections for and ensures the rights of a person who uses renewable energy in this State and revises provisions governing net metering. (BDR 52-959)

Last action — Approved by the Governor. Chapter 589.

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Assembly
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced March 20, 2017. Enacted.

Prognosis

Likely to advance 62% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 23 sponsors

    5 primary, 18 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (5 D).

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

1083 added · 1181 removed

1083 line(s) added, 1181 removed.

→
Previous
Latest
(Reprinted with amendments adopted on June 3, 2017) SECOND REPRINT A.B.
Assembly Bill No.
405 A SSEMBLY BILL N O.
405–Assemblymen Brooks, Watkins, Frierson, Yeager, McCurdy II;
405–A SSEMBLYMEN BROOKS , W ATKINS, FRIERSON, Y EAGER, M CC URDY II;
Araujo, Bilbray-Axelrod, Carrillo, Cohen, Diaz, Fumo, Jauregui, Joiner, Miller, Monroe- Moreno, Neal, Swank and Thompson Joint Sponsors:
ARAUJO, BILBRAY - AXELROD , CARRILLO , COHEN , DIAZ, FUMO , AUREGUI , JOINER, MILLER, MONROE -M ORENO , NEAL, WANK AND THOMPSON MARCH 20, 2017 ____________ JOINTSPONSORS :
Senators Atkinson, Ford, Manendo, Segerblom and Spearman CHAPTER..........
ENATORS A TKINSON, ORD , M ANENDO , SEGERBLOM AND S PEARMAN ____________ Referred to Committee on Commerce and Labor SUMMARY—Establishes certain protections for and ensures the rights of a person who uses renewable energy in this State and revises provisions governing net metering.
(BDR 52-959) FISCAL NOTE:
Effect on Local Government:
Increases or Newly Provides for Term of Imprisonment in County or City Jail or Detention Facility.
Effect on the State:
Yes.
~ EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
creating the contractual requirements for an agreement for the lease or purchase of a distributegeneration system and a power purchase agreement;
creating the contractual requirements for an agreement for the lease or purchase of a distributed generation system and a power purchase agreement;
requiring a utility to provide a credit to certain customer- generators for excess electricity generated by the net metering systems of such customer-generators;
requiring a utility to provide a credit to certain customer-generators for excess electricity generated by the net metering systems of such customer-generators;
- *AB405_R2* – 2 – Legislative Counsel’s Digest:
Legislative Counsel’s Digest:
provisions and summary disclosure statement of agreements for the lease of a distributed generation system.
Sections 9-11 of this bill set forth the requirements for the cover page, distributed generation system.
Sections 15-17 of this bill set forth the requirements for the cover page, provisions and summary disclosure statement of agreements for the sale of the output of a distributed generation system, known as a power purchase agreement.
Sections 15-17 of this bill set forth the requirements for the cover page, provisions and summary disclosure statement of agreements for the sale of the output of a distributed generation system, known as Section 18 of this bill sets forth the disclosure relating to utility rates that must be included with an agreement created pursuant to sections 9-17 if the agreement makes a written reference to the price of electricity that is provided by an electric utility.
Section 18 of this bill sets forth the disclosure relating to utility rates that must be included with an agreement created pursuant to sections 9-17 if the agreement makes a written reference to the price of electricity that is provided by an electric agreement created pursuant to sections 9-17 concerning a distributed generationor an system.
Section 19 of this bill sets forth the minimum warranty requirements for an agreement created pursuant to sections 9-17 concerning a distributed generation system.
Section 20 of this bill:
person fails to comply with sections 2-20 of this bill;
(1) establishes that it is a deceptive trade practice if a person fails to comply with sections 2-20 of this bill;
and (2) authorizes the Publica Utilities Commission of Nevada to direct a customer to the appropriate person or agency to resolve a complaint concerning a solar installation company.
and (2) authorizes the Public Utilities Commission of Nevada to direct a customer to the appropriate person or agency to resolve a complaint concerning a solar installation company.
Section 20 additionally establishes that it is consumer fraud if a person violates any provision - 79th Session (2017) – 2 – of sections 2-20.
Section 20 additionally establishes that it is consumer fraud if a person violates any provision of sections 2-20.
Sections 22-25 of this bill create the Renewable Energy Bill of Rights that appExisting law defines “net metering” as the measure of the difference between the electricity supplied by an electric utility and the electricity generated by a customer-generator that is fed back to the utility.
Sections 22-25 of this bill create the Renewable Energy Bill of Rights that applies to each natural person who is a resident of this State.
(NRS 704.769) Section 27 of this bill requires electric utilities to file a request with the Commission to establish an optional time-variant rate schedule for customers, including customer-generators that acquire an energy storage system.
Existing law defines “net metering” as the measure of the difference between the electricity supplied by an electric utility and the electricity generated by a bill requires electric utilities to file a request with the Commission to establish an optional time-variant rate schedule for customers, including customer-generators that acquire an energy storage system.
Section 28.3 of this bill provides that if a customer-generator accepts the offer kilowatts or less, the utility is required to provide the customer-generator a credit for certain excess electricity that is generated by the customer-generator.
Section 28.3 of this bill provides that if a customer-generator accepts the offer of a utility for net metering and has a net metering system with a capacity of 25 kilowatts or less, the utility is required to provide the customer-generator a credit for certain excess electricity that is generated by the customer-generator.
Section 28.5 of this bill requires the Commission to open an investigatory rates charged by a utility to its customers.
docket to establish a methodology for determining the effect of net metering on rates charged by a utility to its customers.
On or before June 30, 2020, and on biennially thereafter, the Commission is required to submit to the Director of the Legislative Counsel Bureau for transmittal to the Legislature a report concerning the impact of net metering on such rates.
On or before June 30, 2020, and biennially thereafter, the Commission is required to submit to the Director of the Legislative Counsel Bureau for transmittal to the Legislature a report concerning the impact of net metering on such rates.
(1) each person providing electric service in the service territory under such a law would be required to offer net - *AB405_R2* – 3 – metering to its customers;
(1) each person providing electric service in the service territory under such a law would be required to offer net metering to its customers;
and (3) a customer-generator must be required to pay any costs who are in the rate class to which the customer-generator would belong if theervice customer-generator did not have a net metering system.
and (3) a customer-generator must be required to pay any costs charged to other customers of the customer-generator’s provider of electric service customer-generator did not have a net metering system.tor would belong if the Existing law requires each electric utility in this State to offer net metering to customer-generators operating in the service area of the utility until the date on which the cumulative capacity of all net metering systems in this State for which electric utilities have accepted completed applications is 235 megawatts.
Existing law requires each electric utility in this State to offer net metering to customer-generators operating in the service area of the utility until the date on which the cumulative capacity of all net metering systems in this State for which electric utilities have accepted completed applications is 235 megawatts.
(NRS 704.773) Section 31 of this bill amends existing law to require each electric utility to offer net metering to customer-generators operating within the service area of the utility.
(NRSection 31 of this bill amends existing law to require each electric utility to offer net metering to customer-generators operating within the service area of the utility.
(1) charge the customer- generator any fee or charge that is different than that charged to other customers of the utility to which the customer-generator would belong if he or she did not have a net metering system;
(1) charge the customer- generator any fee or charge that is different than that charged to other customers of the utility to which the customer-generator would belong if he or she did not have a - 79th Session (2017) – 3 – net metering system;
Existing law sets forth that after the date on which the cumulative capacity is 235 megawatts, electric utilities are to offer net metering to customer-generators in accordance with a tariff filed by the utility and approved by the Commission.
Existing law sets forth that after the date on which the cumulative capacity is megawatts, electric utilities are to offer net metering to customer-generators in 704.7735) Section 33 of this bill repeals this provision.d by the Commission.
(NRS 704.7735) Section 33 of this bill repeals this provision.
(NRS EXPLANATION – Matter in bolded italics is new;
matter between brackets [omitted material] is material to be omitted.
As used in sections 2 to 20, inclusive, of this act, unless the context otherwise requires, the words and terms defined - *AB405_R2* – 4 – in sections 3 to 8, inclusive, of this act have the meanings ascribed to them in those sections.
As used in sections 2 to 20, inclusive, of this act, unless the context otherwise requires, the words and terms defined in sections 3 to 8, inclusive, of this act have the meanings ascribed to them in those sections.
4.
- 79th Session (2017) – 4 – 4.
The excess generation from which is periodically exported to the grid in accordance with the provisions governing net metering systems used by customer-generators pursuant to NRS 704.766 to 704.775, inclusive, and sections 27 to 29, inclusive, of this act.
The excess generation from which is periodically exported to the grid in accordance with the provisions governing net 704.766 to 704.775, inclusive, and sections 27 to 29, inclusive, of this act.
(a) Sell and install a distributed generation system;
(b) Install a distributed generation system owned by a third party from whom the customer:
or (b) Install a distributed generation system owned by a third party from whom the customer:
Show all 178 changed rows (138 more)
Previous
Latest
or - *AB405_R2* – 5 – (2) Purchases electricitygenerated by a distributed generation system.
or (2) Purchases electricity generated by a distributed generation system.
1.
- 79th Session (2017) – 5 – 1.
An estimated timeline for the installation of the distributed generation system.
An estimated timeline for the installation of the distributed gen3.atiThe estimated amount of the monthly payments due under the lease in the first year of operation of the distributed generation system.
3.
The estimated amount of the monthly payments due under the lease in the first year of operation of the distributed generation system.
14.
the Public Utilities Commission of Nevada, including, without and limitation, a telephone number.
Contact information for the State Contractors’ Board and the Public Utilities Commission of Nevada, including, without limitation, a telephone number.
- *AB405_R2* – 6 – 2.
2.
3.
- 79th Session (2017) – 6 – 3.
6.
of the installation or any inspection of the distributed generation system.
The amounts due at the signing for and at the completion of the installation or any inspection of the distributed generation system.
A disclosure notifying the lessee of the transferability of the obligations under the warranty to a subsequent lessee.
A disclosure notifying the lessee of the transferability of the15.ligThe identification of any state or federal tax incentives that are included in calculating the amount of the monthly payments due under the lease.
15.
The identification of any state or federal tax incentives that are included in calculating the amount of the monthly payments due under the lease.
- *AB405_R2* – 7 – 19.
19.
or (b) Death of the lessee.
or - 79th Session (2017) – 7 – (b) Death of the lessee.
21.
for a period ending not less than 3 business days after the lease ise signed.
The granting to the lessee of the right to rescind the lease for a period ending not less than 3 business days after the lease is signed.
An agreement for the lease of a distributed generation system must include a disclosure that is not more than 3 pages in length and is in at least 10-point font.
An agreement for the lease of a distributed generation system must include a disclosure that is not more than pages in length and is in at least 10-point font.
(c) The name, mailing address, telephone number, electronic mail address and the number of the contractor’s license of the person responsible for all maintenance of the distributed generation system, if different from the solar installation company;
(c) The name, mailing address, telephone number, electronic mail address and the number of the contractor’s license of the generation system, if different from the solar installation company;
- *AB405_R2* – 8 – (h) A description of any one-time or recurring fees, including, without limitation, a description of the circumstances that trigger:
(h) A description of any one-time or recurring fees, including, without limitation, a description of the circumstances that trigger:
(2) Estimated fees for the removal of the distributed generation system;
- 79th Session (2017) – 8 – (2) Estimated fees for the removal of the distributed genera(3) Fees for a notice of removal and refiling pursuant to the Uniform Commercial Code;
(3) Fees for a notice of removal and refiling pursuant to the Uniform Commercial Code;
(3) The estimated annual degradation to the distributed generation system;
(3) The estimated annual degradation to the distributed genera(4) As specified by the lease at the time of installation, whether or not an electric utility must credit a customer of the electric utility for any excess energy that is generated by the distributed generation system;
and (4) As specified by the lease at the time of installation, whether or not an electric utility must credit a customer of the electric utility for any excess energy that is generated by the distributed generation system;
and (2) Any conditions on transferring the lease in connection with the lessee selling his or her property;
and (2) Any conditions on transferring the lease in connection wit(q) A description of any guarantees of the performance of the distributed generation system;
(q) A description of any guarantees of the performance of the distributed generation system;
and - *AB405_R2* – 9 – (s) A disclosure concerning the retention of any portfolio energy credits, if applicable.
and - 79th Session (2017) – 9 – (s) A disclosure concerning the retention of any portfolio energy credits, if applicable.
An agreement for the purchase of a distributed generation system must include a cover page that provides the following information in at least 10-point font:
An agreement for the purchase of a distributed generation system must include a cover page that provides the fol1.winThe size of the distributed generation system.
1.
The size of the distributed generation system.
Contact information for the State Contractors’ Board and Public Utilities Commission of Nevada, including, without limitation, a telephone number.
Contact information for the State Contractors’ Board and Public Utilities Commission of Nevada, including, without limSec.
Sec.
An agreement for the purchase of a distributed generation system must include, without limitation, the following information in at least 10-point font:
a An agreement for the purchase of a distributed generation system must include, without limitation, the following information in at least 10-point font:
3.
- 79th Session (2017) – 10 – 3.
A description, which includes, without limitation, any assumptions, concerning the design and installation of the - *AB405_R2* – 10 – distributed generation system.
A description, which includes, without limitation, any assumptions, concerning the design and installation of the distributed generation system.
(a) The size of the distributed generation system;
12.
purchaser of the distributed generation system and the solar installation company.
A signature block that is signed and dated by the purchaser of the distributed generation system and the solar installation company.
An agreement for the purchase of a distributed generation system must include a disclosure that is not more than 3 pages in length and is in at least 10-point font.
An agreement for the purchase of a distributed generation system must include a disclosure that is not more than pages in length and is in at least 10-point font.
The disclosure described in subsection 1 must be separate from the cover page and agreement described in sections 12 and 13 of this act.
The disclosure described in subsection 1 must be separate from the cover page and agreement described in sections 12 and of this act.
(a) The name, mailing address, telephone number and electronic mail address of the solar installation company;
- 79th Session (2017) – 11 – (a) The name, mailing address, telephone number and ele(b) The name, mailing address, telephone number, electronic mail address and number of the contractor’s license of the person who installed the distributed generation system, if different from the solar installation company;
(b) The name, mailing address, telephone number, electronic mail address and number of the contractor’s license of the person - *AB405_R2* – 11 – who installed the distributed generation system, if different from the solar installation company;
(g) A disclosure notifying the purchaser of the responsible party for obtaining approval for connecting the distributed generation system to the electricity meter on the host customer’s side;
(g) A disclosure notifying the purchaser of the responsible party for obtaining approval for connecting the distributed generation system to the electricity meter on the host customer’s sid(h) Assumptions concerning the design of the distributed generation system, including, without limitation:
(h) Assumptions concerning the design of the distributed generation system, including, without limitation:
(j) A disclosure describing any warranty for the repair of any damage to the roof of the property owned by the purchaser in connection with the installation or removal of the distributed generation system;
(j) A disclosure describing any warranty for the repair of any damage to the roof of the property owned by the purchaser in connection with the installation or removal of the distributed gen(k) A description of any guarantees of the performance of the distributed generation system;
(k) A description of any guarantees of the performance of the distributed generation system;
and (m) A disclosure concerning the retention of any portfolio energy credits, if applicable.
and - 79th Session (2017) – 12 – (m) A disclosure concerning the retention of any portfolio energy credits, if applicable.
A power purchase agreement for the sale of the output of a distributed generation system must include a cover page that provides the following information in at least 10-point font:
A power purchase agreement for the sale of the output of a distributed generation system must include a cover font:that provides the following information in at least 10-point 1.
- *AB405_R2* – 12 – 1.
11.
Public Utilities Commission of Nevada.ay file a complaint with the 12.
Notice that a host customer may file a complaint with the Public Utilities Commission of Nevada.
12.
and (b) The name, mailing address, telephone number and electronic mail address of the person responsible for all maintenance of the distributed generation system, if different from the solar installation company.
and - 79th Session (2017) – 13 – (b) The name, mailing address, telephone number and electronic mail address of the person responsible for all maintenance of the distributed generation system, if different from the solar installation company.
3.
The length of the term of the agreement.
The payments made during the first year of the agreement for the price of electricity, which includes, without limitation, the - *AB405_R2* – 13 – price per kilowatt-hour of electricity and the price per monthly system electrical output.
The payments made during the first year of the agreement for the price of electricity, which includes, without limitation, the price per kilowatt-hour of electricity and the price per monthly system electrical output.
A copy of the warranty for the distributed generation system.
A copy of the warranty for the distributed generation sys12..
12.
16.
- 79th Session (2017) – 14 – 16.
A description of any restrictions that the agreement imposes on the modification or transfer of the property to which the distributed generation system is affixed.
A description of any restrictions that the agreement the distributed generation system is affixed.e property to which 18.
18.
- *AB405_R2* – 14 – 21.
21.
The disclosure described in subsection 1 must be separate from the cover page and agreement described in sections 15 and 16 of this act.
The disclosure described in subsection 1 must be separate from the cover page and agreement described in sections 15 and of this act.
(b) The name, mailing address, telephone number, electronic mail address and number of the contractor’s license of the person who installed the distributed generation system, if different from the solar installation company;
(b) The name, mailing address, telephone number, electronic mail address and number of the contractor’s license of the person who installed the distributed generation system, if different from the(c) The name, mailing address, telephone number, electronic mail address and the number of the contractor’s license of the person responsible for all maintenance of the distributed generation system if different from the solar installation company;
(c) The name, mailing address, telephone number, electronic mail address and the number of the contractor’s license of the person responsible for all maintenance of the distributed generation system if different from the solar installation company;
(1) Any late fees;
- 79th Session (2017) – 15 – (1) Any late fees;
(2) Estimated fees for the removal of the distributed generation system;
generation system;d fees for the removal of the distributed (3) Fees for a notice of removal and refiling pursuant to the Uniform Commercial Code;
(3) Fees for a notice of removal and refiling pursuant to the Uniform Commercial Code;
- *AB405_R2* – 15 – (2) The estimated amount of production for the distributed generation system in the first year of operation;
(2) The estimated amount of production for the distributed generation system in the first year of operation;
and (4) As specified by the agreement at the time of installation, whether or not an electric utility must credit a customer of the electric utility for any excess energy that is generated by the distributed generation system;
and whether or not an electric utility must credit a customer of theion, electric utility for any excess energy that is generated by the distributed generation system;
(m) A description of any guarantees of the performance of the distributed generation system;
distributed generation system;arantees of the performance of the (n) A description of the basis for any estimates of savings that were provided to the purchaser, if applicable;
(n) A description of the basis for any estimates of savings that were provided to the purchaser, if applicable;
Sec.
- 79th Session (2017) – 16 – Sec.
If an agreement for the lease or purchase of a distributed generation system or if a power purchase agreement makes a written reference to the price of electricity that is provided by an electric utility, the agreement or power purchase agreement, as applicable, must also provide, in 12-point font, a disclosure in substantially the following form:
If an agreement for the lease or purchase of a distributed generation system or if a power purchase agreement makes a written reference to the price of electricity that is provided by an electric utility, the agreement or power purchase agreement, substantially the following form:
Actual utility rates may go up or down and actual savings may vary.
in 12-point font, a disclosure in Actual utility rates may go up or down and actual savings may vary.
and - *AB405_R2* – 16 – (b) Expire not earlier than 10 years after the installation of the distributed generation system.
and (b) Expire not earlier than 10 years after the installation of the distributed generation system.
An agreement for the purchase of a distributed generation system must include the following express warranties in writing for the component parts, including parts and labor, of the distributed generation system, either directly from the solar installation company or passed through from the manufacturer of the component parts:
An agreement for the purchase of a distributed generation system must include the following express warranties in writing for the component parts, including parts and labor, of the installation company or passed through from the manufacturer of the component parts:
2.
- 79th Session (2017) – 17 – 2.
A violation of any provision of sections 2 to 20, inclusive, of this act constitutes consumer fraud for the purposes of NRS 41.600.
A violation of any provision of sections 2 to 20, inclusive, NRS 41.600.
4.
constitutes consumer fraud for the purposes of 4.
- *AB405_R2* – 17 – 2.
2.
(a) In a timely manner;
6.
- 79th Session (2017) – 18 – 6.
Except as otherwise provided in section 27 or 28.3 of this act, remain within the existing broad rate class to which the resident would belong in the absence of a net metering system or a system that generates renewable energy or stores energy, or any combination thereof, without any fees or charges that are different than the fees and charges assessed to customers of the same rate class, regardless of the technologies on the customer’s side of the electricity meter, including, without limitation, energy production, energy savings, energy consumption, energy storage or energy shifting technologies, provided that such technologies do not compromise the safety and reliability of the utility grid.
Except as otherwise provided in section 27 or 28.3 of this resident would belong in the absence of a net metering system or a system that generates renewable energy or stores energy, or any combination thereof, without any fees or charges that are different than the fees and charges assessed to customers of the same rate class, regardless of the technologies on the customer’s side of the electricity meter, including, without limitation, energy production, energy savings, energy consumption, energy storage or energy shifting technologies, provided that such technologies do not compromise the safety and reliability of the utility grid.
An electric utility that primarily serves densely populated counties shall, on or before August 1, 2017, file with the Commission in a manner authorized by NRS 704.110 a request that the Commission establish an optional time-variant rate - *AB405_R2* – 18 – schedule for customers, including, without limitation, customer- generators who acquire an energy storage system.
An electric utility that primarily serves densely populated counties shall, on or before August 1, 2017, file with the Commission in a manner authorized by NRS 704.110 a request that the Commission establish an optional time-variant rate schedule for customers, including, without limitation, customer- generators who acquire an energy storage system.
An electric utility that primarily serves less densely populated counties shall, on or before January 16, 2018, file with the Commission in a manner authorized by NRS 704.100 a request that the Commission establish an optional time-variant rate schedule for customers, including, without limitation, customer- generators who acquire an energy storage system.
An electric utility that primarily serves less densely populated counties shall, on or before January 16, 2018, file with the Commission in a manner authorized by NRS 704.100 a request that the Commission establish an optional time-variant rate generators who acquire an energy storage system.ation, customer- 3.
3.
(a) “Electric utility that primarily serves densely populated counties” has the meaning ascribed to it in NRS 704.110.
- 79th Session (2017) – 19 – (a) “Electric utility that primarily serves densely populated counties” has the meaning ascribed to it in NRS 704.110.
(c) “Energy storage system” means any commercially available technology that is capable of retaining energy, storing the energy for a period of time and delivering the energy after storage, including, without limitation, by chemical, thermal or mechanical means.
available technology that is capable of retaining energy, storingy the energy for a period of time and delivering the energy after storage, including, without limitation, by chemical, thermal or mechanical means.
The credit for each kilowatt-hour of excess electricity described in subsection 1 must equal a percentage, as set forth in subsection 3, of the rate the customer-generator would have paid - *AB405_R2* – 19 – for a kilowatt-hour of electricity supplied by the utility at the time the customer-generator fed the kilowatt-hour of excess electricity back to the utility.
The credit for each kilowatt-hour of excess electricity described in subsection 1 must equal a percentage, as set forth in subsection 3, of the rate the customer-generator would have paid for a kilowatt-hour of electricity supplied by the utility at the time the customer-generator fed the kilowatt-hour of excess electricity back to the utility.
3.
to subsection 2 for each kilowatt-hour of excess electricity mustt equal:
The percentage to be used to determine the credit pursuant to subsection 2 for each kilowatt-hour of excess electricity must equal:
(1) On or after the date that the Commission determines that the condition set forth in subparagraph (2) of paragraph (a) has been met;
- 79th Session (2017) – 20 – (1) On or after the date that the Commission determines that the condition set forth in subparagraph (2) of paragraph (a) has been met;
and (2) Before the date on which the Commission determines and posts on its Internet website its determination that the cumulative installed capacity of all net metering systems in this State with a generating capacity of not more than 25 kilowatts for customer generators who accepted the offer of the utility for net metering on or after the date described in subparagraph (1) is equal to 80 megawatts;
and (2) Before the date on which the Commission determines cumulative installed capacity of all net metering systems in this State with a generating capacity of not more than 25 kilowatts for customer generators who accepted the offer of the utility for net metering on or after the date described in subparagraph (1) is equal to 80 megawatts;
On or before the 15th day of each calendar month, a utility shall post on its Internet website and report to the Commission the - *AB405_R2* – 20 – cumulative installed capacity of the net metering systems with a capacity of not more than 25 kilowatts for which a customer- generator has accepted the offer of that utility as of the close of business of the utility on the last business day of the immediately preceding calendar month.
On or before the 15th day of each calendar month, a utility shall post on its Internet website and report to the Commission the capacity of not more than 25 kilowatts for which a customer-th a generator has accepted the offer of that utility as of the close of business of the utility on the last business day of the immediately preceding calendar month.
A customer-generator who accepted the offer of the utility for net metering before the effective date of this section and whose net metering system has a capacity of not more than 25 kilowatts may, but is not required to, submit a request to be treated for all purposes, including, without limitation, for the purposes of subsection 3, as a customer-generator who accepted the offer of the utility for net metering on the date of submitting the request.
A customer-generator who accepted the offer of the utility for net metering before the effective date of this section and whose net metering system has a capacity of not more than 25 kilowatts may, but is not required to, submit a request to be treated for all purposes, including, without limitation, for the purposes of - 79th Session (2017) – 21 – subsection 3, as a customer-generator who accepted the offer of the utility for net metering on the date of submitting the request.
The Commission shall open an investigatory docket to establish a methodology to determine the impact, if any, of net metering pursuant to NRS 704.766 to 704.775, inclusive, and sections 27 to 29, inclusive, of this act on rates charged by a utility to its customers in this State.
The Commission shall open an investigatory docket to establish a methodology to determine the impact, if any, and sections 27 to 29, inclusive, of this act on rates charged by a utility to its customers in this State.
(c) The data used to make the calculations required by paragraph (a), including, without limitation, avoided generation capacity, avoided transmission and generation capacity and avoided system upgrades;
(c) The data used to make the calculations required by paragraph (a), including, without limitation, avoided generation capacity, avoided transmission and generation capacity and avo(d) A comparison of the impact on rates of net metering pursuant to NRS 704.766 to 704.775, inclusive, and sections 27 to 29, inclusive, of this act and the impact on rates of capital expenditures by the utility;
- *AB405_R2* – 21 – (d) A comparison of the impact on rates of net metering pursuant to NRS 704.766 to 704.775, inclusive, and sections 27 to 29, inclusive, of this act and the impact on rates of capital expenditures by the utility;
Each person providing electric service in that service territory shall be deemed to be a utility for the purposes of NRS 704.766 to 704.775, inclusive, and sections 27 to 29, inclusive, of this act;
Each person providing electric service in that service territory shall be deemed to be a utility for the purposes of - 79th Session (2017) – 22 – NRS 704.766 to 704.775, inclusive, and sections 27 to 29, inclusive, of this act;
The Commission or any other agency designated by law to regulate electric service in this State shall prohibit any person providing electric service in the service territory from impeding or interrupting the operation or performance or otherwise restrict the output of an existing net metering system;
The Commission or any other agency designated by law to regulate electric service in this State shall prohibit any person interrupting the operation or performance or otherwise restrict ther output of an existing net metering system;
(b) After the date on which the cumulative capacity requirement described in paragraph (a) is met, in accordance with a tariff filed by the utility and approved by the Commission pursuant to NRS 704.7735.] - *AB405_R2* – 22 – 2.
(b) After the date on which the cumulative capacity requirement the utility and approved by the Commission pursuant toa tariff filed by NRS 704.7735.] 2.
(c) Except as otherwise provided in subsection [5,] 7, shall not charge [a] the customer-generator any fee or charge that [would increase the customer-generator’s minimum monthly charge to an amount greater] is different than that [of] charged to other customers of the utility in the [same] rate class [as] to which the customer-generator [.] would belong if the customer-generator did not have a net metering system.
(c) Except as otherwise provided in subsection [5,] 7, shall not charge [a] the customer-generator any fee or charge that [would increase the customer-generator’s minimum monthly charge to an - 79th Session (2017) – 23 – amount greater] is different than that [of] charged to other customers of the utility in the [same] rate class [as] to which the customer-generator [.] would belong if the customer-generator did not have a net metering system.
(d) Shall not reduce the minimum monthly charge of the customer-generator based on the electricity generated by the customer-generator and fed back to the utility.
customer-generator based on the electricity generated by the customer-generator and fed back to the utility.
[¬] 4.
[¬] metering system, the utility must allow a customer-generatorn of a net governed by [this] subsection 3 to pay the entire cost of the installation or upgrade of the portion of the net metering system.
At the time of installation or upgrade of any portion of a net metering system, the utility must allow a customer-generator governed by [this] subsection 3 to pay the entire cost of the installation or upgrade of the portion of the net metering system.
[4.] 5.
- *AB405_R2* – 23 – [4.] 5.
(a) The system is intended primarily to offset part or all of the customer-generator’s requirements for electricity on property contiguous to the property on which the net metering system is located;
(a) The system is intended primarily to offset part or all of the customer-generator’s requirements for electricity on property - 79th Session (2017) – 24 – contiguous to the property on which the net metering system is located;
and (b) The customer-generator sells or transfers his or her interest in the contiguous property, ¬ the net metering system ceases to be eligible to participate in net metering.
and (b) The customer-generator sells or transfers his or her interest in the contiguous property, metering.
[5.] 7.
metering system ceases to be eligible to participate in net [5.] 7.
(a) Retaining the percentage set forth in subsection 3 of section 28.3 of this act to be used to determine the credit for electricity governed by paragraph (c) of subsection 2 of NRS 704.775, which is applicable to the customer-generator;
(a) Retaining the percentage set forth in subsection 3 of electricity governed by paragraph (c) of subsection 2 of NRSfor 704.775, which is applicable to the customer-generator;
- *AB405_R2* – 24 – 9.
9.
and (3) Interconnection, ¬ based on the allowable size of the net metering system.
and - 79th Session (2017) – 25 – (3) Interconnection, ¬ based on the allowable size of the net metering system.
(b) The particular provisions, limitations and responsibilities of a customer-generator and the utility which must be included in a standard net metering contract.
(b) The particular provisions, limitations and responsibilities of a customer-generator and the utility which must be included in a sta(c) A timeline for processing applications and contracts for net metering applicants.
(c) A timeline for processing applications and contracts for net metering applicants.
(1) Neither the utility nor the customer-generator is entitled to compensation for the electricity provided to the other during the billing period.
(1) Neither the utility nor the customer-generator is entitled to compensation for the electricity provided to the other during the billing(2) The excess electricity which is fed back to the utility during the billing period is carried forward to the next billing period as an addition to the kilowatt-hours generated by the customer- generator in that billing period.
(2) The excess electricity which is fed back to the utility during the billing period is carried forward to the next billing period as an addition to the kilowatt-hours generated by the customer- generator in that billing period.
- *AB405_R2* – 25 – In that case, the excess electricity carried forward must be apportioned evenly among the available time-of-use periods.
In that case, the excess electricity carried forward must be apportioned evenly among the available time-of-use periods.
(I) The net metering system ceases to operate or is disconnected from the utility’s transmission and distribution facilities;
- 79th Session (2017) – 26 – (I) The net metering system ceases to operate or is disconnected from the utility’s transmission and distribution facilities;
(II) The customer-generator ceases to be a customer of the utility at the premises served by the net metering system;
(II) The customer-generator ceases to be a customer of the utilit(III) The customer-generator transfers the net metering system to another person.
or (III) The customer-generator transfers the net metering system to another person.
Not later than 45 days after the effective date of this act, a utility shall file with the Public Utilities Commission of Nevada any amendments to its tariff or tariffs that are necessary to comply with the provisions of section 28.3 of this act.
Not later than 45 days after the effective date of this act, a utility shall file with the Public Utilities Commission of Nevada any amendments to its tariff or tariffs that are necessary to com2.y wAs used in this section, “utility” has the meaning ascribed to it in NRS 704.772.
2.
As used in this section, “utility” has the meaning ascribed to it in NRS 704.772.
- *AB405_R2* – 26 – 3.
3.
If the Legislature provides by law for an open, competitive retail electric energy market for all electricity customers within a service territory, including, without limitation, if the Legislature does so as a result of the proposed state constitutional amendment becomes effective with regard to the customers within that service territory on the date on which such customers have the right to choose the provider of their electric utility service pursuant to that law.
If the Legislature provides by law for an open, competitive retail electric energy market for all electricity customers within a service territory, including, without limitation, if the Legislature - 79th Session (2017) – 27 – does so as a result of the proposed state constitutional amendment known as the Energy Choice Initiative, section 28.7 of this act becomes effective with regard to the customers within that service territory on the date on which such customers have the right to choose the provider of their electric utility service pursuant to that law.
TEXT OF REPEALED SECTION 704.7735 Utility required to offer net metering in accordance with tariff after certain cumulative capacity requirements are met.
~~~~~ 17 - 79th Session (2017)
1.
Except as otherwise provided in subsection 3, each utility shall, in accordance with a tariff filed by the utility and approved by the Commission, offer net metering to customer-generators who submit applications to install net metering systems within its service territory after the date on which the cumulative capacity requirement described in paragraph (a) of subsection 1 of NRS 704.773 is met.
2.
For the purposes of evaluating and approving any tariff filed with the Commission pursuant to subsection 1 and otherwise carrying out the provisions of this section, the Commission:
(a) May establish one or more rate classes for customer-generators.
(b) May establish terms and conditions for the participation by customer-generators in net metering, including, without limitation, limitations on enrollment in net metering which the Commission determines are appropriate to further the public interest.
(c) May close to new customer-generators a tariff filed pursuant to subsection 1 and approved by the Commission if the Commission determines that closing the tariff to new customer-generators is in the public interest.
(d) May authorize a utility to establish just and reasonable rates of costs from customer-generators to other customers of the utility.
(e) Shall not approve a tariff filed pursuant to subsection 1 or authorize any rates or charges for net metering that unreasonably - *AB405_R2* – 27 – shift costs from customer-generators to other customers of the uti3.tyIn approving any tariff submitted pursuant to subsection 1, the Commission shall determine whether and the extent to which any tariff approved or rates or charges authorized pursuant to this section are applicable to customer-generators who, on or before the paragraph (a) of subsection 1 of NRS 704.773 is met, submitted a complete application to install a net metering system within the service territory of a utility.
H - *AB405_R2*
View plain text versions (4)

Action History

  1. Approved by the Governor. Chapter 589.

  2. Enrolled and delivered to Governor.

  3. Senate Amendment No. 1100 concurred in. To enrollment.

  4. In Assembly.

  5. Read third time. Passed, as amended. Title approved, as amended. (Yeas: 21, Nays: None.) To Assembly.

  6. From printer. To re-engrossment. Re-engrossed. Second reprint .

  7. Read second time. Amended. (Amend. No. 1100.) To printer.

  8. Placed on Second Reading File.

  9. From committee: Amend, and do pass as amended.

  10. Read first time. Referred to Committee on Commerce, Labor and Energy. To committee.

  11. In Senate.

  12. Read third time. Passed, as amended. Title approved, as amended. (Yeas: 38, Nays: 2, Excused: 2.) To Senate.

  13. From printer. To engrossment. Engrossed. First reprint .

  14. Read second time. Amended. (Amend. No. 723.) To printer.

  15. From committee: Amend, and do pass as amended.

  16. Waiver granted effective: April 12, 2017.

  17. From printer. To committee.

  18. Read first time. Referred to Committee on Commerce and Labor. To printer.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

5 sponsors · 18 co-sponsors · 44 not signed on

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors AB 405?
AB 405 is sponsored by Neal, Dina (Democratic), Monroe-Moreno, Daniele (Democratic), Ford, Jauregui, Sandra (Democratic), Manendo, Miller, Brittney M. (Democratic), Yeager, Steve (Democratic), William McCurdy II, Chris Brooks, Jason Frierson, Tyrone Thompson, Pat Spearman, Amber Joiner, Justin Watkins, Shannon Bilbray-Axelrod, Kelvin Atkinson, Richard Carrillo, Ozzie Fumo, Tick Segerblom, Cohen, Lesley, Heidi Swank, Nelson Araujo, and Olivia Diaz.
What is the current status of AB 405?
This bill has been enacted into law. Introduced March 20, 2017. Enacted.
Where can I track AB 405?
Track AB 405 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on AB 405

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of AB 405

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →