SF 102 — Wyoming energy transmission study.

Last action — H Speaker Signed SEA No. 0050

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed House
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced February 10, 2026. Enacted.

Signed by Governor Mark Gordon (Republican) on March 06, 2026.

Odds of enactment

High chance

Based on the sponsor, cosponsors, and committee posture, this bill has a high chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Likely to advance 78% · moderate confidence
  • Enacted

    Current position in the legislative process.

  • 7 sponsors

    1 primary, 6 co-sponsors signed on.

  • Bipartisan support

    Sponsored across 2 parties (6 R · 1 D) — cross-party backing.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

This act requires the Wyoming Energy Authority to complete a transmission planning study concerning Wyoming's transmission system and the potential growth of that system. The act requires the Energy Authority to complete the study in two (2) phases. Phase one (1) must analyze the impacts of three potential load-growth scenarios on Wyoming's current system, including a model of Wyoming's transmission needs and the consideration of advanced transmission technologies and electricity storage to meet the need for expanded transmission. Phase two (2) requires the Energy Authority to develop a qualitative summary of Wyoming public utilities' participation, if any, in regional transmission organizations. The act requires the Wyoming Energy Authority to report twice to the Joint Corporations, Elections, and Political Subdivisions Interim Committee and the Joint Minerals, Business, and Economic Development Interim Committee on the results of each phase of the study. The act requires the Energy Authority to establish an advisory working group to provide input on the required study. The working group must be comprised of, at a minimum, the Public Service Commission, the Office of Consumer Advocate, and representatives from investor-owned public utilities, municipal utilities, and rural electric cooperatives. Comments: This act is effective immediately. This act requires two (2) reports from the Wyoming Energy Authority to the Joint Corporations, Elections, and Political Subdivisions Interim Committee and the Joint Minerals, Business, and Economic Development Interim Committee. The first report (for phase one (1) of the study) is due by November 1, 2027; the second report (for phase two) is due by September 1, 2028.

Bill Text

What changed in the latest version

98 added · 100 removed

Plain-language change summary

The updated version of Bill SF 102 specifies that the Wyoming energy authority must conduct a two-phase transmission planning study. The first phase will focus on assessing the impact of three potential load growth scenarios on the state's current transmission system and will identify any potential delivery issues or congestion. This change is important because it ensures that the study will provide a detailed analysis that can help improve Wyoming's energy infrastructure and support future energy demands.

→
Previous
Latest
S TATE OF W YOMING 26LSO-0322 SENATE FILE NO.
ORIGINAL SENATE FILE NO.
SF0102 Wyoming energy transmission study.
SF0102 ENROLLED ACT NO.
Sponsored by:
50, SENATE SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING BUDGET SESSION AN ACT relating to the Wyoming energy authority;
Senator(s) Boner, Dockstader and Steinmetz and Representative(s) Haroldson, Singh, Webb and Yin A BILL for AN ACT relating to public utilities;
requiring the completion of a transmission study;
requiring the completion of a transmission planning study;
6 Be It Enacted by the Legislature of the State of Wyoming:
Be It Enacted by the Legislature of the State of Wyoming:
8 Section 1.
Section 1.
SF0102 STATE OF WYOMING 26LSO-0322 2 (ii) Phase one (1) of the study shall, at a minimum, be an analysis of the impacts of three (3) potential load growth scenarios on Wyoming's current transmission system and shall include all of the following:
(ii) Phase one (1) of the study shall, at a minimum, be an analysis of the impacts of three (3) potential load growth scenarios on Wyoming's current transmission system and shall include all of the following:
7 (A) A model of Wyoming's transmission needs with a power flow assessment of the three (3) potential load growth scenarios identified in subparagraph (C) of this paragraph to identify potential deliverability and congestion constraints;
(A) A model of Wyoming's transmission needs with an assessment of the three (3) potential load growth scenarios identified in subparagraph (C) of this paragraph to identify potential deliverability and congestion constraints;
(C) The consideration of three (3) load growth scenarios in completing this phase of the study, which are:
ORIGINAL SENATE FILE NO.
SF0102 ENROLLED ACT NO.
50, SENATE SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING BUDGET SESSION (C) The consideration of three (3) load growth scenarios in completing this phase of the study, which are:
SF0102 STATE OF WYOMING 26LSO-0322 2 (II) Moderate growth;
(II) Moderate growth;
4 (III) High demand.
(III) High demand.
6 (D) A gap analysis identifying transmission needs to meet various load growth scenarios, including those identified in subparagraph (C) of this paragraph, and recommendations for transmission solutions to meet the identified needs.
(D) A gap analysis identifying transmission needs to meet various load growth scenarios, including those identified in subparagraph (C) of this paragraph.
(iii) Phase two (2) of the study shall explore integration of the transmission system in Wyoming into regional systems and shall include all of the following:
(iii) Phase two (2) of the study shall, at a minimum, develop a qualitative summary and narrative of Wyoming's public utilities' participation, if any, in regional transmission organizations, independent system operators and real-time and extended day ahead markets.
(A) A study of the implications of Wyoming's transmission system being integrated into competing day-ahead and real-time markets and a regional transmission organization;
(b) The Wyoming energy authority shall report to the joint corporations, election and political subdivisions interim committee and the joint minerals, business and economic development interim committee:
(B) An economic analysis of benefits associated with the three (3) load growth scenarios identified in subparagraph (a)(ii)(C) of this section;
(i) Not later than November 1, 2027 on the results of phase one (1) of the study;
SF0102 STATE OF WYOMING 26LSO-0322 2 (C) Identification of additional transmission system upgrades to enhance regional integration.
(ii) Not later than September 1, 2028 on the results of phase two (2) of the study.
6 (b) The Wyoming energy authority shall report to the joint corporations, election and political subdivisions interim committee and the joint minerals, business and economic development interim committee:
(c) The Wyoming energy authority shall establish an advisory working group to provide input on the methodology, assumptions and findings of the study required under this ORIGINAL SENATE FILE NO.
(i) Not later than November 1, 2027 on the results of phase one (1) of the study required in subsection (a) of this section and any recommendations for legislation in response to the study;
SF0102 ENROLLED ACT NO.
(ii) Not later than September 1, 2028 on the results of phase two (2) of the study required in subsection (a) of this section and any recommendations for legislation in response to the study.
50, SENATE SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING BUDGET SESSION section.
4 SF0102 STATE OF WYOMING 26LSO-0322 Section 2.
The advisory working group shall, at a minimum, include representatives of:
(i) Rural electric cooperatives serving Wyoming;
(ii) Investor-owned electric utilities serving Wyoming;
(iii) Municipal electric utilities serving Wyoming;
(iv) The Wyoming public service commission;
(v) The office of consumer advocate.
(d) The advisory working group established under subsection (c) of this section shall be consulted throughout both phases of the study, including during the development of study methodology and scenario assumptions, review of preliminary findings and formulation of recommendations.
ORIGINAL SENATE FILE NO.
SF0102 ENROLLED ACT NO.
50, SENATE SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING BUDGET SESSION Section 2.
(END) SF0102
(END) Speaker of the House President of the Senate Governor TIME APPROVED:
_________ DATE APPROVED:
_________ I hereby certify that this act originated in the Senate.
Chief Clerk 4
View plain text versions (2)

Amendments

1 amendment

Click Show changes on an amendment above to see how it modifies the bill.

Action History

  1. H Speaker Signed SEA No. 0050

  2. Governor Signed SEA No. 0050

  3. Assigned Chapter Number 58

  4. S President Signed SEA No. 0050

  5. H 3rd Reading:Passed 58-2-2-0-0

  6. Assigned Number SEA No. 0050

  7. H COW:Passed

  8. H 2nd Reading:Passed

  9. H09 - Minerals:Recommend Do Pass 9-0-0-0-0

  10. H Placed on General File

  11. H Received for Introduction

  12. H Introduced and Referred to H09 - Minerals

  13. S 3rd Reading:Passed 31-0-0-0-0

  14. S 2nd Reading:Passed

  15. S COW:Passed

  16. S07 - Corporations:Recommend Amend and Do Pass 5-0-0-0-0

  17. S Placed on General File

  18. S Introduced and Referred to S07 - Corporations 29-2-0-0-0

  19. S Received for Introduction

  20. Bill Number Assigned

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 6 co-sponsors · 86 not signed on

Sponsors (1)

Co-sponsors (6)

Not signed on (86)

86 members have not signed on to this bill.

Show all 86 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SF 102 do?
This act requires the Wyoming Energy Authority to complete a transmission planning study concerning Wyoming's transmission system and the potential growth of that system. The act requires the Energy Authority to complete the study in two (2) phases. Phase one (1) must analyze the impacts of three potential load-growth scenarios on Wyoming's current system, including a model of Wyoming's transmission needs and the consideration of advanced transmission technologies and electricity storage to meet the need for expanded transmission. Phase two (2) requires the Energy Authority to develop a qualitative summary of Wyoming public utilities' participation, if any, in regional transmission organizations. The act requires the Wyoming Energy Authority to report twice to the Joint Corporations, Elections, and Political Subdivisions Interim Committee and the Joint Minerals, Business, and Economic Development Interim Committee on the results of each phase of the study. The act requires the Energy Authority to establish an advisory working group to provide input on the required study. The working group must be comprised of, at a minimum, the Public Service Commission, the Office of Consumer Advocate, and representatives from investor-owned public utilities, municipal utilities, and rural electric cooperatives. Comments: This act is effective immediately. This act requires two (2) reports from the Wyoming Energy Authority to the Joint Corporations, Elections, and Political Subdivisions Interim Committee and the Joint Minerals, Business, and Economic Development Interim Committee. The first report (for phase one (1) of the study) is due by November 1, 2027; the second report (for phase two) is due by September 1, 2028.
Who sponsors SF 102?
SF 102 is sponsored by Cheri Steinmetz (Republican), Dan Dockstader (Republican), Brian Boner (Republican), Mike Yin (Democrat), Joe Webb (Republican), Daniel Singh (Republican), and Jeremy Haroldson (Republican).
What is the current status of SF 102?
This bill has been enacted into law. Introduced February 10, 2026. Enacted.
Where can I track SF 102?
Track SF 102 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SF 102

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SF 102

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →