Washington 2025-2026 Regular Session Status: Enacted 3 D cosponsors

SB 6309 — Providing for enhanced municipal permitting tools for high capacity transit projects.

Last action — Effective date 6/11/2026*.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed House
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced January 26, 2026. Enacted.

Signed by Governor Bob Ferguson (Democratic) on March 23, 2026.

Odds of enactment

High chance

Based on the sponsor, cosponsors, and committee posture, this bill has a high chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Likely to advance 76% · moderate confidence
  • Enacted

    Current position in the legislative process.

  • 3 sponsors

    1 primary, 2 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (3 D).

  • Cleared a recorded vote

    Passed 3 recorded votes so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Bill Text

What changed in the latest version

321 added · 385 removed

Plain-language change summary

The updated version of Senate Bill 6309 makes a few key changes regarding development agreements between local governments and property owners. Notably, it clarifies that cities can also enter into agreements for properties outside their boundaries, especially when they're planning annexations or service agreements. This change is important because it allows for greater flexibility in planning and development of transit projects, which can help facilitate better transportation infrastructure and services in growing areas.

→
Previous
Latest
S-4589.1 SUBSTITUTE SENATE BILL 6309 State of Washington 69th Legislature 2026 Regular Session By Senate Local Government (originally sponsored by Senators Liias, Alvarado, and Saldaña) READ FIRST TIME 02/03/26.
S-4173.1 SENATE BILL 6309 State of Washington 69th Legislature 2026 Regular Session By Senators Liias, Alvarado, and Saldaña Read first time 01/26/26.
Referred to Committee on Local Government.
amending RCW 36.70B.170, 19.27.095, 36.70B.070, 58.17.040, and 58.17.040;
amending RCW 36.70B.170, 58.17.040, 58.17.040, and 19.27.095;
A development agreement shall be consistent with applicable development regulations adopted by a local government planning under chapter 36.70A RCW, except that a development agreement with a regional transit authority established under chapter 81.112 RCW may set forth development standards that vary from p.
A development agreement shall be consistent with applicable development regulations adopted by a local government planning under chapter 36.70A RCW, except that a development agreement with a regional transit authority created under chapter 81.112 RCW may set forth development standards that vary from p.
1 SSB 6309 otherwise applicable development regulations in order to accommodate development of the facilities of the regional transit authority.
1 SB 6309 otherwise applicable development regulations in order to accommodate development of the facilities of the regional transit authority.
(1) Apply for land use and construction permits for its facilities before acquiring the real property on which the facilities p.
p.
2 SSB 6309 will be constructed or operated, so long as the authority provides proof of notice to the subject property owner at the time of application;
2 SB 6309 (1) Apply for land use and construction permits for its facilities before acquiring the real property on which the facilities will be constructed or operated;
(2) Apply for construction and technical permits for its facilities before the local government makes a land use decision regarding those facilities, so long as the authority provides proof of notice to the subject property owner at the time of the application;
(2) Apply for construction and technical permits for its facilities before the local government makes a land use decision regarding those facilities;
RCW 19.27.095 and 1991 c 281 s 27 are each amended to read as follows:
(1) A valid and fully complete building permit application for a structure, that is permitted under the zoning or other land use control ordinances in effect on the date of the application shall be considered under the building permit ordinance in effect at the time of application, and the zoning or other land use control ordinances in effect on the date of application.
(2) The requirements for a fully completed application shall be defined by local ordinance ((but for)).
A local government shall accept applications from a regional transit authority established under chapter 81.112 RCW regardless of whether the regional transit authority owns or has possession and use of the property subject to the application, so long as the application is otherwise complete.
For any construction project costing more than ((five thousand dollars)) $5,000 the application shall include, at a minimum:
(a) The legal description, or the tax parcel number assigned pursuant to RCW 84.40.160, and the street address if available, and may include any other identification of the construction site by the prime contractor;
(b) The property owner's name, address, and phone number;
(c) The prime contractor's business name, address, phone number, current state contractor registration number;
and (d) Either:
p.
3 SSB 6309 (i) The name, address, and phone number of the office of the lender administering the interim construction financing, if any;
or (ii) The name and address of the firm that has issued a payment bond, if any, on behalf of the prime contractor for the protection of the owner, if the bond is for an amount not less than ((fifty)) 50 percent of the total amount of the construction project.
(3) The information required on the building permit application by subsection (2)(a) through (d) of this section shall be set forth on the building permit document which is issued to the owner, and on the inspection record card which shall be posted at the construction site.
(4) The information required by subsection (2) of this section and information supplied by the applicant after the permit is issued under subsection (5) of this section shall be kept on record in the office where building permits are issued and made available to any person on request.
If a copy is requested, a reasonable charge may be made.
(5) If any of the information required by subsection (2)(d) of this section is not available at the time the application is submitted, the applicant shall so state and the application shall be processed forthwith and the permit issued as if the information had been supplied, and the lack of the information shall not cause the application to be deemed incomplete for the purposes of vesting under subsection (1) of this section.
However, the applicant shall provide the remaining information as soon as the applicant can reasonably obtain such information.
(6) The limitations imposed by this section shall not restrict conditions imposed under chapter 43.21C RCW.
Sec.
4.
RCW 36.70B.070 and 2023 c 338 s 6 are each amended to read as follows:
(1)(a) Within 28 days after receiving a project permit application, a local government planning pursuant to RCW 36.70A.040 shall provide a written determination to the applicant.
(b) The written determination must state either:
(i) That the application is complete;
or (ii) That the application is incomplete and that the procedural submission requirements of the local government have not been met.
The determination shall outline what is necessary to make the application procedurally complete.
p.
4 SSB 6309 (c) The number of days shall be calculated by counting every calendar day.
(d) To the extent known by the local government, the local government shall identify other agencies of local, state, or federal governments that may have jurisdiction over some aspect of the application.
(2) A project permit application is complete for purposes of this section when it meets the procedural submission requirements of the local government, as outlined on the project permit application.
A local government shall accept applications from a regional transit authority established under chapter 81.112 RCW regardless of whether the regional transit authority owns or has possession and use of the property subject to the application, so long as the application is otherwise complete.
Additional information or studies may be required or project modifications may be undertaken subsequent to the procedural review of the application by the local government.
Show all 99 changed rows (59 more)
Previous
Latest
The determination of completeness shall not preclude the local government from requesting additional information or studies either at the time of the notice of completeness or subsequently if new information is required or substantial changes in the proposed action occur.
However, if the procedural submission requirements, as outlined on the project permit application have been provided, the need for additional information or studies may not preclude a completeness determination.
(3) The determination of completeness may include or be combined with the following:
(a) A preliminary determination of those development regulations that will be used for project mitigation;
(b) A preliminary determination of consistency, as provided under RCW 36.70B.040;
(c) Other information the local government chooses to include;
or (d) The notice of application pursuant to the requirements in RCW 36.70B.110.
(4)(a) An application shall be deemed procedurally complete on the 29th day after receiving a project permit application under this section if the local government does not provide a written determination to the applicant that the application is procedurally incomplete as provided in subsection (1)(b)(ii) of this section.
When the local government does not provide a written determination, they p.
5 SSB 6309 may still seek additional information or studies as provided for in subsection (2) of this section.
(b) Within 14 days after an applicant has submitted to a local government additional information identified by the local government as being necessary for a complete application, the local government shall notify the applicant whether the application is complete or what additional information is necessary.
(c) The notice of application shall be provided within 14 days after the determination of completeness pursuant to RCW 36.70B.110.
Sec.
5.
(5) A division for the purpose of lease when no residential structure other than mobile homes, tiny houses or tiny houses with wheels as defined in RCW 35.21.686, or travel trailers are permitted to be placed upon the land when the city, town, or county has approved a binding site plan for the use of the land in accordance with local regulations;
(5) A division for the purpose of lease when no residential structure other than mobile homes, tiny houses or tiny houses with wheels as defined in RCW 35.21.686, or travel trailers are permitted p.
p.
3 SB 6309 to be placed upon the land when the city, town, or county has approved a binding site plan for the use of the land in accordance with local regulations;
6 SSB 6309 (6) A division made for the purpose of alteration by adjusting boundary lines, between platted or unplatted lots or both, which does not create any additional lot, tract, parcel, site, or division nor create any lot, tract, parcel, site, or division ((which)) that contains insufficient area and dimension to meet minimum requirements for width and area for a building site;
(6) A division made for the purpose of alteration by adjusting boundary lines, between platted or unplatted lots or both, which does not create any additional lot, tract, parcel, site, or division nor create any lot, tract, parcel, site, or division ((which)) that contains insufficient area and dimension to meet minimum requirements for width and area for a building site;
or (ii) in connection with the issuance of building permits or final certificates of occupancy with respect to all of such land;
or (ii) in connection with the issuance of building p.
or (iii) if not approved pursuant to (i) and (ii) of this subsection (7)(e), then pursuant to such other procedures as such p.
4 SB 6309 permits or final certificates of occupancy with respect to all of such land;
7 SSB 6309 city, town, or county may have established for the approval of a binding site plan;
or (iii) if not approved pursuant to (i) and (ii) of this subsection (7)(e), then pursuant to such other procedures as such city, town, or county may have established for the approval of a binding site plan;
(11) A division of land caused by the acquisition of a portion of an existing lot or tract by a regional transit authority as defined in chapter 81.112 RCW that is acquiring land to build facilities as defined in RCW 81.112.020.
8 SSB 6309 Sec.
5 SB 6309 (11) A division of land caused by the acquisition of a portion of an existing lot or tract by an agency with condemnation authority that is acquiring land to build an essential public facility as described in RCW 36.70A.200.
6.
Sec.
4.
(6) A division made for the purpose of alteration by adjusting boundary lines, between platted or unplatted lots or both, which does not create any additional lot, tract, parcel, site, or division nor create any lot, tract, parcel, site, or division ((which)) that contains insufficient area and dimension to meet minimum requirements for width and area for a building site;
(6) A division made for the purpose of alteration by adjusting boundary lines, between platted or unplatted lots or both, which does not create any additional lot, tract, parcel, site, or division nor create any lot, tract, parcel, site, or division ((which)) that p.
6 SB 6309 contains insufficient area and dimension to meet minimum requirements for width and area for a building site;
(b) the improvements constructed or to be p.
(b) the improvements constructed or to be constructed thereon are required by the provisions of the binding site plan to be included in one or more condominiums, cooperatives, or owned by an association or other legal entity in which the owners of units therein or their owners associations have a membership or other legal or beneficial interest;
9 SSB 6309 constructed thereon are required by the provisions of the binding site plan to be included in one or more condominiums, cooperatives, or owned by an association or other legal entity in which the owners of units therein or their owners associations have a membership or other legal or beneficial interest;
"Personal wireless services" means any federally licensed personal wireless service.
"Facilities" means unstaffed facilities that are used for the transmission or reception, or both, of wireless communication services including, but not necessarily limited to, antenna arrays, transmission cables, equipment shelters, and support structures;
10 SSB 6309 (9) A division of land into lots or tracts of less than three acres that is recorded in accordance with chapter 58.09 RCW and is used or to be used for the purpose of establishing a site for construction and operation of consumer-owned or investor-owned electric utility facilities.
7 SB 6309 "Personal wireless services" means any federally licensed personal wireless service.
"Facilities" means unstaffed facilities that are used for the transmission or reception, or both, of wireless communication services including, but not necessarily limited to, antenna arrays, transmission cables, equipment shelters, and support structures;
(9) A division of land into lots or tracts of less than three acres that is recorded in accordance with chapter 58.09 RCW and is used or to be used for the purpose of establishing a site for construction and operation of consumer-owned or investor-owned electric utility facilities.
(11) A division of land caused by the acquisition of a portion of an existing lot or tract by a regional transit authority as defined in chapter 81.112 RCW that is acquiring land to build facilities as defined in RCW 81.112.020.
(11) A division of land caused by the acquisition of a portion of an existing lot or tract by an agency with condemnation authority that is acquiring land to build an essential public facility as described in RCW 36.70A.200.
Sec.
5.
RCW 19.27.095 and 1991 c 281 s 27 are each amended to read as follows:
p.
8 SB 6309 (1) A valid and fully complete building permit application for a structure, that is permitted under the zoning or other land use control ordinances in effect on the date of the application shall be considered under the building permit ordinance in effect at the time of application, and the zoning or other land use control ordinances in effect on the date of application.
(2) The requirements for a fully completed application shall be defined by local ordinance but for any construction project costing more than ((five thousand dollars)) $5,000 the application shall include, at a minimum:
(a) The legal description, or the tax parcel number assigned pursuant to RCW 84.40.160, and the street address if available, and may include any other identification of the construction site by the prime contractor;
(b) The property owner's name, address, and phone number;
(c) The prime contractor's business name, address, phone number, current state contractor registration number;
and (d) Either:
(i) The name, address, and phone number of the office of the lender administering the interim construction financing, if any;
or (ii) The name and address of the firm that has issued a payment bond, if any, on behalf of the prime contractor for the protection of the owner, if the bond is for an amount not less than ((fifty)) 50 percent of the total amount of the construction project.
(3) The information required on the building permit application by subsection (2)(a) through (d) of this section shall be set forth on the building permit document ((which)) that is issued to the owner, and on the inspection record card which shall be posted at the construction site.
(4) The information required by subsection (2) of this section and information supplied by the applicant after the permit is issued under subsection (5) of this section shall be kept on record in the office where building permits are issued and made available to any person on request.
If a copy is requested, a reasonable charge may be made.
(5) If any of the information required by subsection (2)(d) of this section is not available at the time the application is submitted, the applicant shall so state and the application shall be processed forthwith and the permit issued as if the information had been supplied, and the lack of the information shall not cause the p.
9 SB 6309 application to be deemed incomplete for the purposes of vesting under subsection (1) of this section.
However, the applicant shall provide the remaining information as soon as the applicant can reasonably obtain such information.
(6) The limitations imposed by this section shall not restrict conditions imposed under chapter 43.21C RCW.
(7) Applications submitted by a regional transit authority created under chapter 81.112 RCW for permits issued by cities and counties under the state building code shall be considered under the ordinances in effect pursuant to RCW 19.27.031 and 19.27.040 at the time the board of the regional transit authority chooses the route alignment and station locations of a rail fixed guideway system.
7.
6.
Section 5 of this act expires January 1, 2028.
Section 3 of this act expires January 1, 2028.
8.
7.
Section 6 of this act takes effect January 1, 2028.
Section 4 of this act takes effect January 1, 2028.
11 SSB 6309
10 SB 6309
View plain text versions (3)

Action History

  1. Effective date 6/11/2026*.

  2. Chapter 166, 2026 Laws.

  3. Governor signed.

  4. Delivered to Governor.

  5. Speaker signed.

  6. President signed.

  7. Passed final passage; yeas, 30; nays, 19; absent, 0; excused, 0.

  8. Senate concurred in House amendments.

  9. Third reading, passed; yeas, 56; nays, 38; absent, 0; excused, 4.

  10. Rules suspended. Placed on Third Reading.

  11. Committee amendment(s) adopted with no other amendments.

  12. Rules Committee relieved of further consideration. Placed on second reading.

  13. Referred to Rules 2 Review.

  14. Minority; without recommendation.

  15. Minority; do not pass.

  16. LG - Majority; do pass with amendment(s).

  17. Executive action taken in the House Committee on Local Government at 8:00 AM.

  18. Public hearing in the House Committee on Local Government at 10:30 AM.

  19. First reading, referred to Local Government.

  20. Third reading, passed; yeas, 31; nays, 17; absent, 0; excused, 1.

  21. Rules suspended. Placed on Third Reading.

  22. 1st substitute bill substituted (LGV 26).

  23. Placed on second reading by Rules Committee.

  24. Passed to Rules Committee for second reading.

  25. Minority; do not pass.

  26. WM - Majority; without recommendation.

  27. Executive action taken in the Senate Committee on Ways & Means at 10:30 AM.

  28. Referred to Ways & Means.

  29. Minority; without recommendation.

  30. Minority; do not pass.

  31. And refer to Ways & Means.

  32. LGV - Majority; 1st substitute bill be substituted, do pass.

  33. Executive action taken in the Senate Committee on Local Government at 1:30 PM.

  34. Public hearing in the Senate Committee on Local Government at 1:30 PM.

  35. First reading, referred to Local Government.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 2 co-sponsors · 148 not signed on · 57 voted No

Sponsors (1)

Co-sponsors (2)

Not signed on (148)

148 members have not signed on to this bill.

Show all 148 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 30 Yea · 19 Nay
Party YeaNayPresentNot Voting
Democrat 30000
Republican 01900
Total 301900
% of votes cast 61%39%0%0%
How each member voted (49)
Member Party Vote
Adrian Cortes Democrat Yea
Annette Cleveland Democrat Yea
Bob Hasegawa Democrat Yea
Claire Wilson Democrat Yea
Claudia Kauffman Democrat Yea
Deborah Krishnadasan Democrat Yea
Derek Stanford Democrat Yea
Drew Hansen Democrat Yea
Emily Alvarado Democrat Yea
Jamie Pedersen Democrat Yea
Javier Valdez Democrat Yea
Jesse Salomon Democrat Yea
Jessica Bateman Democrat Yea
John Lovick Democrat Yea
June Robinson Democrat Yea
Lisa Wellman Democrat Yea
Liz Lovelett Democrat Yea
Manka Dhingra Democrat Yea
Marcus Riccelli Democrat Yea
Marko Liias Democrat Yea
Mike Chapman Democrat Yea
Noel Frame Democrat Yea
Rebecca Saldaña Democrat Yea
Sharon Shewmake Democrat Yea
Steve Conway Democrat Yea
T'wina Nobles Democrat Yea
Tina Orwall Democrat Yea
Vandana Slatter Democrat Yea
Victoria Hunt Democrat Yea
Yasmin Trudeau Democrat Yea
Chris Gildon Republican Nay
Curtis King Republican Nay
Drew MacEwen Republican Nay
Jeff Holy Republican Nay
Jeff Wilson Republican Nay
Jim McCune Republican Nay
John Braun Republican Nay
Judy Warnick Republican Nay
Keith Goehner Republican Nay
Keith Wagoner Republican Nay
Leonard Christian Republican Nay
Mark Schoesler Republican Nay
Matt Boehnke Republican Nay
Nikki Torres Republican Nay
Paul Harris Republican Nay
Perry Dozier Republican Nay
Phil Fortunato Republican Nay
Ron Muzzall Republican Nay
Shelly Short Republican Nay

Official roll call →

Passed 56 Yea · 38 Nay · 4 Other
Party YeaNayPresentNot Voting
Republican 03701
Democrat 56103
Total 563804
% of votes cast 57%39%0%4%
How each member voted (98)
Member Party Vote
Adam Bernbaum Democrat Yea
Adison Richards Democrat Yea
Adrian Cortes Democrat Yea
Alex Ramel Democrat Yea
Alicia Rule Democrat Yea
Amy Walen Democrat Not Voting
April Berg Democrat Yea
Beth Doglio Democrat Yea
Brandy Donaghy Democrat Yea
Brianna Thomas Democrat Yea
Chipalo Street Democrat Yea
Chris Stearns Democrat Yea
Cindy Ryu Democrat Yea
Clyde Shavers Democrat Yea
Dan Bronoske Democrat Yea
Darya Farivar Democrat Yea
Dave Paul Democrat Yea
David Hackney Democrat Yea
Davina Duerr Democrat Yea
Debra Entenman Democrat Yea
Debra Lekanoff Democrat Not Voting
Edwin Obras Democrat Yea
Gerry Pollet Democrat Yea
Greg Nance Democrat Yea
Jake Fey Democrat Yea
Jamila Taylor Democrat Yea
Janice Zahn Democrat Yea
Javier Valdez Democrat Nay
Joe Fitzgibbon Democrat Yea
Joe Timmons Democrat Yea
Julia Reed Democrat Yea
Kristine Reeves Democrat Yea
Larry Springer Democrat Yea
Lauren Davis Democrat Yea
Laurie Jinkins Democrat Yea
Lillian Ortiz-Self Democrat Yea
Lisa Callan Democrat Yea
Lisa Parshley Democrat Yea
Liz Berry Democrat Yea
Mari Leavitt Democrat Yea
Mary Fosse Democrat Yea
Melanie Morgan Democrat Yea
Mia Gregerson Democrat Yea
Monica Jurado Stonier Democrat Yea
My-Linh Thai Democrat Yea
Natasha Hill Democrat Yea
Nicole Macri Democrat Yea
Osman Salahuddin Democrat Yea
Roger Goodman Democrat Yea
Sharlett Mena Democrat Yea
Sharon Tomiko Santos Democrat Yea
Sharon Wylie Democrat Yea
Shaun Scott Democrat Yea
Shelley Kloba Democrat Yea
Steve Bergquist Democrat Yea
Steve Tharinger Democrat Not Voting
Strom Peterson Democrat Yea
Tarra Simmons Democrat Yea
Timm Ormsby Democrat Yea
Zach Hall Democrat Yea
Alex Ybarra Republican Nay
Andrew Barkis Republican Nay
Andrew Engell Republican Nay
April Connors Republican Nay
Brian Burnett Republican Nay
Carolyn Eslick Republican Nay
Chris Corry Republican Nay
Cyndy Jacobsen Republican Nay
Dan Griffey Republican Nay
David Stuebe Republican Nay
Deb Manjarrez Republican Nay
Drew Stokesbary Republican Nay
Ed Orcutt Republican Not Voting
Gloria Mendoza Republican Nay
Hunter Abell Republican Nay
Jenny Graham Republican Nay
Jeremie Dufault Republican Nay
Jim Walsh Republican Nay
Joe Schmick Republican Nay
Joel McEntire Republican Nay
John Ley Republican Nay
Joshua Penner Republican Nay
Kevin Waters Republican Nay
Mark Klicker Republican Nay
Mary Dye Republican Nay
Matt Marshall Republican Nay
Michael Keaton Republican Nay
Mike Steele Republican Nay
Mike Volz Republican Nay
Peter Abbarno Republican Nay
Rob Chase Republican Nay
Sam Low Republican Nay
Skyler Rude Republican Nay
Stephanie Barnard Republican Nay
Stephanie McClintock Republican Nay
Suzanne Schmidt Republican Nay
Tom Dent Republican Nay
Travis Couture Republican Nay

Official roll call →

Passed 31 Yea · 17 Nay · 1 Other
Party YeaNayPresentNot Voting
Democrat 30000
Republican 11701
Total 311701
% of votes cast 63%35%0%2%
How each member voted (49)
Member Party Vote
Adrian Cortes Democrat Yea
Annette Cleveland Democrat Yea
Bob Hasegawa Democrat Yea
Claire Wilson Democrat Yea
Claudia Kauffman Democrat Yea
Deborah Krishnadasan Democrat Yea
Derek Stanford Democrat Yea
Drew Hansen Democrat Yea
Emily Alvarado Democrat Yea
Jamie Pedersen Democrat Yea
Javier Valdez Democrat Yea
Jesse Salomon Democrat Yea
Jessica Bateman Democrat Yea
John Lovick Democrat Yea
June Robinson Democrat Yea
Lisa Wellman Democrat Yea
Liz Lovelett Democrat Yea
Manka Dhingra Democrat Yea
Marcus Riccelli Democrat Yea
Marko Liias Democrat Yea
Mike Chapman Democrat Yea
Noel Frame Democrat Yea
Rebecca Saldaña Democrat Yea
Sharon Shewmake Democrat Yea
Steve Conway Democrat Yea
T'wina Nobles Democrat Yea
Tina Orwall Democrat Yea
Vandana Slatter Democrat Yea
Victoria Hunt Democrat Yea
Yasmin Trudeau Democrat Yea
Chris Gildon Republican Nay
Curtis King Republican Nay
Drew MacEwen Republican Nay
Jeff Holy Republican Not Voting
Jeff Wilson Republican Nay
Jim McCune Republican Nay
John Braun Republican Nay
Judy Warnick Republican Nay
Keith Goehner Republican Nay
Keith Wagoner Republican Nay
Leonard Christian Republican Nay
Mark Schoesler Republican Yea
Matt Boehnke Republican Nay
Nikki Torres Republican Nay
Paul Harris Republican Nay
Perry Dozier Republican Nay
Phil Fortunato Republican Nay
Ron Muzzall Republican Nay
Shelly Short Republican Nay

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 6309?
SB 6309 is sponsored by Rebecca Saldaña (Democrat), Emily Alvarado (Democrat), and Marko Liias (Democrat).
What is the current status of SB 6309?
This bill has been enacted into law. Introduced January 26, 2026. Enacted.
Where can I track SB 6309?
Track SB 6309 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 6309

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 6309

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →