Utah 2026 General Session Status: Enacted 2 R cosponsors

SB 164 — School Construction Amendments

Last action — Governor Signed

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed Senate
  4. ✓
    Passed House
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced January 20, 2026. Enacted.

Signed by Governor Spencer Cox (Republican) on March 19, 2026.

Prognosis

Advancing 54% · moderate confidence

Where this bill stands today.

Odds of enactment

High

How often bills like it became law.

  • Enacted

    Current position in the legislative process.

  • 2 sponsors

    1 primary, 1 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (2 R).

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

Bill Text

What changed in the latest version

1637 added · 1670 removed

Plain-language change summary

In the latest revision of Bill SB 164, several important updates have been made to improve oversight and safety for construction projects led by local education agencies (LEAs). Notably, the bill now establishes clear planning requirements and consultation with security experts to ensure that safety standards are met. It also introduces a new online system for managing construction documents and tracking compliance, which will help to streamline the approval process and ensure projects stay within budget. These changes matter because they enhance the safety, efficiency, and accountability of public school construction projects, making sure they meet established standards before work begins.

→
Previous
Latest
SB0164S02 compared with SB0164 {Omitted text} shows text that was in SB0164 but was omitted in SB0164S02 inserted text shows text that was not in SB0164 but was inserted into SB0164S02 DISCLAIMER:
Enrolled Copy S.B.
This document is provided to assist you in your comparison of the two bills.
164 School Construction Amendments GENERAL SESSION STATE OF UTAH Chief Sponsor:
Sometimes this automated comparison will NOT be completely accurate.
Therefore, you need to read the actual bills.
This automatically generated document could contain inaccuracies caused by:
limitations of the compare program;
bad input data;
or other causes.
School Construction Amendments GENERAL SESSION STATE OF UTAH Chief Sponsor:
Wilson House Sponsor:Thomas W.
Wilson House Sponsor:
Thomas W.
▸ establishes educational facility planning requirements for a local education agency (LEA) , including {architect licensing and } notification requirements;
▸ establishes educational facility planning requirements for a local education agency (LEA), including notification requirements;
S B ▸ requires consultation with the state security chief on mandatory safety and security1standards;
▸ requires consultation with the state security chief on mandatory safety and security standards;
▸ 6 SB0164 compared with SB0164S02 creates architect and design professional cost oversight with benchmarks and review requirements;
▸ creates architect and design professional cost oversight with benchmarks and review requirements;
▸ establishes inspection verification and monitoring procedures with qualified inspector requirements;
▸ establishes inspection verification and monitoring procedures with qualified inspector S.B.
164 Enrolled Copy requirements;
▸ requires {LEAs } an LEA to obtain division approval that projects fit within established cost matrices before construction;
▸ requires an LEA to obtain division approval that projects fit within established cost matrices before construction;
▸ allows division-managed construction services for {an LEA } a school district with fee structures and reimbursement requirements;
▸ allows division-managed construction services for a school district with fee structures and reimbursement requirements;
▸ {establishes construction oversight fee of 1.25% of project cost for all projects;} ▸ {provides charter school alternative compliance options with reduced requirements for smaller projects;} ▸ authorizes the division to establish a fee schedule to recover costs of oversight activities;
▸ authorizes the division to establish a fee schedule to recover costs of oversight activities;
- 2 - SB0164 compared with SB0164S02 ▸ sets an implementation timeline requiring full compliance by January 1, 2027;
▸ sets an implementation timeline requiring full compliance by January 1, 2027;
10-20-304 , as renumbered and amended by Laws of Utah 2025, First Special Session, Chapter 15 17-79-305 , as renumbered and amended by Laws of Utah 2025, First Special Session, Chapter 14 63G-6a-1302 , as last amended by Laws of Utah 2022, Chapter 421 ENACTS:
10-20-304, as renumbered and amended by Laws of Utah 2025, First Special Session, Chapter 15 17-79-305, as renumbered and amended by Laws of Utah 2025, First Special Session, Chapter 14 - 2 - Enrolled Copy S.B.
63A-5b-1201 , Utah Code Annotated 1953 63A-5b-1202 , Utah Code Annotated 1953 63A-5b-1203 , Utah Code Annotated 1953 63A-5b-1204 , Utah Code Annotated 1953 63A-5b-1205 , Utah Code Annotated 1953 63A-5b-1206 , Utah Code Annotated 1953 63A-5b-1207 , Utah Code Annotated 1953 63A-5b-1208 , Utah Code Annotated 1953 63A-5b-1209 , Utah Code Annotated 1953 63A-5b-1210 , Utah Code Annotated 1953 63A-5b-1211 , Utah Code Annotated 1953 63A-5b-1212 , Utah Code Annotated 1953 63A-5b-1213 , Utah Code Annotated 1953 63A-5b-1214 , Utah Code Annotated 1953 63A-5b-1215 , Utah Code Annotated 1953 63A-5b-1216 , Utah Code Annotated 1953 63A-5b-1217 , Utah Code Annotated 1953 63A-5b-1218 , Utah Code Annotated 1953 63A-5b-1219 , Utah Code Annotated 1953 - 3 - SB0164 compared with SB0164S02 63A-5b-1220 , Utah Code Annotated 1953 63A-5b-1221 , Utah Code Annotated 1953 63A-5b-1222 , Utah Code Annotated 1953 REPEALS AND REENACTS:
164 63G-6a-1302, as last amended by Laws of Utah 2022, Chapter 421 ENACTS:
53E-3-701 , as enacted by Laws of Utah 2018, Chapter 1 53E-3-702 , as last amended by Laws of Utah 2024, Chapter 21 53E-3-703 , as last amended by Laws of Utah 2019, Chapter 186 53E-3-704 , as renumbered and amended by Laws of Utah 2018, Chapter 1 REPEALS:
63A-5b-1201, Utah Code Annotated 1953 63A-5b-1202, Utah Code Annotated 1953 63A-5b-1203, Utah Code Annotated 1953 63A-5b-1204, Utah Code Annotated 1953 63A-5b-1205, Utah Code Annotated 1953 63A-5b-1206, Utah Code Annotated 1953 63A-5b-1207, Utah Code Annotated 1953 63A-5b-1208, Utah Code Annotated 1953 63A-5b-1209, Utah Code Annotated 1953 63A-5b-1210, Utah Code Annotated 1953 63A-5b-1211, Utah Code Annotated 1953 63A-5b-1212, Utah Code Annotated 1953 63A-5b-1213, Utah Code Annotated 1953 63A-5b-1214, Utah Code Annotated 1953 63A-5b-1215, Utah Code Annotated 1953 63A-5b-1216, Utah Code Annotated 1953 63A-5b-1217, Utah Code Annotated 1953 63A-5b-1218, Utah Code Annotated 1953 63A-5b-1219, Utah Code Annotated 1953 63A-5b-1220, Utah Code Annotated 1953 63A-5b-1221, Utah Code Annotated 1953 63A-5b-1222, Utah Code Annotated 1953 REPEALS AND REENACTS:
53E-3-705 , as last amended by Laws of Utah 2024, Chapter 85 53E-3-706 , as last amended by Laws of Utah 2024, Chapter 21 53E-3-707 , as last amended by Laws of Utah 2019, Chapter 186 53E-3-708 , as renumbered and amended by Laws of Utah 2018, Chapter 1 53E-3-709 , as last amended by Laws of Utah 2019, Chapter 186 53E-3-710 , as renumbered and amended by Laws of Utah 2018, Chapter 1 53E-3-711 , as renumbered and amended by Laws of Utah 2018, Chapter 1 Be it enacted by the Legislature of the state of Utah:
53E-3-701, as enacted by Laws of Utah 2018, Chapter 1 53E-3-702, as last amended by Laws of Utah 2024, Chapter 21 53E-3-703, as last amended by Laws of Utah 2019, Chapter 186 53E-3-704, as renumbered and amended by Laws of Utah 2018, Chapter 1 REPEALS:
53E-3-705, as last amended by Laws of Utah 2024, Chapter 85 53E-3-706, as last amended by Laws of Utah 2024, Chapter 21 53E-3-707, as last amended by Laws of Utah 2019, Chapter 186 53E-3-708, as renumbered and amended by Laws of Utah 2018, Chapter 1 - 3 - S.B.
164 Enrolled Copy 53E-3-709, as last amended by Laws of Utah 2019, Chapter 186 53E-3-710, as renumbered and amended by Laws of Utah 2018, Chapter 1 53E-3-711, as renumbered and amended by Laws of Utah 2018, Chapter 1 Be it enacted by the Legislature of the state of Utah:
10-20-304.
10-20-304 .
(1) (a) Each county, municipality, school district, charter school, special district, special service district, and political subdivision of the state shall conform to any applicable land use ordinance of any municipality when installing, constructing, operating, or otherwise using any area, land, or building situated within that municipality.
(1)(a) Each county, municipality, school district, charter school, special district, special service district, and political subdivision of the state shall conform to any applicable land use ordinance of any municipality when installing, constructing, operating, or otherwise using any area, land, or building situated within that municipality.
(2) - 4 - SB0164 compared with SB0164S02 (a) Except as provided in Subsection (3), a school district or charter school is subject to a municipality's land use ordinances.
(2)(a) Except as provided in Subsection (3), a school district or charter school is subject to a municipality's land use ordinances.
(b) (i) Notwithstanding Subsection (3), a municipality may:
(b)(i) Notwithstanding Subsection (3), a municipality may:
(3) A municipality may not:
- 4 - Enrolled Copy S.B.
(a) impose requirements for landscaping, fencing, aesthetic considerations, construction methods or materials{[, additional building inspections]} , municipal building codes, building use for educational purposes, or the placement or use of temporary classroom facilities on school property;
164 (3) A municipality may not:
(a) impose requirements for landscaping, fencing, aesthetic considerations, construction methods or materials, additional building inspections, municipal building codes, building use for educational purposes, or the placement or use of temporary classroom facilities on school property;
- 5 - SB0164 compared with SB0164S02 (e) require a school district or charter school to pay any impact fee for an improvement project unless the impact fee is imposed as provided in Title 11, Chapter 36a, Impact Fees Act;
(e) require a school district or charter school to pay any impact fee for an improvement project unless the impact fee is imposed as provided in Title 11, Chapter 36a, Impact Fees Act;
and (b) maximize school, student, and site safety.
and - 5 - S.B.
164 Enrolled Copy (b) maximize school, student, and site safety.
(6) (a) The Division of Facilities Construction and Management has the sole authority to approve inspectors for school construction projects under Title 63A, Chapter 5b, Part 12, Public School Construction Oversight.
(6)(a) The Division of Facilities Construction and Management has the sole authority to approve inspectors for school construction projects under Title 63A, Chapter 5b, Part 12, Public School Construction Oversight.
(b) A school district {or charter school shall use only } may only use inspectors approved by the Division of Facilities Construction and Management as follows:
(b) A school district may only use inspectors approved by the Division of Facilities Construction and Management as follows:
- 6 - SB0164 compared with SB0164S02 (ii) a municipal building inspector who is on the division's approved roster under Section 63A-5b-1220;
(ii) a municipal building inspector who is on the division's approved roster under Section 63A-5b-1220;
or (iii) a certified building inspector , which may include a qualified school district inspector, who meets all of the following requirements:
or (iii) a certified building inspector, which may include a qualified school district inspector, who meets all of the following requirements:
Show all 314 changed rows (274 more)
Previous
Latest
(B) is not an employee of the contractor{, school district, or charter school} ;
(B) is not an employee of the contractor;
[(6) (a) Notwithstanding Subsection (3)(d), a school district or charter school shall use:] [(i) a municipal building inspector;] [(ii) (A) for a school district, a school district building inspector from that school district;
[(6)(a) Notwithstanding Subsection (3)(d), a school district or charter school shall use:] [(i) a municipal building inspector;] [(ii)(A) for a school district, a school district building inspector from that school district;
or] [(iii) an independent, certified building inspector who is not an employee of the contractor, licensed to perform the inspection that the inspector is requested to perform, and approved by a municipal building inspector or:] [(A) for a school district, a school district building inspector from that school district;
or] [(iii) an independent, certified building inspector who is not an employee of the contractor, licensed to perform the inspection that the inspector is requested to perform, and approved by a municipal building inspector or:] [(A) for a school district, a school district building inspector from that school - 6 - Enrolled Copy S.B.
or] [(B) for a charter school, a school district building inspector from the school district in which the charter school is located.] [(b) The approval under Subsection (6)(a)(iii) may not be unreasonably withheld.] [(c) If a school district or charter school uses a school district or independent building inspector under Subsection (6)(a)(ii) or (iii), the school district or charter school shall submit to the state superintendent of public instruction and municipal building official, on a monthly basis during construction of the school building, a copy of each inspection certificate regarding the school building.] (7) - 7 - SB0164 compared with SB0164S02 (a) A charter school, home-based microschool, or micro-education entity shall be considered a permitted use in all zoning districts within a municipality.
164 district;
or] [(B) for a charter school, a school district building inspector from the school district in which the charter school is located.] [(b) The approval under Subsection (6)(a)(iii) may not be unreasonably withheld.] [(c) If a school district or charter school uses a school district or independent building inspector under Subsection (6)(a)(ii) or (iii), the school district or charter school shall submit to the state superintendent of public instruction and municipal building official, on a monthly basis during construction of the school building, a copy of each inspection certificate regarding the school building.] (7)(a) A charter school, home-based microschool, or micro-education entity shall be considered a permitted use in all zoning districts within a municipality.
(e) (i) A certificate authorizing permanent occupancy issued by the Division of Facilities Construction and Management under Section 63A-5b-1208 shall be the exclusive certificate required, and the municipality shall accept the Division of Facilities Construction and Management's certificate as satisfying all local occupancy requirements.
(e)(i) A certificate authorizing permanent occupancy issued by the Division of Facilities Construction and Management under Section 63A-5b-1208 shall be the exclusive certificate required, and the municipality shall accept the Division of Facilities Construction and Management's certificate as satisfying all local occupancy requirements.
[(e) (i) A school district, charter school, or micro-education entity may seek a certificate authorizing permanent occupancy of a school building from:] [(A) the state superintendent of public instruction, as provided in Subsection 53E-3-706(3), if the school district or charter school used an independent building inspector for inspection of the school building;
[(e)(i) A school district, charter school, or micro-education entity may seek a certificate authorizing permanent occupancy of a school building from:] [(A) the state superintendent of public instruction, as provided in Subsection 53E-3-706(3), if the school district or charter school used an independent - 7 - S.B.
or] [(B) a municipal official with authority to issue the certificate, if the school district, charter school, or micro-education entity used a municipal building inspector for inspection of the school building.] [(ii) A school district may issue its own certificate authorizing permanent occupancy of a school building if it used its own building inspector for inspection of the school building, subject to the notification requirement of Subsection 53E-3-706(3)(a).] - 8 - SB0164 compared with SB0164S02 [(iii) A charter school or micro-education entity may seek a certificate authorizing permanent occupancy of a school building from a school district official with authority to issue the certificate, if the charter school or micro-education entity used a school district building inspector for inspection of the school building.] [(iv) A certificate authorizing permanent occupancy issued by the state superintendent of public instruction under Subsection 53E-3-706(3) or a school district official with authority to issue the certificate shall be considered to satisfy any municipal requirement for an inspection or a certificate of occupancy.] (f) (i) A micro-education entity may operate in a facility that meets Group E Occupancy requirements as defined by the International Building Code, as incorporated by Section 15A-2-103.
164 Enrolled Copy building inspector for inspection of the school building;
or] [(B) a municipal official with authority to issue the certificate, if the school district, charter school, or micro-education entity used a municipal building inspector for inspection of the school building.] [(ii) A school district may issue its own certificate authorizing permanent occupancy of a school building if it used its own building inspector for inspection of the school building, subject to the notification requirement of Subsection 53E-3-706(3)(a).] [(iii) A charter school or micro-education entity may seek a certificate authorizing permanent occupancy of a school building from a school district official with authority to issue the certificate, if the charter school or micro-education entity used a school district building inspector for inspection of the school building.] [(iv) A certificate authorizing permanent occupancy issued by the state superintendent of public instruction under Subsection 53E-3-706(3) or a school district official with authority to issue the certificate shall be considered to satisfy any municipal requirement for an inspection or a certificate of occupancy.] (f)(i) A micro-education entity may operate in a facility that meets Group E Occupancy requirements as defined by the International Building Code, as incorporated by Section 15A-2-103.
(ii) (A) each classroom in the facility has an exit directly to the outside at the level of exit or discharge;
(ii)(A) each classroom in the facility has an exit directly to the outside at the level of exit or discharge;
(h) (i) A home-based microschool is not subject to additional occupancy requirements beyond occupancy requirements that apply to a primary dwelling.
(h)(i) A home-based microschool is not subject to additional occupancy requirements beyond occupancy requirements that apply to a primary dwelling.
(ii) If a floor that is below grade in a home-based microschool is used for home-based microschool purposes, the below grade floor of the home-based microschool shall have at least one emergency escape or rescue window that complies with the requirements for emergency escape and rescue windows as defined by the International Residential Code, as incorporated by Section 15A-2-103.
(ii) If a floor that is below grade in a home-based microschool is used for home-based - 8 - Enrolled Copy S.B.
(8) - 9 - SB0164 compared with SB0164S02 (a) A specified public agency intending to develop its land shall submit to the land use authority a development plan and schedule:
164 microschool purposes, the below grade floor of the home-based microschool shall have at least one emergency escape or rescue window that complies with the requirements for emergency escape and rescue windows as defined by the International Residential Code, as incorporated by Section 15A-2-103.
(8)(a) A specified public agency intending to develop its land shall submit to the land use authority a development plan and schedule:
(b) The land use authority shall respond to a specified public agency's submission under Subsection (8) (a) with reasonable promptness in order to allow the specified public agency to consider information the municipality provides under Subsection (8)(a)(ii) in the process of preparing the budget for the development.
(b) The land use authority shall respond to a specified public agency's submission under Subsection (8)(a) with reasonable promptness in order to allow the specified public agency to consider information the municipality provides under Subsection (8)(a)(ii) in the process of preparing the budget for the development.
(b) requiring a home-based microschool or micro-education entity to obtain a business license;
(b) requiring a home-based microschool or micro-education entity to obtain a business - 9 - S.B.
164 Enrolled Copy license;
and - 10 - SB0164 compared with SB0164S02 (e) imposing regulations on the location of a project that are necessary to avoid risks to health or safety.
and (e) imposing regulations on the location of a project that are necessary to avoid risks to health or safety.
(11) (a) Section 63A-5b-1218 governs the requirements for permitting and inspection of public school buildings.
(11)(a) Section 63A-5b-1218 governs the requirements for permitting and inspection of public school buildings.
17-79-305.
17-79-305 .
(1) (a) Each county, municipality, school district, charter school, special district, special service district, and political subdivision of the state shall conform to any applicable land use ordinance of any county when installing, constructing, operating, or otherwise using any area, land, or building situated within a mountainous planning district or the unincorporated portion of the county, as applicable.
(1)(a) Each county, municipality, school district, charter school, special district, special service district, and political subdivision of the state shall conform to any applicable land use ordinance of any county when installing, constructing, operating, or otherwise using any area, land, or building situated within a mountainous planning district or the unincorporated portion of the county, as applicable.
(2) (a) Except as provided in Subsection (3), a school district or charter school is subject to a county's land use ordinances.
(2)(a) Except as provided in Subsection (3), a school district or charter school is subject to a county's land use ordinances.
(b) (i) Notwithstanding Subsection (3), a county may:
(b)(i) Notwithstanding Subsection (3), a county may:
and (B) impose regulations upon the location of a project that are necessary to avoid unreasonable risks to health or safety, as provided in Subsection (3)(f).
and (B) impose regulations upon the location of a project that are necessary to avoid - 10 - Enrolled Copy S.B.
- 11 - SB0164 compared with SB0164S02 (ii) The standards to which a county may subject a charter school under Subsection (2)(b)(i) shall be objective standards only and may not be subjective.
164 unreasonable risks to health or safety, as provided in Subsection (3)(f).
(ii) The standards to which a county may subject a charter school under Subsection (2)(b)(i) shall be objective standards only and may not be subjective.
(a) impose requirements for landscaping, fencing, aesthetic considerations, construction methods or materials{[, additional building inspections]} , county building codes, building use for educational purposes, or the placement or use of temporary classroom facilities on school property;
(a) impose requirements for landscaping, fencing, aesthetic considerations, construction methods or materials, additional building inspections, county building codes, building use for educational purposes, or the placement or use of temporary classroom facilities on school property;
(i) is not imposed on a similar land use or structure in the zone in which the land use or structure is approved;
(i) is not imposed on a similar land use or structure in the zone in which the land use - 11 - S.B.
or - 12 - SB0164 compared with SB0164S02 (ii) uses the tax exempt status of the school district or charter school as criteria for prohibiting or regulating the land use or location of the structure.
164 Enrolled Copy or structure is approved;
or (ii) uses the tax exempt status of the school district or charter school as criteria for prohibiting or regulating the land use or location of the structure.
(6) (a) The Division of Facilities Construction and Management has the sole authority to approve inspectors for school construction projects under Title 63A, Chapter 5b, Part 12, Public School Construction Oversight.
(6)(a) The Division of Facilities Construction and Management has the sole authority to approve inspectors for school construction projects under Title 63A, Chapter 5b, Part 12, Public School Construction Oversight.
(b) A school district {or charter school shall use only } may only use inspectors approved by the Division of Facilities Construction and Management as follows:
(b) A school district may only use inspectors approved by the Division of Facilities Construction and Management as follows:
or (iii) a certified building inspector , which may include a qualified school district inspector, who meets all of the following requirements:
or (iii) a certified building inspector, which may include a qualified school district inspector, who meets all of the following requirements:
(B) is not an employee of the contractor{, school district, or charter school} ;
(B) is not an employee of the contractor;
- 13 - SB0164 compared with SB0164S02 [(6) (a) Notwithstanding Subsection (3)(d), a school district or charter school shall use:] [(i) a county building inspector;] [(ii) (A) for a school district, a school district building inspector from that school district;
[(6)(a) Notwithstanding Subsection (3)(d), a school district or charter school shall use:] [(i) a county building inspector;] - 12 - Enrolled Copy S.B.
164 [(ii)(A) for a school district, a school district building inspector from that school district;
or] [(B) for a charter school, a school district building inspector from the school district in which the charter school is located.] [(b) The approval under Subsection (6)(a)(iii) may not be unreasonably withheld.] [(c) If a school district or charter school uses a school district or independent building inspector under Subsection (6)(a)(ii) or (iii), the school district or charter school shall submit to the state superintendent of public instruction and county building official, on a monthly basis during construction of the school building, a copy of each inspection certificate regarding the school building.] (7) (a) A charter school, home-based microschool, or micro-education entity shall be considered a permitted use in all zoning districts within a county.
or] [(B) for a charter school, a school district building inspector from the school district in which the charter school is located.] [(b) The approval under Subsection (6)(a)(iii) may not be unreasonably withheld.] [(c) If a school district or charter school uses a school district or independent building inspector under Subsection (6)(a)(ii) or (iii), the school district or charter school shall submit to the state superintendent of public instruction and county building official, on a monthly basis during construction of the school building, a copy of each inspection certificate regarding the school building.] (7)(a) A charter school, home-based microschool, or micro-education entity shall be considered a permitted use in all zoning districts within a county.
- 14 - SB0164 compared with SB0164S02 (e) (i) A certificate authorizing permanent occupancy issued by the Division of Facilities Construction and Management under Section 63A-5b-1208 shall be the exclusive certificate required, and a county shall accept the division's certificate as satisfying all local occupancy requirements.
(e)(i) A certificate authorizing permanent occupancy issued by the Division of Facilities Construction and Management under Section 63A-5b-1208 shall be the exclusive certificate required, and a county shall accept the division's certificate as satisfying all local occupancy requirements.
(ii) A micro-education entity is not subject to the requirements of Title 63A, Chapter 5b, Part 12, Public School Construction Oversight, and shall comply with local building codes and permitting requirements through county building officials.
(ii) A micro-education entity is not subject to the requirements of Title 63A, Chapter - 13 - S.B.
[(e) (i) A school district , charter school, or micro-education entity may seek a certificate authorizing permanent occupancy of a school building from:] [(A) the state superintendent of public instruction, as provided in Subsection 53E-3-706(3), if the school district, charter school, or micro-education entity used an independent building inspector for inspection of the school building;
164 Enrolled Copy 5b, Part 12, Public School Construction Oversight, and shall comply with local building codes and permitting requirements through county building officials.
or] [(B) a county official with authority to issue the certificate, if the school district, charter school, or micro-education entity used a county building inspector for inspection of the school building.] [(ii) A school district may issue its own certificate authorizing permanent occupancy of a school building if it used its own building inspector for inspection of the school building, subject to the notification requirement of Subsection 53E-3-706(3)(d)(ii).] [(iii) A charter school or micro-education entity may seek a certificate authorizing permanent occupancy of a school building from a school district official with authority to issue the certificate, if the charter school or micro-education entity used a school district building inspector for inspection of the school building.] [(iv) A certificate authorizing permanent occupancy issued by the state superintendent of public instruction under Subsection 53E-3-706(3) or a school district official with authority to issue the certificate shall be considered to satisfy any county requirement for an inspection or a certificate of occupancy.] (f) (i) A micro-education entity may operate a facility that meets Group E Occupancy requirements as defined by the International Building Code, as incorporated by Subsection 15A-2-103(1)(a).
[(e)(i) A school district , charter school, or micro-education entity may seek a certificate authorizing permanent occupancy of a school building from:] [(A) the state superintendent of public instruction, as provided in Subsection 53E-3-706(3), if the school district, charter school, or micro-education entity used an independent building inspector for inspection of the school building;
or] [(B) a county official with authority to issue the certificate, if the school district, charter school, or micro-education entity used a county building inspector for inspection of the school building.] [(ii) A school district may issue its own certificate authorizing permanent occupancy of a school building if it used its own building inspector for inspection of the school building, subject to the notification requirement of Subsection 53E-3-706(3)(d)(ii).] [(iii) A charter school or micro-education entity may seek a certificate authorizing permanent occupancy of a school building from a school district official with authority to issue the certificate, if the charter school or micro-education entity used a school district building inspector for inspection of the school building.] [(iv) A certificate authorizing permanent occupancy issued by the state superintendent of public instruction under Subsection 53E-3-706(3) or a school district official with authority to issue the certificate shall be considered to satisfy any county requirement for an inspection or a certificate of occupancy.] (f)(i) A micro-education entity may operate a facility that meets Group E Occupancy requirements as defined by the International Building Code, as incorporated by Subsection 15A-2-103(1)(a).
- 15 - SB0164 compared with SB0164S02 (g) A micro-education entity may operate a facility that is subject to and complies with the same occupancy requirements as a Class A-1, A-3, B, or M Occupancy as defined by the International Building Code, as incorporated by Subsection 15A-2-103(1)(a), if:
(g) A micro-education entity may operate a facility that is subject to and complies with the same occupancy requirements as a Class A-1, A-3, B, or M Occupancy as defined by the International Building Code, as incorporated by Subsection 15A-2-103(1)(a), if:
(ii) (A) each classroom in the facility has an exit directly to the outside at the level of exit discharge;
(ii)(A) each classroom in the facility has an exit directly to the outside at the level - 14 - Enrolled Copy S.B.
164 of exit discharge;
(h) (i) A home-based microschool is not subject to additional occupancy requirements beyond occupancy requirements that apply to a primary dwelling.
(h)(i) A home-based microschool is not subject to additional occupancy requirements beyond occupancy requirements that apply to a primary dwelling.
(ii) If a floor that is below grade in a home-based microschool is used for home-based microschool purposes, the below grade floor of the home-based microschool shall have at least one emergency escape or rescue window that complies with the requirements for emergency escape and rescue windows as defined by the International Residential Code, as incorporated in Section 15A-1-210.
(ii) If a floor that is below grade in a home-based microschool is used for home-based microschool purposes, the below grade floor of the home-based microschool shall have at least one emergency escape or rescue window that complies with the requirements for emergency escape and rescue windows as defined by the International Residential Code, as incorporated [in] by Section 15A-1-210.
(8) (a) A specified public agency intending to develop its land shall submit to the land use authority a development plan and schedule:
(8)(a) A specified public agency intending to develop its land shall submit to the land use authority a development plan and schedule:
(b) The land use authority shall respond to a specified public agency's submission under Subsection (8) (a) with reasonable promptness in order to allow the specified public agency to consider information - 16 - SB0164 compared with SB0164S02 the municipality provides under Subsection (8)(a)(ii) in the process of preparing the budget for the development.
(b) The land use authority shall respond to a specified public agency's submission under Subsection (8)(a) with reasonable promptness in order to allow the specified public agency to consider information the municipality provides under Subsection (8)(a)(ii) in the process of preparing the budget for the development.
(a) requiring a home-based microschool or micro-education entity to comply with local zoning and land use regulations that do not conflict with this section, including:
(a) requiring a home-based microschool or micro-education entity to comply with local - 15 - S.B.
164 Enrolled Copy zoning and land use regulations that do not conflict with this section, including:
(12) (a) Section 63A-5b-1218 governs the requirements for permitting and inspection of public school buildings.
(12)(a) Section 63A-5b-1218 governs the requirements for permitting and inspection of public school buildings.
53E-3-701.
53E-3-701 .
As used in this part, "division" means the same as that term is defined in Section - 17 - SB0164 compared with SB0164S02 63A-5b-102.
As used in this part, "division" means the same as that term is defined in Section 63A-5b-102.
53E-3-702.
53E-3-702 .
(b) participate in construction rules development and review;
- 16 - Enrolled Copy S.B.
164 (b) participate in construction rules development and review;
53E-3-703.
53E-3-703 .
{(3) {Before purchasing real property in relation to a construction project or an existing building for school use, an LEA shall provide written notice to:} } - 18 - SB0164 compared with SB0164S02 {(a) {the municipality or county where the property is located;} } {(b) {affected utility companies;} } {(c) {relevant transportation authorities;
(3) An LEA shall ensure all construction contracts include the provisions for construction contracts as the division determines.
and} } {(d) {the local fire authority.} } {(4) {The LEA shall ensure the notice is provided at least 30 days before:} } {(a) {closing on a property purchase;
or} } {(b) {entering into a lease agreement for school use.} } {(5) {Before beginning construction of a school building, an LEA shall submit to the entities listed in Subsection (3):} } {(a) {a development plan and schedule;} } {(b) {anticipated enrollment and traffic impacts;
and} } {(c) {child access routing plans.} } (6)(3) An LEA shall ensure all construction contracts include the provisions for construction contracts as the division determines.
53E-3-704.
53E-3-704 .
(2) {A school district } An LEA shall require payment and performance bonds as provided in Section 14-1-18 for construction contracts exceeding $50,000.
(2) An LEA shall require payment and performance bonds as provided in Section 14-1-18 for construction contracts exceeding $50,000.
(a) contract provisions the division establishes under Subsection {53E-3-703(6)} 53E-3-703(3);
(a) contract provisions the division establishes under Subsection 53E-3-703(3);
Section 7 is enacted to read:
Section 63A-5b-1201 is enacted to read:
63A-5b-1201.
Part 12.
Public School Construction Oversight - 17 - S.B.
164 Enrolled Copy 63A-5b-1201 .
12.
(1) This part does not apply to micro-education entities as defined in Section 53G-6-201.
Public School Construction Oversight (1) This part does not apply to micro-education entities as defined in Section 53G-6-201.
{(a) {"Charter school" means a charter school established under Title 53G, Chapter 5, Charter Schools.} } - 19 - SB0164 compared with SB0164S02 (b){(a)} {"LEA} "Charter school" means the same as that term is defined in Section {53E-1-102} 53G-5-102.
(a) "Charter school" means the same as that term is defined in Section 53G-5-102.
Section 8 is enacted to read:
Section 63A-5b-1202 is enacted to read:
63A-5b-1202.
63A-5b-1202 .
(1) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the division shall make rules establishing comprehensive standards for public school construction that {may } shall include:
(1) In accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the division shall make rules establishing comprehensive standards for public school construction that shall include:
(i) a process for {an LEA } a school district to report project related issues;
(i) a process for a school district to report project related issues;
(l) facility condition assessment requirements, including:
- 18 - Enrolled Copy S.B.
164 (l) facility condition assessment requirements, including:
- 20 - SB0164 compared with SB0164S02 (iii) standardized assessment methodologies;
(iii) standardized assessment methodologies;
(r) standards for {LEA } school district coordination with municipalities and counties regarding school siting, traffic impacts, and site safety considerations;
(r) standards for school district coordination with municipalities and counties regarding school siting, traffic impacts, and site safety considerations;
(a) the fire marshal;
- 19 - S.B.
- 21 - SB0164 compared with SB0164S02 (b) the school construction liaison on educational programming needs and coordination of safety and security requirements;
164 Enrolled Copy (a) the fire marshal;
(c) representatives from {LEAs} school districts;
(b) the school construction liaison on educational programming needs and coordination of safety and security requirements;
and (d) {design } architects, engineers, and construction professionals.
(c) representatives from school districts;
and (d) architects, engineers, and construction professionals.
(a) provide professional construction oversight for {an LEA } a school district lacking internal capacity;
(a) provide professional construction oversight for a school district lacking internal capacity;
(7) The division {may contract } shall collaborate with the state fire marshal, state security chief, {or } and local governmental entities to:
(7) The division shall collaborate with the state fire marshal, state security chief, and local governmental entities to:
(8) In exercising oversight authority, the division shall recognize that:
- 20 - Enrolled Copy S.B.
- 22 - SB0164 compared with SB0164S02 (a) public school construction is typically funded through local bond measures approved by school district voters;
164 (8) In exercising oversight authority, the division shall recognize that:
(b) school facilities are owned and operated by the {LEA} school district;
(a) public school construction is typically funded through local bond measures approved by school district voters;
(b) school facilities are owned and operated by the school district;
(9){(10)} {An LEA } A school district may appeal division determinations under this section to the appeals panel established under Section 63A-5b-1221.
(10) A school district may appeal division determinations under this section to the appeals panel established under Section 63A-5b-1221.
(10){(11)} The division shall require:
(11) The division shall require:
Section 9 is enacted to read:
Section 63A-5b-1203 is enacted to read:
63A-5b-1203.
63A-5b-1203 .
or (c) a construction manager {or } general contractor, subject to the restrictions in Subsection (2).
or (c) a construction manager general contractor, subject to the restrictions in Subsection (2).
(2) (a) An LEA may {only } use a construction manager {or } general contractor delivery method if:
(2)(a) An LEA may use a construction manager general contractor delivery method if:
- 23 - SB0164 compared with SB0164S02 (i) the LEA demonstrates to the division that the project meets appropriate criteria for using a construction manager {or } general contractor under Subsection 63G-6a-1302(3);
- 21 - S.B.
(ii) the LEA employs or contracts with qualified construction management staff with demonstrated construction manager {or } general contractor experience;and (iii) the LEA submits a detailed project management plan approved by the division{;
164 Enrolled Copy (i) the LEA demonstrates to the division that the project meets appropriate criteria for using a construction manager general contractor under Subsection 63G-6a-1302(3);
and} .
(ii) the LEA employs or contracts with qualified construction management staff with demonstrated construction manager general contractor experience;
{(iv) {the division determines that a construction manager or general contractor is the most appropriate delivery method for the specific project.} } (b) The division may only deny approval for a construction manager {or } general contractor delivery method if:
and (iii) the LEA submits a detailed project management plan approved by the division.
(i) the LEA lacks sufficient {internal } expertiseto manage the project;
(b) The division may only deny approval for a construction manager general contractor delivery method if:
(i) the LEA lacks sufficient expertise to manage the project;
or (iii) {design-build } other methods of delivery would provide better cost control and project outcomes.
or (iii) other methods of delivery would provide better cost control and project outcomes.
(a) establish clear criteria for when a construction manager {or } general contractor delivery method is appropriate, considering the factors described in Subsection 63G-6a-1302(3);
(a) establish clear criteria for when a construction manager general contractor delivery method is appropriate, considering the factors described in Subsection 63G-6a-1302(3);
and (iii) circumstances when each delivery method is most appropriate;and (c) require additional oversight and reporting for projects using a construction manager or general contractor{;
and (iii) circumstances when each delivery method is most appropriate;
and} .
and (c) require additional oversight and reporting for projects using a construction manager or general contractor.
{(d) {encourage use of a design-build delivery method for new school construction through:} } {(i) {streamlined approval processes;} } {(ii) {reduced administrative requirements;
(4) For projects under $3,000,000, an LEA shall use design-bid-build unless the division approves an alternative delivery method under Section 63G-6a-1302.
and} } {(iii) {technical assistance programs.} } (4) For projects under $3,000,000, an LEA shall use design-bid-build unless the division approves an alternative delivery method under Section 63G-6a-1302.
- 24 - SB0164 compared with SB0164S02 (b) requirements for subcontractor procurement in Subsection 63G-6a-1302(5)(b);
(b) requirements for subcontractor procurement in Subsection 63G-6a-1302(5)(b);
(7) The contractor registry requirement in Subsection (6):
- 22 - Enrolled Copy S.B.
164 (7) The contractor registry requirement in Subsection (6):
{(8) {A charter school with a project under $5,000,000:} } {(a) {may use any delivery method authorized by Section 63G-6a-1302;} } {(b) {shall notify the division of the selected delivery method;
Section 10.
and} } {(c) {shall provide justification to the division if using a construction manager or general contractor delivery method.} } Section 10.
Section 63A-5b-1204 is enacted to read:
Section 10 is enacted to read:
63A-5b-1204 .
63A-5b-1204.
- 25 - SB0164 compared with SB0164S02 (a) submit a detailed written request to the division before soliciting proposals;
(a) submit a detailed written request to the division before soliciting proposals;
(a) provide pre-approved design options for common school types and sizes;
- 23 - S.B.
164 Enrolled Copy (a) provide pre-approved design options for common school types and sizes;
(c) accelerate the approval process for {LEAs } school districts using standard designs;
(c) accelerate the approval process for school districts using standard designs;
(6) The division shall develop and maintain a library of standardized school design prototypes developed in collaboration with architects experienced in the design of school facilities that:
(6) The division shall develop and maintain a library of standardized school design templates developed in collaboration with architects experienced in the design of school facilities that:
- 26 - SB0164 compared with SB0164S02 (a) shall comply with all procurement requirements under Title 63G, Chapter 6a, Utah Procurement Code;
(a) shall comply with all procurement requirements under Title 63G, Chapter 6a, Utah Procurement Code;
(b) using qualifications-based selection procedures as required by Subsection 63G-6a-1502(1);
- 24 - Enrolled Copy S.B.
164 (b) using qualifications-based selection procedures as required by Subsection 63G-6a-1502(1);
Section 11 is enacted to read:
Section 63A-5b-1205 is enacted to read:
63A-5b-1205.
63A-5b-1205 .
and - 27 - SB0164 compared with SB0164S02 (i) other building or construction codes the division determines relevant.
and (i) other building or construction codes the division determines relevant.
(b) provide written justification for any costs exceeding division benchmarks by more than 10%;
(b) provide written justification for any costs exceeding division benchmarks by more - 25 - S.B.
164 Enrolled Copy than 10%;
- 28 - SB0164 compared with SB0164S02 (c) provide written explanation for any required modifications or denials;
(c) provide written explanation for any required modifications or denials;
(b) cost matrix determinations under Subsections (6) and (7);
- 26 - Enrolled Copy S.B.
164 (b) cost matrix determinations under Subsections (6) and (7);
Section 12 is enacted to read:
Section 63A-5b-1206 is enacted to read:
63A-5b-1206.
63A-5b-1206 .
and (f) structural observation reporting mandates for Risk Category III buildings as {as } defined in the International Building Code adopted under Section 15A-1-204.
and (f) structural observation reporting mandates for Risk Category III buildings as defined in the International Building Code adopted under Section 15A-1-204.
- 29 - SB0164 compared with SB0164S02 (5) {An LEA } A school district may appeal technical compliance determinations under this section to the appeals panel established under Section 63A-5b-1221.
(5) A school district may appeal technical compliance determinations under this section to the appeals panel established under Section 63A-5b-1221.
Section 13 is enacted to read:
Section 63A-5b-1207 is enacted to read:
63A-5b-1207.
63A-5b-1207 .
(2) An LEA shall use the online system to:
- 27 - S.B.
164 Enrolled Copy (2) An LEA shall use the online system to:
Section 14 is enacted to read:
Section 63A-5b-1208 is enacted to read:
63A-5b-1208.
63A-5b-1208 .
and - 30 - SB0164 compared with SB0164S02 (e) provide evidence of qualified inspection arrangements that meet the requirements described in Subsection 63A-5b-1220.
and (e) provide evidence of qualified inspection arrangements that meet the requirements described in Subsection 63A-5b-1220.
(4) The division may:
- 28 - Enrolled Copy S.B.
164 (4) The division may:
- 31 - SB0164 compared with SB0164S02 (6) The division shall:
(6) The division shall:
(7) (a) A certificate authorizing permanent occupancy issued by the division under this section:
(7)(a) A certificate authorizing permanent occupancy issued by the division under this - 29 - S.B.
164 Enrolled Copy section:
- 32 - SB0164 compared with SB0164S02 (a) an LEA may request a temporary certificate of occupancy from the division;
(a) an LEA may request a temporary certificate of occupancy from the division;
Section 15 is enacted to read:
Section 63A-5b-1209 is enacted to read:
63A-5b-1209.
63A-5b-1209 .
(1) Upon written request from the division, an LEA shall provide:
- 30 - Enrolled Copy S.B.
(a) in accordance with Subsection (7), documentation and information regarding {past } construction projects{, including projects completed before the effective date of this part} ;
164 (1) Upon written request from the division, an LEA shall provide:
(a) in accordance with Subsection (7), documentation and information regarding construction projects;
- 33 - SB0164 compared with SB0164S02 (iv) creating training programs and best practices;
(iv) creating training programs and best practices;
and (g) provide better technical assistance to an LEA.
and - 31 - S.B.
164 Enrolled Copy (g) provide better technical assistance to an LEA.
or - 34 - SB0164 compared with SB0164S02 (b) administrative penalties not exceeding $5,000, subject to appeal under Section 63A-5b-1221.
or (b) administrative penalties not exceeding $5,000, subject to appeal under Section 63A-5b-1221.
(b) projects {completed within the last 5 years, including projects } in process or completed {before January 1, 2027} after May 6, 2026;
(b) projects in process or completed after May 6, 2026;
Section 16 is enacted to read:
Section 63A-5b-1210 is enacted to read:
63A-5b-1210.
63A-5b-1210 .
(vii) {supports } supports for auditand compliance activities;
(vii) supports for audit and compliance activities;
(B) estimated costs for each deferred maintenance item;
- 32 - Enrolled Copy S.B.
164 (B) estimated costs for each deferred maintenance item;
(2) (a) Notwithstanding the division's tracking of deferred maintenance, the division and the state assume no liability for any deferred maintenance costs or issues arising from deferred maintenance.
(2)(a) Notwithstanding the division's tracking of deferred maintenance, the division and the state assume no liability for any deferred maintenance costs or issues arising from deferred maintenance.
- 35 - SB0164 compared with SB0164S02 (b) The LEA shall retain all liability for deferred maintenance costs and any consequences resulting from deferred maintenance decisions.
(b) The LEA shall retain all liability for deferred maintenance costs and any consequences resulting from deferred maintenance decisions.
(c) include facility condition assessments updated at least every five years;
- 33 - S.B.
164 Enrolled Copy (c) include facility condition assessments updated at least every five years;
- 36 - SB0164 compared with SB0164S02 (b) by July 1, 2028:
(b) by July 1, 2028:
Section 17 is enacted to read:
Section 63A-5b-1211 is enacted to read:
63A-5b-1211.
- 34 - Enrolled Copy S.B.
164 63A-5b-1211 .
and - 37 - SB0164 compared with SB0164S02 (d) standardized forms and reporting requirements.
and (d) standardized forms and reporting requirements.
(3) (a) In collaboration with the school construction liaison described in Section 63A-5b-1212, the division shall provide annual training for LEA officials covering:
(3)(a) In collaboration with the school construction liaison described in Section 63A-5b-1212, the division shall provide annual training for LEA officials covering:
Section 18 is enacted to read:
Section 63A-5b-1212 is enacted to read:
63A-5b-1212.
- 35 - S.B.
164 Enrolled Copy 63A-5b-1212 .
- 38 - SB0164 compared with SB0164S02 (a) serves as the primary contact between the state board and the division on school construction matters;
(a) serves as the primary contact between the state board and the division on school construction matters;
Section 19 is enacted to read:
Section 63A-5b-1213 is enacted to read:
63A-5b-1213.
63A-5b-1213 .
(a) any project exceeding $3,500,000 in total cost;
- 36 - Enrolled Copy S.B.
- 39 - SB0164 compared with SB0164S02 (b) complex projects requiring specialized expertise;
164 (a) any project exceeding $3,500,000 in total cost;
(b) complex projects requiring specialized expertise;
(4) (a) The division shall establish a cost structure for managed services where:
(4)(a) The division shall establish a cost structure for managed services where:
and (B) for projects under $3,500,000, the actual cost of providing management services in relation to the specific project;and (iii) fee schedules are published annually in division rules{;
and (B) for projects under $3,500,000, the actual cost of providing management services in relation to the specific project;
and} .
and (iii) fee schedules are published annually in division rules.
{(iv) {cost savings achieved through division management may be shared with the LEA.} } (b) The division shall ensure:
(b) The division shall ensure:
and (ii) an LEA {shall } may not pay duplicative fees.
and (ii) an LEA may not pay duplicative fees.
{(i) {the 1.25% construction oversight fee component;} } (ii){(i)} additional direct project management costs;
(i) additional direct project management costs;
and (iii){(ii)} the total administrative fee percentage.
and (ii) the total administrative fee percentage.
Section 20 is enacted to read:
Section 63A-5b-1214 is enacted to read:
- 40 - SB0164 compared with SB0164S02 63A-5b-1214.
63A-5b-1214 .
(1) {For } Except for an LEA that has hired a division approved project manager to provide services as described in this section, for all public school construction projects, an LEA shall pay the division a construction oversight {fee equal to 1.25% of } , building official, plan review, and administration fee in accordance with a fee schedule established by division rule under Section 63A-5b-1217 and approved by the {total project cost} rate committee created in Section 63A-1-114.
(1) Except for an LEA that has hired a division approved project manager to provide services as described in this section, for all public school construction projects, an LEA shall pay the division a construction oversight, building official, plan review, and administration fee in accordance with a fee schedule established by division rule under - 37 - S.B.
164 Enrolled Copy Section 63A-5b-1217 and approved by the rate committee created in Section 63A-1-114.
{(b) {shall be calculated based on the total project cost including:} } {(i) {construction contracts;} } {(ii) {architect and design professional fees;} } {(iii) {furniture, fixtures, and equipment;} } {(iv) {site development and utility connections;} } {(v) {testing and inspection services;
(b) shall be established by division rule under Section 63A-5b-1217 to recover the reasonable costs of oversight activities and may be reduced or waived for LEAs with delegated oversight authority;
and} } {(vi) {other project-related costs;} } (c){(b)} shall be {paid to the } established by division {according } rule under Section 63A-5b-1217 to recover the {following schedule:} reasonable costs of oversight activities and may be reduced or waived for LEAs with delegated oversight authority;
and (c) may be included in the LEA's bond authorization or other funding mechanism.
and {(i) {25% upon issuance of a construction permit;} } {(ii) {25% at 25% project completion;} } {(iii) {25% at 50% project completion;
and} } {(iv) {25% at substantial completion;
and} } (d){(c)} may be included in the LEA's bond authorization or other funding mechanism.
- 41 - SB0164 compared with SB0164S02 (g) standardized design template development;
(g) standardized design template development;
{(a) {the administrative fee structure in Subsection 63A-5b-1213(4) includes the 1.25% construction oversight fee;} } (b){(a)} the LEA shall not pay duplicative fees;
(a) the LEA shall not pay duplicative fees;
and (c){(b)} the division shall clearly delineate {in } the fee structure {how the construction } for oversight {fee is incorporated} activities.
and (b) the division shall clearly delineate the fee structure for oversight activities.
{(6) {A charter school subject to alternative compliance under Section 63A-5b-1217 shall:} } {(a) {pay the construction oversight fee for projects exceeding $500,000 in total cost;} } {(b) {for projects under $500,000, pay a reduced fee of 0.75% of total project cost;
(6) An LEA may appeal fee assessments or payment schedule requirements under this section to the appeals panel established under Section 63A-5b-1221.
and} } {(c) {follow the same payment schedule as provided in Subsection (2)(c).} } (7){(6)} An LEA may appeal fee assessments or payment schedule requirements under this section to the appeals panel established under Section 63A-5b-1221.
Section 21 is enacted to read:
Section 63A-5b-1215 is enacted to read:
63A-5b-1215.
63A-5b-1215 .
(a) issue written warnings and compliance orders;
- 38 - Enrolled Copy S.B.
164 (a) issue written warnings and compliance orders;
- 42 - SB0164 compared with SB0164S02 (b) $5,000 for significant violations;
(b) $5,000 for significant violations;
Section 22 is enacted to read:
Section 63A-5b-1216 is enacted to read:
63A-5b-1216.
63A-5b-1216 .
(a) establishes minimum qualification standards based on experience, financial capacity, and performance history;
(a) establishes minimum qualification standards based on experience, financial capacity, - 39 - S.B.
164 Enrolled Copy and performance history;
- 43 - SB0164 compared with SB0164S02 (2) To be eligible to bid on public school construction exceeding $500,000, a contractor shall:
(2) To be eligible to bid on public school construction exceeding $500,000, a contractor shall:
(iv) roofing contractors;
- 40 - Enrolled Copy S.B.
164 (iv) roofing contractors;
- 44 - SB0164 compared with SB0164S02 (d) is updated at least annually;
(d) is updated at least annually;
Section 23 is enacted to read:
Section 63A-5b-1217 is enacted to read:
63A-5b-1217.
63A-5b-1217 .
{Charter school alternative compliance} Delegated oversight authority for qualified LEAs.
Delegated oversight authority for qualified LEAs.
{(1) {Except as provided in Subsection (2), a charter school may elect to comply with this part through:} } (1) Notwithstanding any other provision of this part, the division may delegate oversight authority for school facility planning, design review, and construction plan approval to an LEA that has demonstrated internal capacity in construction management, procurement, and project delivery.
(1) Notwithstanding any other provision of this part, the division may delegate oversight authority for school facility planning, design review, and construction plan approval to an LEA that has demonstrated internal capacity in construction management, procurement, and project delivery.
(3) (a) {full compliance with } An LEA granted delegated oversight authority remains subject to all {sections } applicable {to an LEA;
(3)(a) An LEA granted delegated oversight authority remains subject to all applicable reporting, audit, and compliance reviews by the division.
or} reporting, audit, and compliance reviews by the division.
(b) The division may revoke delegated authority upon a finding of material non-compliance or substantial risk to health, safety, or fiscal integrity.
{(b) {alternative compliance under this section.} } {(2) {A charter school with a project exceeding $5,000,000 in total cost shall comply with all requirements applicable to LEAs under this part.} } {(3) {A charter school electing alternative compliance shall:} } {(a) {comply with architect cost oversight requirements under Section 63A-5b-1204;} } {(b) {submit all projects to standardized cost reporting under Section 63A-5b-1210;} } {(c) {use qualified, certified inspectors from the division's approved roster;} } {(d) {comply with all safety and security standards established by the state security chief;} } {(e) {notify affected entities under Subsection (4) for any construction or major alteration project;
(4) If the division grants delegated oversight authority to an LEA under this section, the division shall adjust, reduce, or waive any oversight fee assessed under this part to reflect the scope and level of oversight actually performed by the division.
and} } {(f) {receive division approval for plan compliance verification under Subsection (5).} } {(4) {In accordance with Section 53E-3-703, before beginning any construction, major alteration, or occupancy of an existing building for school use, a charter school shall notify and coordinate with:} } - 45 - SB0164 compared with SB0164S02 {(a) {the municipality or county where the facility is located;} } {(b) {the relevant transportation authorities if the project may impact traffic patterns;} } {(c) {utility companies serving the area;} } {(d) {the local fire authority;
(5) The division shall establish by rule a schedule for oversight fees that is proportional to the oversight services provided, including reduced or zero fees where oversight is primarily satisfied through audits, reporting, or delegated authority.
and} } {(e) {any other entities the division identifies as potentially affected by the project.} } {(5) {For plan compliance verification and exemption from the full plan review process under Section 63A-5b-1205, a charter school shall:} } {(a) {submit construction documents or occupancy plans to the division;} } {(b) {demonstrate compliance with building codes, accessibility requirements, and safety standards;
and} } {(c) {receive written division approval before occupancy.} } {(6) {A charter school using alternative compliance is exempt from:} } {(a) {mandatory use of the online document management system under Section 63A-5b-1207, but shall submit required reports in division-approved formats;} } {(b) {detailed monthly construction reporting requirements;
and} } {(c) {mandatory compliance audits, unless the charter school has demonstrated repeated violations.} } (7){(b)} The division may {require a charter school } revoke delegated authority upon a finding of material non-compliance or substantial risk to {use full LEA compliance if:} health, safety, or fiscal integrity.
{(a) {the charter school has violated safety standards;} } {(b) {the total project cost exceeds $3,000,000;
or} } {(c) {the charter school has demonstrated repeated noncompliance with alternative requirements.} } {(8) } {(a) {This section applies only to charter schools.} } {(b) {Micro-education entities are exempt from all requirements of this part and shall comply with applicable local building codes and permitting requirements.} } (9){(4)} {A charter school may appeal } If the {following determinations } division grants delegated oversight authority to an LEA under this section {to } , the {appeals panel established } division shall adjust, reduce, or waive any oversight fee assessed under {Section 63A-5b-1221:} this part to reflect the scope and level of oversight actually performed by the division.
{(a) {requirements to use full LEA compliance under Subsection (7);} } - 46 - SB0164 compared with SB0164S02 {(b) {plan compliance verification denials under Subsection (5);} } {(c) {architect cost oversight determinations under Subsection (3)(a);
and} } {(d) {safety and security compliance requirements under Subsection (3)(d).} } (5) The division shall establish by rule a schedule for oversight fees that is proportional to the oversight services provided, including reduced or zero fees where oversight is primarily satisfied through audits, reporting, or delegated authority.
Section 24 is enacted to read:
Section 63A-5b-1218 is enacted to read:
63A-5b-1218.
63A-5b-1218 .
(a) receive notification of projects from the State Board of Education or the division;
- 41 - S.B.
164 Enrolled Copy (a) receive notification of projects from the State Board of Education or the division;
Section 25 is enacted to read:
Section 63A-5b-1219 is enacted to read:
63A-5b-1219.
63A-5b-1219 .
(1) (a) There is created within the General Fund a restricted account known as the "Public School Construction Oversight Restricted Account." (b) The account shall be funded by:
(1)(a) There is created within the General Fund a restricted account known as the "Public School Construction Oversight Restricted Account." (b) The account shall be funded by:
- 47 - SB0164 compared with SB0164S02 (ii) may not be used for other division operations unrelated to public school construction oversight;
(ii) may not be used for other division operations unrelated to public school construction oversight;
(e) compliance monitoring and enforcement;
- 42 - Enrolled Copy S.B.
164 (e) compliance monitoring and enforcement;
Section 26 is enacted to read:
Section 63A-5b-1220 is enacted to read:
63A-5b-1220.
63A-5b-1220 .
- 48 - SB0164 compared with SB0164S02 (A) International Code Council commercial building plans examination (B3);or {(B) {International Code Council commercial energy plans examination (78);
(A) International Code Council commercial building plans examination (B3);
or} } (C){(B)} structural peer review certification for educational facilities;
or (B) structural peer review certification for educational facilities;
(4){(5)} The division may remove individuals from the approved roster for:
(5) The division may remove individuals from the approved roster for:
(a) failure to maintain required certifications;
- 43 - S.B.
164 Enrolled Copy (a) failure to maintain required certifications;
(5){(6)} The division shall:
(6) The division shall:
Section 27 is enacted to read:
Section 63A-5b-1221 is enacted to read:
63A-5b-1221.
63A-5b-1221 .
and (c) a third member with relevant expertise selected jointly by the members described in Subsections (2) (a) and (b).
and (c) a third member with relevant expertise selected jointly by the members described in Subsections (2)(a) and (b).
(a) shall be selected based on expertise relevant to the specific matter under {appeal,which } appeal, which may include:
(a) shall be selected based on expertise relevant to the specific matter under appeal, which may include:
- 49 - SB0164 compared with SB0164S02 (i) construction management;
(i) construction management;
(d) architect and design professional fee determinations under Section 63A-5b-1204;
- 44 - Enrolled Copy S.B.
164 (d) architect and design professional fee determinations under Section 63A-5b-1204;
- 50 - SB0164 compared with SB0164S02 (6) Upon receiving a notice of appeal:
(6) Upon receiving a notice of appeal:
(a) conduct proceedings in accordance with Title 63G, Chapter 4, Administrative Procedures Act, to the extent applicable;
- 45 - S.B.
164 Enrolled Copy (a) conduct proceedings in accordance with Title 63G, Chapter 4, Administrative Procedures Act, to the extent applicable;
and - 51 - SB0164 compared with SB0164S02 (c) does not prevent either party from seeking emergency relief through the courts if immediate and irreparable harm would result from delay.
and (c) does not prevent either party from seeking emergency relief through the courts if immediate and irreparable harm would result from delay.
(b) costs of expert review shall be shared equally by the LEA and the division unless the panel determines otherwise based on the outcome;
(b) costs of expert review shall be shared equally by the LEA and the division unless the - 46 - Enrolled Copy S.B.
164 panel determines otherwise based on the outcome;
Section 28 is enacted to read:
Section 63A-5b-1222 is enacted to read:
63A-5b-1222.
63A-5b-1222 .
- 52 - SB0164 compared with SB0164S02 63G-6a-1302.
63G-6a-1302 .
(a) when the project must be ready to be occupied;
- 47 - S.B.
164 Enrolled Copy (a) when the project must be ready to be occupied;
and - 53 - SB0164 compared with SB0164S02 (b) when entering into a subcontract that was not specifically included in the construction manager/ general contractor's cost proposal, the construction manager/general contractor shall procure the subcontractor by using a standard procurement process, or an exception to the requirement to use a standard procurement process, described in Part 8, Exceptions to Procurement Requirements, in the same manner as if the subcontract work was procured directly by the procurement unit.
and (b) when entering into a subcontract that was not specifically included in the construction manager/general contractor's cost proposal, the construction manager/general contractor shall procure the subcontractor by using a standard procurement process, or an exception to the requirement to use a standard procurement process, described in Part 8, Exceptions to Procurement Requirements, in the same manner as if the subcontract work was procured directly by the procurement unit.
Section 30.
- 48 - Enrolled Copy S.B.
164 Section 30.
This Bill Repeals:
Effective date.
2-12-26 2:02 PM - 54 -
- 49 -
View plain text versions (6)

How this bill changes current law

7 changes Share ↗

Compared against the Utah Code as published AI-generated reading aid — verify against the official bill.

The bill transfers oversight of public school construction from the State Board of Education to the Division of Facilities Construction and Management and establishes new permitting and inspection authority.

  • 10-20-304

    [(6)(a) Notwithstanding Subsection (3)(d), a school district or charter school shall use:] → [...]

    This change eliminates the existing requirement for school districts or charter schools to use specific types of inspectors.

  • 10-20-304

    provide for inspection of school construction or assess a fee or other charges for inspection[, unless the school district or charter school is unable to provide for inspection by an inspector, other than the project architect or contractor, who is qualified under criteria established by the state superintendent]; → [...]

    The bill modifies the conditions under which municipalities can assess fees for inspection of school construction.

  • 10-20-304

    Subject to Section [53E-3-710] 53E-3-703 and in accordance with standards the Division of Facilities Construction and Management establishes in rule, a school district or charter school shall coordinate the siting of a new school with the municipality in which the school is to be located, to: → Subject to Section 53E-3-703 and in accordance with standards the Division of Facilities Construction and Management establishes in rule, a school district or charter school shall coordinate the siting of a new school with the municipality in which the school is to be located, to:

    This change updates the reference to the correct section number for clarity.

  • 17-79-305

    provide for inspection of school construction or assess a fee or other charges for inspection[, unless the school district or charter school is unable to provide for inspection by an inspector, other than the project architect or contractor, who is qualified under criteria established by the state superintendent]; → [...]

    The bill modifies the conditions under which counties can assess fees for inspection of school construction.

  • 17-79-305

    Subject to Section [53E-3-710] 53E-3-703 and in accordance with standards the Division of Facilities Construction and Management establishes in rule, a school district or charter school shall coordinate the siting of a new school with the county in which the school is to be located, to: → Subject to Section 53E-3-703 and in accordance with standards the Division of Facilities Construction and Management establishes in rule, a school district or charter school shall coordinate the siting of a new school with the county in which the school is to be located, to:

    This change updates the reference to the correct section number for clarity.

  • 63G-6a-1302

    A rulemaking authority shall, by rule provide as many alternative methods of construction contracting management as determined to be feasible. → The Division of Facilities Construction and Management shall provide various methods of construction contracting management, as deemed feasible.

    This updates the wording to specify the authority of the Division of Facilities Construction and Management in construction contracting management.

  • 63G-6a-1302

    procurement rules adopted by the facilities division under Subsections (1) through (3) for state building construction projects and school construction projects described in Title 63A, Chapter 5b, Part 12, Public School Construction Oversight, may authorize the use of a design-build provider as one method of construction contracting management. → The procurement rules adopted by the Division of Facilities Construction and Management for state and school construction projects may authorize the use of various contracting methods.

    This broadens the scope of contracting methods the Division is authorized to use for construction projects.

Action History

  1. Governor Signed

  2. Senate/ to Governor

  3. Senate/ received enrolled bill from Printing

  4. Senate/ enrolled bill to Printing

  5. Enrolled Bill Returned to House or Senate

  6. Draft of Enrolled Bill Prepared

  7. Bill Received from Senate for Enrolling

  8. Senate/ signed by President/ sent for enrolling

  9. Senate/ received from House

  10. House/ to Senate

  11. House/ signed by Speaker/ returned to Senate

  12. House/ passed 3rd reading

  13. House/ uncircled

  14. House/ circled

  15. House/ 3rd reading

  16. House/ 2nd reading

  17. House/ committee report favorable [House Education Committee]

  18. House Comm - Favorable Recommendation [House Education Committee]

  19. House/ to standing committee [House Education Committee]

  20. House/ 1st reading (Introduced)

  21. House/ received from Senate

  22. Senate/ to House

  23. Senate/ passed 3rd reading

  24. Senate/ 3rd reading

  25. Senate/ passed 2nd reading

  26. Senate/ substituted

  27. Senate/ uncircled

  28. LFA/ fiscal note publicly available for SB0164S02

  29. LFA/ fiscal note sent to sponsor for SB0164S02

  30. LFA/ bill sent to agencies for fiscal input for SB0164S02

  31. LFA/ bill assigned to staff for fiscal analysis for SB0164S02

  32. LFA/ fiscal note publicly available for SB0164S01

  33. LFA/ fiscal note sent to sponsor for SB0164S01

  34. Senate/ circled

  35. Senate/ 2nd reading

  36. LFA/ bill sent to agencies for fiscal input for SB0164S01

  37. LFA/ bill assigned to staff for fiscal analysis for SB0164S01

  38. Senate/ received fiscal note from Fiscal Analyst

  39. LFA/ fiscal note publicly available for SB0164

  40. LFA/ fiscal note sent to sponsor for SB0164

  41. Senate/ placed on 2nd Reading Calendar

  42. Senate/ committee report favorable [Senate Education Committee]

  43. Senate Comm - Favorable Recommendation [Senate Education Committee]

  44. Senate/ to standing committee [Senate Education Committee]

  45. Senate/ 1st reading (Introduced)

  46. Senate/ received bill from Legislative Research

  47. LFA/ bill sent to agencies for fiscal input for SB0164

  48. LFA/ bill assigned to staff for fiscal analysis for SB0164

  49. Numbered Bill Publicly Distributed

  50. Bill Numbered but not Distributed

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 1 co-sponsors · 102 not signed on

Sponsors (1)

Co-sponsors (1)

Not signed on (102)

102 members have not signed on to this bill.

Show all 102 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 164?
SB 164 is sponsored by Karen M. Peterson (Republican) and Chris H. Wilson (Republican).
What is the current status of SB 164?
This bill has been enacted into law. Introduced January 20, 2026. Enacted.
Where can I track SB 164?
Track SB 164 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 164

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 164

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →