South Dakota 2026 Regular Session Status: In Committee Bipartisan · 6 D · 3 R cosponsors

HB 1273 — revise certain mining statutes.

Last action — Agriculture and Natural Resources Deferred to the 41st legislative day , Passed, YEAS 9, NAYS 2 H.J. 20

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the House. Introduced February 04, 2026. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the House.

Odds of enactment

Low chance

Based on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Likely to advance 62% · high confidence
  • In Committee

    Current position in the legislative process.

  • 9 sponsors

    9 primary, 0 co-sponsors signed on.

  • Bipartisan support

    Sponsored across 2 parties (6 D · 3 R) — cross-party backing.

  • Cleared a recorded vote

    Passed 1 recorded vote so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Bill Text

What changed in the latest version

218 added · 222 removed

Plain-language change summary

The recent amendment to Bill HB 1273 removes a section that exempted state government entities from certain fees and sureties related to mining operations. Additionally, it clarifies the requirements for mining operators regarding annual reports and fees. This change is important because it maintains uniformity in regulations for mining operations, ensuring that all operators, regardless of their affiliations, are treated equally under the law.

→
Previous
Latest
1273A 101st Legislative Session 1273 South Dakota Legislature House Bill 1273 AMENDMENT 1273A FOR THE INTRODUCED BILL Introduced by:
26.482.22 101st Legislative Session 1273 South Dakota Legislature House Bill 1273 Introduced by:
B E IT ENACTED BY THE LEGISLATURE OF THE S TATE OF SOUTH D AKOTA :
B E IT ENACTED BY THE L EGISLATURE OF THE STATE OF SOUTH D AKOTA :
1273A 2 1273 (7)(6) "Development," the work performed in relation to a deposit, following the exploration required to prove minerals are in existence in commercial quantities but before production activities, aimed at preparing the site for mining, defining further the ore deposit by drilling or other means, conducting pilot plant operations, and constructing roads or ancillary facilities;
26.482.22 2 1273 (7)(6) "Development," the work performed in relation to a deposit, following the exploration required to prove minerals are in existence in commercial quantities but before production activities, aimed at preparing the site for mining, defining further the ore deposit by drilling or other means, conducting pilot plant operations, and constructing roads or ancillary facilities;
1273A 3 1273 (7) "Large-scale mine," a mine permitted under this chapter that is:
26.482.22 3 1273 (7) "Large-scale mine," a mine permitted under this chapter that is:
(b) Which includes any temporary cessation of production, as described in sections 6 7 and 7 8 of this Act;
(b) Which includes any temporary cessation of production, as described in sections 6 and 7 of this Act;
1273A 4 1273 (14) "Reclamation," the employment during and after a mining operation of procedures reasonably designed to minimize as much as practicable the disruption from the mining operation and to provide for the rehabilitation of affected land through the rehabilitation of plant cover, soil stability, water resources, or other measures appropriate to the subsequent beneficial use of such the mined and reclaimed lands;
26.482.22 4 1273 (14) "Reclamation," the employment during and after a mining operation of procedures reasonably designed to minimize as much as practicable the disruption from the mining operation and to provide for the rehabilitation of affected land through the rehabilitation of plant cover, soil stability, water resources, or other measures appropriate to the subsequent beneficial use of such the mined and reclaimed lands;
1273A 5 1273 application to amend a small scale small-scale permit shall must include the application fee provided by § 45-6B-55.
26.482.22 5 1273 application to amend a small scale small-scale permit shall must include the application fee provided by § 45-6B-55.
That a NEW SECTION be added to chapter 45-6B:
No fee or surety under this chapter may be required of any unit of state government or any political subdivision of this state.
Section 5.
Section 6.
Section 5.
Except as provided in subsection 45-6B-3(6)(b) sections 6 7 and 7 8 of this Act, the operator shall annually file on the anniversary date of the permit a notice of intent to continue mining operations.
Except as provided in subsection 45-6B-3(6)(b) sections 6 and 7 of this Act, the operator shall annually file on the anniversary date of the permit a notice of intent to continue mining operations.
Section 7.
Section 6.
(1) Files a request with the board pursuant to section 7 8 of this Act to cease production for one hundred eighty days or more, stating:
(1) Files a request with the board pursuant to section 7 of this Act to cease production for one hundred eighty days or more, stating:
An operator is not required to file a request for temporary cessation if the operator resumes mining within one year and has included, in the operator's permit application, a statement that the affected lands are to be used for less than one hundred eighty days per year.
1273A 6 1273 An operator is not required to file a request for temporary cessation if the operator resumes mining within one year and has included, in the operator's permit application, a statement that the affected lands are to be used for less than one hundred eighty days per year.
26.482.22 6 1273 The operator may file with the board a request for an extension of the period of temporary cessation of production.
The operator may file with the board a request for an extension of the period of temporary cessation of production.
An operator may not continue a temporary cessation of production longer than ten five years.
An operator may not continue a temporary cessation of production longer than ten years.
If production ceases for longer than ten five years, the operator must terminate the operation and comply with the reclamation requirements of this chapter.
If production ceases for longer than ten years, the operator must terminate the operation and comply with the reclamation requirements of this chapter.
Section 8.
Section 7.
Section 9.
Section 8.
Section 10.
Section 9.
Overstrikes indicate deleted language.
45-6B-81.
1273A 7 1273 45-6B-81.
(3) Establish the procedure for transfer of permits;
Overstrikes indicate deleted language.
26.482.22 7 1273 (3) Establish the procedure for transfer of permits;
(8) Establish the procedure to address reclamation before or during a temporary cessation of mining activity, pursuant to subdivision 45-6B-3(6) sections 6 7 and 7 8 of this Act;
(8) Establish the procedure to address reclamation before or during a temporary cessation of mining activity, pursuant to subdivision 45-6B-3(6) sections 6 and 7 of this Act;
Section 11.
Section 10.
Part 3800), as amended to January 1, 2011, the Mined Land Reclamation Act (this chapter), the regulated substance discharges statutes in chapter 34A-12, the Resource Conservation and Recovery Act of 1976, as amended to January 1, 2011, the Comprehensive Environmental Response, Compensation and Liability Act of Overstrikes indicate deleted language.
Part 3800), as amended to January 1, 2011, the Mined Land Reclamation Act (this chapter), the regulated substance discharges statutes in chapter 34A-12, the Resource Conservation and Recovery Act of 1976, as amended to January 1, 2011, the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (P.L.
1273A 8 1273 1980 (P.L.
94-469), as amended to January 1, 2011, Lawrence County extractive industries ordinances, as amended to January 1, 2011, and all rules and regulations promulgated to implement existing statutes, including rules dealing with air pollution, control of visible emissions, open burning, control of particulate emissions, control of sulfur compound emissions, new source performance standards, standards of performance for storage vessels of petroleum liquids, air standards, spill control plans, buried tanks, water pollution, public water systems, and dredge and fill permit requirements.
94-469), as amended to January 1, 2011, Lawrence County extractive industries ordinances, as amended to January 1, 2011, and all rules and regulations promulgated to implement existing statutes, including rules dealing with air pollution, Overstrikes indicate deleted language.
Section 12.
26.482.22 8 1273 control of visible emissions, open burning, control of particulate emissions, control of sulfur compound emissions, new source performance standards, standards of performance for storage vessels of petroleum liquids, air standards, spill control plans, buried tanks, water pollution, public water systems, and dredge and fill permit requirements.
Section 11.
Section 13.
Section 12.
Overstrikes indicate deleted language.
45-6B-94.
1273A 9 1273 45-6B-94.
Section 14.
Section 13.
45-6B-95.
Overstrikes indicate deleted language.
26.482.22 9 1273 45-6B-95.
Section 15.
Section 14.
Show all 51 changed rows (11 more)
Previous
Latest
Section 16.
Section 15.
(1) "Affected land," the surface area, surface water, and groundwater disturbed by reason of the building of access roads or trails, leveling drill sites, storage areas, Overstrikes indicate deleted language.
(1) "Affected land," the surface area, surface water, and groundwater disturbed by reason of the building of access roads or trails, leveling drill sites, storage areas, containment ponds, or other support facilities for the purpose of exploration, including the land affected by surface subsidence;
1273A 10 1273 containment ponds, or other support facilities for the purpose of exploration, including the land affected by surface subsidence;
(4) "Bulk samples," the removal of not more than five thousand tons of mineralized material by means of a shaft, adit, or test open pit to determine the economic feasibility of conducting a mining operation;
Overstrikes indicate deleted language.
26.482.22 10 1273 (4) "Bulk samples," the removal of not more than five thousand tons of mineralized material by means of a shaft, adit, or test open pit to determine the economic feasibility of conducting a mining operation;
(9) "Reclamation," the employment during and after an exploration operation of procedures reasonably designed to minimize the disruption from the exploration Overstrikes indicate deleted language.
(9) "Reclamation," the employment during and after an exploration operation of procedures reasonably designed to minimize the disruption from the exploration operation and to provide for the rehabilitation of plant cover, soil stability, water resources, or other measures appropriate to the subsequent beneficial use of such the explored land;
1273A 11 1273 operation and to provide for the rehabilitation of plant cover, soil stability, water resources, or other measures appropriate to the subsequent beneficial use of such the explored land;
and (10) "Test hole," a well, core hole, core test, observation well, or other well drilled from the surface to determine the presence of mineral, mineral resource, ore, coal, or Overstrikes indicate deleted language.
and (10) "Test hole," a well, core hole, core test, observation well, or other well drilled from the surface to determine the presence of mineral, mineral resource, ore, coal, or rock unit, or to obtain geological or geophysical information or other subsurface data, including holes drilled for purposes of seismic survey, but excluding drilling in conjunction with mining or quarry operations and structural foundations and oil and gas wells regulated pursuant to chapter 45-9.
26.482.22 11 1273 rock unit, or to obtain geological or geophysical information or other subsurface data, including holes drilled for purposes of seismic survey, but excluding drilling in conjunction with mining or quarry operations and structural foundations and oil and gas wells regulated pursuant to chapter 45-9.
Section 17.
Section 16.
Section 18.
Section 17.
Underscores indicate new language.
View plain text versions (2)

Action History

  1. Agriculture and Natural Resources Deferred to the 41st legislative day , Passed, YEAS 9, NAYS 2 H.J. 20

  2. Agriculture and Natural Resources Motion to amend , Passed, H.J. 20 Amendment 1273A

  3. Scheduled for hearing H.J. 1

  4. First read in House and referred to House Agriculture and Natural Resources H.J. 217

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

9 sponsors · 0 co-sponsors · 96 not signed on · 1 voted No

Sponsors (9)

Co-sponsors (0)

None.

Not signed on (96)

96 members have not signed on to this bill.

Show all 96 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 9 Yea · 2 Nay · 2 Other
Party YeaNayPresentNot Voting
Republican 8102
Unaffiliated 1000
Democratic 0100
Total 9202
% of votes cast 69%15%0%15%
How each member voted (13)
Member Party Vote
Van Diepen — Yea
Kadyn Wittman Democratic Nay
Drew Peterson Republican Yea
Jana Hunt Republican Yea
John Shubeck Republican Yea
Kaley Nolz Republican Yea
Kathy Rice Republican Nay
Liz May Republican Yea
Marty Overweg Republican Yea
Spencer Gosch Republican Yea
Tim Goodwin Republican Not Voting
Travis Ismay Republican Not Voting
Trish Ladner Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors HB 1273?
HB 1273 is sponsored by Kadyn Wittman (Democratic), Carl Perry (Republican), Erik Muckey (Democratic), Liz Larson (Democratic), Terri Jorgenson (Republican), Erin Healy (Democratic), Tim Goodwin (Republican), Eric Emery (Democratic), and Nicole Uhre-Balk (Democratic).
What is the current status of HB 1273?
This bill is in committee in the House. Introduced February 04, 2026. It must pass committee before a floor vote.
Where can I track HB 1273?
Track HB 1273 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 1273

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 1273

Last checked for changes 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →