Pennsylvania 2025-2026 Regular Session Status: Passed House 44 D cosponsors

HB 1834 — An Act providing for the regulation of commercial data centers; imposing duties on the Pennsylvania Public Utility Commission, the Department of Human Services and the Pennsylvania Energy Development Authority; establishing the Data Center Low-Income Home Energy Assistance Program Enhancement Account and the Pennsylvania Energy Independence Account; providing for clean firm energy requirements, contract filing, commission review, disclosure requirements, backup generation standards, curtailment standards and certification and expedited interconnection for commercial data centers bringing incremental clean firm energy resources; and imposing penalties.

Last action — Referred to Consumer Protection & Professional Licensure

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has passed the House. Introduced September 04, 2025. It now moves to the second chamber.

Next likely step: consideration and a floor vote in the Senate.

Odds of enactment

Moderate chance

Based on the sponsor, cosponsors, and committee posture, this bill has a moderate chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Advancing 42% · moderate confidence
  • Passed House

    Current position in the legislative process.

  • 44 sponsors

    1 primary, 43 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (44 D).

  • Mixed recorded votes

    5 passed, 2 failed in recorded votes so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Bill Text

What changed in the latest version

1464 added · 701 removed

Plain-language change summary

The latest version of Bill HB 1834 has been updated to clarify its focus specifically on the regulation of large data centers, emphasizing their responsibilities regarding energy costs and contributions to low-income energy assistance programs. This change is important because it ensures that these large energy users are held accountable for their impact on both the environment and the community's energy needs, helping to manage the burden on low-income households. The bill also introduces compliance measures for renewable energy and energy independence, promoting a more sustainable energy future for Pennsylvania.

→
Previous
Latest
PRIOR PRINTER'S NO.
PRIOR PRINTER'S NOS.
2257 PRINTER'S NO.
2257, 2846 PRINTER'S NO.
2846 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL Session of No.
3061 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL Session of No.
1834 2025 INTRODUCED BY MATZIE, INGLIS, DEASY, NEILSON, MULLINS, HADDOCK, D.
1834 2025 INTRODUCED BY MATZIE, INGLIS, DEASY, NEILSON, MULLINS, HADDOCK, DONAHUE, PROBST, HILL-EVANS, GIRAL, SANCHEZ, CURRY, D.
WILLIAMS, DAVIDSON, HOWARD, FRANKEL, MALAGARI, BOROWSKI, BOYD, PROKOPIAK, SCOTT, MARKOSEK, STEELE, SMITH-WADE-EL, CIRESI AND FREEMAN, SEPTEMBER 2, 2025 AS REPORTED FROM COMMITTEE ON ENERGY, HOUSE OF REPRESENTATIVES, AS AMENDED, FEBRUARY 2, 2026 AN ACT Providing for regulation of commercial data centers by the <-- Pennsylvania Public Utility Commission, for recovery of costs, for contributions to the Low-Income Home Energy Assistance Program, for renewable energy requirements and for filing and enforcement;
WILLIAMS, DAVIDSON, HOWARD, FRANKEL, MALAGARI, BOROWSKI, BOYD, PROKOPIAK, SCOTT, MARKOSEK, STEELE, SMITH-WADE-EL, CIRESI, FREEMAN, FRIEL, WEBSTER, McNEILL, WAXMAN, TAKAC, AND GREEN, SEPTEMBER 2, 2025NST, HANBIDGE, DOUGHERTY, RIVERA AS AMENDED ON SECOND CONSIDERATION, HOUSE OF REPRESENTATIVES, MARCH 23, 2026 AN ACT Providing for regulation of large load users by the Pennsylvania <-- Public Utility Commission, for cost responsibility, for contributions to the Low-Income Home Energy Assistance Program, for renewable energy requirements and for contract filing, commission review and enforcement;
establishing the Data Center LIHEAP Public Utility Commission and the Department of Humanania Services.
establishing the Data Center Low-Income Home Energy Assistance Program Enhancement Account and the Pennsylvania Energy Independence Account;
and imposing duties on the Pennsylvania Public Utility Commission, the Department of Human Services and the Pennsylvania Energy Development Authority.
PROVIDING FOR THE REGULATION OF COMMERCIAL DATA CENTERS;
<-- IMPOSING DUTIES ON THE PENNSYLVANIA PUBLIC UTILITY COMMISSION, THE DEPARTMENT OF HUMAN SERVICES AND THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY;
ESTABLISHING THE DATA CENTER LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM ENHANCEMENT ACCOUNT AND THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT;
PROVIDING FOR CLEAN FIRM ENERGY REQUIREMENTS, CONTRACT FILING, COMMISSION REVIEW, DISCLOSURE REQUIREMENTS, BACKUP GENERATION STANDARDS, CURTAILMENT STANDARDS AND CERTIFICATION AND EXPEDITED INTERCONNECTION FOR COMMERCIAL DATA CENTERS BRINGING INCREMENTAL CLEAN FIRM ENERGY RESOURCES;
AND IMPOSING PENALTIES.
"Commercial data center." A facility, campus of facilities or array of interconnected facilities in this Commonwealth that meets all of the following criteria:
"ALTERNATIVE COMPLIANCE PAYMENT." A PER-MEGAWATT-HOUR <-- PAYMENT MADE BY A COMMERCIAL DATA CENTER UNDER SECTION 7(E) IF THE COMMERCIAL DATA CENTER ELECTS TO SATISFY ITS CLEAN FIRM ENERGY PROCUREMENT REQUIREMENT THROUGH PAYMENT IN LIEU OF PROCUREMENT.
(1) Is used by a business entity or other enterprise to operate, manage or maintain a computer, group of computers or other organized assembly of hardware and software for the primary purpose of processing, storing, retrieving or transmitting data.
"BACKSTOP PROCUREMENT OF CAPACITY." AN EMERGENCY OR BACKSTOP PROCUREMENT OF CAPACITY BY THE APPLICABLE REGIONAL TRANSMISSION ORGANIZATION OR ITS SUCCESSOR ORGANIZATION.
(2) Has a peak demand of 25 megawatts or greater.
"CLEAN FIRM ENERGY." ENERGY DERIVED FROM NUCLEAR ENERGY, HYDROELECTRIC POWER, INCLUDING PUMPED STORAGE, GEOTHERMAL ENERGY, FUEL CELLS, SOLAR ENERGY, INCLUDING SOLAR ENERGY PAIRED WITH STORAGE RESOURCES, WIND ENERGY, INCLUDING WIND ENERGY PAIRED WITH STORAGE RESOURCES, CLEAN HYDROGEN-FUELED ENERGY GENERATION, BATTERY ENERGY STORAGE SYSTEMS AND LONG-DURATION STORAGE RESOURCES THAT MEET ALL OF THE FOLLOWING:
(1) THE RESOURCE IS DISPATCHABLE OR CAPABLE OF PROVIDING FIRM SERVICE SO THAT THE RESOURCE CAN DELIVER ELECTRICITY ON DEMAND WITH AN AVAILABILITY FACTOR CONSISTENT WITH STANDARDS ESTABLISHED BY THE COMMISSION.
(2) THE RESOURCE CONSTITUTES INCREMENTAL CAPACITY, INCLUDING ANY OF THE FOLLOWING:
(I) PLACEMENT IN SERVICE OF A NEW CLEAN FIRM ENERGY GENERATION FACILITY ON OR AFTER JANUARY 1, 2025.
20250HB1834PN3061 - 2 - (II) AN UPRATE OR EFFICIENCY IMPROVEMENT AT AN EXISTING CLEAN FIRM ENERGY GENERATION FACILITY COMPLETED ON OR AFTER JANUARY 1, 2025, THAT INCREASES ACCREDITED CAPACITY OR NET OUTPUT.
(III) PLACEMENT IN SERVICE OF A BATTERY ENERGY STORAGE SYSTEM ON OR AFTER JANUARY 1, 2025, THAT PROVIDES AT LEAST TWO HOURS OF CONTINUOUS DISCHARGE OR ANOTHER DURATION DETERMINED BY THE COMMISSION TO PROVIDE RELIABLE CAPACITY VALUE.
(IV) PLACEMENT IN SERVICE OF A LONG-DURATION STORAGE RESOURCE ON OR AFTER JANUARY 1, 2025, THAT PROVIDES NOT LESS THAN FOUR HOURS OF CONTINUOUS DISCHARGE CAPABILITY AND FIRM SERVICE AS DETERMINED BY THE COMMISSION.
"CLEAN FIRM ENERGY CERTIFICATE." A TRADABLE INSTRUMENT REPRESENTING ONE MEGAWATT-HOUR OF ELIGIBLE INCREMENTAL CLEAN FIRM ENERGY, ISSUED AND RETIRED THROUGH A REGISTRY ESTABLISHED BY THE COMMISSION TO DEMONSTRATE ADDITIONALITY AND DELIVERABILITY CONSISTENT WITH SECTION 7 AND REGULATIONS PROMULGATED UNDER THIS ACT.
"CLEAN FIRM ENERGY GENERATION." ELECTRICITY GENERATED FROM CLEAN FIRM ENERGY.
THE TERM DOES NOT INCLUDE A BATTERY ENERGY STORAGE SYSTEM OR LONG-DURATION STORAGE RESOURCE.
THE TERM INCLUDES SOLAR ENERGY PAIRED WITH STORAGE RESOURCES AND WIND ENERGY PAIRED WITH STORAGE RESOURCES.
"CLEAN HYDROGEN." HYDROGEN PRODUCED THROUGH A PROCESS THAT RESULTS IN A LIFECYCLE GREENHOUSE GAS EMISSIONS RATE OF LESS THAN FOUR KILOGRAMS OF CARBON DIOXIDE EQUIVALENT PER KILOGRAM OF HYDROGEN.
"CLEAN OIL FURNACE." AN OIL-FIRED FURNACE THAT MEETS ALL OF THE FOLLOWING:
20250HB1834PN3061 - 3 - (1) IS ENERGY STAR-CERTIFIED.
(2) IS DESIGNED TO OPERATE ON A BLENDED LIQUID FUEL CONTAINING NOT LESS THAN 20% BIODIESEL, RENEWABLE DIESEL OR SECOND GENERATION BIOFUEL.
(3) DEMONSTRATES IMPROVED EFFICIENCY OR REDUCED EMISSIONS RELATIVE TO THE SYSTEM BEING REPLACED, AS DETERMINED BY THE DEPARTMENT OF ENVIRONMENTAL PROTECTION.
"COMMERCIAL DATA CENTER." A FACILITY, CAMPUS OF FACILITIES OR ARRAY OF INTERCONNECTED FACILITIES IN THIS COMMONWEALTH THAT MEETS ALL OF THE FOLLOWING:
(1) IS USED BY A BUSINESS ENTITY OR OTHER ENTERPRISE TO OPERATE, MANAGE OR MAINTAIN A COMPUTER, GROUP OF COMPUTERS OR OTHER ORGANIZED ASSEMBLY OF HARDWARE AND SOFTWARE FOR THE PRIMARY PURPOSE OF PROCESSING, STORING, RETRIEVING OR TRANSMITTING DATA.
(2) HAS A PEAK DEMAND OF 25 MEGAWATTS OR GREATER.
(3) IS INTERCONNECTED TO A PUBLIC UTILITY AT A SINGLE POINT OF INTERCONNECTION OR MULTIPLE POINTS OF INTERCONNECTION OR IS INTERCONNECTED TO MULTIPLE PUBLIC UTILITIES WITHIN THIS COMMONWEALTH THROUGH MULTIPLE POINTS OF INTERCONNECTION.
"Fund." The Data Center LIHEAP Enhancement Fund established under section 5(a).
"Community energy facility." A facility that complies with <-- the terms necessary to achieve designation as a community energy facility under a State law enacted on or after the effective date of this definition establishing a community energy program in this Commonwealth.
"COMMUNITY ENERGY FACILITY." A FACILITY THAT COMPLIES WITH <-- THE REQUIREMENTS NECESSARY TO ACHIEVE DESIGNATION AS A COMMUNITY ENERGY FACILITY UNDER A STATE LAW ENACTED ON OR AFTER THE 20250HB1834PN3061 - 4 - EFFECTIVE DATE OF THIS DEFINITION ESTABLISHING A COMMUNITY ENERGY PROGRAM IN THIS COMMONWEALTH.
"Electric distribution company." As defined in 66 Pa.C.S.
§ 2803 (relating to definitions).
"Electric service." All interconnection services and other <-- required elements provided by an electric distribution company for the jurisdictional transmission and distribution of electricity.
The term shall be construed in a manner consistent with the meaning of service as defined in 66 Pa.C.S.
Show all 473 changed rows (433 more)
Previous
Latest
§ 102 (relating to definitions) as it applies to public utilities.
"Energy-efficient heat pump." An electric heat pump that meets or exceeds the highest efficiency tier, excluding any advanced tier, established by the Consortium for Energy Efficiency as of the effective date of this definition or a functionally equivalent program designated by the Department of Environmental Protection.
"High voltage." 69,000 volts or higher.
"Interruptible rate." A rate published in an electric distribution company's tariff and approved by the commission as just and reasonable that authorizes the electric distribution company to curtail service to customers taking service under the rate during a regional supply shortage or in response to a projected regional supply shortage, in response to actual or projected conditions on the bulk power system and under other conditions specified in the rate when, in the electric distribution company's discretion, curtailment is necessary to protect its ability to provide firm electric service to customers served under other tariff rate schedules.
The term includes a rate that contains provisions for coordination with a regional transmission organization voluntary curtailment program 20250HB1834PN3061 - 5 - under which load is curtailed in a preemergency condition.
"Large load user." A facility, campus of facilities or array of interconnected facilities in this Commonwealth that meets all of the following:
(1) Has a peak demand of 25 megawatts or greater.
(2) Is interconnected to a public utility at a single point of interconnection or multiple interconnection points or is interconnected to multiple public utilities in this Commonwealth at multiple interconnection points.
"ELECTRIC GENERATION SUPPLIER." AS DEFINED IN 66 PA.C.S.
§ <-- 2803.
"ELECTRIC SERVICE." ALL INTERCONNECTION SERVICES AND OTHER REQUIRED ELEMENTS PROVIDED BY AN ELECTRIC DISTRIBUTION COMPANY FOR THE JURISDICTIONAL TRANSMISSION AND DISTRIBUTION OF ELECTRICITY.
THE TERM SHALL BE CONSTRUED IN A MANNER CONSISTENT WITH THE MEANING OF SERVICE UNDER 66 PA.C.S.
§ 102 (RELATING TO DEFINITIONS) AS APPLIED TO PUBLIC UTILITIES.
"ENERGY-EFFICIENT HEAT PUMP." AN ELECTRIC HEAT PUMP THAT MEETS OR EXCEEDS THE HIGHEST EFFICIENCY TIER, EXCLUDING AN ADVANCED TIER, ESTABLISHED BY THE CONSORTIUM FOR ENERGY EFFICIENCY AS OF THE EFFECTIVE DATE OF THIS DEFINITION OR A FUNCTIONALLY EQUIVALENT PROGRAM DESIGNATED BY THE DEPARTMENT OF ENVIRONMENTAL PROTECTION.
"ENERGY STAR." THE VOLUNTARY ENERGY EFFICIENCY CERTIFICATION PROGRAM ESTABLISHED BY THE UNITED STATES 20250HB1834PN3061 - 6 - ENVIRONMENTAL PROTECTION AGENCY AND THE UNITED STATES DEPARTMENT OF ENERGY, OR ANY SUCCESSOR PROGRAM, THAT ESTABLISHES MINIMUM PERFORMANCE AND EFFICIENCY STANDARDS FOR QUALIFYING EQUIPMENT.
"FUEL CELL." AN ELECTROCHEMICAL DEVICE THAT CONVERTS CHEMICAL ENERGY IN A HYDROGEN-RICH FUEL DIRECTLY INTO ELECTRICITY, HEAT AND WATER WITHOUT COMBUSTION.
"INCREMENTAL CAPACITY." ADDITIONAL ACCREDITED CAPACITY OR ADDITIONAL NET ENERGY OUTPUT FROM A CLEAN FIRM ENERGY GENERATION RESOURCE OR LONG-DURATION STORAGE RESOURCE THAT MEETS ALL OF THE FOLLOWING:
(1) RESULTS FROM THE PLACEMENT IN SERVICE OF A NEW RESOURCE ON OR AFTER JANUARY 1, 2025.
(2) RESULTS FROM AN UPRATE OR EFFICIENCY IMPROVEMENT COMPLETED ON OR AFTER JANUARY 1, 2025, AT AN EXISTING CLEAN FIRM ENERGY GENERATION RESOURCE OR LONG-DURATION STORAGE RESOURCE, TO THE EXTENT THAT THE IMPROVEMENT INCREASES ACCREDITED CAPACITY OR NET OUTPUT AVAILABLE TO THE GRID.
(3) IN THE CASE OF A BATTERY ENERGY STORAGE SYSTEM OR LONG-DURATION STORAGE RESOURCE, RESULTS FROM THE INSTALLATION OF NEW STORAGE EQUIPMENT OR THE EXPANSION OR REPOWERING OF AN EXISTING STORAGE FACILITY COMPLETED ON OR AFTER JANUARY 1, 2025, THAT INCREASES DISCHARGE DURATION, RATED CAPACITY OR FIRM SERVICE CAPABILITY.
(4) IS VERIFIED AND CERTIFIED BY THE COMMISSION AS REPRESENTING ADDITIONAL ACCREDITED CAPACITY OR ADDITIONAL NET ENERGY OUTPUT THAT WOULD NOT HAVE BEEN AVAILABLE TO THE BULK ELECTRIC SYSTEM IN THIS COMMONWEALTH ABSENT THE INVESTMENT IDENTIFIED UNDER PARAGRAPH (1), (2) OR (3).
"INTERRUPTIBLE RATE." A RATE PUBLISHED IN AN ELECTRIC 20250HB1834PN3061 - 7 - DISTRIBUTION COMPANY'S TARIFF AND APPROVED BY THE COMMISSION AS JUST AND REASONABLE THAT AUTHORIZES THE ELECTRIC DISTRIBUTION COMPANY TO CURTAIL SERVICE TO CUSTOMERS TAKING SERVICE UNDER THE RATE DURING A REGIONAL SUPPLY SHORTAGE, IN RESPONSE TO A PROJECTED REGIONAL SUPPLY SHORTAGE, IN RESPONSE TO ACTUAL OR PROJECTED CONDITIONS ON THE BULK POWER SYSTEM OR UNDER OTHER CONDITIONS SPECIFIED IN THE RATE WHEN, IN THE ELECTRIC DISTRIBUTION COMPANY'S DISCRETION, CURTAILMENT IS NECESSARY TO PROTECT THE ELECTRIC DISTRIBUTION COMPANY'S ABILITY TO PROVIDE FIRM ELECTRIC SERVICE TO CUSTOMERS SERVED UNDER OTHER TARIFF RATE SCHEDULES.
THE TERM INCLUDES A RATE THAT CONTAINS PROVISIONS FOR COORDINATION WITH A REGIONAL TRANSMISSION ORGANIZATION VOLUNTARY OR MANDATORY CURTAILMENT PROGRAM UNDER WHICH LOAD IS CURTAILED IN A PREEMERGENCY CONDITION.
"LIFECYCLE GREENHOUSE GAS EMISSIONS." THE TERM SHALL HAVE THE MEANING GIVEN TO IT UNDER 26 U.S.C.
§ 45V(C)(1)(A) AND (B) (RELATING TO CREDIT FOR PRODUCTION OF CLEAN HYDROGEN), AS IN EFFECT ON THE EFFECTIVE DATE OF THIS DEFINITION.
"LOAD-SERVING ENTITY." AN ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER THAT SERVES RETAIL LOAD WITHIN THE REGIONAL TRANSMISSION ORGANIZATION IN WHICH THE ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER PARTICIPATES.
"LONG-DURATION STORAGE RESOURCE." A STORAGE RESOURCE LOCATED WITHIN THIS COMMONWEALTH THAT MEETS ALL OF THE FOLLOWING:
(1) IS CAPABLE OF DELIVERING NOT LESS THAN FOUR HOURS OF CONTINUOUS DISCHARGE AT RATED CAPACITY.
(2) IS DISPATCHABLE OR CAPABLE OF PROVIDING FIRM SERVICE CONSISTENT WITH STANDARDS ESTABLISHED BY THE COMMISSION.
(3) QUALIFIES AS INCREMENTAL CAPACITY PLACED IN SERVICE 20250HB1834PN3061 - 8 - ON OR AFTER JANUARY 1, 2025.
"LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM." A FEDERALLY FUNDED PROGRAM THAT PROVIDES FINANCIAL ASSISTANCE IN THE FORM OF CASH AND CRISIS GRANTS TO LOW-INCOME HOUSEHOLDS FOR HOME ENERGY BILLS AND IS ADMINISTERED BY THE DEPARTMENT OF HUMAN SERVICES.
"MATERIAL ADVERSE IMPACT." A DEMONSTRABLE AND SIGNIFICANT EFFECT ON ELECTRIC BILL AFFORDABILITY FOR RESIDENTIAL CUSTOMERS, AS DETERMINED BY THE COMMISSION BY REGULATION OR ORDER, CONSIDERING RATE LEVELS, CUMULATIVE RIDERS AND SURCHARGES AND INCOME-BASED AFFORDABILITY METRICS.
"Pennsylvania Energy Development Authority." The authority established under section 2803-C of the act of April 9, 1929 (P.L.177, No.175), known as The Administrative Code of 1929.
"Pennsylvania Energy Independence Account." The restricted account established under section 6(a).
§ 102 (relating to definitions).
§ 102.
"Ratepayer." A retail customer of a public utility that purchases electric service for consumption.
"Ratepayer." A retail customer of an electric distribution <-- company that purchases electric service for consumption.
"Renewable energy." Solar, wind energy, biomass or hydroelectric power.
"Regional supply shortage." A condition in which supply reserves are less than target supply reserves as determined by the regional transmission organization, consistent with the resource adequacy criterion of a loss of load expectation of one day in 10 years or 0.1 days per year for the applicable region.
"Regional transmission organization" or "RTO." An entity approved by the Federal Energy Regulatory Commission to control and operate electric transmission facilities in interstate commerce and ensure nondiscriminatory access to those facilities.
"Renewable energy." Solar energy, wind energy, nuclear energy, geothermal energy, biomass energy, energy generated from 20250HB1834PN3061 - 9 - a renewable natural gas device or hydroelectric power.
"Renewable natural gas device." A device that generates electricity relying upon a fuel source consisting of at least 75% biodiesel or biogas, including biogas derived from municipal solid waste, industrial waste, food waste, wastewater treatment material and animal manure, resulting from the decomposition of organic matter under anaerobic conditions, or any methane resource classified as a Tier I alternative energy source as defined in section 2 of the act of November 30, 2004 (P.L.1672, No.213), known as the Alternative Energy Portfolio Standards Act, the principal constituents of which are methane and carbon dioxide, that has been upgraded for use in place of fossil natural gas, gasoline or diesel fuel.
"Small-scale energy system." A system with a nameplate capacity rating that does not exceed two megawatts that generates or stores electricity by means of solar panels, batteries or renewable natural gas devices, or a combination of those resources.
The term includes an energy-efficient heat pump installed at a home or residential building, a small business as defined in 62 Pa.C.S.
§ 2102 (relating to definitions), a charitable organization as defined in section 3 of the act of December 19, 1990 (P.L.1200, No.202), known as the Solicitation of Funds for Charitable Purposes Act, an educational institution, a religious institution, a municipal building or a State government building.
"RATEPAYER." A RETAIL CUSTOMER OF AN ELECTRIC DISTRIBUTION <-- COMPANY THAT PURCHASES ELECTRIC DELIVERY SERVICE.
"REGIONAL SUPPLY SHORTAGE." A CONDITION IN WHICH SUPPLY RESERVES ARE LESS THAN TARGET SUPPLY RESERVES AS DETERMINED BY THE REGIONAL TRANSMISSION ORGANIZATION.
20250HB1834PN3061 - 10 - "REGIONAL TRANSMISSION ORGANIZATION." AN ENTITY APPROVED BY THE FEDERAL ENERGY REGULATORY COMMISSION TO CONTROL AND OPERATE ELECTRIC TRANSMISSION FACILITIES IN INTERSTATE COMMERCE AND ENSURE NONDISCRIMINATORY ACCESS TO THOSE FACILITIES.
"RENEWABLE NATURAL GAS DEVICE." A DEVICE THAT GENERATES ELECTRICITY USING A FUEL SOURCE CONSISTING OF AT LEAST 75% BIODIESEL OR BIOGAS, INCLUDING BIOGAS DERIVED FROM MUNICIPAL SOLID WASTE, INDUSTRIAL WASTE, FOOD WASTE, WASTEWATER TREATMENT MATERIAL AND ANIMAL MANURE RESULTING FROM THE DECOMPOSITION OF ORGANIC MATTER UNDER ANAEROBIC CONDITIONS, OR ANY METHANE RESOURCE CLASSIFIED AS A TIER I ALTERNATIVE ENERGY SOURCE AS DEFINED IN SECTION 2 OF THE ACT OF NOVEMBER 30, 2004 (P.L.1672, NO.213), KNOWN AS THE ALTERNATIVE ENERGY PORTFOLIO STANDARDS ACT, THE PRINCIPAL CONSTITUENTS OF WHICH ARE METHANE AND CARBON DIOXIDE, THAT HAS BEEN UPGRADED FOR USE IN PLACE OF FOSSIL NATURAL GAS, GASOLINE OR DIESEL FUEL.
"SMALL-SCALE ENERGY SYSTEM." A SYSTEM WITH A NAMEPLATE CAPACITY RATING THAT DOES NOT EXCEED TWO MEGAWATTS AND THAT GENERATES OR STORES ELECTRICITY BY MEANS OF SOLAR PANELS, BATTERIES OR RENEWABLE NATURAL GAS DEVICES, OR A COMBINATION OF THOSE RESOURCES.
THE TERM INCLUDES AN ENERGY-EFFICIENT HEAT PUMP OR CLEAN OIL FURNACE INSTALLED AT A HOME OR RESIDENTIAL BUILDING, A SMALL BUSINESS AS DEFINED IN 62 PA.C.S.
§ 2102 (RELATING TO DEFINITIONS), A CHARITABLE ORGANIZATION AS DEFINED IN SECTION 3 OF THE ACT OF DECEMBER 19, 1990 (P.L.1200, NO.202), KNOWN AS THE SOLICITATION OF FUNDS FOR CHARITABLE PURPOSES ACT, AN EDUCATIONAL INSTITUTION, A RELIGIOUS INSTITUTION, A MUNICIPAL BUILDING OR A STATE GOVERNMENT BUILDING.
"Universal service and energy conservation." As defined in 66 Pa.C.S.
§ 2803 for electric service and 66 Pa.C.S.
§ 2202 20250HB1834PN3061 - 11 - (relating to definitions) for natural gas service.
"USEFUL LIFE." FOR PURPOSES OF COST ALLOCATION AND RECOVERY <-- UNDER THIS ACT, THE DEPRECIABLE LIFE USED IN COMMISSION-APPROVED COST RECOVERY OR A PERIOD DETERMINED BY THE COMMISSION.
(a) Temporary regulations.-- (1) In order to facilitate the prompt implementation of this act, the commission shall promulgate temporary regulations no later than 90 days after the effective date of this subsection.
(a) Temporary regulations.-- (1) To facilitate prompt implementation of this act, the <-- commission shall promulgate temporary regulations no later than 90 days after the effective date of this subsection.
(2) Temporary regulations under this subsection shall expire not later than two years after publication.
(2) Temporary regulations under this subsection shall expire no later than two years after publication in the Pennsylvania Bulletin.
(3) The commission may promulgate temporary regulations 20250HB1834PN2846 - 2 - that are not subject to:
(1) TO FACILITATE THE PROMPT IMPLEMENTATION OF THIS ACT, <-- THE COMMISSION SHALL PROMULGATE TEMPORARY REGULATIONS NO LATER THAN 90 DAYS AFTER THE EFFECTIVE DATE OF THIS SUBSECTION.
THE COMMISSION SHALL TRANSMIT NOTICE OF THE PROMULGATION OF THE TEMPORARY REGULATIONS TO THE LEGISLATIVE REFERENCE BUREAU FOR PUBLICATION IN THE NEXT AVAILABLE ISSUE OF THE PENNSYLVANIA BULLETIN.
(2) TEMPORARY REGULATIONS PROMULGATED UNDER THIS SUBSECTION SHALL EXPIRE NO LATER THAN TWO YEARS AFTER PUBLICATION IN THE PENNSYLVANIA BULLETIN.
(3) The commission may promulgate temporary regulations under this subsection that are not subject to any of the following:
(ii) Sections 201, 202, 203, 204 and 205 of the act of July 31, 1968 (P.L.769, No.240), referred to as the Commonwealth Documents Law.
(ii) Sections 201, 202, 203, 204 and 205 of the act of July 31, 1968 (P.L.769, No.240), referred to as the 20250HB1834PN3061 - 12 - Commonwealth Documents Law.
(4) The commission's authority to promulgate temporary regulations under this subsection shall expire two years after the effective date of this subsection.
(4) The commission's authority to promulgate temporary <-- regulations under this subsection shall expire two years after the effective date of this subsection.
(b) Regulation requirements.--Regulations promulgated under subsection (a) shall include, at a minimum, provisions relating to all of the following:
(b) Required regulatory topics.--Regulations promulgated under subsection (a) shall include provisions addressing all of the following:
(1) Deposits or financial security required from commercial data centers.
(1) Commercial terms and conditions between large load users and electric distribution companies for high voltage electric service, including all of the following:
(2) Calculations of contributions in aid of construction for transmission and distribution infrastructure.
(i) Deposits or financial security required from large load users.
(3) Minimum contract terms between commercial data centers and public utilities.
(ii) Calculations of contributions in aid of construction for distribution infrastructure or direct assignment through rates of costs for transmission service.
(4) Load ramping schedules to ensure infrastructure adequacy.
(iii) Minimum contract terms that require a large load user, if the large load user ceases operations before satisfying the minimum contract terms, to take a minimum level of service sufficient to generate expected revenues that protect other customers.
(5) Exit or early termination fees.
The electric distribution company shall require the large load user to 20250HB1834PN3061 - 13 - secure the obligation under this subparagraph by a letter of credit or other comparable financial instrument that ensures payment if the large load user ceases operations or otherwise fails to satisfy the obligation.
20250HB1834PN2846 - 3 - (6) Measures to prevent circumvention of the commercial data center threshold through multiple facilities, interconnection points or metering points.
(iv) Load ramping schedules to ensure infrastructure adequacy.
(7) Utility tracking of all costs to serve commercial data centers and verification that revenues collected exceed costs incurred.
(v) Exit fees or early termination fees.
(8) Curtailment of some or all of a commercial data center's load during emergency conditions.
(vi) Measures to prevent circumvention of the large load user threshold through multiple facilities, interconnection points or metering points.
(9) An end-of-contract process providing sufficient notice of a commercial data center's renewal or closure.
(vii) Tracking of all costs, including transmission costs and distribution costs, to serve large load users and verification that revenues collected exceed costs incurred.
(viii) An end-of-contract process that provides sufficient notice of a large load user's renewal or closure.
(2) Curtailment of a large load user's load under an interruptible rate.
(3) Standards governing coordination of an electric distribution company's interruptible rate with an RTO voluntary curtailment program to ensure Statewide consistency.
(4) Conditions for interconnection of new large load user load as new load while ensuring continued provision of electric service to existing customers that is adequate, reasonable, reasonably continuous and without unreasonable interruption or delay.
For new interconnections and incremental additions of load associated with an interconnected large load user, if a regional supply shortage 20250HB1834PN3061 - 14 - exists or is likely to exist as forecasted or determined by the RTO in which the electric distribution system participates, the commission shall impose one or more of the following conditions:
(i) Require the large load user to take electric distribution service under the electric distribution company's interruptible rate.
(ii) Permit firm electric distribution service on the condition that the large load user has been certified to have brought its own incremental energy resources after placement in service of the energy resource or resources under a certification program established by the commission, the Federal Energy Regulatory Commission or the RTO or independent system operator in which the applicable public utility participates.
(iii) A combination of subparagraphs (i) and (ii).
(5) Disclosure requirements under section 10.
(6) Curtailment standards under section 11.
(7) Certification and expedited interconnection standards under section 12.
(8) Cost responsibility standards under section 4.
Recovery of costs.
Prohibition on cost shifting and recovery of costs.
A public utility may not recover from ratepayers, whether through base rates, riders, surcharges or any other ratemaking mechanism, costs that:
(a) Prohibition on cross-subsidization.--An electric distribution company may not recover from ratepayers other than large load users, whether through base rates, riders, surcharges or another ratemaking mechanism, costs that meet all of the following:
(1) are directly attributable to the provision of electric service to a commercial data center;
(1) The costs are directly attributable to the provision of electric service to a large load user.
and (2) would not have been incurred but for the electricity demand of the commercial data center.
(2) The costs would not have been incurred but for the 20250HB1834PN3061 - 15 - electricity demand of the large load user.
(b) Rate review and allocation.--The commission shall review rates to ensure that costs of providing service to a large load user are not subsidized by another customer class.
For rate determinations, each electric distribution company serving large load users shall have the following duties:
(1) Do one of the following:
(i) Allocate the costs of serving large load users to large load users in a manner equal to the costs of serving large load users, including direct costs and indirect costs associated with providing service to large load users, whether through new or existing facilities.
(ii) Directly assign the costs of serving a large load user to the large load user.
(2) Mitigate the risk of all of the following:
(i) Other electric service customers paying costs associated with providing service to large load users where the costs do not benefit other customer classes.
(ii) Shifting the costs of serving a large load user to other electric service customers, including costs incurred by an electric distribution company to meet load requirements resulting from the provision of electric service to a large load user.
(c) Cost-of-service study.--A public utility that serves or is reasonably expected to serve large load user load shall submit a full cost-of-service study when seeking a rate increase under 66 Pa.C.S.
§ 1308 (relating to voluntary changes in rates) to support the public utility's proposed allocation of shared costs or indirect costs that benefit multiple customer classes, including large load users.
20250HB1834PN3061 - 16 - (d) Universal service and energy conservation programs.--A public utility shall recover from large load users costs incurred by the public utility in connection with the development, implementation and support of universal service and energy conservation programs consistent with 66 Pa.C.S.
§§ 2203(6), (7), (8), (9) and (10) (relating to standards for restructuring of natural gas utility industry) and 2804(8) and (9) (relating to standards for restructuring of electric industry) through a tariff rate approved by the commission.
(e) Duration of allocation and recovery standards.--The commission shall establish standards to ensure that large load user cost allocation and recovery assigns to the large load user responsible for the costs specified under subsection (a), including construction costs, ongoing transmission costs and distribution costs, for a minimum of 10 years in a manner that supports business development in this Commonwealth while minimizing the risk of stranded infrastructure costs, maintaining customer affordability and maintaining overall system reliability.
(a) Fund.--The Data Center LIHEAP Enhancement Fund is established as a restricted fund in the State Treasury.
(a) LIHEAP enhancement account.--The Data Center Low-Income Home Energy Assistance Program Enhancement Account is established as a restricted account in the General Fund.
The Department of Human Services, in collaboration with the State Treasurer, shall administer the fund.
The Department of Human Services shall use money appropriated from the account under subsection (e) for a supplemental program to enhance LIHEAP.
The Department of Human Services shall use the money appropriated from the fund under subsection (d) to implement a supplemental program to enhance the Low-Income Home Energy Assistance Program.
(b) Sources.--The fund shall consist of all of the following:
(b) Sources of money.--Money from the following sources shall be deposited into the account:
20250HB1834PN2846 - 4 - (1) Payments made under subsection (c).
20250HB1834PN3061 - 17 - (1) Payments made under subsection (c).
(2) Interest accrued on the money in the fund.
(2) Interest accrued on money in the account.
(3) Money from any other source authorized by Federal or State law.
(3) Money from another source authorized by Federal or State law.
(c) Annual payments.--No later than June 30 of each year, each commercial data center shall make a payment to the fund in accordance with the following schedule based on peak demand:
(c) Annual payments.-- (1) No later than June 1 of each year, each large load user with at least 25 megawatts annual peak load shall make payments to the account as follows:
(1) At least 25 megawatts but less than 75 megawatts:
(i) $40,000 per megawatt of annual peak load up to and including 25 megawatts.
$250,000.
(ii) For each additional megawatt of annual peak load above 25 megawatts, an additional $50,000 per megawatt.
(2) At least 75 megawatts but less than 100 megawatts:
(2) Payments under this subsection shall be required for the duration of the load.
$400,000.
The commission may adjust the payment amounts periodically.
(3) 100 megawatts or more:
(d) Appropriation.--Money in the account is appropriated to the Department of Human Services on a continuing basis for the purposes of this section.
$500,000.
(4) THE COMMISSION'S AUTHORITY TO PROMULGATE TEMPORARY <-- REGULATIONS UNDER THIS SUBSECTION SHALL EXPIRE TWO YEARS AFTER THE EFFECTIVE DATE OF THIS SUBSECTION.
(d) Appropriation.--Money in the fund is appropriated on a continuing basis to the Department of Human Services for the purposes of this section.
BEFORE THE EXPIRATION OF THIS AUTHORITY, THE COMMISSION SHALL PROMULGATE FINAL REGULATIONS IN ACCORDANCE WITH STATE LAW AND SUBSECTION (B).
(e) Regulations.--The Department of Human Services, in collaboration with the State Treasurer, shall promulgate regulations necessary to implement this section.
(B) REQUIRED REGULATORY TOPICS.--REGULATIONS PROMULGATED UNDER SUBSECTION (A) SHALL INCLUDE PROVISIONS GOVERNING ALL OF THE FOLLOWING:
Section 6.
(1) RETAIL TARIFF TERMS AND CONDITIONS BETWEEN A COMMERCIAL DATA CENTER AND AN ELECTRIC DISTRIBUTION COMPANY 20250HB1834PN3061 - 18 - FOR ELECTRIC SERVICE TO SAFEGUARD EXISTING CUSTOMERS FROM STRANDED INVESTMENT AND COST SHIFTING, INCLUDING ALL OF THE FOLLOWING:
Renewable energy requirements.
(I) DEPOSITS OR OTHER FINANCIAL SECURITY REQUIRED FROM A COMMERCIAL DATA CENTER.
A public utility that enters into a contract for electric service with a commercial data center on or after the effective date of this section shall ensure that not less than 25% of the electricity supplied under the contract is generated from renewable energy sources.
(II) CONTRIBUTIONS IN AID OF CONSTRUCTION FOR NETWORK UPGRADES OR DISTRIBUTION INFRASTRUCTURE AND DIRECT ASSIGNMENT THROUGH RATES OF COSTS FOR TRANSMISSION SERVICE, TO THE EXTENT PERMITTED BY LAW.
Section 7.
(III) MINIMUM CONTRACT TERMS AND MINIMUM LOAD OBLIGATIONS THAT REQUIRE A COMMERCIAL DATA CENTER, IF THE COMMERCIAL DATA CENTER CEASES OPERATIONS BEFORE SATISFYING THE MINIMUM CONTRACT TERM OR ENGAGES IN ECONOMIC PEAK-SHAVING BEHAVIOR, TO TAKE A MINIMUM LEVEL OF SERVICE FOR A MINIMUM NUMBER OF YEARS SUFFICIENT TO GENERATE EXPECTED REVENUES THAT PROTECT OTHER CUSTOMERS.
Filing and enforcement.
AN ELECTRIC DISTRIBUTION COMPANY SHALL REQUIRE THE COMMERCIAL DATA CENTER TO SECURE THE OBLIGATION UNDER THIS SUBPARAGRAPH BY A LETTER OF CREDIT OR OTHER COMPARABLE FINANCIAL INSTRUMENT THAT ENSURES PAYMENT IF THE COMMERCIAL DATA CENTER CEASES OPERATIONS OR OTHERWISE FAILS TO SATISFY THE OBLIGATION.
(a) Filing requirement.-- (1) A public utility shall file with the commission a copy of each contract executed with a commercial data center on or after the effective date of this section.
(IV) LOAD-RAMPING SCHEDULES TO ENSURE INFRASTRUCTURE ADEQUACY.
(2) The public utility shall include with the filing 20250HB1834PN2846 - 5 - sufficient documentation to permit the commission to conduct the review under paragraph (3).
(3) The commission shall review each contract under paragraph (1) to determine all of the following:
(i) The impact on the grid system of the PJM Interconnection, L.L.C., regional transmission organization or its successor.
(ii) The effect on the reliability of that grid system.
(iii) The impact on ratepayers.
(iv) Compliance with the requirements under sections 4 and 6.
(b) Enforcement.--A violation of this act shall be subject to enforcement by the commission under 66 Pa.C.S.
Ch.
33 (relating to violations and penalties).
Section 8.
Effective date.
This act shall take effect in 90 days.
PROVIDING FOR REGULATION OF LARGE LOAD USERS BY THE PENNSYLVANIA <-- PUBLIC UTILITY COMMISSION, FOR COST RESPONSIBILITY, FOR CONTRIBUTIONS TO THE LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM, FOR RENEWABLE ENERGY REQUIREMENTS AND FOR CONTRACT FILING, COMMISSION REVIEW AND ENFORCEMENT;
ESTABLISHING THE DATA CENTER LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM ACCOUNT;
AND IMPOSING DUTIES ON THE PENNSYLVANIA PUBLICDENCE UTILITY COMMISSION, THE DEPARTMENT OF HUMAN SERVICES AND THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY.
THE GENERAL ASSEMBLY OF THE COMMONWEALTH OF PENNSYLVANIA HEREBY ENACTS AS FOLLOWS:
SECTION 1.
SHORT TITLE.
THIS ACT SHALL BE KNOWN AND MAY BE CITED AS THE DATA CENTER ACT.
SECTION 2.
DEFINITIONS.
THE FOLLOWING WORDS AND PHRASES WHEN USED IN THIS ACT SHALL HAVE THE MEANINGS GIVEN TO THEM IN THIS SECTION UNLESS THE 20250HB1834PN2846 - 6 - CONTEXT CLEARLY INDICATES OTHERWISE:
"COMMISSION." THE PENNSYLVANIA PUBLIC UTILITY COMMISSION.
"COMMUNITY ENERGY FACILITY." A FACILITY THAT COMPLIES WITH THE TERMS NECESSARY TO ACHIEVE DESIGNATION AS A COMMUNITY ENERGY FACILITY UNDER A STATE LAW ENACTED ON OR AFTER THE EFFECTIVE DATE OF THIS DEFINITION ESTABLISHING A COMMUNITY ENERGY PROGRAM IN THIS COMMONWEALTH.
"ELECTRIC DISTRIBUTION COMPANY." AS DEFINED IN 66 PA.C.S.
§ 2803 (RELATING TO DEFINITIONS).
"ELECTRIC SERVICE." ALL INTERCONNECTION SERVICES AND OTHER REQUIRED ELEMENTS PROVIDED BY AN ELECTRIC DISTRIBUTION COMPANY FOR THE JURISDICTIONAL TRANSMISSION AND DISTRIBUTION OF ELECTRICITY.
THE TERM SHALL BE CONSTRUED IN A MANNER CONSISTENT WITH THE MEANING OF SERVICE AS DEFINED IN 66 PA.C.S.
§ 102 (RELATING TO DEFINITIONS) AS IT APPLIES TO PUBLIC UTILITIES.
"ENERGY-EFFICIENT HEAT PUMP." AN ELECTRIC HEAT PUMP THAT MEETS OR EXCEEDS THE HIGHEST EFFICIENCY TIER, EXCLUDING ANY ADVANCED TIER, ESTABLISHED BY THE CONSORTIUM FOR ENERGY EFFICIENCY AS OF THE EFFECTIVE DATE OF THIS DEFINITION OR A FUNCTIONALLY EQUIVALENT PROGRAM DESIGNATED BY THE DEPARTMENT OF ENVIRONMENTAL PROTECTION.
"HIGH VOLTAGE." 69,000 VOLTS OR HIGHER.
"INTERRUPTIBLE RATE." A RATE PUBLISHED IN AN ELECTRIC DISTRIBUTION COMPANY'S TARIFF AND APPROVED BY THE COMMISSION AS JUST AND REASONABLE THAT AUTHORIZES THE ELECTRIC DISTRIBUTION COMPANY TO CURTAIL SERVICE TO CUSTOMERS TAKING SERVICE UNDER THE RATE DURING A REGIONAL SUPPLY SHORTAGE OR IN RESPONSE TO A PROJECTED REGIONAL SUPPLY SHORTAGE, IN RESPONSE TO ACTUAL OR PROJECTED CONDITIONS ON THE BULK POWER SYSTEM AND UNDER OTHER CONDITIONS SPECIFIED IN THE RATE WHEN, IN THE ELECTRIC 20250HB1834PN2846 - 7 - DISTRIBUTION COMPANY'S DISCRETION, CURTAILMENT IS NECESSARY TO PROTECT ITS ABILITY TO PROVIDE FIRM ELECTRIC SERVICE TO CUSTOMERS SERVED UNDER OTHER TARIFF RATE SCHEDULES.
THE TERM INCLUDES A RATE THAT CONTAINS PROVISIONS FOR COORDINATION WITH A REGIONAL TRANSMISSION ORGANIZATION VOLUNTARY CURTAILMENT PROGRAM UNDER WHICH LOAD IS CURTAILED IN A PREEMERGENCY CONDITION.
"LARGE LOAD USER." A FACILITY, CAMPUS OF FACILITIES OR ARRAY OF INTERCONNECTED FACILITIES IN THIS COMMONWEALTH THAT MEETS ALL OF THE FOLLOWING:
(1) HAS A PEAK DEMAND OF 25 MEGAWATTS OR GREATER.
(2) IS INTERCONNECTED TO A PUBLIC UTILITY AT A SINGLE POINT OF INTERCONNECTION OR MULTIPLE INTERCONNECTION POINTS OR IS INTERCONNECTED TO MULTIPLE PUBLIC UTILITIES IN THIS COMMONWEALTH AT MULTIPLE INTERCONNECTION POINTS.
"LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM" OR "LIHEAP." A FEDERALLY FUNDED PROGRAM THAT PROVIDES FINANCIAL ASSISTANCE IN THE FORM OF CASH AND CRISIS GRANTS TO LOW-INCOME HOUSEHOLDS FOR HOME ENERGY BILLS AND IS ADMINISTERED BY THE DEPARTMENT OF HUMAN SERVICES.
"PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY." THE AUTHORITY ESTABLISHED UNDER SECTION 2803-C OF THE ACT OF APRIL 9, 1929 (P.L.177, NO.175), KNOWN AS THE ADMINISTRATIVE CODE OF 1929.
"PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT." THE RESTRICTED ACCOUNT ESTABLISHED UNDER SECTION 6(A).
"PUBLIC UTILITY." AS DEFINED IN 66 PA.C.S.
§ 102.
"RATEPAYER." A RETAIL CUSTOMER OF AN ELECTRIC DISTRIBUTION COMPANY THAT PURCHASES ELECTRIC SERVICE FOR CONSUMPTION.
"REGIONAL SUPPLY SHORTAGE." A CONDITION IN WHICH SUPPLY RESERVES ARE LESS THAN TARGET SUPPLY RESERVES AS DETERMINED BY THE REGIONAL TRANSMISSION ORGANIZATION, CONSISTENT WITH THE 20250HB1834PN2846 - 8 - RESOURCE ADEQUACY CRITERION OF A LOSS OF LOAD EXPECTATION OF ONE DAY IN 10 YEARS OR 0.1 DAYS PER YEAR FOR THE APPLICABLE REGION.
"REGIONAL TRANSMISSION ORGANIZATION" OR "RTO." AN ENTITY APPROVED BY THE FEDERAL ENERGY REGULATORY COMMISSION TO CONTROL AND OPERATE ELECTRIC TRANSMISSION FACILITIES IN INTERSTATE COMMERCE AND ENSURE NONDISCRIMINATORY ACCESS TO THOSE FACILITIES.
"RENEWABLE ENERGY." SOLAR ENERGY, WIND ENERGY, NUCLEAR ENERGY, GEOTHERMAL ENERGY, BIOMASS ENERGY, ENERGY GENERATED FROM A RENEWABLE NATURAL GAS DEVICE OR HYDROELECTRIC POWER.
"RENEWABLE NATURAL GAS DEVICE." A DEVICE THAT GENERATES ELECTRICITY RELYING UPON A FUEL SOURCE CONSISTING OF AT LEAST 75% BIODIESEL OR BIOGAS, INCLUDING BIOGAS DERIVED FROM MUNICIPAL SOLID WASTE, INDUSTRIAL WASTE, FOOD WASTE, WASTEWATER TREATMENT MATERIAL AND ANIMAL MANURE, RESULTING FROM THE DECOMPOSITION OF ORGANIC MATTER UNDER ANAEROBIC CONDITIONS, OR ANY METHANE RESOURCE CLASSIFIED AS A TIER I ALTERNATIVE ENERGY SOURCE AS DEFINED IN SECTION 2 OF THE ACT OF NOVEMBER 30, 2004 (P.L.1672, NO.213), KNOWN AS THE ALTERNATIVE ENERGY PORTFOLIO STANDARDS ACT, THE PRINCIPAL CONSTITUENTS OF WHICH ARE METHANE AND CARBON DIOXIDE, THAT HAS BEEN UPGRADED FOR USE IN PLACE OF FOSSIL NATURAL GAS, GASOLINE OR DIESEL FUEL.
"SMALL-SCALE ENERGY SYSTEM." A SYSTEM WITH A NAMEPLATE CAPACITY RATING THAT DOES NOT EXCEED TWO MEGAWATTS THAT GENERATES OR STORES ELECTRICITY BY MEANS OF SOLAR PANELS, BATTERIES OR RENEWABLE NATURAL GAS DEVICES, OR A COMBINATION OF THOSE RESOURCES.
THE TERM INCLUDES AN ENERGY-EFFICIENT HEAT PUMP INSTALLED AT A HOME OR RESIDENTIAL BUILDING, A SMALL BUSINESS AS DEFINED IN 62 PA.C.S.
§ 2102 (RELATING TO DEFINITIONS), A CHARITABLE ORGANIZATION AS DEFINED IN SECTION 3 OF THE ACT OF 20250HB1834PN2846 - 9 - DECEMBER 19, 1990 (P.L.1200, NO.202), KNOWN AS THE SOLICITATION OF FUNDS FOR CHARITABLE PURPOSES ACT, AN EDUCATIONAL INSTITUTION, A RELIGIOUS INSTITUTION, A MUNICIPAL BUILDING OR A STATE GOVERNMENT BUILDING.
"UNIVERSAL SERVICE AND ENERGY CONSERVATION." AS DEFINED IN 66 PA.C.S.
§ 2803 FOR ELECTRIC SERVICE AND 66 PA.C.S.
§ 2202 (RELATING TO DEFINITIONS) FOR NATURAL GAS SERVICE.
SECTION 3.
DUTIES OF COMMISSION.
(A) TEMPORARY REGULATIONS.-- (1) TO FACILITATE PROMPT IMPLEMENTATION OF THIS ACT, THE COMMISSION SHALL PROMULGATE TEMPORARY REGULATIONS NO LATER THAN 90 DAYS AFTER THE EFFECTIVE DATE OF THIS SUBSECTION.
(2) TEMPORARY REGULATIONS UNDER THIS SUBSECTION SHALL EXPIRE NO LATER THAN TWO YEARS AFTER PUBLICATION IN THE PENNSYLVANIA BULLETIN.
(3) THE COMMISSION MAY PROMULGATE TEMPORARY REGULATIONS UNDER THIS SUBSECTION THAT ARE NOT SUBJECT TO ANY OF THE FOLLOWING:
(I) SECTION 612 OF THE ACT OF APRIL 9, 1929 (P.L.177, NO.175), KNOWN AS THE ADMINISTRATIVE CODE OF 1929.
(II) SECTIONS 201, 202, 203, 204 AND 205 OF THE ACT OF JULY 31, 1968 (P.L.769, NO.240), REFERRED TO AS THE COMMONWEALTH DOCUMENTS LAW.
(III) SECTIONS 204(B) AND 301(10) OF THE ACT OF OCTOBER 15, 1980 (P.L.950, NO.164), KNOWN AS THE COMMONWEALTH ATTORNEYS ACT.
(IV) THE ACT OF JUNE 25, 1982 (P.L.633, NO.181), KNOWN AS THE REGULATORY REVIEW ACT.
(4) THE COMMISSION'S AUTHORITY TO PROMULGATE TEMPORARY 20250HB1834PN2846 - 10 - REGULATIONS UNDER THIS SUBSECTION SHALL EXPIRE TWO YEARS AFTER THE EFFECTIVE DATE OF THIS SUBSECTION.
AFTER THE EXPIRATION OF THIS AUTHORITY, THE COMMISSION SHALL PROMULGATE FINAL REGULATIONS IN ACCORDANCE WITH STATE LAW AND SUBSECTION (B).
(B) REQUIRED REGULATORY TOPICS.--REGULATIONS PROMULGATED UNDER SUBSECTION (A) SHALL INCLUDE PROVISIONS ADDRESSING ALL OF THE FOLLOWING:
(1) COMMERCIAL TERMS AND CONDITIONS BETWEEN LARGE LOAD USERS AND ELECTRIC DISTRIBUTION COMPANIES FOR HIGH VOLTAGE ELECTRIC SERVICE, INCLUDING ALL OF THE FOLLOWING:
(I) DEPOSITS OR FINANCIAL SECURITY REQUIRED FROM LARGE LOAD USERS.
(II) CALCULATIONS OF CONTRIBUTIONS IN AID OF CONSTRUCTION FOR DISTRIBUTION INFRASTRUCTURE OR DIRECT ASSIGNMENT THROUGH RATES OF COSTS FOR TRANSMISSION SERVICE.
(III) MINIMUM CONTRACT TERMS THAT REQUIRE A LARGE LOAD USER, IF THE LARGE LOAD USER CEASES OPERATIONS BEFORE SATISFYING THE MINIMUM CONTRACT TERMS, TO TAKE A MINIMUM LEVEL OF SERVICE SUFFICIENT TO GENERATE EXPECTED REVENUES THAT PROTECT OTHER CUSTOMERS.
THE ELECTRIC DISTRIBUTION COMPANY SHALL REQUIRE THE LARGE LOAD USER TO SECURE THE OBLIGATION UNDER THIS SUBPARAGRAPH BY A LETTER OF CREDIT OR OTHER COMPARABLE FINANCIAL INSTRUMENT THAT ENSURES PAYMENT IF THE LARGE LOAD USER CEASES OPERATIONS OR OTHERWISE FAILS TO SATISFY THE OBLIGATION.
(IV) LOAD RAMPING SCHEDULES TO ENSURE INFRASTRUCTURE ADEQUACY.
20250HB1834PN2846 - 11 - (VI) MEASURES TO PREVENT CIRCUMVENTION OF THE LARGE LOAD USER THRESHOLD THROUGH MULTIPLE FACILITIES, INTERCONNECTION POINTS OR METERING POINTS.
(VI) MEASURES TO PREVENT CIRCUMVENTION OF THE COMMERCIAL DATA CENTER THRESHOLD THROUGH MULTIPLE FACILITIES, INTERCONNECTION POINTS OR METERING POINTS.
(VII) TRACKING OF ALL COSTS, INCLUDING TRANSMISSION COSTS AND DISTRIBUTION COSTS, TO SERVE LARGE LOAD USERS AND VERIFICATION THAT REVENUES COLLECTED EXCEED COSTS INCURRED.
(VII) TRACKING OF ALL COSTS, INCLUDING TRANSMISSION AND DISTRIBUTION COSTS, INCURRED TO SERVE A COMMERCIAL 20250HB1834PN3061 - 19 - DATA CENTER AND VERIFICATION THAT THE REVENUES COLLECTED EXCEED THE COSTS INCURRED.
(VIII) AN END-OF-CONTRACT PROCESS THAT PROVIDES SUFFICIENT NOTICE OF A LARGE LOAD USER'S RENEWAL OR CLOSURE.
(VIII) AN END-OF-CONTRACT PROCESS THAT PROVIDES SUFFICIENT NOTICE OF A COMMERCIAL DATA CENTER'S RENEWAL OR CLOSURE.
(2) CURTAILMENT OF A LARGE LOAD USER'S LOAD UNDER AN INTERRUPTIBLE RATE.
(IX) TO THE EXTENT PERMITTED BY FEDERAL AND STATE LAW, A PROCESS FOR THE DIRECT ASSIGNMENT TO A COMMERCIAL DATA CENTER OF COSTS ASSIGNED BY A REGIONAL TRANSMISSION ORGANIZATION, AS DETERMINED BY THE COMMISSION.
(3) STANDARDS GOVERNING COORDINATION OF AN ELECTRIC DISTRIBUTION COMPANY'S INTERRUPTIBLE RATE WITH AN RTO VOLUNTARY CURTAILMENT PROGRAM TO ENSURE STATEWIDE CONSISTENCY.
(2) CURTAILMENT OF A COMMERCIAL DATA CENTER'S LOAD UNDER AN INTERRUPTIBLE RATE.
(4) CONDITIONS FOR INTERCONNECTION OF NEW LARGE LOAD USER LOAD AS NEW LOAD WHILE ENSURING CONTINUED PROVISION OF ELECTRIC SERVICE TO EXISTING CUSTOMERS THAT IS ADEQUATE, REASONABLE, REASONABLY CONTINUOUS AND WITHOUT UNREASONABLE INTERRUPTION OR DELAY.
(3) STANDARDS GOVERNING COORDINATION OF AN ELECTRIC DISTRIBUTION COMPANY'S INTERRUPTIBLE RATE WITH A REGIONAL TRANSMISSION ORGANIZATION VOLUNTARY OR MANDATORY CURTAILMENT PROGRAM TO ENSURE STATEWIDE CONSISTENCY.
FOR NEW INTERCONNECTIONS AND INCREMENTAL ADDITIONS OF LOAD ASSOCIATED WITH AN INTERCONNECTED LARGE LOAD USER, IF A REGIONAL SUPPLY SHORTAGE EXISTS OR IS LIKELY TO EXIST AS FORECASTED OR DETERMINED BY THE RTO IN WHICH THE ELECTRIC DISTRIBUTION SYSTEM PARTICIPATES, THE COMMISSION SHALL IMPOSE ONE OR MORE OF THE FOLLOWING CONDITIONS:
(4) CONDITIONS FOR INTERCONNECTION OF NEW COMMERCIAL DATA CENTER LOAD WHILE ENSURING THE CONTINUED PROVISION OF ELECTRIC SERVICE TO EXISTING CUSTOMERS THAT IS ADEQUATE, REASONABLE, REASONABLY CONTINUOUS AND WITHOUT UNREASONABLE INTERRUPTION OR DELAY.
(I) REQUIRE THE LARGE LOAD USER TO TAKE ELECTRIC DISTRIBUTION SERVICE UNDER THE ELECTRIC DISTRIBUTION COMPANY'S INTERRUPTIBLE RATE.
IF A REGIONAL SUPPLY SHORTAGE EXISTS OR IS LIKELY TO EXIST, AS FORECASTED OR DETERMINED BY THE REGIONAL TRANSMISSION ORGANIZATION IN WHICH THE ELECTRIC DISTRIBUTION SYSTEM PARTICIPATES, THE COMMISSION SHALL IMPOSE ANY OF THE FOLLOWING CONDITIONS ON A NEW INTERCONNECTION OR AN INCREMENTAL ADDITION OF LOAD ASSOCIATED WITH AN INTERCONNECTED COMMERCIAL DATA CENTER:
20250HB1834PN2846 - 12 - (II) PERMIT FIRM ELECTRIC DISTRIBUTION SERVICE ON THE CONDITION THAT THE LARGE LOAD USER HAS BEEN CERTIFIED TO HAVE BROUGHT ITS OWN INCREMENTAL ENERGY RESOURCES AFTER PLACEMENT IN SERVICE OF THE ENERGY RESOURCE OR RESOURCES UNDER A CERTIFICATION PROGRAM ESTABLISHED BY THE COMMISSION, THE FEDERAL ENERGY REGULATORY COMMISSION OR THE RTO OR INDEPENDENT SYSTEM OPERATOR IN WHICH THE APPLICABLE PUBLIC UTILITY PARTICIPATES.
(I) REQUIRING THE COMMERCIAL DATA CENTER TO TAKE ELECTRIC DISTRIBUTION SERVICE UNDER THE ELECTRIC DISTRIBUTION COMPANY'S INTERRUPTIBLE RATE.
(III) A COMBINATION OF SUBPARAGRAPHS (I) AND (II).
(II) PERMITTING FIRM ELECTRIC DISTRIBUTION SERVICE 20250HB1834PN3061 - 20 - ON THE CONDITION THAT THE COMMERCIAL DATA CENTER HAS BEEN CERTIFIED TO HAVE BROUGHT ITS OWN INCREMENTAL CLEAN FIRM ENERGY RESOURCES INTO SERVICE UNDER A CERTIFICATION PROGRAM ESTABLISHED BY THE COMMISSION, THE FEDERAL ENERGY REGULATORY COMMISSION OR THE REGIONAL TRANSMISSION ORGANIZATION OR INDEPENDENT SYSTEM OPERATOR IN WHICH THE APPLICABLE PUBLIC UTILITY PARTICIPATES.
(5) DISCLOSURE REQUIREMENTS UNDER SECTION 10.
(III) IMPOSING A COMBINATION OF THE REQUIREMENTS UNDER SUBPARAGRAPHS (I) AND (II).
(6) CURTAILMENT STANDARDS UNDER SECTION 11.
(5) COST RESPONSIBILITY STANDARDS UNDER SECTION 4.
(7) CERTIFICATION AND EXPEDITED INTERCONNECTION STANDARDS UNDER SECTION 12.
(6) ESTABLISHMENT OF THE ALTERNATIVE COMPLIANCE PAYMENT RATE AND CALCULATION METHODS UNDER SECTION 7(E).
(8) COST RESPONSIBILITY STANDARDS UNDER SECTION 4.
(7) DISCLOSURE REQUIREMENTS UNDER SECTION 10.
(8) BACKUP GENERATION STANDARDS UNDER SECTION 11.
(9) CURTAILMENT STANDARDS UNDER SECTION 12.
(10) CERTIFICATION AND EXPEDITED INTERCONNECTION STANDARDS UNDER SECTION 13.
(A) PROHIBITION ON CROSS-SUBSIDIZATION.--AN ELECTRIC DISTRIBUTION COMPANY MAY NOT RECOVER FROM RATEPAYERS OTHER THAN LARGE LOAD USERS, WHETHER THROUGH BASE RATES, RIDERS, SURCHARGES OR ANOTHER RATEMAKING MECHANISM, COSTS THAT MEET ALL OF THE FOLLOWING:
(A) PROHIBITION ON CROSS-SUBSIDIZATION.--AN ELECTRIC DISTRIBUTION COMPANY MAY NOT RECOVER FROM RATEPAYERS OTHER THAN COMMERCIAL DATA CENTERS, WHETHER THROUGH BASE RATES, RIDERS, SURCHARGES OR ANOTHER RATEMAKING MECHANISM, A COST CAUSED IN WHOLE OR IN PART BY THE INTERCONNECTION, SERVICE OR LOAD OF A COMMERCIAL DATA CENTER, INCLUDING A COST ASSOCIATED WITH CAPACITY, ENERGY, ANCILLARY SERVICES, TRANSMISSION, DISTRIBUTION, NETWORK UPGRADES OR DEDICATED FACILITIES, IF EITHER OF THE FOLLOWING APPLIES:
(1) THE COSTS ARE DIRECTLY ATTRIBUTABLE TO THE PROVISION OF ELECTRIC SERVICE TO A LARGE LOAD USER.
(1) THE COST IS DIRECTLY ATTRIBUTABLE TO THE PROVISION OF ELECTRIC SERVICE TO A COMMERCIAL DATA CENTER.
(2) THE COSTS WOULD NOT HAVE BEEN INCURRED BUT FOR THE ELECTRICITY DEMAND OF THE LARGE LOAD USER.
(2) THE COST WOULD NOT HAVE BEEN INCURRED BUT FOR THE 20250HB1834PN3061 - 21 - ELECTRICITY DEMAND OF A COMMERCIAL DATA CENTER.
(B) RATE REVIEW AND ALLOCATION.--THE COMMISSION SHALL REVIEW RATES TO ENSURE THAT COSTS OF PROVIDING SERVICE TO A LARGE LOAD USER ARE NOT SUBSIDIZED BY ANOTHER CUSTOMER CLASS.
(B) RATE REVIEW AND ALLOCATION.--THE COMMISSION SHALL REVIEW RATES TO ENSURE THAT THE COST OF PROVIDING SERVICE TO A COMMERCIAL DATA CENTER IS NOT SUBSIDIZED BY ANOTHER CUSTOMER CLASS.
FOR RATE DETERMINATIONS, EACH ELECTRIC DISTRIBUTION COMPANY SERVING LARGE LOAD USERS SHALL HAVE THE FOLLOWING DUTIES:
FOR PURPOSES OF A RATE DETERMINATION, EACH ELECTRIC DISTRIBUTION COMPANY SERVING A COMMERCIAL DATA CENTER SHALL HAVE THE FOLLOWING DUTIES:
(1) DO ONE OF THE FOLLOWING:
(1) TO ALLOCATE OR ASSIGN COSTS IN ONE OF THE FOLLOWING WAYS:
20250HB1834PN2846 - 13 - (I) ALLOCATE THE COSTS OF SERVING LARGE LOAD USERS TO LARGE LOAD USERS IN A MANNER EQUAL TO THE COSTS OF SERVING LARGE LOAD USERS, INCLUDING DIRECT COSTS AND INDIRECT COSTS ASSOCIATED WITH PROVIDING SERVICE TO LARGE LOAD USERS, WHETHER THROUGH NEW OR EXISTING FACILITIES.
(I) ALLOCATE THE COST OF SERVING COMMERCIAL DATA CENTERS TO A CUSTOMER CLASS CONSISTING SOLELY OF COMMERCIAL DATA CENTERS IN AN AMOUNT EQUAL TO THE COST OF SERVING COMMERCIAL DATA CENTERS, INCLUDING DIRECT AND INDIRECT COSTS ASSOCIATED WITH PROVIDING SERVICE TO COMMERCIAL DATA CENTERS THROUGH NEW OR EXISTING FACILITIES.
(II) DIRECTLY ASSIGN THE COSTS OF SERVING A LARGE LOAD USER TO THE LARGE LOAD USER.
(II) DIRECTLY ASSIGN THE COST OF SERVING A COMMERCIAL DATA CENTER TO THE COMMERCIAL DATA CENTER.
(2) MITIGATE THE RISK OF ALL OF THE FOLLOWING:
(2) TO MITIGATE THE RISK OF ANY OF THE FOLLOWING:
(I) OTHER ELECTRIC SERVICE CUSTOMERS PAYING COSTS ASSOCIATED WITH PROVIDING SERVICE TO LARGE LOAD USERS WHERE THE COSTS DO NOT BENEFIT OTHER CUSTOMER CLASSES.
(I) ANOTHER ELECTRIC SERVICE CUSTOMER PAYING A COST ASSOCIATED WITH PROVIDING SERVICE TO A COMMERCIAL DATA CENTER IF THE COST DOES NOT BENEFIT ANOTHER CUSTOMER CLASS.
(II) SHIFTING THE COSTS OF SERVING A LARGE LOAD USER TO OTHER ELECTRIC SERVICE CUSTOMERS, INCLUDING COSTS INCURRED BY AN ELECTRIC DISTRIBUTION COMPANY TO MEET LOAD REQUIREMENTS RESULTING FROM THE PROVISION OF ELECTRIC SERVICE TO A LARGE LOAD USER.
(II) SHIFTING TO ANOTHER ELECTRIC SERVICE CUSTOMER THE COST OF SERVING A COMMERCIAL DATA CENTER, INCLUDING A COST INCURRED BY AN ELECTRIC DISTRIBUTION COMPANY TO MEET LOAD REQUIREMENTS RESULTING FROM THE PROVISION OF ELECTRIC SERVICE TO A COMMERCIAL DATA CENTER.
(C) COST-OF-SERVICE STUDY.--A PUBLIC UTILITY THAT SERVES OR IS REASONABLY EXPECTED TO SERVE LARGE LOAD USER LOAD SHALL SUBMIT A FULL COST-OF-SERVICE STUDY WHEN SEEKING A RATE INCREASE UNDER 66 PA.C.S.
(C) COST-OF-SERVICE STUDY.--A PUBLIC UTILITY THAT SERVES OR IS REASONABLY EXPECTED TO SERVE COMMERCIAL DATA CENTER LOAD 20250HB1834PN3061 - 22 - SHALL SUBMIT A FULL COST-OF-SERVICE STUDY WHEN SEEKING A RATE INCREASE UNDER 66 PA.C.S.
§ 1308 (RELATING TO VOLUNTARY CHANGES IN RATES) TO SUPPORT THE PUBLIC UTILITY'S PROPOSED ALLOCATION OF SHARED COSTS OR INDIRECT COSTS THAT BENEFIT MULTIPLE CUSTOMER CLASSES, INCLUDING LARGE LOAD USERS.
§ 1308 (RELATING TO VOLUNTARY CHANGES IN RATES) TO SUPPORT THE PUBLIC UTILITY'S PROPOSED ALLOCATION OF SHARED OR INDIRECT COSTS THAT BENEFIT MULTIPLE CUSTOMER CLASSES, INCLUDING COMMERCIAL DATA CENTERS.
(D) UNIVERSAL SERVICE AND ENERGY CONSERVATION PROGRAMS.--A PUBLIC UTILITY SHALL RECOVER FROM LARGE LOAD USERS COSTS INCURRED BY THE PUBLIC UTILITY IN CONNECTION WITH THE DEVELOPMENT, IMPLEMENTATION AND SUPPORT OF UNIVERSAL SERVICE AND ENERGY CONSERVATION PROGRAMS CONSISTENT WITH 66 PA.C.S.
(D) UNIVERSAL SERVICE AND ENERGY CONSERVATION PROGRAMS.--A PUBLIC UTILITY SHALL RECOVER FROM COMMERCIAL DATA CENTERS THE COSTS INCURRED BY THE PUBLIC UTILITY IN CONNECTION WITH THE DEVELOPMENT, IMPLEMENTATION AND SUPPORT OF UNIVERSAL SERVICE AND ENERGY CONSERVATION PROGRAMS, CONSISTENT WITH 66 PA.C.S.
§§ 2203(6), (7), (8), (9) AND (10) (RELATING TO STANDARDS FOR RESTRUCTURING OF NATURAL GAS UTILITY INDUSTRY) AND 2804(8) AND 20250HB1834PN2846 - 14 - (9) (RELATING TO STANDARDS FOR RESTRUCTURING OF ELECTRIC INDUSTRY) THROUGH A TARIFF RATE APPROVED BY THE COMMISSION.
§§ 2203(6), (7), (8), (9) AND (10) (RELATING TO STANDARDS FOR RESTRUCTURING OF NATURAL GAS UTILITY INDUSTRY) AND 2804(8) AND (9) (RELATING TO STANDARDS FOR RESTRUCTURING OF ELECTRIC INDUSTRY), THROUGH A TARIFF RATE APPROVED BY THE COMMISSION.
(E) DURATION OF ALLOCATION AND RECOVERY STANDARDS.--THE COMMISSION SHALL ESTABLISH STANDARDS TO ENSURE THAT LARGE LOAD USER COST ALLOCATION AND RECOVERY ASSIGNS TO THE LARGE LOAD USER RESPONSIBLE FOR THE COSTS SPECIFIED UNDER SUBSECTION (A), INCLUDING CONSTRUCTION COSTS, ONGOING TRANSMISSION COSTS AND DISTRIBUTION COSTS, FOR A MINIMUM OF 10 YEARS IN A MANNER THAT SUPPORTS BUSINESS DEVELOPMENT IN THIS COMMONWEALTH WHILE MINIMIZING THE RISK OF STRANDED INFRASTRUCTURE COSTS, MAINTAINING CUSTOMER AFFORDABILITY AND MAINTAINING OVERALL SYSTEM RELIABILITY.
(E) DURATION OF ALLOCATION AND RECOVERY STANDARDS.--THE COMMISSION SHALL ESTABLISH STANDARDS TO ENSURE THAT A COMMERCIAL DATA CENTER RESPONSIBLE FOR COSTS SPECIFIED UNDER SUBSECTION (A), INCLUDING CONSTRUCTION, TRANSMISSION AND DISTRIBUTION COSTS, REMAINS RESPONSIBLE FOR THOSE COSTS FOR THE USEFUL LIFE OF THE ASSOCIATED INFRASTRUCTURE OR FOR THE DURATION OF THE SERVICE OBLIGATION, WHICHEVER IS LONGER, IN A MANNER THAT SUPPORTS BUSINESS DEVELOPMENT IN THIS COMMONWEALTH WHILE MINIMIZING THE RISK OF STRANDED INFRASTRUCTURE COSTS, MAINTAINING CUSTOMER AFFORDABILITY AND MAINTAINING OVERALL SYSTEM RELIABILITY.
(F) TRANSMISSION AND REGIONAL COST IMPACTS.--TO THE MAXIMUM EXTENT PERMITTED UNDER FEDERAL LAW, THE COMMISSION SHALL ENSURE THAT A COST ALLOCATED TO AN ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER UNDER A TARIFF APPROVED BY THE FEDERAL ENERGY REGULATORY COMMISSION AND ASSOCIATED WITH 20250HB1834PN3061 - 23 - TRANSMISSION FACILITIES, NETWORK UPGRADES, CAPACITY OBLIGATIONS OR ANOTHER REGIONAL SYSTEM COST, IF CAUSED IN WHOLE OR IN PART BY A COMMERCIAL DATA CENTER, IS APPROPRIATELY ALLOCATED AT RETAIL AND RECOVERED FROM THE COMMERCIAL DATA CENTER AND DOES NOT RESULT IN UNREASONABLE COST IMPACTS TO RESIDENTIAL CUSTOMERS OR SMALL COMMERCIAL CUSTOMERS.
(G) CURTAILMENT OBLIGATIONS.-- (1) IF A REGIONAL TRANSMISSION ORGANIZATION ISSUES A CURTAILMENT OBLIGATION OR DIRECTIVE AND ASSIGNS THE OBLIGATION OR DIRECTIVE TO AN ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER IN ITS CAPACITY AS A LOAD- SERVING ENTITY, IN WHOLE OR IN PART DUE TO THE PROVISION OF ELECTRIC SERVICE TO A COMMERCIAL DATA CENTER, THE ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER SHALL REQUIRE THE COMMERCIAL DATA CENTER TO SATISFY THE CURTAILMENT OBLIGATION OR DIRECTIVE UNDER CONTRACTUAL TERMS OR TARIFF PROVISIONS APPROVED BY THE COMMISSION.
(2) ANOTHER CUSTOMER OF THE ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER MAY NOT BE ASSIGNED RESPONSIBILITY FOR A CURTAILMENT OBLIGATION RESULTING FROM THE COMMERCIAL DATA CENTER'S SERVICE.
(3) NOTHING IN THIS SUBSECTION SHALL BE CONSTRUED TO:
(I) PREVENT OR HINDER AN ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER FROM TAKING ACTION NECESSARY TO MAINTAIN SYSTEM RELIABILITY;
OR (II) PROHIBIT AN ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER FROM IMPLEMENTING A VOLUNTARY LOAD CURTAILMENT PROGRAM APPROVED BY THE COMMISSION.
(H) BACKSTOP PROCUREMENT OBLIGATIONS.-- 20250HB1834PN3061 - 24 - (1) IF A REGIONAL TRANSMISSION ORGANIZATION UNDERTAKES BACKSTOP PROCUREMENT OF CAPACITY OR A COMPARABLE RELIABILITY SERVICE AND ASSIGNS A FINANCIAL OR OTHER OBLIGATION TO AN ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER IN ITS CAPACITY AS A LOAD-SERVING ENTITY, IN WHOLE OR IN PART DUE TO A COMMERCIAL DATA CENTER'S SERVICE, THE ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER SHALL ALLOCATE THE OBLIGATION AT RETAIL TO AND RECOVER THE OBLIGATION FROM THE COMMERCIAL DATA CENTER OR COMMERCIAL DATA CENTERS THAT GAVE RISE TO THE OBLIGATION UNDER TERMS COMPARABLE TO THOSE UNDER WHICH THE OBLIGATION IS ASSIGNED TO THE ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER.
(2) IF AN ELECTRIC DISTRIBUTION COMPANY DOES NOT PROVIDE RETAIL DEFAULT SERVICE TO A COMMERCIAL DATA CENTER AND, IN ITS CAPACITY AS A LOAD-SERVING ENTITY, RECEIVES AN ASSIGNMENT OF COST OBLIGATIONS RELATED TO BACKSTOP PROCUREMENT FROM A REGIONAL TRANSMISSION ORGANIZATION, THE ELECTRIC DISTRIBUTION COMPANY MAY ESTABLISH A NONBYPASSABLE SURCHARGE TO PASS THROUGH THE OBLIGATION ON A PRO RATA BASIS TO EACH COMMERCIAL DATA CENTER TAKING ELECTRIC SERVICE UNDER THE ELECTRIC DISTRIBUTION COMPANY'S TARIFF IF THE REBUTTABLE PRESUMPTION UNDER SUBSECTION (I)(2) APPLIES.
(I) REGIONAL GENERATION, CAPACITY AND RELIABILITY COSTS.- (1) TO THE MAXIMUM EXTENT PERMITTED UNDER FEDERAL LAW, IF A REGIONAL TRANSMISSION ORGANIZATION ASSIGNS, UNDER A TARIFF APPROVED BY THE FEDERAL ENERGY REGULATORY COMMISSION, TO AN ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER IN ITS CAPACITY AS A LOAD-SERVING ENTITY A COST ASSOCIATED IN WHOLE OR IN PART WITH THE PROCUREMENT OF NEW 20250HB1834PN3061 - 25 - GENERATION SUPPLY, CAPACITY OR A COMPARABLE RELIABILITY SERVICE UNDERTAKEN TO MEET THE ELECTRICITY DEMAND OF ONE OR MORE COMMERCIAL DATA CENTERS, THE ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER SHALL DIRECTLY ASSIGN, ALLOCATE AND RECOVER THE COST FROM THE APPLICABLE COMMERCIAL DATA CENTER OR COMMERCIAL DATA CENTERS.
(2) THERE SHALL BE A REBUTTABLE PRESUMPTION THAT A COST DESCRIBED UNDER PARAGRAPH (1) IS ATTRIBUTABLE TO A COMMERCIAL DATA CENTER IF ANY OF THE FOLLOWING APPLY:
(I) THE REGIONAL TRANSMISSION ORGANIZATION OR ITS INDEPENDENT MARKET MONITOR IDENTIFIES THE LOAD ADDITION AS A MATERIAL DRIVER OF THE PROCUREMENT.
(II) THE TIMING OF THE PROCUREMENT IS REASONABLY CORRELATED WITH THE COMMERCIAL DATA CENTER'S LOAD ADDITION.
(III) THE PROCUREMENT WOULD NOT HAVE OCCURRED IN SUBSTANTIALLY THE SAME FORM OR TIME FRAME ABSENT THE COMMERCIAL DATA CENTER'S LOAD ADDITION.
(3) THE PRESUMPTION UNDER PARAGRAPH (2) SHALL APPLY SOLELY TO RETAIL ALLOCATION AND RECOVERY BY THE COMMISSION AND MAY NOT BE CONSTRUED TO ALTER AN ASSIGNMENT OR DETERMINATION MADE UNDER A TARIFF APPROVED BY THE FEDERAL ENERGY REGULATORY COMMISSION.
(4) IF A REGIONAL TRANSMISSION ORGANIZATION DOES NOT DIRECTLY ALLOCATE THE COSTS DESCRIBED UNDER PARAGRAPH (1) TO THE COMMERCIAL DATA CENTER OR COMMERCIAL DATA CENTERS THAT GAVE RISE TO THE COSTS, THE COMMISSION SHALL ESTABLISH AND IMPLEMENT, CONSISTENT WITH FEDERAL LAW, A JUST AND REASONABLE MECHANISM TO ALLOCATE AND RECOVER THE COSTS FROM THE APPLICABLE COMMERCIAL DATA CENTER OR COMMERCIAL DATA CENTERS 20250HB1834PN3061 - 26 - WITHOUT ALTERING THE WHOLESALE ASSIGNMENT ESTABLISHED UNDER A TARIFF APPROVED BY THE FEDERAL ENERGY REGULATORY COMMISSION.
(5) IF AN ELECTRIC DISTRIBUTION COMPANY DOES NOT PROVIDE RETAIL DEFAULT SERVICE TO A COMMERCIAL DATA CENTER AND, IN ITS CAPACITY AS A LOAD-SERVING ENTITY, RECEIVES AN ASSIGNMENT OF GENERATION SUPPLY, CAPACITY OR COMPARABLE RELIABILITY SERVICE COST OBLIGATIONS FROM A REGIONAL TRANSMISSION ORGANIZATION, THE ELECTRIC DISTRIBUTION COMPANY MAY ESTABLISH A NONBYPASSABLE SURCHARGE TO PASS THROUGH THE OBLIGATION ON A PRO RATA BASIS TO EACH COMMERCIAL DATA CENTER TAKING SERVICE UNDER THE ELECTRIC DISTRIBUTION COMPANY'S TARIFF IF THE REBUTTABLE PRESUMPTION UNDER PARAGRAPH (2) APPLIES.
(J) FINANCIAL SECURITY.-- (1) AS A CONDITION OF TAKING ELECTRIC SERVICE, A COMMERCIAL DATA CENTER WHOSE LOAD IS REASONABLY LIKELY TO TRIGGER OR CONTRIBUTE TO AN OBLIGATION UNDER SUBSECTION (H) SHALL PROVIDE FINANCIAL SECURITY, IN A FORM AND AMOUNT APPROVED BY THE COMMISSION, SUFFICIENT TO ENSURE THAT EXISTING AND FUTURE CUSTOMERS OF THE PUBLIC UTILITY ARE HELD HARMLESS FOR THE FULL TERM AND VALUE OF THE OBLIGATION.
(2) THE FINANCIAL SECURITY REQUIRED UNDER PARAGRAPH (1) SHALL REMAIN IN EFFECT FOR THE DURATION OF THE APPLICABLE CAPACITY OBLIGATION AND ANY ASSOCIATED COST RECOVERY PERIOD.
(3) AS A CONDITION OF TAKING ELECTRIC SERVICE, A COMMERCIAL DATA CENTER REASONABLY EXPECTED TO TRIGGER OR CONTRIBUTE TO A COST DESCRIBED UNDER SUBSECTION (I) SHALL PROVIDE AND MAINTAIN FINANCIAL SECURITY, IN A FORM AND AMOUNT APPROVED BY THE COMMISSION, SUFFICIENT TO ENSURE FULL RECOVERY OF THE COST FOR THE DURATION OF THE OBLIGATION AND TO HOLD HARMLESS EXISTING AND FUTURE CUSTOMERS OF THE 20250HB1834PN3061 - 27 - ELECTRIC DISTRIBUTION COMPANY.
(K) DURATION OF RESPONSIBILITY.--COST RESPONSIBILITY UNDER SUBSECTIONS (H) AND (I) SHALL APPLY FOR THE USEFUL LIFE OF THE ASSOCIATED FACILITIES OR THE DURATION OF THE REGIONAL OBLIGATION, WHICHEVER IS LONGER.
(L) FEDERAL LAW.--NOTHING IN SUBSECTIONS (G), (H), (I), (J) AND (K) SHALL BE CONSTRUED TO CONFLICT WITH OR PREEMPT THE JURISDICTION OF THE FEDERAL ENERGY REGULATORY COMMISSION OR TO REQUIRE AN ELECTRIC DISTRIBUTION COMPANY OR ELECTRIC GENERATION SUPPLIER TO TAKE ACTION INCONSISTENT WITH A TARIFF APPROVED BY THE FEDERAL ENERGY REGULATORY COMMISSION.
(M) IMPLEMENTATION.--THE COMMISSION SHALL PROMULGATE REGULATIONS OR ISSUE ORDERS NECESSARY TO IMPLEMENT SUBSECTIONS (G), (H), (I), (J), (K) AND (L) IN A MANNER CONSISTENT WITH FEDERAL LAW GOVERNING REGIONAL TRANSMISSION ORGANIZATIONS AND APPLICABLE TARIFFS AND AGREEMENTS.
(N) ALTERNATIVE COMPLIANCE PAYMENTS NOT RECOVERABLE.--AN ELECTRIC DISTRIBUTION COMPANY MAY NOT RECOVER, THROUGH BASE RATES, RIDERS, SURCHARGES OR ANOTHER RATEMAKING MECHANISM, AN ALTERNATIVE COMPLIANCE PAYMENT UNDER SECTION 7(E) FROM A RATEPAYER OTHER THAN THE COMMERCIAL DATA CENTER RESPONSIBLE FOR THE PAYMENT.
(A) LIHEAP ENHANCEMENT ACCOUNT.--THE DATA CENTER LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM ENHANCEMENT ACCOUNT IS ESTABLISHED AS A RESTRICTED ACCOUNT IN THE GENERAL FUND.
(A) ESTABLISHMENT OF ACCOUNT.--THE DATA CENTER LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM ENHANCEMENT ACCOUNT IS ESTABLISHED AS A RESTRICTED ACCOUNT IN THE GENERAL FUND.
THE DEPARTMENT OF HUMAN SERVICES SHALL USE MONEY APPROPRIATED FROM THE ACCOUNT UNDER SUBSECTION (E) FOR A SUPPLEMENTAL PROGRAM TO ENHANCE LIHEAP.
THE DEPARTMENT OF HUMAN SERVICES SHALL USE MONEY APPROPRIATED FROM THE DATA CENTER LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM ENHANCEMENT ACCOUNT UNDER SUBSECTION (D) FOR A SUPPLEMENTAL 20250HB1834PN3061 - 28 - PROGRAM TO ENHANCE THE LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM.
(B) SOURCES OF MONEY.--MONEY FROM THE FOLLOWING SOURCES SHALL BE DEPOSITED INTO THE ACCOUNT:
(B) SOURCES OF MONEY.--THE FOLLOWING SHALL BE DEPOSITED INTO THE DATA CENTER LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM ENHANCEMENT ACCOUNT:
(2) INTEREST ACCRUED ON MONEY IN THE ACCOUNT.
(2) INTEREST ACCRUED ON MONEY IN THE DATA CENTER LOW- INCOME HOME ENERGY ASSISTANCE PROGRAM ENHANCEMENT ACCOUNT.
(C) ANNUAL PAYMENTS.-- (1) NO LATER THAN JUNE 1 OF EACH YEAR, EACH LARGE LOAD USER WITH AT LEAST 25 MEGAWATTS ANNUAL PEAK LOAD SHALL MAKE 20250HB1834PN2846 - 15 - PAYMENTS TO THE ACCOUNT AS FOLLOWS:
(C) ANNUAL PAYMENTS.-- (1) NO LATER THAN JUNE 1 OF EACH YEAR, EACH COMMERCIAL DATA CENTER WITH AN ANNUAL PEAK LOAD OF AT LEAST 25 MEGAWATTS SHALL PAY INTO THE DATA CENTER LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM ENHANCEMENT ACCOUNT AS FOLLOWS:
(II) FOR EACH ADDITIONAL MEGAWATT OF ANNUAL PEAK LOAD ABOVE 25 MEGAWATTS, AN ADDITIONAL $50,000 PER MEGAWATT.
(II) FOR EACH ADDITIONAL MEGAWATT OF ANNUAL PEAK LOAD ABOVE 25 MEGAWATTS, AN ADDITIONAL $40,000 PER MEGAWATT.
(2) PAYMENTS UNDER THIS SUBSECTION SHALL BE REQUIRED FOR THE DURATION OF THE LOAD.
(2) A PAYMENT UNDER THIS SUBSECTION SHALL BE REQUIRED FOR THE DURATION OF THE LOAD.
THE COMMISSION MAY ADJUST THE PAYMENT AMOUNTS PERIODICALLY.
(3) THE COMMISSION MAY ADJUST THE PAYMENT AMOUNTS UNDER THIS SUBSECTION PERIODICALLY TO ACCOUNT FOR INFLATION.
(D) APPROPRIATION.--MONEY IN THE ACCOUNT IS APPROPRIATED TO THE DEPARTMENT OF HUMAN SERVICES ON A CONTINUING BASIS FOR THE PURPOSES OF THIS SECTION.
THE COMMISSION SHALL MAKE AN ADJUSTMENT UNDER THIS PARAGRAPH BY PROMULGATING REGULATIONS.
(E) REGULATIONS AND GUIDELINES.--THE DEPARTMENT OF HUMAN SERVICES MAY PROMULGATE REGULATIONS OR ISSUE GUIDELINES NECESSARY TO IMPLEMENT THIS SECTION.
(D) APPROPRIATION.--MONEY IN THE DATA CENTER LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM ENHANCEMENT ACCOUNT IS APPROPRIATED TO THE DEPARTMENT OF HUMAN SERVICES ON A CONTINUING BASIS FOR THE 20250HB1834PN3061 - 29 - PURPOSES OF THIS SECTION.
(e) Regulations and guidelines.--The Department of Human Services may promulgate regulations or issue guidelines necessary to implement this section.
Section 6.
Pennsylvania Energy Independence Account.
<-- (a) Establishment.--The Pennsylvania Energy Independence Account is established as a restricted account in the General Fund.
The Pennsylvania Energy Development Authority shall expend money from the account for the purposes of this act and may establish separate subaccounts within the account.
(b) Sources of money.--Money from the following sources shall be deposited into the account:
(1) Money appropriated or transferred by the General Assembly for deposit into the account.
(2) Federal funding available for the purposes of this act as appropriated by the General Assembly for deposit into the account.
(3) Interest and other amounts resulting from investment of money in the account.
(4) Gifts, grants and donations made to the account.
(c) Allocation and geographic minimums.--Money in the account is appropriated to the Pennsylvania Energy Development Authority on a continuing basis to provide grants, loans or loan guarantees to finance new small-scale energy systems or community energy facilities, subject to the following geographic minimums:
(1) No less than 25% of the value of the payments shall be allocated to projects within the borough, town or city in which a large load user is located unless the Pennsylvania Energy Development Authority determines that insufficient 20250HB1834PN3061 - 30 - high-quality projects have been proposed within the borough, town or city and provides notice to the mayor or governing body of the city, borough, town or township at least 90 days in advance of making the determination.
(2) No less than 50% of the value of the payments shall be allocated to projects within the county in which the large load user is located unless the Pennsylvania Energy Development Authority determines that insufficient high- quality projects have been proposed within the county and provides notice to the governing body of the county at least 90 days in advance of making the determination.
(d) Construction loans.--The Pennsylvania Energy Development Authority may provide a construction loan under this section only if the loan will be the senior debt secured by the facility and does not exceed 60% of the facility's estimated construction cost.
(e) Application criteria.--The Pennsylvania Energy Development Authority shall use the following criteria to evaluate a loan application under this section:
(1) The applicant's:
(i) Quality of services and management.
(ii) Efficiency of operations.
(iii) History of operations in this Commonwealth and the United States.
(iv) Resource operation attributes.
(v) Ability to address regional needs, local needs and reliability needs.
(vi) Access to resources essential for operating the project for which the loan is requested, including land, water and reliable infrastructure as applicable.
20250HB1834PN3061 - 31 - (vii) Evidence of creditworthiness and ability to repay the loan on the terms established in the loan agreement, including total assets, total liabilities, net worth and credit ratings issued by major credit rating agencies.
(2) The generation capacity and estimated costs of the project for which the loan is requested.
(3) Other factors the Pennsylvania Energy Development Authority considers appropriate.
(f) Monthly payments.--A large load user placed into service on or after the effective date of this subsection shall make a monthly payment to the Pennsylvania Energy Independence Account equal to 0.8¢ per kilowatt-hour of actual energy usage in the preceding month.
The monthly payment shall be reduced to 0.4¢ per kilowatt-hour if the large load user is certified to have provided its own incremental energy resources after placement in service of the energy resource or resources under a program established by the commission, the Federal Energy Regulatory Commission or the RTO or independent system operator in which the applicable public utility participates.
Section 7.
Renewable energy requirements.
On or after the effective date of this section, energy supplied to large load users shall include not less than 25% of electricity generated from renewable energy sources.
Section 8.
Contract filing, commission review and enforcement.
(a) Filing required.--An electric distribution company shall file with the commission a copy of each electric service contract executed with a large load user on or after the effective date of this subsection, including the following:
(1) A contract for electric service between a public 20250HB1834PN3061 - 32 - utility and a large load user for high voltage electric service entered into under a commission-approved rate schedule for distribution service.
(2) A construction services agreement, engineering agreement or similar agreement between a public utility and a large load user relating to the public utility's high voltage transmission infrastructure or distribution infrastructure.
(3) A construction services agreement, engineering services agreement or similar agreement between a public utility and a large load user relating to transmission infrastructure that is the subject of the public utility's application for commission approval and authorization to locate and construct a transmission line or a portion of a transmission line with a design voltage greater than 100,000 volts.
(b) Distribution of filed contracts.--A public utility shall provide a copy of an electric service contract filed under this section to the Office of Consumer Advocate, the Office of Small Business Advocate and Bureau of Investigation and Enforcement within the commission, subject to appropriate confidentiality protective agreements or orders.
(c) Supporting documentation.--An electric distribution company shall include with the filing sufficient documentation to permit the commission to conduct the review under subsection (d).
(d) Commission review.--The commission shall review each contract filed under this section to determine all of the following:
(1) The impact on continued provision of electric service that is adequate, safe and reliable to residents and 20250HB1834PN3061 - 33 - businesses of this Commonwealth.
(2) The impact on ratepayers and electric bill affordability for residential customers and commercial customers.
The impact on low-income customers shall be determined as a subset of residential customers.
(3) Compliance with sections 3, 4 and 7.
Section 9.
Annual report.
(a) Report.--The commission shall submit a written report to the General Assembly each year for a minimum of 10 years and shall make a public version of the report available on its publicly accessible Internet website.
(b) Contents.--The report shall describe all of the following:
(1) The commission's efforts to implement this act during the prior year.
(2) The commission's determinations under section 8(d) regarding the impact of large load users on continued provision of adequate, safe and reliable electric service to residents and businesses of this Commonwealth, the impact on ratepayers and electric bill affordability and compliance with sections 3, 4 and 7.
(3) Recommendations for legislative changes or regulatory changes to further improve the commission's oversight responsibilities under this act.
Section 10.
Disclosure requirements.
(a) Interconnection requests.--The commission shall require each planned large load user to disclose to the commission, the applicable electric distribution company and the applicable RTO or independent system operator whether the planned large load user is pursuing a substantially similar request for electric 20250HB1834PN3061 - 34 - service within this Commonwealth or within the applicable RTO or independent system operator, the approval of which would result in a material change, a delay or a withdrawal of the interconnection request.
The disclosure may withhold or anonymize competitively sensitive details.
The commission shall prohibit or set reasonable restrictions on the sale or disclosure of information provided to an electric distribution company under this subsection.
(b) Backup generation.--The commission shall require each planned large load user to disclose to the commission, the applicable electric distribution company and the applicable RTO or independent system operator information about the planned large load user's backup generation resources and storage resources and the capability to rely on backup generation resources or storage resources during periods of required load shed or curtailment, including the amount of notice required to deploy backup generation resources or storage resources.
Section 11.
Curtailment standards.
(a) Direction to large load users.--The commission shall require electric distribution companies, during periods of emergency curtailment or manual load dump, to direct large load users to deploy backup generation resources or storage resources or curtail load before curtailment or manual load dump of residential customers or small commercial customers.
(b) Priority.--The commission may require an electric distribution company to prioritize issuance of a direction under subsection (a) to a large load user that is not certified to have brought its own incremental energy resources after placement in service of the energy resource or resources under a program established by the commission, the Federal Energy 20250HB1834PN3061 - 35 - Regulatory Commission or the RTO or independent system operator in which the applicable public utility participates.
(c) Environmental compliance.--Nothing in this section shall be construed to authorize or require a violation of an emissions limitation under Federal or State law or a violation of another environmental regulation.
Section 12.
Certification and expedited interconnection for large load users bringing incremental energy resources.
(a) Certification program.--The commission shall establish a program to certify large load users that have brought or plan to bring incremental energy resources.
Certification shall be based on a binding financial commitment by a large load user, including a power purchase agreement, to enable an incremental energy resource or resources equivalent on a one-for-one accredited unforced capacity basis, including a reasonable reserve margin, tied to the large load user's ramp and utilization schedule, through any combination of the following (1) Placement in service of a new generation resource or combined generation and storage resource.
(2) Uprate or expansion of an existing generation resource to the extent of the uprated capacity.
(3) Participation in a demand response product, if participation continues for the duration of the certification period or until the large load user has brought additional energy capacity equivalent to the capacity value of the demand response product.
(4) Another incremental addition of accredited unforced capacity as measured by the applicable RTO or independent system operator.
20250HB1834PN3061 - 36 - (b) Interconnection priority.--The commission shall require electric distribution companies to prioritize the interconnection of large load users certified under subsection (a) and, for interconnections subject to State jurisdiction, to prioritize the interconnection of paired generation resources or storage resources associated with a certified large load user.
(A) ESTABLISHMENT.--THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT IS ESTABLISHED AS A RESTRICTED ACCOUNT IN THE GENERAL FUND.
<-- (A) ESTABLISHMENT OF ACCOUNT.--THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT IS ESTABLISHED AS A RESTRICTED ACCOUNT IN THE GENERAL FUND.
THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY SHALL EXPEND MONEY FROM THE ACCOUNT FOR THE PURPOSES OF THIS ACT AND MAY ESTABLISH SEPARATE SUBACCOUNTS WITHIN THE ACCOUNT.
THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY SHALL EXPEND MONEY FROM THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT FOR THE PURPOSES OF THIS ACT AND MAY ESTABLISH SUBACCOUNTS WITHIN THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT.
(B) SOURCES OF MONEY.--MONEY FROM THE FOLLOWING SOURCES SHALL BE DEPOSITED INTO THE ACCOUNT:
(B) SOURCES OF MONEY.--THE FOLLOWING SHALL BE DEPOSITED INTO THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT:
(1) MONEY APPROPRIATED OR TRANSFERRED BY THE GENERAL ASSEMBLY FOR DEPOSIT INTO THE ACCOUNT.
(1) MONEY APPROPRIATED OR TRANSFERRED BY THE GENERAL ASSEMBLY FOR DEPOSIT INTO THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT.
(2) FEDERAL FUNDING AVAILABLE FOR THE PURPOSES OF THIS ACT AS APPROPRIATED BY THE GENERAL ASSEMBLY FOR DEPOSIT INTO THE ACCOUNT.
(2) SUPPLEMENTAL FEDERAL FUNDING AVAILABLE FOR THE PURPOSES OF THIS ACT AND APPROPRIATED BY THE GENERAL ASSEMBLY FOR DEPOSIT INTO THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT.
(3) INTEREST AND OTHER AMOUNTS RESULTING FROM INVESTMENT OF MONEY IN THE ACCOUNT.
(3) INTEREST AND OTHER AMOUNTS RESULTING FROM THE INVESTMENT OF MONEY IN THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT.
20250HB1834PN2846 - 16 - (4) GIFTS, GRANTS AND DONATIONS MADE TO THE ACCOUNT.
(4) GIFTS, GRANTS AND DONATIONS MADE TO THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT.
(C) ALLOCATION AND GEOGRAPHIC MINIMUMS.--MONEY IN THE ACCOUNT IS APPROPRIATED TO THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY ON A CONTINUING BASIS TO PROVIDE GRANTS, LOANS OR LOAN GUARANTEES TO FINANCE NEW SMALL-SCALE ENERGY SYSTEMS OR COMMUNITY ENERGY FACILITIES, SUBJECT TO THE FOLLOWING GEOGRAPHIC MINIMUMS:
(C) USE OF MONEY.--MONEY IN THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT IS APPROPRIATED TO THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY ON A CONTINUING BASIS TO PROVIDE GRANTS, 20250HB1834PN3061 - 37 - LOANS AND LOAN GUARANTEES TO FINANCE NEW CLEAN FIRM ENERGY SYSTEMS, SMALL-SCALE ENERGY SYSTEMS, ENERGY EFFICIENCY PROJECTS AND COMMUNITY ENERGY FACILITIES.
(1) NO LESS THAN 25% OF THE VALUE OF THE PAYMENTS SHALL BE ALLOCATED TO PROJECTS WITHIN THE BOROUGH, TOWN OR CITY IN WHICH A LARGE LOAD USER IS LOCATED UNLESS THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY DETERMINES THAT INSUFFICIENT HIGH-QUALITY PROJECTS HAVE BEEN PROPOSED WITHIN THE BOROUGH, TOWN OR CITY AND PROVIDES NOTICE TO THE MAYOR OR GOVERNING BODY OF THE CITY, BOROUGH, TOWN OR TOWNSHIP AT LEAST 90 DAYS IN ADVANCE OF MAKING THE DETERMINATION.
(D) CONSTRUCTION LOANS.--THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY MAY PROVIDE A CONSTRUCTION LOAN UNDER THIS SECTION ONLY IF THE LOAN CONSTITUTES THE SENIOR DEBT SECURED BY THE FACILITY AND DOES NOT EXCEED 60% OF THE FACILITY'S ESTIMATED CONSTRUCTION COST.
(2) NO LESS THAN 50% OF THE VALUE OF THE PAYMENTS SHALL BE ALLOCATED TO PROJECTS WITHIN THE COUNTY IN WHICH THE LARGE LOAD USER IS LOCATED UNLESS THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY DETERMINES THAT INSUFFICIENT HIGH- QUALITY PROJECTS HAVE BEEN PROPOSED WITHIN THE COUNTY AND PROVIDES NOTICE TO THE GOVERNING BODY OF THE COUNTY AT LEAST 90 DAYS IN ADVANCE OF MAKING THE DETERMINATION.
(E) ADMINISTRATIVE COSTS.--THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY MAY USE NOT MORE THAN 5% ANNUALLY OF THE MONEY IN THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT FOR ADMINISTRATIVE COSTS RELATING TO THE AUTHORITY'S RESPONSIBILITIES UNDER THIS ACT.
(D) CONSTRUCTION LOANS.--THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY MAY PROVIDE A CONSTRUCTION LOAN UNDER THIS SECTION ONLY IF THE LOAN WILL BE THE SENIOR DEBT SECURED BY THE FACILITY AND DOES NOT EXCEED 60% OF THE FACILITY'S ESTIMATED CONSTRUCTION COST.
(F) APPLICATION CRITERIA.--IN EVALUATING AN APPLICATION FOR A LOAN UNDER THIS SECTION, THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY SHALL CONSIDER ALL OF THE FOLLOWING:
(E) APPLICATION CRITERIA.--THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY SHALL USE THE FOLLOWING CRITERIA TO EVALUATE A LOAN APPLICATION UNDER THIS SECTION:
(1) THE APPLICANT'S:
20250HB1834PN2846 - 17 - (1) THE APPLICANT'S:
(I) QUALITY OF SERVICES AND MANAGEMENT;
(I) QUALITY OF SERVICES AND MANAGEMENT.
(II) EFFICIENCY OF OPERATIONS;
(II) EFFICIENCY OF OPERATIONS.
(III) HISTORY OF OPERATIONS IN THIS COMMONWEALTH AND THE UNITED STATES;
(III) HISTORY OF OPERATIONS IN THIS COMMONWEALTH AND THE UNITED STATES.
(IV) RESOURCE OPERATION ATTRIBUTES;
(IV) RESOURCE OPERATION ATTRIBUTES.
(V) ABILITY TO ADDRESS REGIONAL, LOCAL AND RELIABILITY NEEDS;
(V) ABILITY TO ADDRESS REGIONAL NEEDS, LOCAL NEEDS AND RELIABILITY NEEDS.
(VI) ACCESS TO RESOURCES ESSENTIAL FOR OPERATING THE PROJECT FOR WHICH THE LOAN IS REQUESTED, INCLUDING LAND, WATER AND RELIABLE INFRASTRUCTURE, AS APPLICABLE;
(VI) ACCESS TO RESOURCES ESSENTIAL FOR OPERATING THE PROJECT FOR WHICH THE LOAN IS REQUESTED, INCLUDING LAND, WATER AND RELIABLE INFRASTRUCTURE AS APPLICABLE.
AND (VII) EVIDENCE OF CREDITWORTHINESS AND ABILITY TO REPAY THE LOAN ON THE TERMS ESTABLISHED IN THE LOAN AGREEMENT, INCLUDING TOTAL ASSETS, TOTAL LIABILITIES, NET 20250HB1834PN3061 - 38 - WORTH AND CREDIT RATINGS ISSUED BY MAJOR CREDIT RATING AGENCIES.
(VII) EVIDENCE OF CREDITWORTHINESS AND ABILITY TO REPAY THE LOAN ON THE TERMS ESTABLISHED IN THE LOAN AGREEMENT, INCLUDING TOTAL ASSETS, TOTAL LIABILITIES, NET WORTH AND CREDIT RATINGS ISSUED BY MAJOR CREDIT RATING AGENCIES.
(2) THE GENERATION CAPACITY AND ESTIMATED COST OF THE PROJECT FOR WHICH A GRANT, LOAN OR LOAN GUARANTEE IS REQUESTED.
(2) THE GENERATION CAPACITY AND ESTIMATED COSTS OF THE PROJECT FOR WHICH THE LOAN IS REQUESTED.
(3) ANY OTHER FACTOR THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY CONSIDERS APPROPRIATE.
(3) OTHER FACTORS THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY CONSIDERS APPROPRIATE.
(G) ANNUAL PAYMENTS.-- (1) NO LATER THAN JUNE 1 OF EACH YEAR, EACH COMMERCIAL DATA CENTER WITH AN ANNUAL PEAK LOAD OF AT LEAST 25 MEGAWATTS SHALL PAY INTO THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT AS FOLLOWS:
(F) MONTHLY PAYMENTS.--A LARGE LOAD USER PLACED INTO SERVICE ON OR AFTER THE EFFECTIVE DATE OF THIS SUBSECTION SHALL MAKE A MONTHLY PAYMENT TO THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT EQUAL TO 0.8¢ PER KILOWATT-HOUR OF ACTUAL ENERGY USAGE IN THE PRECEDING MONTH.
(I) $2,000 PER MEGAWATT OF ANNUAL PEAK LOAD UP TO AND INCLUDING 25 MEGAWATTS.
THE MONTHLY PAYMENT SHALL BE REDUCED TO 0.4¢ PER KILOWATT-HOUR IF THE LARGE LOAD USER IS CERTIFIED TO HAVE PROVIDED ITS OWN INCREMENTAL ENERGY RESOURCES AFTER PLACEMENT IN SERVICE OF THE ENERGY RESOURCE OR RESOURCES UNDER A PROGRAM ESTABLISHED BY THE COMMISSION, THE FEDERAL ENERGY REGULATORY COMMISSION OR THE RTO OR INDEPENDENT SYSTEM OPERATOR IN WHICH 20250HB1834PN2846 - 18 - THE APPLICABLE PUBLIC UTILITY PARTICIPATES.
(II) FOR EACH ADDITIONAL MEGAWATT OF ANNUAL PEAK LOAD ABOVE 25 MEGAWATTS, AN ADDITIONAL $2,000 PER MEGAWATT.
(2) A PAYMENT UNDER THIS SUBSECTION SHALL BE REQUIRED FOR THE DURATION OF THE LOAD.
(3) THE COMMISSION MAY ADJUST THE PAYMENT AMOUNTS UNDER THIS SUBSECTION PERIODICALLY TO ACCOUNT FOR INFLATION.
THE COMMISSION SHALL MAKE AN ADJUSTMENT UNDER THIS PARAGRAPH BY PROMULGATING REGULATIONS.
(H) EXEMPTION.--A COMMERCIAL DATA CENTER CERTIFIED BY THE COMMISSION UNDER SECTION 13 TO HAVE BROUGHT ITS OWN INCREMENTAL CLEAN FIRM ENERGY RESOURCES SHALL BE EXEMPT FROM SUBSECTION (G).
RENEWABLE ENERGY REQUIREMENTS.
CLEAN FIRM ENERGY REQUIREMENTS.
ON OR AFTER THE EFFECTIVE DATE OF THIS SECTION, ENERGY SUPPLIED TO LARGE LOAD USERS SHALL INCLUDE NOT LESS THAN 25% OF ELECTRICITY GENERATED FROM RENEWABLE ENERGY SOURCES.
(A) PROCUREMENT REQUIREMENT.--ENERGY SUPPLIED TO A COMMERCIAL DATA CENTER SHALL INCLUDE ELECTRICITY PROCURED FROM INCREMENTAL CLEAN FIRM ENERGY RESOURCES LOCATED WITHIN THIS 20250HB1834PN3061 - 39 - COMMONWEALTH IN AN AMOUNT NOT LESS THAN THE FOLLOWING PERCENTAGES OF THE COMMERCIAL DATA CENTER'S ANNUAL ELECTRICITY CONSUMPTION:
(1) BEGINNING JANUARY 1, 2027, 10%.
(2) BEGINNING JANUARY 1, 2030, 14.5%.
(3) BEGINNING JANUARY 1, 2035, 32%.
(B) INCREMENTAL REQUIREMENT.--AS CERTIFIED BY THE COMMISSION, ONLY INCREMENTAL CAPACITY OR INCREMENTAL NET ADDITIONAL MEGAWATT-HOURS DELIVERED TO THE GRID RELATIVE TO A BASELINE YEAR MAY QUALIFY TO SATISFY SUBSECTION (A).
(C) COMPLIANCE METHODS.--A COMMERCIAL DATA CENTER MAY DEMONSTRATE COMPLIANCE WITH THIS SECTION THROUGH ANY OF THE FOLLOWING:
(1) A POWER PURCHASE AGREEMENT OR OTHER BILATERAL CONTRACT FOR CLEAN FIRM ENERGY.
(2) RETIREMENT OF A CLEAN FIRM ENERGY CERTIFICATE ISSUED THROUGH A REGISTRY ESTABLISHED BY THE COMMISSION.
(3) ANOTHER METHOD OR INSTRUMENT APPROVED BY THE COMMISSION.
(D) COST CONTAINMENT AND FLEXIBILITY.--TO PROTECT SYSTEM RELIABILITY AND RATEPAYER AFFORDABILITY, THE COMMISSION SHALL HAVE THE FOLLOWING DUTIES:
(1) ESTABLISH AN ALTERNATIVE COMPLIANCE PAYMENT AVAILABLE TO A COMMERCIAL DATA CENTER.
(2) PERMIT THE BANKING OF CLEAN FIRM ENERGY CERTIFICATES FOR UP TO THREE COMPLIANCE YEARS.
(3) AUTHORIZE LIMITED BORROWING OF FUTURE-YEAR CERTIFICATES UNDER CONDITIONS DETERMINED BY THE COMMISSION.
(4) TEMPORARILY ADJUST THE PERCENTAGES UNDER SUBSECTION (A) IF THE COMMISSION DETERMINES THAT INSUFFICIENT ELIGIBLE 20250HB1834PN3061 - 40 - IN-STATE SUPPLY OF CLEAN FIRM ENERGY EXISTS FOR A COMPLIANCE YEAR, IF THE COMMISSION ISSUES WRITTEN FINDINGS AND A SCHEDULE FOR RESTORING FULL COMPLIANCE WITH THIS SECTION.
(E) ALTERNATIVE COMPLIANCE PAYMENT.-- (1) A COMMERCIAL DATA CENTER THAT DOES NOT PROCURE OR DEMONSTRATE RETIREMENT OF SUFFICIENT CLEAN FIRM ENERGY CERTIFICATES TO SATISFY SUBSECTION (A) FOR A COMPLIANCE YEAR SHALL MAKE AN ALTERNATIVE COMPLIANCE PAYMENT TO THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT ESTABLISHED UNDER SECTION 6.
(2) THE COMMISSION SHALL ESTABLISH THE RATE OF THE ALTERNATIVE COMPLIANCE PAYMENT BY REGULATION.
THE RATE SHALL BE EXPRESSED IN DOLLARS PER MEGAWATT-HOUR AND SHALL BE CALCULATED IN A MANNER THAT DOES ALL OF THE FOLLOWING:
(I) ENSURES THAT THE ALTERNATIVE COMPLIANCE PAYMENT IS A VIABLE COST CONTAINMENT MECHANISM FOR COMMERCIAL DATA CENTERS.
(II) REFLECTS THE COMMISSION'S ASSESSMENT OF THE MARKET COST OF INCREMENTAL CLEAN FIRM ENERGY RESOURCES.
(III) SUPPORTS THE COMMONWEALTH'S INTEREST IN FACILITATING TIMELY INVESTMENT IN CLEAN FIRM ENERGY AND LONG-DURATION STORAGE RESOURCES LOCATED WITHIN THIS COMMONWEALTH.
(3) AN ALTERNATIVE COMPLIANCE PAYMENT UNDER THIS SUBSECTION SHALL BE DEPOSITED INTO THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT AND USED FOR THE PURPOSES SPECIFIED IN SECTION 6(C), INCLUDING GRANTS, LOANS AND LOAN GUARANTEES TO FINANCE NEW CLEAN FIRM ENERGY SYSTEMS, ENERGY EFFICIENCY PROJECTS, SMALL-SCALE ENERGY SYSTEMS, COMMUNITY ENERGY FACILITIES AND OTHER PROJECTS THAT SUPPORT ENERGY RELIABILITY 20250HB1834PN3061 - 41 - AND INDEPENDENCE IN THIS COMMONWEALTH.
(4) PAYMENT OF AN ALTERNATIVE COMPLIANCE PAYMENT UNDER THIS SUBSECTION SHALL CONSTITUTE FULL COMPLIANCE WITH SUBSECTION (A) FOR THE CORRESPONDING MEGAWATT-HOURS.
CONTRACT FILING, COMMISSION REVIEW AND ENFORCEMENT.
CONTRACT FILING AND COMMISSION REVIEW.
(A) FILING REQUIRED.--AN ELECTRIC DISTRIBUTION COMPANY SHALL FILE WITH THE COMMISSION A COPY OF EACH ELECTRIC SERVICE CONTRACT EXECUTED WITH A LARGE LOAD USER ON OR AFTER THE EFFECTIVE DATE OF THIS SUBSECTION, INCLUDING THE FOLLOWING:
(A) FILING REQUIREMENT.--AN ELECTRIC DISTRIBUTION COMPANY SHALL FILE WITH THE COMMISSION A COPY OF EACH CONTRACT EXECUTED WITH A COMMERCIAL DATA CENTER ON OR AFTER THE EFFECTIVE DATE OF THIS SUBSECTION, INCLUDING ANY OF THE FOLLOWING:
(1) A CONTRACT FOR ELECTRIC SERVICE BETWEEN A PUBLIC UTILITY AND A LARGE LOAD USER FOR HIGH VOLTAGE ELECTRIC SERVICE ENTERED INTO UNDER A COMMISSION-APPROVED RATE SCHEDULE FOR DISTRIBUTION SERVICE.
(1) A CONTRACT FOR ELECTRIC SERVICE BETWEEN A PUBLIC UTILITY AND A COMMERCIAL DATA CENTER ENTERED INTO UNDER A COMMISSION-APPROVED RATE SCHEDULE FOR DISTRIBUTION SERVICE.
(2) A CONSTRUCTION SERVICES AGREEMENT, ENGINEERING AGREEMENT OR SIMILAR AGREEMENT BETWEEN A PUBLIC UTILITY AND A LARGE LOAD USER RELATING TO THE PUBLIC UTILITY'S HIGH VOLTAGE TRANSMISSION INFRASTRUCTURE OR DISTRIBUTION INFRASTRUCTURE.
(2) A CONSTRUCTION SERVICES AGREEMENT, ENGINEERING SERVICES AGREEMENT OR SIMILAR AGREEMENT BETWEEN A PUBLIC UTILITY AND A COMMERCIAL DATA CENTER RELATING TO THE PUBLIC UTILITY'S HIGH-VOLTAGE TRANSMISSION INFRASTRUCTURE OR DISTRIBUTION INFRASTRUCTURE.
(3) A CONSTRUCTION SERVICES AGREEMENT, ENGINEERING SERVICES AGREEMENT OR SIMILAR AGREEMENT BETWEEN A PUBLIC UTILITY AND A LARGE LOAD USER RELATING TO TRANSMISSION INFRASTRUCTURE THAT IS THE SUBJECT OF THE PUBLIC UTILITY'S APPLICATION FOR COMMISSION APPROVAL AND AUTHORIZATION TO LOCATE AND CONSTRUCT A TRANSMISSION LINE OR A PORTION OF A TRANSMISSION LINE WITH A DESIGN VOLTAGE GREATER THAN 100,000 VOLTS.
(3) A CONSTRUCTION SERVICES AGREEMENT, ENGINEERING SERVICES AGREEMENT OR SIMILAR AGREEMENT BETWEEN A PUBLIC UTILITY AND A COMMERCIAL DATA CENTER RELATING TO TRANSMISSION INFRASTRUCTURE THAT IS THE SUBJECT OF THE PUBLIC UTILITY'S APPLICATION FOR COMMISSION APPROVAL AND AUTHORIZATION TO LOCATE AND CONSTRUCT A TRANSMISSION LINE OR A PORTION OF A TRANSMISSION LINE WITH A DESIGN VOLTAGE GREATER THAN 100,000 VOLTS.
(B) DISTRIBUTION OF FILED CONTRACTS.--A PUBLIC UTILITY SHALL PROVIDE A COPY OF AN ELECTRIC SERVICE CONTRACT FILED UNDER THIS SECTION TO THE OFFICE OF CONSUMER ADVOCATE, THE OFFICE OF SMALL BUSINESS ADVOCATE AND BUREAU OF INVESTIGATION AND ENFORCEMENT 20250HB1834PN2846 - 19 - WITHIN THE COMMISSION, SUBJECT TO APPROPRIATE CONFIDENTIALITY PROTECTIVE AGREEMENTS OR ORDERS.
(B) DISTRIBUTION OF FILED CONTRACTS.--A PUBLIC UTILITY SHALL PROVIDE A COPY OF A CONTRACT FILED UNDER SUBSECTION (A) TO THE OFFICE OF CONSUMER ADVOCATE, THE OFFICE OF SMALL BUSINESS ADVOCATE AND THE BUREAU OF INVESTIGATION AND ENFORCEMENT WITHIN THE COMMISSION, SUBJECT TO AN APPROPRIATE CONFIDENTIALITY 20250HB1834PN3061 - 42 - AGREEMENT, PROTECTIVE AGREEMENT OR PROTECTIVE ORDER.
(C) SUPPORTING DOCUMENTATION.--AN ELECTRIC DISTRIBUTION COMPANY SHALL INCLUDE WITH THE FILING SUFFICIENT DOCUMENTATION TO PERMIT THE COMMISSION TO CONDUCT THE REVIEW UNDER SUBSECTION (D).
(C) SUPPORTING DOCUMENTATION.--AN ELECTRIC DISTRIBUTION COMPANY SHALL INCLUDE WITH A FILING UNDER SUBSECTION (A) SUFFICIENT DOCUMENTATION TO PERMIT THE COMMISSION TO CONDUCT THE REVIEW REQUIRED UNDER SUBSECTION (D).
(1) THE IMPACT ON CONTINUED PROVISION OF ELECTRIC SERVICE THAT IS ADEQUATE, SAFE AND RELIABLE TO RESIDENTS AND BUSINESSES OF THIS COMMONWEALTH.
(1) THE IMPACT OF THE CONTRACT ON THE CONTINUED PROVISION OF ELECTRIC SERVICE THAT IS ADEQUATE, SAFE AND RELIABLE TO RESIDENTS AND BUSINESSES OF THIS COMMONWEALTH.
(2) THE IMPACT ON RATEPAYERS AND ELECTRIC BILL AFFORDABILITY FOR RESIDENTIAL CUSTOMERS AND COMMERCIAL CUSTOMERS.
(2) THE IMPACT OF THE CONTRACT ON RATEPAYERS AND ELECTRIC BILL AFFORDABILITY FOR RESIDENTIAL CUSTOMERS AND COMMERCIAL CUSTOMERS.
(3) COMPLIANCE WITH SECTIONS 3, 4 AND 7.
(3) WHETHER THE CONTRACT IS REASONABLY LIKELY TO RESULT IN A MATERIAL ADVERSE IMPACT ON ELECTRIC BILL AFFORDABILITY OR RELIABILITY FOR RESIDENTIAL CUSTOMERS.
(4) WHETHER THE CONTRACT COMPLIES WITH SECTIONS 3, 4 AND 7.
(E) APPROVAL STANDARD.--THE COMMISSION MAY NOT APPROVE A CONTRACT UNDER THIS ACT IF THE COMMISSION FINDS THAT THE CONTRACT IS REASONABLY LIKELY TO RESULT IN A MATERIAL ADVERSE IMPACT ON ELECTRIC BILL AFFORDABILITY OR RELIABILITY FOR RESIDENTIAL CUSTOMERS.
AS A CONDITION OF APPROVAL, THE COMMISSION MAY REQUIRE THE IMPOSITION OF ANY REASONABLE MITIGATION MEASURE NECESSARY TO ENSURE THAT THE CONTRACT WILL NOT RESULT IN A MATERIAL ADVERSE IMPACT ON ELECTRIC BILL AFFORDABILITY OR RELIABILITY FOR RESIDENTIAL CUSTOMERS.
(A) REPORT.--THE COMMISSION SHALL SUBMIT A WRITTEN REPORT TO THE GENERAL ASSEMBLY EACH YEAR FOR A MINIMUM OF 10 YEARS AND SHALL MAKE A PUBLIC VERSION OF THE REPORT AVAILABLE ON ITS PUBLICLY ACCESSIBLE INTERNET WEBSITE.
20250HB1834PN3061 - 43 - (A) REPORT.--FOR AT LEAST 10 YEARS, THE COMMISSION SHALL SUBMIT A WRITTEN REPORT TO THE GENERAL ASSEMBLY EACH YEAR AND SHALL MAKE A PUBLIC VERSION OF THE REPORT AVAILABLE ON THE COMMISSION'S PUBLICLY ACCESSIBLE INTERNET WEBSITE.
(B) CONTENTS.--THE REPORT SHALL DESCRIBE ALL OF THE FOLLOWING:
(B) CONTENTS.--THE REPORT SHALL INCLUDE ALL OF THE FOLLOWING:
(1) THE COMMISSION'S EFFORTS TO IMPLEMENT THIS ACT DURING THE PRIOR YEAR.
(1) THE COMMISSION'S EFFORTS DURING THE PRIOR YEAR TO IMPLEMENT THIS ACT.
(2) THE COMMISSION'S DETERMINATIONS UNDER SECTION 8(D) REGARDING THE IMPACT OF LARGE LOAD USERS ON CONTINUED PROVISION OF ADEQUATE, SAFE AND RELIABLE ELECTRIC SERVICE TO RESIDENTS AND BUSINESSES OF THIS COMMONWEALTH, THE IMPACT ON 20250HB1834PN2846 - 20 - RATEPAYERS AND ELECTRIC BILL AFFORDABILITY AND COMPLIANCE WITH SECTIONS 3, 4 AND 7.
(2) THE COMMISSION'S DETERMINATIONS UNDER SECTION 8(D) REGARDING THE IMPACT OF COMMERCIAL DATA CENTERS ON THE CONTINUED PROVISION OF ELECTRIC SERVICE THAT IS ADEQUATE, SAFE AND RELIABLE TO RESIDENTS AND BUSINESSES OF THIS COMMONWEALTH, THE IMPACT ON RATEPAYERS AND ELECTRIC BILL AFFORDABILITY AND COMPLIANCE WITH SECTIONS 3, 4 AND 7.
(3) RECOMMENDATIONS FOR LEGISLATIVE CHANGES OR REGULATORY CHANGES TO FURTHER IMPROVE THE COMMISSION'S OVERSIGHT RESPONSIBILITIES UNDER THIS ACT.
(3) RECOMMENDATIONS FOR LEGISLATIVE OR REGULATORY CHANGES TO IMPROVE THE COMMISSION'S OVERSIGHT RESPONSIBILITIES UNDER THIS ACT.
(A) INTERCONNECTION REQUESTS.--THE COMMISSION SHALL REQUIRE EACH PLANNED LARGE LOAD USER TO DISCLOSE TO THE COMMISSION, THE APPLICABLE ELECTRIC DISTRIBUTION COMPANY AND THE APPLICABLE RTO OR INDEPENDENT SYSTEM OPERATOR WHETHER THE PLANNED LARGE LOAD USER IS PURSUING A SUBSTANTIALLY SIMILAR REQUEST FOR ELECTRIC SERVICE WITHIN THIS COMMONWEALTH OR WITHIN THE APPLICABLE RTO OR INDEPENDENT SYSTEM OPERATOR, THE APPROVAL OF WHICH WOULD RESULT IN A MATERIAL CHANGE, A DELAY OR A WITHDRAWAL OF THE INTERCONNECTION REQUEST.
(A) INTERCONNECTION REQUESTS.--THE COMMISSION SHALL REQUIRE EACH PLANNED COMMERCIAL DATA CENTER TO DISCLOSE TO THE COMMISSION, THE APPLICABLE ELECTRIC DISTRIBUTION COMPANY AND THE APPLICABLE REGIONAL TRANSMISSION ORGANIZATION OR INDEPENDENT SYSTEM OPERATOR WHETHER THE PLANNED COMMERCIAL DATA CENTER IS PURSUING A SUBSTANTIALLY SIMILAR REQUEST FOR ELECTRIC SERVICE WITHIN THIS COMMONWEALTH OR WITHIN THE APPLICABLE REGIONAL TRANSMISSION ORGANIZATION OR INDEPENDENT SYSTEM OPERATOR IF APPROVAL OF THE SUBSTANTIALLY SIMILAR REQUEST WOULD RESULT IN A CHANGE, DELAY OR WITHDRAWAL OF THE INTERCONNECTION REQUEST.
THE COMMISSION SHALL PROHIBIT OR SET REASONABLE RESTRICTIONS ON THE SALE OR DISCLOSURE OF INFORMATION PROVIDED TO AN ELECTRIC DISTRIBUTION COMPANY UNDER THIS SUBSECTION.
THE COMMISSION SHALL PROHIBIT OR IMPOSE REASONABLE 20250HB1834PN3061 - 44 - RESTRICTIONS ON THE SALE OR DISCLOSURE OF INFORMATION PROVIDED TO AN ELECTRIC DISTRIBUTION COMPANY UNDER THIS SUBSECTION.
(B) BACKUP GENERATION.--THE COMMISSION SHALL REQUIRE EACH PLANNED LARGE LOAD USER TO DISCLOSE TO THE COMMISSION, THE APPLICABLE ELECTRIC DISTRIBUTION COMPANY AND THE APPLICABLE RTO OR INDEPENDENT SYSTEM OPERATOR INFORMATION ABOUT THE PLANNED LARGE LOAD USER'S BACKUP GENERATION RESOURCES AND STORAGE RESOURCES AND THE CAPABILITY TO RELY ON BACKUP GENERATION RESOURCES OR STORAGE RESOURCES DURING PERIODS OF REQUIRED LOAD SHED OR CURTAILMENT, INCLUDING THE AMOUNT OF NOTICE REQUIRED TO DEPLOY BACKUP GENERATION RESOURCES OR STORAGE RESOURCES.
(B) BACKUP GENERATION.--THE COMMISSION SHALL REQUIRE EACH PLANNED COMMERCIAL DATA CENTER TO DISCLOSE TO THE COMMISSION, THE APPLICABLE ELECTRIC DISTRIBUTION COMPANY AND THE APPLICABLE REGIONAL TRANSMISSION ORGANIZATION OR INDEPENDENT SYSTEM OPERATOR INFORMATION REGARDING THE PLANNED COMMERCIAL DATA CENTER'S BACKUP GENERATION RESOURCES AND STORAGE RESOURCES AND THE PLANNED COMMERCIAL DATA CENTER'S CAPABILITY TO RELY ON BACKUP GENERATION RESOURCES OR STORAGE RESOURCES DURING A PERIOD OF REQUIRED LOAD SHEDDING OR CURTAILMENT, INCLUDING THE AMOUNT OF NOTICE REQUIRED TO DEPLOY BACKUP GENERATION RESOURCES OR STORAGE RESOURCES.
CURTAILMENT STANDARDS.
BACKUP GENERATION STANDARDS.
(A) DIRECTION TO LARGE LOAD USERS.--THE COMMISSION SHALL 20250HB1834PN2846 - 21 - REQUIRE ELECTRIC DISTRIBUTION COMPANIES, DURING PERIODS OF EMERGENCY CURTAILMENT OR MANUAL LOAD DUMP, TO DIRECT LARGE LOAD USERS TO DEPLOY BACKUP GENERATION RESOURCES OR STORAGE RESOURCES OR CURTAIL LOAD BEFORE CURTAILMENT OR MANUAL LOAD DUMP OF RESIDENTIAL CUSTOMERS OR SMALL COMMERCIAL CUSTOMERS.
A COMMERCIAL DATA CENTER'S ONSITE FOSSIL-FUELED BACKUP GENERATION SHALL COMPLY WITH ALL OF THE FOLLOWING:
(B) PRIORITY.--THE COMMISSION MAY REQUIRE AN ELECTRIC DISTRIBUTION COMPANY TO PRIORITIZE ISSUANCE OF A DIRECTION UNDER SUBSECTION (A) TO A LARGE LOAD USER THAT IS NOT CERTIFIED TO HAVE BROUGHT ITS OWN INCREMENTAL ENERGY RESOURCES AFTER PLACEMENT IN SERVICE OF THE ENERGY RESOURCE OR RESOURCES UNDER A PROGRAM ESTABLISHED BY THE COMMISSION, THE FEDERAL ENERGY REGULATORY COMMISSION OR THE RTO OR INDEPENDENT SYSTEM OPERATOR IN WHICH THE APPLICABLE PUBLIC UTILITY PARTICIPATES.
(1) MEET OR EXCEED THE TIER 4 EMISSIONS STANDARDS OF THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY OR BOTH MEET THE TIER 2 EMISSIONS STANDARDS AND BE EQUIPPED WITH A SELECTIVE CATALYTIC REDUCTION SYSTEM OR ANOTHER EMISSIONS CONTROL SYSTEM THAT MORE STRINGENTLY REDUCES NITROGEN OXIDES, WHERE APPLICABLE.
(C) ENVIRONMENTAL COMPLIANCE.--NOTHING IN THIS SECTION SHALL BE CONSTRUED TO AUTHORIZE OR REQUIRE A VIOLATION OF AN EMISSIONS LIMITATION UNDER FEDERAL OR STATE LAW OR A VIOLATION OF ANOTHER ENVIRONMENTAL REGULATION.
(2) BE LIMITED TO EMERGENCY USE AND LIMITED TESTING AND MAINTENANCE CONSISTENT WITH FEDERAL AND STATE AIR QUALITY LAWS AND REGULATIONS.
(3) BE PERMITTED, MONITORED AND REPORTED IN THE AGGREGATE AS A SINGLE EMISSIONS SOURCE OR AS PART OF A SINGLE EMISSIONS SOURCE, WHERE PRACTICABLE, IN COORDINATION WITH THE DEPARTMENT OF ENVIRONMENTAL PROTECTION.
CERTIFICATION AND EXPEDITED INTERCONNECTION FOR LARGE LOAD USERS BRINGING INCREMENTAL ENERGY RESOURCES.
CURTAILMENT STANDARDS.
(A) CERTIFICATION PROGRAM.--THE COMMISSION SHALL ESTABLISH A PROGRAM TO CERTIFY LARGE LOAD USERS THAT HAVE BROUGHT OR PLAN TO BRING INCREMENTAL ENERGY RESOURCES.
20250HB1834PN3061 - 45 - (A) DIRECTION TO COMMERCIAL DATA CENTERS.--DURING A PERIOD OF EMERGENCY CURTAILMENT OR MANUAL LOAD DUMP, THE COMMISSION SHALL REQUIRE AN ELECTRIC DISTRIBUTION COMPANY TO DIRECT A COMMERCIAL DATA CENTER TO DEPLOY BACKUP GENERATION RESOURCES OR STORAGE RESOURCES OR CURTAIL LOAD BEFORE THE ELECTRIC DISTRIBUTION COMPANY CURTAILS SERVICE TO A RESIDENTIAL CUSTOMER OR SMALL COMMERCIAL CUSTOMER.
CERTIFICATION SHALL BE BASED ON A BINDING FINANCIAL COMMITMENT BY A LARGE LOAD USER, INCLUDING A POWER PURCHASE AGREEMENT, TO ENABLE AN INCREMENTAL ENERGY RESOURCE OR RESOURCES EQUIVALENT ON A ONE-FOR-ONE ACCREDITED UNFORCED CAPACITY BASIS, INCLUDING A REASONABLE RESERVE MARGIN, TIED TO THE LARGE LOAD USER'S RAMP AND UTILIZATION SCHEDULE, THROUGH ANY COMBINATION OF THE FOLLOWING (1) PLACEMENT IN SERVICE OF A NEW GENERATION RESOURCE OR 20250HB1834PN2846 - 22 - COMBINED GENERATION AND STORAGE RESOURCE.
(B) PRIORITY.--THE COMMISSION MAY REQUIRE AN ELECTRIC DISTRIBUTION COMPANY TO GIVE PRIORITY UNDER SUBSECTION (A) TO A COMMERCIAL DATA CENTER THAT HAS NOT BEEN CERTIFIED TO HAVE BROUGHT ITS OWN INCREMENTAL CLEAN FIRM ENERGY RESOURCES INTO SERVICE UNDER A PROGRAM ESTABLISHED BY THE COMMISSION, THE FEDERAL ENERGY REGULATORY COMMISSION OR THE REGIONAL TRANSMISSION ORGANIZATION OR INDEPENDENT SYSTEM OPERATOR IN WHICH THE APPLICABLE PUBLIC UTILITY PARTICIPATES.
(2) UPRATE OR EXPANSION OF AN EXISTING GENERATION RESOURCE TO THE EXTENT OF THE UPRATED CAPACITY.
(C) ENVIRONMENTAL COMPLIANCE.--NOTHING IN THIS SECTION SHALL BE CONSTRUED TO AUTHORIZE OR REQUIRE A VIOLATION OF A FEDERAL OR STATE EMISSIONS LIMITATION OR ANOTHER FEDERAL OR STATE ENVIRONMENTAL LAW OR REGULATION.
(3) PARTICIPATION IN A DEMAND RESPONSE PRODUCT, IF PARTICIPATION CONTINUES FOR THE DURATION OF THE CERTIFICATION PERIOD OR UNTIL THE LARGE LOAD USER HAS BROUGHT ADDITIONAL ENERGY CAPACITY EQUIVALENT TO THE CAPACITY VALUE OF THE DEMAND RESPONSE PRODUCT.
(4) ANOTHER INCREMENTAL ADDITION OF ACCREDITED UNFORCED CAPACITY AS MEASURED BY THE APPLICABLE RTO OR INDEPENDENT SYSTEM OPERATOR.
(B) INTERCONNECTION PRIORITY.--THE COMMISSION SHALL REQUIRE ELECTRIC DISTRIBUTION COMPANIES TO PRIORITIZE THE INTERCONNECTION OF LARGE LOAD USERS CERTIFIED UNDER SUBSECTION (A) AND, FOR INTERCONNECTIONS SUBJECT TO STATE JURISDICTION, TO PRIORITIZE THE INTERCONNECTION OF PAIRED GENERATION RESOURCES OR STORAGE RESOURCES ASSOCIATED WITH A CERTIFIED LARGE LOAD USER.
ENFORCEMENT.
CERTIFICATION AND EXPEDITED INTERCONNECTION FOR COMMERCIAL DATA CENTERS BRINGING INCREMENTAL CLEAN FIRM ENERGY RESOURCES.
A VIOLATION OF THIS ACT SHALL BE SUBJECT TO ENFORCEMENT BY THE COMMISSION UNDER 66 PA.C.S.
(A) CERTIFICATION PROGRAM.--THE COMMISSION SHALL ESTABLISH A PROGRAM TO CERTIFY A COMMERCIAL DATA CENTER THAT HAS BROUGHT OR PLANS TO BRING INCREMENTAL CLEAN FIRM ENERGY RESOURCES.
CH.
CERTIFICATION SHALL BE BASED ON A BINDING FINANCIAL COMMITMENT BY THE COMMERCIAL DATA CENTER, INCLUDING A POWER PURCHASE AGREEMENT, TO ENABLE INCREMENTAL CLEAN FIRM ENERGY RESOURCES ON A ONE-FOR-ONE ACCREDITED UNFORCED CAPACITY BASIS, INCLUDING A REASONABLE RESERVE MARGIN, TIED TO THE COMMERCIAL DATA CENTER'S 20250HB1834PN3061 - 46 - RAMP-UP AND UTILIZATION SCHEDULE, THROUGH ANY COMBINATION OF THE FOLLOWING:
33 (RELATING TO VIOLATIONS AND PENALTIES).
(1) PLACEMENT IN SERVICE BY THE COMMERCIAL DATA CENTER OR A THIRD PARTY OF AN INCREMENTAL CLEAN FIRM ENERGY RESOURCE OR COMBINED GENERATION AND STORAGE RESOURCE WITHIN THE REGIONAL TRANSMISSION ORGANIZATION THAT SERVES THE COMMERCIAL DATA CENTER.
SECTION 14.
(2) AN UPRATE OR EXPANSION OF AN EXISTING CLEAN FIRM ENERGY RESOURCE OR COMBINED GENERATION AND STORAGE RESOURCE WITHIN THE REGIONAL TRANSMISSION ORGANIZATION THAT SERVES THE COMMERCIAL DATA CENTER, TO THE EXTENT OF THE ADDITIONAL ACCREDITED UNFORCED CAPACITY.
CONSTRUCTION.
(3) PARTICIPATION IN A DEMAND RESPONSE PRODUCT, IF THE PARTICIPATION CONTINUES FOR THE DURATION OF THE CERTIFICATION PERIOD OR UNTIL THE COMMERCIAL DATA CENTER HAS BROUGHT ADDITIONAL ACCREDITED UNFORCED CAPACITY EQUIVALENT TO THE CAPACITY VALUE OF THE DEMAND RESPONSE PRODUCT.
NOTHING IN THIS ACT SHALL BE CONSTRUED TO AUTHORIZE AN ELECTRIC DISTRIBUTION COMPANY TO OWN ELECTRIC GENERATION SUPPLY IN THIS COMMONWEALTH.
(4) ANOTHER INCREMENTAL ADDITION OF ACCREDITED UNFORCED CAPACITY FROM INCREMENTAL CLEAN FIRM ENERGY RESOURCES, AS MEASURED BY THE APPLICABLE REGIONAL TRANSMISSION ORGANIZATION OR INDEPENDENT SYSTEM OPERATOR.
SECTION 15.
(B) INTERCONNECTION PRIORITY.--THE COMMISSION SHALL REQUIRE AN ELECTRIC DISTRIBUTION COMPANY TO GIVE PRIORITY TO THE INTERCONNECTION OF A COMMERCIAL DATA CENTER CERTIFIED UNDER SUBSECTION (A).
EFFECTIVE DATE.
FOR AN INTERCONNECTION SUBJECT TO STATE JURISDICTION, THE COMMISSION SHALL ALSO REQUIRE AN ELECTRIC DISTRIBUTION COMPANY TO GIVE PRIORITY TO THE INTERCONNECTION OF AN INCREMENTAL CLEAN FIRM ENERGY RESOURCE OR COMBINED GENERATION AND STORAGE RESOURCE ASSOCIATED WITH A CERTIFIED COMMERCIAL DATA CENTER.
THIS ACT SHALL TAKE EFFECT IN 60 DAYS.
20250HB1834PN3061 - 47 - Section 13 14.
20250HB1834PN2846 - 23 -
Enforcement.
<-- A violation of this act shall be subject to enforcement by the commission under 66 Pa.C.S.
Ch.
33 (relating to violations and penalties).
Section 14 15.
Construction.
<-- Nothing in this act shall be construed to authorize an electric distribution company to own electric generation supply in this Commonwealth.
Section 15 16.
Effective date.
<-- This act shall take effect in 60 days.
20250HB1834PN3061 - 48 -
View plain text versions (3)

Action History

  1. Referred to Consumer Protection & Professional Licensure

  2. Third consideration and final passage

  3. Re-reported as committed

  4. Re-committed to Appropriations

  5. Second consideration, with amendments

  6. Removed from table

  7. Laid on the table

  8. First consideration

  9. Reported as amended

  10. Referred to Energy

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 43 co-sponsors · 209 not signed on · 155 voted No

Sponsors (1)

Co-sponsors (43)

Not signed on (209)

209 members have not signed on to this bill.

Show all 209 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 22 Yea · 15 Nay
Party YeaNayPresentNot Voting
Democratic 22000
Republican 01500
Total 221500
% of votes cast 59%41%0%0%
How each member voted (37)
Member Party Vote
Abigail Salisbury Democratic Yea
Aerion Abney Democratic Yea
Anthony A. Bellmon Democratic Yea
Ben Waxman Democratic Yea
Benjamin V. Sanchez Democratic Yea
Bridget M. Kosierowski Democratic Yea
Dave Madsen Democratic Yea
Emily Kinkead Democratic Yea
Gina H. Curry Democratic Yea
Joe Webster Democratic Yea
Jordan A. Harris Democratic Yea
Justin C. Fleming Democratic Yea
Kyle Donahue Democratic Yea
Kyle J. Mullins Democratic Yea
La'Tasha D. Mayes Democratic Yea
Manuel Guzman Democratic Yea
Pat Gallagher Democratic Yea
Paul Friel Democratic Yea
Regina G. Young Democratic Yea
Steven R. Malagari Democratic Yea
Tarik Khan Democratic Yea
Tim Brennan Democratic Yea
Ann Flood Republican Nay
Chad G. Reichard Republican Nay
Charity Grimm Krupa Republican Nay
Eric Davanzo Republican Nay
Eric R. Nelson Republican Nay
James B. Struzzi Republican Nay
Jamie Barton Republican Nay
Jeff Olsommer Republican Nay
Jim Rigby Republican Nay
Joshua D. Kail Republican Nay
Kristin Marcell Republican Nay
Marci Mustello Republican Nay
Marla Brown Republican Nay
Thomas H. Kutz Republican Nay
Zachary Mako Republican Nay

Official roll call →

FINAL PASSAGE

Passed 104 Yea · 95 Nay · 1 Other
Party YeaNayPresentNot Voting
Republican 29401
Democratic 102000
Unaffiliated 0100
Total 1049501
% of votes cast 52%48%0%1%
How each member voted (200)
Member Party Vote
Stephenie Scialabba — Nay
Abigail Salisbury Democratic Yea
Aerion Abney Democratic Yea
Amen Brown Democratic Yea
Ana Tiburcio Democratic Yea
Andre D. Carroll Democratic Yea
Anita Astorino Kulik Democratic Yea
Anthony A. Bellmon Democratic Yea
Arvind Venkat Democratic Yea
Ben Waxman Democratic Yea
Benjamin V. Sanchez Democratic Yea
Brandon J. Markosek Democratic Yea
Brian Munroe Democratic Yea
Bridget M. Kosierowski Democratic Yea
Carol Hill-Evans Democratic Yea
Carol Kazeem Democratic Yea
Chris Pielli Democratic Yea
Christina D. Sappey Democratic Yea
Christopher M. Rabb Democratic Yea
Dan Frankel Democratic Yea
Dan Goughnour Democratic Yea
Dan K. Williams Democratic Yea
Daniel J. Deasy Democratic Yea
Danielle Friel Otten Democratic Yea
Danilo Burgos Democratic Yea
Darisha K. Parker Democratic Yea
Dave Madsen Democratic Yea
David M. Delloso Democratic Yea
Ed Neilson Democratic Yea
Eddie Day Pashinski Democratic Yea
Elizabeth Fiedler Democratic Yea
Emily Kinkead Democratic Yea
Frank Burns Democratic Yea
G. Roni Green Democratic Yea
Gina H. Curry Democratic Yea
Greg Scott Democratic Yea
Greg Vitali Democratic Yea
Heather Boyd Democratic Yea
Ismail Smith-Wade-El Democratic Yea
Jacklyn Rusnock Democratic Yea
Jared G. Solomon Democratic Yea
Jason Dawkins Democratic Yea
Jeanne McNeill Democratic Yea
Jen Mazzocco Democratic Yea
Jennifer O'Mara Democratic Yea
Jessica Benham Democratic Yea
Jim Haddock Democratic Yea
Jim Prokopiak Democratic Yea
Joanna E. McClinton Democratic Yea
Joe Ciresi Democratic Yea
Joe McAndrew Democratic Yea
Joe Webster Democratic Yea
Johanny Cepeda-Freytiz Democratic Yea
John C. Inglis III Democratic Yea
Jordan A. Harris Democratic Yea
Jose Giral Democratic Yea
Joseph C. Hohenstein Democratic Yea
Justin C. Fleming Democratic Yea
Keith S. Harris Democratic Yea
Kristine C. Howard Democratic Yea
Kyle Donahue Democratic Yea
Kyle J. Mullins Democratic Yea
La'Tasha D. Mayes Democratic Yea
Leanne Krueger Democratic Yea
Lindsay Powell Democratic Yea
Lisa A. Borowski Democratic Yea
Liz Hanbidge Democratic Yea
Malcolm Kenyatta Democratic Yea
Mandy Steele Democratic Yea
Manuel Guzman Democratic Yea
Mary Jo Daley Democratic Yea
MaryLouise Isaacson Democratic Yea
Matthew D. Bradford Democratic Yea
Maureen E. Madden Democratic Yea
Melissa Cerrato Democratic Yea
Melissa L. Shusterman Democratic Yea
Michael H. Schlossberg Democratic Yea
Morgan Cephas Democratic Yea
Nancy Guenst Democratic Yea
Napoleon J. Nelson Democratic Yea
Nathan Davidson Democratic Yea
Nikki Rivera Democratic Yea
Pat Gallagher Democratic Yea
Patrick J. Harkins Democratic Yea
Paul Friel Democratic Yea
Paul Takac Democratic Yea
Perry S. Warren Democratic Yea
Peter Schweyer Democratic Yea
Regina G. Young Democratic Yea
Rick Krajewski Democratic Yea
Robert E. Merski Democratic Yea
Robert F. Matzie Democratic Yea
Robert Freeman Democratic Yea
Ryan A. Bizzarro Democratic Yea
Scott Conklin Democratic Yea
Sean Dougherty Democratic Yea
Steve Samuelson Democratic Yea
Steven R. Malagari Democratic Yea
Tarah Probst Democratic Yea
Tarik Khan Democratic Yea
Tim Brennan Democratic Yea
Tim Briggs Democratic Yea
Tina M. Davis Democratic Yea
Aaron Bernstine Republican Nay
Abby Major Republican Nay
Alec J. Ryncavage Republican Nay
Andrew Kuzma Republican Nay
Ann Flood Republican Nay
Barbara Gleim Republican Nay
Brad Roae Republican Nay
Brenda M. Pugh Republican Nay
Brett R. Miller Republican Nay
Brian C. Rasel Republican Nay
Brian Smith Republican Nay
Bryan Cutler Republican Nay
Bud Cook Republican Nay
Carl Walker Metzgar Republican Nay
Chad G. Reichard Republican Nay
Charity Grimm Krupa Republican Nay
Clint Owlett Republican Nay
Craig T. Staats Republican Nay
Craig Williams Republican Nay
Dallas Kephart Republican Nay
Dan Moul Republican Nay
Dane Watro Republican Nay
David H. Rowe Republican Nay
David H. Zimmerman Republican Nay
David M. Maloney Republican Nay
Donna Scheuren Republican Nay
Doyle Heffley Republican Nay
Eric Davanzo Republican Nay
Eric J. Weaknecht Republican Nay
Eric R. Nelson Republican Nay
Gary W. Day Republican Nay
Jack Rader Republican Nay
Jacob D. Banta Republican Nay
James B. Struzzi Republican Nay
Jamie Barton Republican Nay
Jamie L. Flick Republican Nay
Jamie Walsh Republican Nay
Jason Ortitay Republican Nay
Jeff Olsommer Republican Nay
Jeremy Shaffer Republican Nay
Jesse Topper Republican Nay
Jill N. Cooper Republican Nay
Jim Rigby Republican Nay
Joanne Stehr Republican Nay
Joe Emrick Republican Nay
Joe Hamm Republican Nay
Joe Hogan Republican Yea
Joe Kerwin Republican Nay
John A. Lawrence Republican Nay
John A. Schlegel Republican Nay
Jonathan Fritz Republican Nay
Joseph D'Orsie Republican Nay
Josh Bashline Republican Nay
Joshua D. Kail Republican Nay
Kate A. Klunk Republican Nay
Kathleen C. Tomlinson Republican Yea
Kathy L. Rapp Republican Nay
Keith J. Greiner Republican Nay
Kerry A. Benninghoff Republican Nay
Kristin Marcell Republican Nay
Leslie Rossi Republican Nay
Marc S. Anderson Republican Nay
Marci Mustello Republican Nay
Mark M. Gillen Republican Nay
Marla Brown Republican Nay
Martin T. Causer Republican Nay
Martina A. White Republican Not Voting
Michael Stender Republican Nay
Mike Armanini Republican Nay
Mike Jones Republican Nay
Milou Mackenzie Republican Nay
Mindy Fee Republican Nay
Natalie Mihalek Republican Nay
Parke Wentling Republican Nay
Perry A. Stambaugh Republican Nay
R. Lee James Republican Nay
Rich Irvin Republican Nay
Rob W. Kauffman Republican Nay
Robert Leadbeter Republican Nay
Roman Kozak Republican Nay
Russ Diamond Republican Nay
Ryan Warner Republican Nay
Scott Barger Republican Nay
Shelby Labs Republican Nay
Sheryl M. Delozier Republican Nay
Stephanie Borowicz Republican Nay
Steven C. Mentzer Republican Nay
Thomas H. Kutz Republican Nay
Thomas L. Mehaffie Republican Nay
Tim Twardzik Republican Nay
Timothy J. O'Neal Republican Nay
Timothy R. Bonner Republican Nay
Tina Pickett Republican Nay
Tom Jones Republican Nay
Valerie S. Gaydos Republican Nay
Wendy Fink Republican Nay
Zachary Mako Republican Nay

Official roll call →

A2696

Passed 102 Yea · 97 Nay · 1 Other
Party YeaNayPresentNot Voting
Democratic 101100
Republican 19501
Unaffiliated 0100
Total 1029701
% of votes cast 51%49%0%1%
How each member voted (200)
Member Party Vote
Stephenie Scialabba — Nay
Abigail Salisbury Democratic Yea
Aerion Abney Democratic Yea
Amen Brown Democratic Yea
Ana Tiburcio Democratic Yea
Andre D. Carroll Democratic Yea
Anita Astorino Kulik Democratic Yea
Anthony A. Bellmon Democratic Yea
Arvind Venkat Democratic Yea
Ben Waxman Democratic Yea
Benjamin V. Sanchez Democratic Yea
Brandon J. Markosek Democratic Yea
Brian Munroe Democratic Yea
Bridget M. Kosierowski Democratic Yea
Carol Hill-Evans Democratic Yea
Carol Kazeem Democratic Yea
Chris Pielli Democratic Yea
Christina D. Sappey Democratic Yea
Christopher M. Rabb Democratic Yea
Dan Frankel Democratic Yea
Dan Goughnour Democratic Yea
Dan K. Williams Democratic Yea
Daniel J. Deasy Democratic Yea
Danielle Friel Otten Democratic Yea
Danilo Burgos Democratic Yea
Darisha K. Parker Democratic Yea
Dave Madsen Democratic Yea
David M. Delloso Democratic Yea
Ed Neilson Democratic Yea
Eddie Day Pashinski Democratic Yea
Elizabeth Fiedler Democratic Yea
Emily Kinkead Democratic Yea
Frank Burns Democratic Nay
G. Roni Green Democratic Yea
Gina H. Curry Democratic Yea
Greg Scott Democratic Yea
Greg Vitali Democratic Yea
Heather Boyd Democratic Yea
Ismail Smith-Wade-El Democratic Yea
Jacklyn Rusnock Democratic Yea
Jared G. Solomon Democratic Yea
Jason Dawkins Democratic Yea
Jeanne McNeill Democratic Yea
Jen Mazzocco Democratic Yea
Jennifer O'Mara Democratic Yea
Jessica Benham Democratic Yea
Jim Haddock Democratic Yea
Jim Prokopiak Democratic Yea
Joanna E. McClinton Democratic Yea
Joe Ciresi Democratic Yea
Joe McAndrew Democratic Yea
Joe Webster Democratic Yea
Johanny Cepeda-Freytiz Democratic Yea
John C. Inglis III Democratic Yea
Jordan A. Harris Democratic Yea
Jose Giral Democratic Yea
Joseph C. Hohenstein Democratic Yea
Justin C. Fleming Democratic Yea
Keith S. Harris Democratic Yea
Kristine C. Howard Democratic Yea
Kyle Donahue Democratic Yea
Kyle J. Mullins Democratic Yea
La'Tasha D. Mayes Democratic Yea
Leanne Krueger Democratic Yea
Lindsay Powell Democratic Yea
Lisa A. Borowski Democratic Yea
Liz Hanbidge Democratic Yea
Malcolm Kenyatta Democratic Yea
Mandy Steele Democratic Yea
Manuel Guzman Democratic Yea
Mary Jo Daley Democratic Yea
MaryLouise Isaacson Democratic Yea
Matthew D. Bradford Democratic Yea
Maureen E. Madden Democratic Yea
Melissa Cerrato Democratic Yea
Melissa L. Shusterman Democratic Yea
Michael H. Schlossberg Democratic Yea
Morgan Cephas Democratic Yea
Nancy Guenst Democratic Yea
Napoleon J. Nelson Democratic Yea
Nathan Davidson Democratic Yea
Nikki Rivera Democratic Yea
Pat Gallagher Democratic Yea
Patrick J. Harkins Democratic Yea
Paul Friel Democratic Yea
Paul Takac Democratic Yea
Perry S. Warren Democratic Yea
Peter Schweyer Democratic Yea
Regina G. Young Democratic Yea
Rick Krajewski Democratic Yea
Robert E. Merski Democratic Yea
Robert F. Matzie Democratic Yea
Robert Freeman Democratic Yea
Ryan A. Bizzarro Democratic Yea
Scott Conklin Democratic Yea
Sean Dougherty Democratic Yea
Steve Samuelson Democratic Yea
Steven R. Malagari Democratic Yea
Tarah Probst Democratic Yea
Tarik Khan Democratic Yea
Tim Brennan Democratic Yea
Tim Briggs Democratic Yea
Tina M. Davis Democratic Yea
Aaron Bernstine Republican Nay
Abby Major Republican Nay
Alec J. Ryncavage Republican Nay
Andrew Kuzma Republican Nay
Ann Flood Republican Nay
Barbara Gleim Republican Nay
Brad Roae Republican Nay
Brenda M. Pugh Republican Nay
Brett R. Miller Republican Nay
Brian C. Rasel Republican Nay
Brian Smith Republican Nay
Bryan Cutler Republican Nay
Bud Cook Republican Nay
Carl Walker Metzgar Republican Nay
Chad G. Reichard Republican Nay
Charity Grimm Krupa Republican Nay
Clint Owlett Republican Nay
Craig T. Staats Republican Nay
Craig Williams Republican Nay
Dallas Kephart Republican Nay
Dan Moul Republican Nay
Dane Watro Republican Nay
David H. Rowe Republican Nay
David H. Zimmerman Republican Nay
David M. Maloney Republican Nay
Donna Scheuren Republican Nay
Doyle Heffley Republican Nay
Eric Davanzo Republican Nay
Eric J. Weaknecht Republican Nay
Eric R. Nelson Republican Nay
Gary W. Day Republican Nay
Jack Rader Republican Nay
Jacob D. Banta Republican Nay
James B. Struzzi Republican Nay
Jamie Barton Republican Nay
Jamie L. Flick Republican Nay
Jamie Walsh Republican Yea
Jason Ortitay Republican Nay
Jeff Olsommer Republican Nay
Jeremy Shaffer Republican Nay
Jesse Topper Republican Nay
Jill N. Cooper Republican Nay
Jim Rigby Republican Nay
Joanne Stehr Republican Nay
Joe Emrick Republican Nay
Joe Hamm Republican Nay
Joe Hogan Republican Nay
Joe Kerwin Republican Nay
John A. Lawrence Republican Nay
John A. Schlegel Republican Nay
Jonathan Fritz Republican Nay
Joseph D'Orsie Republican Nay
Josh Bashline Republican Nay
Joshua D. Kail Republican Nay
Kate A. Klunk Republican Nay
Kathleen C. Tomlinson Republican Nay
Kathy L. Rapp Republican Nay
Keith J. Greiner Republican Nay
Kerry A. Benninghoff Republican Nay
Kristin Marcell Republican Nay
Leslie Rossi Republican Nay
Marc S. Anderson Republican Nay
Marci Mustello Republican Nay
Mark M. Gillen Republican Nay
Marla Brown Republican Nay
Martin T. Causer Republican Nay
Martina A. White Republican Not Voting
Michael Stender Republican Nay
Mike Armanini Republican Nay
Mike Jones Republican Nay
Milou Mackenzie Republican Nay
Mindy Fee Republican Nay
Natalie Mihalek Republican Nay
Parke Wentling Republican Nay
Perry A. Stambaugh Republican Nay
R. Lee James Republican Nay
Rich Irvin Republican Nay
Rob W. Kauffman Republican Nay
Robert Leadbeter Republican Nay
Roman Kozak Republican Nay
Russ Diamond Republican Nay
Ryan Warner Republican Nay
Scott Barger Republican Nay
Shelby Labs Republican Nay
Sheryl M. Delozier Republican Nay
Stephanie Borowicz Republican Nay
Steven C. Mentzer Republican Nay
Thomas H. Kutz Republican Nay
Thomas L. Mehaffie Republican Nay
Tim Twardzik Republican Nay
Timothy J. O'Neal Republican Nay
Timothy R. Bonner Republican Nay
Tina Pickett Republican Nay
Tom Jones Republican Nay
Valerie S. Gaydos Republican Nay
Wendy Fink Republican Nay
Zachary Mako Republican Nay

Official roll call →

A2670

Failed 95 Yea · 104 Nay · 1 Other
Party YeaNayPresentNot Voting
Democratic 110100
Republican 93301
Unaffiliated 1000
Total 9510401
% of votes cast 48%52%0%1%
How each member voted (200)
Member Party Vote
Stephenie Scialabba — Yea
Abigail Salisbury Democratic Nay
Aerion Abney Democratic Nay
Amen Brown Democratic Nay
Ana Tiburcio Democratic Nay
Andre D. Carroll Democratic Nay
Anita Astorino Kulik Democratic Nay
Anthony A. Bellmon Democratic Nay
Arvind Venkat Democratic Nay
Ben Waxman Democratic Nay
Benjamin V. Sanchez Democratic Nay
Brandon J. Markosek Democratic Nay
Brian Munroe Democratic Nay
Bridget M. Kosierowski Democratic Nay
Carol Hill-Evans Democratic Nay
Carol Kazeem Democratic Nay
Chris Pielli Democratic Nay
Christina D. Sappey Democratic Nay
Christopher M. Rabb Democratic Nay
Dan Frankel Democratic Nay
Dan Goughnour Democratic Nay
Dan K. Williams Democratic Nay
Daniel J. Deasy Democratic Nay
Danielle Friel Otten Democratic Nay
Danilo Burgos Democratic Nay
Darisha K. Parker Democratic Nay
Dave Madsen Democratic Nay
David M. Delloso Democratic Nay
Ed Neilson Democratic Nay
Eddie Day Pashinski Democratic Nay
Elizabeth Fiedler Democratic Nay
Emily Kinkead Democratic Nay
Frank Burns Democratic Yea
G. Roni Green Democratic Nay
Gina H. Curry Democratic Nay
Greg Scott Democratic Nay
Greg Vitali Democratic Nay
Heather Boyd Democratic Nay
Ismail Smith-Wade-El Democratic Nay
Jacklyn Rusnock Democratic Nay
Jared G. Solomon Democratic Nay
Jason Dawkins Democratic Nay
Jeanne McNeill Democratic Nay
Jen Mazzocco Democratic Nay
Jennifer O'Mara Democratic Nay
Jessica Benham Democratic Nay
Jim Haddock Democratic Nay
Jim Prokopiak Democratic Nay
Joanna E. McClinton Democratic Nay
Joe Ciresi Democratic Nay
Joe McAndrew Democratic Nay
Joe Webster Democratic Nay
Johanny Cepeda-Freytiz Democratic Nay
John C. Inglis III Democratic Nay
Jordan A. Harris Democratic Nay
Jose Giral Democratic Nay
Joseph C. Hohenstein Democratic Nay
Justin C. Fleming Democratic Nay
Keith S. Harris Democratic Nay
Kristine C. Howard Democratic Nay
Kyle Donahue Democratic Nay
Kyle J. Mullins Democratic Nay
La'Tasha D. Mayes Democratic Nay
Leanne Krueger Democratic Nay
Lindsay Powell Democratic Nay
Lisa A. Borowski Democratic Nay
Liz Hanbidge Democratic Nay
Malcolm Kenyatta Democratic Nay
Mandy Steele Democratic Nay
Manuel Guzman Democratic Nay
Mary Jo Daley Democratic Nay
MaryLouise Isaacson Democratic Nay
Matthew D. Bradford Democratic Nay
Maureen E. Madden Democratic Nay
Melissa Cerrato Democratic Nay
Melissa L. Shusterman Democratic Nay
Michael H. Schlossberg Democratic Nay
Morgan Cephas Democratic Nay
Nancy Guenst Democratic Nay
Napoleon J. Nelson Democratic Nay
Nathan Davidson Democratic Nay
Nikki Rivera Democratic Nay
Pat Gallagher Democratic Nay
Patrick J. Harkins Democratic Nay
Paul Friel Democratic Nay
Paul Takac Democratic Nay
Perry S. Warren Democratic Nay
Peter Schweyer Democratic Nay
Regina G. Young Democratic Nay
Rick Krajewski Democratic Nay
Robert E. Merski Democratic Nay
Robert F. Matzie Democratic Nay
Robert Freeman Democratic Nay
Ryan A. Bizzarro Democratic Nay
Scott Conklin Democratic Nay
Sean Dougherty Democratic Nay
Steve Samuelson Democratic Nay
Steven R. Malagari Democratic Nay
Tarah Probst Democratic Nay
Tarik Khan Democratic Nay
Tim Brennan Democratic Nay
Tim Briggs Democratic Nay
Tina M. Davis Democratic Nay
Aaron Bernstine Republican Yea
Abby Major Republican Yea
Alec J. Ryncavage Republican Yea
Andrew Kuzma Republican Yea
Ann Flood Republican Yea
Barbara Gleim Republican Nay
Brad Roae Republican Yea
Brenda M. Pugh Republican Yea
Brett R. Miller Republican Yea
Brian C. Rasel Republican Yea
Brian Smith Republican Yea
Bryan Cutler Republican Yea
Bud Cook Republican Yea
Carl Walker Metzgar Republican Yea
Chad G. Reichard Republican Yea
Charity Grimm Krupa Republican Yea
Clint Owlett Republican Yea
Craig T. Staats Republican Yea
Craig Williams Republican Yea
Dallas Kephart Republican Yea
Dan Moul Republican Yea
Dane Watro Republican Yea
David H. Rowe Republican Yea
David H. Zimmerman Republican Yea
David M. Maloney Republican Yea
Donna Scheuren Republican Yea
Doyle Heffley Republican Yea
Eric Davanzo Republican Yea
Eric J. Weaknecht Republican Yea
Eric R. Nelson Republican Yea
Gary W. Day Republican Yea
Jack Rader Republican Yea
Jacob D. Banta Republican Yea
James B. Struzzi Republican Yea
Jamie Barton Republican Yea
Jamie L. Flick Republican Yea
Jamie Walsh Republican Nay
Jason Ortitay Republican Yea
Jeff Olsommer Republican Yea
Jeremy Shaffer Republican Yea
Jesse Topper Republican Yea
Jill N. Cooper Republican Nay
Jim Rigby Republican Yea
Joanne Stehr Republican Yea
Joe Emrick Republican Yea
Joe Hamm Republican Yea
Joe Hogan Republican Yea
Joe Kerwin Republican Yea
John A. Lawrence Republican Yea
John A. Schlegel Republican Yea
Jonathan Fritz Republican Yea
Joseph D'Orsie Republican Yea
Josh Bashline Republican Yea
Joshua D. Kail Republican Yea
Kate A. Klunk Republican Yea
Kathleen C. Tomlinson Republican Yea
Kathy L. Rapp Republican Yea
Keith J. Greiner Republican Yea
Kerry A. Benninghoff Republican Yea
Kristin Marcell Republican Yea
Leslie Rossi Republican Yea
Marc S. Anderson Republican Yea
Marci Mustello Republican Yea
Mark M. Gillen Republican Yea
Marla Brown Republican Yea
Martin T. Causer Republican Yea
Martina A. White Republican Not Voting
Michael Stender Republican Yea
Mike Armanini Republican Yea
Mike Jones Republican Yea
Milou Mackenzie Republican Yea
Mindy Fee Republican Yea
Natalie Mihalek Republican Yea
Parke Wentling Republican Yea
Perry A. Stambaugh Republican Yea
R. Lee James Republican Yea
Rich Irvin Republican Yea
Rob W. Kauffman Republican Yea
Robert Leadbeter Republican Yea
Roman Kozak Republican Yea
Russ Diamond Republican Yea
Ryan Warner Republican Yea
Scott Barger Republican Yea
Shelby Labs Republican Yea
Sheryl M. Delozier Republican Yea
Stephanie Borowicz Republican Yea
Steven C. Mentzer Republican Yea
Thomas H. Kutz Republican Yea
Thomas L. Mehaffie Republican Yea
Tim Twardzik Republican Yea
Timothy J. O'Neal Republican Yea
Timothy R. Bonner Republican Yea
Tina Pickett Republican Yea
Tom Jones Republican Yea
Valerie S. Gaydos Republican Yea
Wendy Fink Republican Yea
Zachary Mako Republican Yea

Official roll call →

A2486

Failed 97 Yea · 102 Nay · 1 Other
Party YeaNayPresentNot Voting
Democratic 010200
Republican 96001
Unaffiliated 1000
Total 9710201
% of votes cast 49%51%0%1%
How each member voted (200)
Member Party Vote
Stephenie Scialabba — Yea
Abigail Salisbury Democratic Nay
Aerion Abney Democratic Nay
Amen Brown Democratic Nay
Ana Tiburcio Democratic Nay
Andre D. Carroll Democratic Nay
Anita Astorino Kulik Democratic Nay
Anthony A. Bellmon Democratic Nay
Arvind Venkat Democratic Nay
Ben Waxman Democratic Nay
Benjamin V. Sanchez Democratic Nay
Brandon J. Markosek Democratic Nay
Brian Munroe Democratic Nay
Bridget M. Kosierowski Democratic Nay
Carol Hill-Evans Democratic Nay
Carol Kazeem Democratic Nay
Chris Pielli Democratic Nay
Christina D. Sappey Democratic Nay
Christopher M. Rabb Democratic Nay
Dan Frankel Democratic Nay
Dan Goughnour Democratic Nay
Dan K. Williams Democratic Nay
Daniel J. Deasy Democratic Nay
Danielle Friel Otten Democratic Nay
Danilo Burgos Democratic Nay
Darisha K. Parker Democratic Nay
Dave Madsen Democratic Nay
David M. Delloso Democratic Nay
Ed Neilson Democratic Nay
Eddie Day Pashinski Democratic Nay
Elizabeth Fiedler Democratic Nay
Emily Kinkead Democratic Nay
Frank Burns Democratic Nay
G. Roni Green Democratic Nay
Gina H. Curry Democratic Nay
Greg Scott Democratic Nay
Greg Vitali Democratic Nay
Heather Boyd Democratic Nay
Ismail Smith-Wade-El Democratic Nay
Jacklyn Rusnock Democratic Nay
Jared G. Solomon Democratic Nay
Jason Dawkins Democratic Nay
Jeanne McNeill Democratic Nay
Jen Mazzocco Democratic Nay
Jennifer O'Mara Democratic Nay
Jessica Benham Democratic Nay
Jim Haddock Democratic Nay
Jim Prokopiak Democratic Nay
Joanna E. McClinton Democratic Nay
Joe Ciresi Democratic Nay
Joe McAndrew Democratic Nay
Joe Webster Democratic Nay
Johanny Cepeda-Freytiz Democratic Nay
John C. Inglis III Democratic Nay
Jordan A. Harris Democratic Nay
Jose Giral Democratic Nay
Joseph C. Hohenstein Democratic Nay
Justin C. Fleming Democratic Nay
Keith S. Harris Democratic Nay
Kristine C. Howard Democratic Nay
Kyle Donahue Democratic Nay
Kyle J. Mullins Democratic Nay
La'Tasha D. Mayes Democratic Nay
Leanne Krueger Democratic Nay
Lindsay Powell Democratic Nay
Lisa A. Borowski Democratic Nay
Liz Hanbidge Democratic Nay
Malcolm Kenyatta Democratic Nay
Mandy Steele Democratic Nay
Manuel Guzman Democratic Nay
Mary Jo Daley Democratic Nay
MaryLouise Isaacson Democratic Nay
Matthew D. Bradford Democratic Nay
Maureen E. Madden Democratic Nay
Melissa Cerrato Democratic Nay
Melissa L. Shusterman Democratic Nay
Michael H. Schlossberg Democratic Nay
Morgan Cephas Democratic Nay
Nancy Guenst Democratic Nay
Napoleon J. Nelson Democratic Nay
Nathan Davidson Democratic Nay
Nikki Rivera Democratic Nay
Pat Gallagher Democratic Nay
Patrick J. Harkins Democratic Nay
Paul Friel Democratic Nay
Paul Takac Democratic Nay
Perry S. Warren Democratic Nay
Peter Schweyer Democratic Nay
Regina G. Young Democratic Nay
Rick Krajewski Democratic Nay
Robert E. Merski Democratic Nay
Robert F. Matzie Democratic Nay
Robert Freeman Democratic Nay
Ryan A. Bizzarro Democratic Nay
Scott Conklin Democratic Nay
Sean Dougherty Democratic Nay
Steve Samuelson Democratic Nay
Steven R. Malagari Democratic Nay
Tarah Probst Democratic Nay
Tarik Khan Democratic Nay
Tim Brennan Democratic Nay
Tim Briggs Democratic Nay
Tina M. Davis Democratic Nay
Aaron Bernstine Republican Yea
Abby Major Republican Yea
Alec J. Ryncavage Republican Yea
Andrew Kuzma Republican Yea
Ann Flood Republican Yea
Barbara Gleim Republican Yea
Brad Roae Republican Yea
Brenda M. Pugh Republican Yea
Brett R. Miller Republican Yea
Brian C. Rasel Republican Yea
Brian Smith Republican Yea
Bryan Cutler Republican Yea
Bud Cook Republican Yea
Carl Walker Metzgar Republican Yea
Chad G. Reichard Republican Yea
Charity Grimm Krupa Republican Yea
Clint Owlett Republican Yea
Craig T. Staats Republican Yea
Craig Williams Republican Yea
Dallas Kephart Republican Yea
Dan Moul Republican Yea
Dane Watro Republican Yea
David H. Rowe Republican Yea
David H. Zimmerman Republican Yea
David M. Maloney Republican Yea
Donna Scheuren Republican Yea
Doyle Heffley Republican Yea
Eric Davanzo Republican Yea
Eric J. Weaknecht Republican Yea
Eric R. Nelson Republican Yea
Gary W. Day Republican Yea
Jack Rader Republican Yea
Jacob D. Banta Republican Yea
James B. Struzzi Republican Yea
Jamie Barton Republican Yea
Jamie L. Flick Republican Yea
Jamie Walsh Republican Yea
Jason Ortitay Republican Yea
Jeff Olsommer Republican Yea
Jeremy Shaffer Republican Yea
Jesse Topper Republican Yea
Jill N. Cooper Republican Yea
Jim Rigby Republican Yea
Joanne Stehr Republican Yea
Joe Emrick Republican Yea
Joe Hamm Republican Yea
Joe Hogan Republican Yea
Joe Kerwin Republican Yea
John A. Lawrence Republican Yea
John A. Schlegel Republican Yea
Jonathan Fritz Republican Yea
Joseph D'Orsie Republican Yea
Josh Bashline Republican Yea
Joshua D. Kail Republican Yea
Kate A. Klunk Republican Yea
Kathleen C. Tomlinson Republican Yea
Kathy L. Rapp Republican Yea
Keith J. Greiner Republican Yea
Kerry A. Benninghoff Republican Yea
Kristin Marcell Republican Yea
Leslie Rossi Republican Yea
Marc S. Anderson Republican Yea
Marci Mustello Republican Yea
Mark M. Gillen Republican Yea
Marla Brown Republican Yea
Martin T. Causer Republican Yea
Martina A. White Republican Not Voting
Michael Stender Republican Yea
Mike Armanini Republican Yea
Mike Jones Republican Yea
Milou Mackenzie Republican Yea
Mindy Fee Republican Yea
Natalie Mihalek Republican Yea
Parke Wentling Republican Yea
Perry A. Stambaugh Republican Yea
R. Lee James Republican Yea
Rich Irvin Republican Yea
Rob W. Kauffman Republican Yea
Robert Leadbeter Republican Yea
Roman Kozak Republican Yea
Russ Diamond Republican Yea
Ryan Warner Republican Yea
Scott Barger Republican Yea
Shelby Labs Republican Yea
Sheryl M. Delozier Republican Yea
Stephanie Borowicz Republican Yea
Steven C. Mentzer Republican Yea
Thomas H. Kutz Republican Yea
Thomas L. Mehaffie Republican Yea
Tim Twardzik Republican Yea
Timothy J. O'Neal Republican Yea
Timothy R. Bonner Republican Yea
Tina Pickett Republican Yea
Tom Jones Republican Yea
Valerie S. Gaydos Republican Yea
Wendy Fink Republican Yea
Zachary Mako Republican Yea

Official roll call →

Passed 14 Yea · 12 Nay
Party YeaNayPresentNot Voting
Democratic 14000
Republican 01200
Total 141200
% of votes cast 54%46%0%0%
How each member voted (26)
Member Party Vote
Amen Brown Democratic Yea
Arvind Venkat Democratic Yea
Chris Pielli Democratic Yea
Elizabeth Fiedler Democratic Yea
Heather Boyd Democratic Yea
Jacklyn Rusnock Democratic Yea
Joe McAndrew Democratic Yea
John C. Inglis III Democratic Yea
Jose Giral Democratic Yea
Kyle Donahue Democratic Yea
Mandy Steele Democratic Yea
Melissa Cerrato Democratic Yea
Nathan Davidson Democratic Yea
Paul Friel Democratic Yea
Bud Cook Republican Nay
Craig Williams Republican Nay
Dallas Kephart Republican Nay
Jamie Barton Republican Nay
Joe Hamm Republican Nay
Joshua D. Kail Republican Nay
Kathy L. Rapp Republican Nay
Martin T. Causer Republican Nay
Mike Armanini Republican Nay
Natalie Mihalek Republican Nay
Perry A. Stambaugh Republican Nay
Ryan Warner Republican Nay

Official roll call →

Passed 14 Yea · 12 Nay
Party YeaNayPresentNot Voting
Democratic 14000
Republican 01200
Total 141200
% of votes cast 54%46%0%0%
How each member voted (26)
Member Party Vote
Amen Brown Democratic Yea
Arvind Venkat Democratic Yea
Chris Pielli Democratic Yea
Elizabeth Fiedler Democratic Yea
Heather Boyd Democratic Yea
Jacklyn Rusnock Democratic Yea
Joe McAndrew Democratic Yea
John C. Inglis III Democratic Yea
Jose Giral Democratic Yea
Kyle Donahue Democratic Yea
Mandy Steele Democratic Yea
Melissa Cerrato Democratic Yea
Nathan Davidson Democratic Yea
Paul Friel Democratic Yea
Bud Cook Republican Nay
Craig Williams Republican Nay
Dallas Kephart Republican Nay
Jamie Barton Republican Nay
Joe Hamm Republican Nay
Joshua D. Kail Republican Nay
Kathy L. Rapp Republican Nay
Martin T. Causer Republican Nay
Mike Armanini Republican Nay
Natalie Mihalek Republican Nay
Perry A. Stambaugh Republican Nay
Ryan Warner Republican Nay

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors HB 1834?
HB 1834 is sponsored by Robert F. Matzie (Democratic), John C. Inglis III (Democratic), Daniel J. Deasy (Democratic), Ed Neilson (Democratic), Kyle J. Mullins (Democratic), Jim Haddock (Democratic), Kyle Donahue (Democratic), Tarah Probst (Democratic), Carol Hill-Evans (Democratic), Jose Giral (Democratic), Benjamin V. Sanchez (Democratic), Gina H. Curry (Democratic), Dan K. Williams (Democratic), Nathan Davidson (Democratic), Kristine C. Howard (Democratic), Dan Frankel (Democratic), Steven R. Malagari (Democratic), Lisa A. Borowski (Democratic), Heather Boyd (Democratic), Jim Prokopiak (Democratic), Greg Scott (Democratic), Brandon J. Markosek (Democratic), Mandy Steele (Democratic), Ismail Smith-Wade-El (Democratic), Joe Ciresi (Democratic), Robert Freeman (Democratic), Paul Friel (Democratic), Joe Webster (Democratic), Jeanne McNeill (Democratic), Ben Waxman (Democratic), Paul Takac (Democratic), Jennifer O'Mara (Democratic), Tarik Khan (Democratic), Rick Krajewski (Democratic), Nancy Guenst (Democratic), Liz Hanbidge (Democratic), Sean Dougherty (Democratic), Nikki Rivera (Democratic), G. Roni Green (Democratic), Tim Brennan (Democratic), Malcolm Kenyatta (Democratic), Tina M. Davis (Democratic), Steve Samuelson (Democratic), and Abigail Salisbury (Democratic).
What is the current status of HB 1834?
This bill has passed the House. Introduced September 04, 2025. It now moves to the second chamber.
Where can I track HB 1834?
Track HB 1834 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 1834

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 1834

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →