West Virginia 2026 Session Status: Introduced 4 R cosponsors

SB 424 — Establishing Affordable Electricity and Economic Growth Act of 2026

Last action — To Finance

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House of Delegates
  5. 5
    To Executive
  6. 6
    Enacted

This bill died with 2026 Session. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there are no live odds of enactment. It would have to be reintroduced in the current session to move again.

Summary

Establishing Affordable Electricity and Economic Growth Act of 2026

Bill Text

What changed in the latest version

60 added · 87 removed

Plain-language change summary

The revised version of SB 424 includes a few key changes regarding the Department of Economic Development. The name "Department" has been replaced with "Division," which indicates a shift in how this body is described within the government structure. Additionally, the bill emphasizes the importance of transparency and accountability for government agencies, stating that these qualities are essential for their continued funding and existence. These changes highlight a commitment to a more accountable approach to managing coal electric generation and economic development in the state.

→
Previous
Latest
WEST VIRGINIA LEGISLATURE REGULAR SESSION Introduced Senate Bill 424 By Senators Hart, Fuller, Helton, Phillips, Rose, Willis, and Z.
CS for SB 424 WEST VIRGINIA LEGISLATURE REGULAR SESSION Committee Substitute for Senate Bill 424 By Senators Hart, Fuller, Helton, Phillips, Rose, Willis, and Z.
Maynard [Introduced January 15, 2026;
Maynard [Reported January 30, 2026, from the Committee on Energy, Industry, and Mining] CS for SB 424 A BILL to amend and reenact §5B-2O-1, §5B-2O-2, §5B-2O-3, and §5B-2O-4 of the Code of West Virginia, 1931, as amended;
referred to the Committee on Energy, Industry, and Mining;
and then to the Committee on Finance] Intr SB 424 2026R2046 A BILL to amend and reenact §5B-2O-1, §5B-2O-2, §5B-2O-3, and §5B-2O-4 of the Code of West Virginia, 1931, as amended;
(3) In developing regulatory actions and identifying appropriate approaches to encourage development of coal electric generation and coke production projects, agencies should attempt to Intr SB 424 2026R2046 promote coordination, simplification, and harmonization.
(3) In developing regulatory actions and identifying appropriate approaches to encourage development of coal electric generation and coke production projects, agencies should attempt to 1 CS for SB 424 promote coordination, simplification, and harmonization.
and (5) The West Virginia Department of Economic Development established in §5B-2-1 et seq.
and (5) The West Virginia Department Division of Economic Development established in §5B- 2-1 et seq.
(d) The Legislature declares that the value of government agencies such as the Department of Economic Development is contingent upon their ability to implement directives from Intr SB 424 2026R2046 this code in a manner consistent with the stated purpose and that transparency and accountability within all government agencies is a prerequisite for the continued relevance, funding, and existence of the agencies.
(d) The Legislature declares that the value of government agencies such as the Division of Economic Development is contingent upon their ability to implement directives from this code in a 2 CS for SB 424 manner consistent with the stated purpose and that transparency and accountability within all government agencies is a prerequisite for the continued relevance, funding, and existence of the agencies.
(a) The Department of Economic Development is authorized and directed to identify economically viable sites within the state that are, respectively:
(a) The Department Division of Economic Development is authorized and directed to identify economically viable sites within the state that are, respectively:
(1) Located near a convenient and sufficient supply of thermal coal for power generation and metallurgical coal for producing coking as used in making steel.
(1) Located near a convenient and sufficient supply of thermal coal for power generation and metallurgical coal for producing coke as used in making steel.
(b) The Department of Economic Development shall use the following criteria in identifying economically viable sites for coal electric generation projects:
(b) The Department Division of Economic Development shall use the following criteria in identifying economically viable sites for coal electric generation projects:
and (4) Geographic locations that can demonstrate that allowable emission increases from one Intr SB 424 2026R2046 or more coal electric generation facilities, in conjunction with all other applicable emission increases or reductions, including secondary emissions, would not cause or contribute to air pollution in violation of:
and (4) Geographic locations that can demonstrate that allowable emission increases from one 3 CS for SB 424 or more coal electric generation facilities, in conjunction with all other applicable emission increases or reductions, including secondary emissions, would not cause or contribute to air pollution in violation of:
(c) The Department of Economic Development shall use the following criteria in identifying economically viable sites for coke production projects:
(c) The Division of Economic Development shall use the following criteria in identifying economically viable sites for coke production projects:
(3) Geographic locations that fulfill the air quality conditions imposed by the Division of Air Quality of the West Virginia Department of Environmental Protection for coke producing facilities;
(3) Geographic locations that fulfill the air quality conditions imposed by the Division of Air Quality of the West Virginia Division of Environmental Protection for coke producing facilities;
and (4) Geographic locations that can demonstrate that allowable emission increases from one or more coke producing facilities, in conjunction with all other applicable emission increases or reductions (including secondary emissions), would not cause or contribute to air pollution in violation of:
and (4) Geographic locations that can demonstrate that allowable emission increases from one or more coke producing facilities, in conjunction with all other applicable emission increases or reductions, including secondary emissions, would not cause or contribute to air pollution in violation of:
(b) Any application for a siting certificate pursuant to §24-2-11c of the West Virginia this code filed with the Public Service Commission for development of a coal electric generation or Intr SB 424 2026R2046 coke production project at a Designated Site shall be adjudicated, inclusive of public hearings, and a final order issued by the Public Service Commission, within 270 calendar days after the date of the filing of the application, notwithstanding the requirements of any other provision of this code.
(c) Nothing in this section is intended to preclude, modify, or establish new Public Service Commission jurisdiction over:
(1) Any exercise of powers, duties, and obligations pursuant to the West Virginia Public Energy Authority Act;
and or (2) The right of end-user consumers of electricity to develop, invest in, or otherwise contract for on-site electric self-generation or cogeneration facilities, including those utilizing coal as a fuel source.
(3) (d) This section does not:
(1) Alter, modify and/or or cancel any existing cogeneration tariffs tariff authorized by the Public Service Commission, nor (4) This section does not (2) Authorize the sale of electricity to end-users in the state.
(d) (e) Where a designated site has been identified, in accordance with §22-5-11c of this code, as a location where additional data would be helpful for modeling or other evaluation of the potential emission of a coal generation project, the Department of Economic Development shall construct such facilities as are necessary to acquire such data.
(a) Following identification of economically viable sites that may be suitable for coal electric generation or coke production projects, the Department of Economic Development shall identify and designate each site it has determined to be suitable for coal electric generation or coke production projects as a "Designated Site," and shall communicate the Designated Sites to the West Virginia Department of Environmental Protection’s Division of Air Quality and, in the case of coal electric generation, the West Virginia Public Service Commission as sites suitable for the construction and operation of coal electric generation projects.
(a) Following identification of economically viable sites that may be suitable for coal electric generation or coke production projects, the Department Division of Economic Development shall 4 CS for SB 424 identify and designate each site it has determined to be suitable for coal electric generation or coke production projects as a "Designated Site," and shall communicate the Designated Sites to the West Virginia Department Division of Environmental Protection’s Division of Air Quality and, in the case of coal electric generation, the West Virginia Public Service Commission as sites suitable for the construction and operation of coal electric generation projects.
Intr SB 424 2026R2046 (b) Any application for a siting certificate pursuant to §24-2-11c of the West Virginia this code filed with the Public Service Commission for development of a coal electric generation or coke production project at a Designated Site shall be adjudicated, inclusive of public hearings, and a final order issued by the Public Service Commission, within 270 calendar days after the date of the filing of the application, notwithstanding the requirements of any other provision of this code.
(b) Any application for a siting certificate pursuant to §24-2-11c of the West Virginia this code filed with the Public Service Commission for development of a coal electric generation or coke production project at a Designated Site shall be adjudicated, inclusive of public hearings, and a final order issued by the Public Service Commission, within 270 calendar days after the date of the filing of the application, notwithstanding the requirements of any other provision of this code.
(1) Alter, modify and/or or cancel any existing cogeneration tariffs tariff authorized by the Public Service Commission, nor (4) This section does not (2) Authorize the sale of electricity to end-users in the state.
(1) Alter, modify, and/or or cancel any existing cogeneration tariffs tariff authorized by the Public Service Commission;
(d) (e) Where a designated site has been identified, in accordance with §22-5-11c of this code, as a location where additional data would be helpful for modeling or other evaluation of the potential emission of a coal generation project, the Department of Economic Development shall construct such facilities as are necessary to acquire such data.
nor (4) This section does not (2) Authorize the sale of electricity to end-users in the state.
(d) (e) Where a designated site has been identified, in accordance with §22-5-11c of this code, as a location where additional data would be helpful for modeling or other evaluation of the potential emission of a coal generation project, the Department Division of Economic Development shall construct such facilities as are necessary to acquire such data.
Timeframe and performance criteria for Department of Economic Development.
Timeframe and performance criteria for Division of Economic Development.
(a) The Department of Economic Development shall submit a preliminary report to the Joint Committee on Energy and Manufacturing no later than December 31, 2026, outlining a minimum of four initial locations under consideration each for coal electrical generation and coke production, respectively.
5 CS for SB 424 (a) The Division of Economic Development shall submit a preliminary report to the Joint Committee on Government and Finance on or before December 31, 2026, outlining a minimum of four initial locations under consideration, each for coal electrical generation and coke production facility, respectively.
(1) Two of the four locations considered for coal electrical generation shall be from a Intr SB 424 2026R2046 geographical area north of Interstate 64, and two of the four locations considered for electrical generation shall be from a geographical area south of Interstate 64.
(1) Two of the four locations considered for coal electrical generation shall be from a geographical area north of Interstate 64, and two of the four locations considered for electrical generation shall be from a geographical area south of Interstate 64.
(b) The Department of Economic Development shall identify and designate at least one site each pursuant to §5B-2O-4 of this code for coal electric generation and coke production, respectively, and submit a report to the Joint Committee on Energy and Manufacturing regarding the designation no later than December 31, 2026.
(b) The Division of Economic Development shall identify and designate at least one site each pursuant to §5B-2O-4 of this article for coal electric generation and coke production, respectively, and submit a report to the Joint Committee on Government and Finance regarding the designation on or before December 31, 2026.
(c) The Department of Economic Development shall identify and designate at least one additional coal electric generation site and one coke production site per year for the subsequent five-year period following calendar year 2026.
(c) The Division of Economic Development shall identify and designate at least one additional coal electric generation site and one coke production site per year for the subsequent five-year period following calendar year 2026.
NOTE:
The purpose of this bill is to establish the Affordable Electricity and Economic Growth Act of 2026 to facilitate coke production and steelmaking in the state.
Strike-throughs indicate language that would be stricken from a heading or the present law and underscoring indicates new language that would be added.
View plain text versions (2)

Action History

  1. Filed for introduction

  2. To Energy, Industry, and Mining then Finance

  3. Introduced in Senate

  4. To Energy, Industry, and Mining

  5. Committee substitute reported, but first to Finance

  6. To Finance

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 7 co-sponsors · 144 not signed on

Sponsors (1)

Co-sponsors (7)

Not signed on (144)

144 members have not signed on to this bill.

Show all 144 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 424 do?
Establishing Affordable Electricity and Economic Growth Act of 2026
Who sponsors SB 424?
SB 424 is sponsored by Phillips, Rose, Willis, Roberts, Craig A. Hart (Republican), Scott Fuller (Republican), Brian Helton (Republican), and Zack Maynard (Republican).
What is the current status of SB 424?
This bill died with 2026 Session. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track SB 424?
Track SB 424 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 424

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 424

Last checked for changes 8 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →