SB 245 — Requiring declaration of pooled units be filed with drilling permits
Last action — To Energy, Industry, and Mining
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
1Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House of Delegates
-
5To Executive
-
6Enacted
This bill has been introduced in the Senate. Introduced January 14, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Summary
Requiring declaration of pooled units be filed with drilling permits
In the bill's own words, from its opening clause.
Bill Text
- Introduced Introduced Version Current pdf
AI-generated reading aid from the bill's amendatory text — verify against the official bill.
This bill establishes a new requirement for operators to file a declaration of pooled unit with specific information related to oil and gas drilling units.
-
§22C-9-7b
§22C-9-7b. Declaration of Pooled Unit. (a) Within 60 days after a drilling permit is issued, the operator shall file a "Declaration of Pooled Unit" in the office of the Clerk of the County Commission of the county or counties in which all wells in a unit are to be drilled and proof of recording shall be furnished to the oil and gas conservation commission. The following information shall be included in each Declaration of Pooled Unit: (1) The name of the unit: Provided, That the clerk shall index the name of the unit in the grantee index or lease index or another public index as the clerk may in its discretion use; (2) The API number(s) and name(s) of the well(s) to be drilled in the unit; (3) The taxing districts and county(s) in which the unit is located; (4) A plat indicating the latitude and longitude of each well to be drilled in the unit, and the proposed well bore and the area declared to be included within the unit; (5) A tract or index number identifying each mineral and surface parcel on the plat; and (6) An index to the plat shall include the following information for each parcel included in the unit: (A) The name of the original lessor(s) and original lessee(s) identified on the lease(s) of the mineral parcel(s) included in the unit; (B) The internal lease number(s) the operator assigned to such lease(s) in its records; (C) The date of each lease included in the unit; (D) The recording information from the county in which each lease or memorandum of each lease is recorded, including Book and Page; (E) The surface tax map parcel identification for each surface parcel and each surface parcel believed to be above each mineral parcel; (F) The gross acres of the parcel included in the original lease(s); (G) The net acreage of the lease(s) within each parcel included in the unit; and (H) The percentage of the net acreage each mineral parcel contributes to the acreage of the entire pooled unit. (b) A Declaration of Pooled Unit is required when the unit boundary is traversing penetrated by a wellbore drilled from a well two or more units. In addition to the requirements established in subsection (a) of this section, the Declaration of Pooled Unit shall include no less than the following information: (1) The API number(s), name(s), and completion date(s) of the traversing well(s); (2) The names of the units being traversed by these well(s); (3) The total horizontal length of the wellbore(s) of the traversing well(s); (4) The length of the perforated wellbore(s) within each unit as a percentage of the total horizontal wellbore(s); and (5) The operator's allocation of production between affected units and the allocation factor assigned to each well. (c) If a Declaration of Pooled Unit is amended to add or remove any lands, within 60 days, the operator shall prepare an "Amended Declaration of Pooled Unit" and record it in the office of the clerk of the county commission in the county or counties in which the unit and the affected lands are located and provide proof of the recording to the Oil and Gas Conservation Commission. The Amended Declaration of Pooled Unit shall also include all information required in either subsections (a) or (b) of this section. (d) Upon written request via email or letter to an operator's Owner Relations Department, by any lessor or other royalty owner in the unit, the operator shall provide information regarding the data and method used by the operator in its calculation of the acreage included in the unit within 60 days of receipt of email or letter. (e) If an operator fails to comply with any requirement of this section, any interested lessor or other interested royalty owner may send to the operator, by certified mail, a written request compliance. In such request, the lessor or other royalty owner shall reasonably identify the deficient Declaration of Pooled Unit or amended Declaration of Pooled Unit, as applicable. If the operator fails to cure such noncompliance within 60 days after receiving the written request, the lessor or other royalty owner may bring a civil action to enforce the provisions of this section and shall be entitled to recover from the operator any resulting attorney fees or court costs incurred by the claimant the civil action. (f) This act shall take effect in 120 days from passage.
This introduces new regulatory requirements for oil and gas operators regarding the declaration of pooled units.
Action History
-
Filed for introduction
-
To Energy, Industry, and Mining then Finance
-
Introduced in Senate
-
To Energy, Industry, and Mining
Sponsors
- Charles H. Clements · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 151 not signed on
Sponsors (1)
- Charles H. Clements Republican
Co-sponsors (0)
None.
Not signed on (151)
151 members have not signed on to this bill.
Show all 151 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
- Senate Energy, Industry and Mining Referred January 14, 2026
- Senate Energy, Industry and Mining Referred January 14, 2026
- Senate Finance
Frequently asked questions
- What does SB 245 do?
- Requiring declaration of pooled units be filed with drilling permits
- Who sponsors SB 245?
- SB 245 is sponsored by Charles H. Clements (Republican).
- What is the current status of SB 245?
- This bill has been introduced in the Senate. Introduced January 14, 2026. It must pass committee before a floor vote.
- Where can I track SB 245?
- Track SB 245 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 245
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 245
Last checked for changes 13 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →