HB1532 — Utility RELIEF (Reducing Energy Load Inflation for Everyday Families) Act
Last action — Committee Report (House of Origin) — Favorable with Amendments
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
✓Passed House of Delegates
-
✓Passed Senate
-
✓To Executive
-
6Enacted
This bill has been enacted into law. Introduced February 13, 2026. Enacted.
Signed by Governor Wes Moore (Democratic) on March 13, 2026.
Summary
Transferring the electric universal service program to the Office of Home Energy Programs and requiring the Office to authorize benefits under the program for certain electric customers; establishing the Green and Renewable Energy Efficiency for Nonprofits Loan Program in the Maryland Clean Energy Center; altering certain required procedures related to the permitting, inspection, and interconnection of certain residential solar energy systems; altering the uses of the Environmental Trust Fund; etc.
Bill Text
What changed in the latest version
7947 added · 382 removedPlain-language change summary
The amendments to HB1532 involve the removal of several sections that previously outlined specific prohibitions and requirements related to energy efficiency and conservation plans, as well as definitions concerning energy resources and nuclear energy projects. Notably, the prohibition against approving energy plans that included a certain residential sector subprogram has been eliminated. This means the Public Service Commission may now consider a wider range of energy efficiency and conservation strategies without the previously imposed restrictions. Consequently, the changes could impact how energy projects are proposed and approved, potentially allowing for broader initiatives in energy efficiency.
HOUSE BILL 1532 C5, M5 6lr3230EMERGENCY By:BILL (6lr3230) ENROLLED BILL — Environment and Transportation/Education, Energy, and the Environment — Introduced by The Speaker and Delegates Korman and Fraser–Hidalgo, Fraser–Hidalgo, Allen, Behler, Foley, Guyton, Healey, Holmes, J.
TheLong, SpeakerLewis, andOdom, DelegatesStein, Korman and Fraser–HidalgoZiegler IntroducedRead and readExamined firstby time:Proofreaders:
February_______________________________________________ 13,Proofreader. 2026 Assigned to:
Environment_______________________________________________ andProofreader. Transportation A BILL ENTITLED AN ACT concerning Continuing the Next Generation Energy Act FOR the purpose of lowering the maximum monthly energy demand that is required for a certain large load customer to qualify for a specific rate schedule;
Sealed with the Great Seal and presented to the Governor, for his approval this _______ day of _______________ at ________________________ o’clock, ________M.
______________________________________________ Speaker.
CHAPTER ______ AN ACT concerning Continuing the Next Generation Energy Act Utility RELIEF (Reducing Energy Load Inflation for Everyday Families) Act FOR the purpose of lowering the maximum monthly energy demand that is required for a certain large load customer to qualify for a specific rate schedule;
altering the definitionEXPLANATION: of “large capacity energy resource” and “zero–emission credit” for provisions relating to energy solicitation and procurement;
C APITALS INDICATE MATTER ADDED TO EXISTING LA.
[Brackets] indicate matter deleted from existing law.
Underlining indicates amendments to bill.
Strike out indicates matter stricken from the bill by amendment or deleted from the law by amendment.
Italics indicate opposite chamber/conference committee amendments.
*hb1532* HOUSE BILL 1532 definition of “large capacity energy resource” and “zero–emission credit” for provisions relating to energy solicitation and procurement;
and generally relating to electricity rate schedules, rate plans, energy efficiency and conservation plans, and long–term pricing schedules and purchase pricing obligations.obligations moving the electric universal service program to the Office of Home Energy Programs;
BYaltering repealingcertain andrequired reenacting,procedures withrelated amendments,to Articlethe –permitting, Publicinspection, Utilities Section 4–212(c), 4–213, 7–222(c)(5), 7–223(a) and (b)(1)interconnection andof (4),certain 7–224(a)(1)residential andsolar (d),energy 7–225(b)systems; through (d), 7–1201(g), 7–1216(b), and 7–1220 Annotated Code of Maryland EXPLANATION:
Caltering APITALSthe INDICATEuses MATTERof ADDEDthe TOEnvironmental EXISTINGTrust L.WFund; [Brackets] indicate matter deleted from existing law.
*hb1532*requiring HOUSEthe BILLPublic 1532Service (2025Commission, Replacementin Volumeconsultation andwith 2025the Supplement)Maryland BYEnergy repealingAdministration and reenacting,the withoutPower amendments,Plant ArticleResearch –Program, Publicto Utilitiesdevelop Sectioncertain 7–1201(a)dashboards; and 7–1216(a) Annotated Code of Maryland (2025 Replacement Volume and 2025 Supplement) SECTION 1.
requiring certain public service companies to give a certain notice and certain information to customers;
altering certain provisions relating to and establishing certain requirements for large load customers;
altering the applicability of certain rate schedules;
requiring the owners of certain transmission lines to participate as a member in a regional transmission organization;
altering the application process and projects subject to certificate of public convenience and necessity requirements;
repealing certain requirements for gas companies to develop and implement certain programs and services relating to energy efficiency, conservation, demand response, beneficial electrification, and greenhouse gas emissions reductions;
authorizing and altering the recovery of certain costs by electric companies and gas companies;
altering certain greenhouse gas emissions reduction targets for electric companies and the manner in which electric companies must meet certain reductions;
authorizing the use of certain portable solar energy generating systems under certain circumstances;
altering certain authorized rate structures for electricity supply;
altering the administration of certain incentives and rebates;
altering the definition of “large capacity energy resource” for provisions relating to certain solicitations;
altering factors that the Commission is required to consider when approving a certain nuclear energy generation project;
altering the definition of “zero–emission credit” for provisions relating to a certain escrow account;
authorizing the Commission to approve an increase in the total cost of a certain nuclear energy generation project, subject to certain conditions;
authorizing the Board of Public Works to waive the inclusion of certain clauses in a certain contract;
altering the uses of the Maryland Strategic Energy Investment Fund;
requiring the Governor to include in the annual budget bill a certain appropriation to the Maryland Strategic Energy Investment Fund to be credited to certain accounts;
requiring the Administration to conduct certain alternative compliance fee auctions;
altering the conditions under which the Commission may approve the use of a certain multiyear rate plan;
authorizing the Commission to require a public service commission to include certain information in a certain multiyear rate plan;
HOUSE BILL 1532 3 prohibiting certain public service companies from recovering certain costs through rates;
Show all 500 changed lines (460 more)
altering the net energy metering program;
requiring the Commission to establish a successor program to the net energy metering program;
limiting certain alternative forms of regulating certain services of electric companies;
requiring the Commission to conduct certain studies and proceedings;
authorizing the Governor to transfer certain funds to the Commission to be refunded or credited to certain electric customers for a certain purpose;
requiring the Commission to issue a certain request for information and request for proposals for a certain purpose;
requiring the Program, in consultation with the Department of the Environment and the Administration, to conduct a certain study;
altering and adding certain reporting requirements relating to public service companies, transmission congestion, and the status of the Maryland Energy Storage Program;
and generally relating to energy policy in the State.
transferring the electric universal service program to the Office of Home Energy Programs and requiring the Office to authorize benefits under the program for certain electric customers;
establishing the Green and Renewable Energy Efficiency for Nonprofits Loan Program in the Maryland Clean Energy Center;
altering certain required procedures related to the permitting, inspection, and interconnection of certain residential solar energy systems;
altering the uses of the Environmental Trust Fund;
requiring the Public Service Commission to develop certain dashboards;
requiring certain public service companies to give certain information to customers under certain circumstances;
altering certain provisions relating to and establishing certain requirements for large load customers, including requiring the Commission to establish a large load customer registry, a voluntary clean capacity rating program, and an interconnection process for certain large load customers;
requiring the owners of certain transmission lines to participate as a member in a regional transmission organization;
altering certain provisions and establishing certain requirements relating to certificates of public convenience and necessity and other approvals to construct certain generating systems;
repealing certain requirements for gas companies to develop and implement certain programs and services relating to energy efficiency, conservation, demand response, beneficial electrification, and greenhouse gas emissions reductions;
authorizing and altering the recovery of certain costs by electric companies and gas companies;
altering certain greenhouse gas emissions reduction targets for electric companies and the manner in which electric companies must meet certain reductions;
altering certain provisions relating to community solar energy generating systems;
authorizing the use of certain portable solar energy generating systems under certain circumstances;
altering certain authorized rate structures for electricity supply;
altering the administration of certain incentives and rebates;
altering the definition of “large capacity energy resource” for provisions relating to certain solicitations;
altering factors that the Commission is required to consider when approving a certain nuclear energy generation project;
altering the definition of “zero–emission credit” for certain provisions;
authorizing the Commission to approve an increase in the total cost of a certain nuclear energy generation project, subject to certain conditions;
specifying the first term of the Director of the Strategic Energy Planning Office;
prohibiting the construction of a data center in certain development districts in Baltimore City;
altering the methods certain units may use for procurement contracts;
authorizing the Board of Public Works to waive the inclusion of certain clauses in a certain contract;
HOUSE BILL 1532 altering certain provisions relating to the Energy Storage System Grant Program;
altering the uses of the Maryland Strategic Energy Investment Fund and certain compliance fees paid into the Fund;
requiring the Maryland Energy Administration to conduct certain alternative compliance fee auctions;
altering the conditions under which the Commission may approve the use of a certain multiyear rate plan;
authorizing the Commission to require a public service commission to include certain information in a certain multiyear rate plan;
prohibiting certain public service companies from recovering certain costs through rates;
altering the net energy metering program;
requiring the Commission to approve, as a successor program to the net energy metering program, a framework for a net energy metering program to begin on a certain date;
prohibiting the Commission from approving a rate increase that is based on forecast test years until the later of a certain date or completion of a certain proceeding;
altering certain provisions relating to a procurement solicitation for certain energy storage devices;
requiring the Commission to conduct certain studies and proceedings;
requiring that certain funds in the Maryland Strategic Energy Investment Fund be used for certain purposes;
authorizing the Governor to transfer certain funds to the Administration, the Commission, the Comptroller, the Interagency Commission on School Construction, the Department of Natural Resources, and the Dedicated Purpose Account for certain purposes;
authorizing certain committees of the General Assembly to request that the Strategic Energy Planning Office assess certain policy scenarios and submit a certain report;
requiring the Commission to prepare recommendations for changes to a certain program cycle;
requiring the Commission to issue a certain request for information and request for proposals for a certain purpose;
requiring the Power Plant Research Program, in consultation with the Department of the Environment and the Administration, to conduct a certain study;
altering or adding certain reporting requirements relating to certain greenhouse gas emissions reductions, public service companies, transmission congestion and constraints, and independent distribution operators;
authorizing the Commission to contract for the service of independent consultants and experts to implement and execute any part of this Act;
and generally relating to energy policy in the State.
BY repealing and reenacting, with amendments, Article – Public Utilities Section 4–212(c), 4–213, 7–222(c)(5), 7–223(a) and (b)(1) and (4), 7–224(a)(1) and (d), 7–225(b) through (d), 7–1201(g), 7–1216(b), and 7–1220 Annotated Code of Maryland (2025 Replacement Volume and 2025 Supplement) BY repealing and reenacting, without amendments, Article – Public Utilities Section 7–1201(a) and 7–1216(a) Annotated Code of Maryland (2025 Replacement Volume and 2025 Supplement) BY renumbering Article – Human Services HOUSE BILL 1532 5 Section 5–5A–08 through 5–5A–10 to be Section 5–5A–09 through 5–5A–11, respectively Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) BY transferring Article – Public Utilities Section 7–512.1 Annotated Code of Maryland (2025 Replacement Volume and 2025 Supplement) to be Article – Human Services Section 5–5A–08 Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – Housing and Community Development Section 2–102(a)(10) Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) BY repealing and reenacting, without amendments, Article – Human Services Section 5–101(a) through (c), 5–5A–02, and 5–5A–03 Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – Human Services Section 5–5A–01 Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – Human Services Section 5–5A–08 Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) (As enacted by Section 2 of this Act) BY repealing and reenacting, with amendments, Article – Local Government Section 1–1320 Annotated Code of Maryland (2013 Volume and 2025 Supplement) HOUSE BILL 1532 BY repealing and reenacting, with amendments, Article – Natural Resources Section 3–302 Annotated Code of Maryland (2023 Replacement Volume and 2025 Supplement) BY adding to Article – Public Utilities Section 2–124, 4–203.1, 7–109, 7–207.6, 7–216.1(d), 7–306.4, 7–321, and 7–322 Annotated Code of Maryland (2025 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – Public Utilities Section 4–212, 4–213, 4–504, 7–207(a), (b)(3) and (4), (c), (d), (e), (f), and (h), 7–208, 7–222, 7–223, 7–225, 7–226, 7–227, 7–228, 7–306(d) and (j), 7–505(b)(2) and (c), 7–510(d)(2) and (3), 7–510.3(o), 7–1006, 7–1007, 7–1201(g), 7–1216(b), and 7–1220 Annotated Code of Maryland (2025 Replacement Volume and 2025 Supplement) BY repealing and reenacting, without amendments, Article – Public Utilities Section 7–207(g), 7–216.1(a)(1) and (5) and (c), 7–221, 7–306(a)(1), (4), and (7), 7–505(b)(1), 7–1201(a), and 7–1216(a) Annotated Code of Maryland (2025 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – State Finance and Procurement Section 13–217 Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY repealing and reenacting, without amendments, Article – State Finance and Procurement Section 13–218(a)(2) Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY adding to Article – State Finance and Procurement Section 13–218(f) Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY repealing and reenacting, without amendments, HOUSE BILL 1532 7 Article – State Government Section 9–20B–01(a) and (b) and 9–20B–05(a) Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – State Government Section 9–20B–05(f), (g), and (i) Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY adding to Article – State Government Section 9–20B–05(n);
and 9–20E–01 and 9–20E–02 to be under the new subtitle “Subtitle 20E.
Alternative Compliance Fee Auctions” Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Chapter 623 of the Acts of the General Assembly of 2025 Section 4 BY repealing and reenacting, with amendments, Chapter 624 of the Acts of the General Assembly of 2025 Section 4 BY renumbering Article – Economic Development Section 10–862 and the part “Part VII.
Short Title” to be Section 10–871 and the part “Part VIII.
Short Title”, respectively Annotated Code of Maryland (2024 Replacement Volume and 2025 Supplement) BY renumbering Article – Human Services Section 5–5A–08 through 5–5A–10 to be Section 5–5A–09 through 5–5A–11, respectively Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) BY transferring Article – Public Utilities Section 7–512.1 Annotated Code of Maryland (2025 Replacement Volume and 2025 Supplement) to be Article – Human Services HOUSE BILL 1532 Section 5–5A–08 Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – Economic Development Section 10–826 Annotated Code of Maryland (2024 Replacement Volume and 2025 Supplement) BY adding to Article – Economic Development Section 10–862 through 10–868 to be under the new part “Part VII.
Green and Renewable Energy Efficiency for Nonprofits Loan Program” Annotated Code of Maryland (2024 Replacement Volume and 2025 Supplement) BY adding to Article – Environment Section 2–1209 Annotated Code of Maryland (2013 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – Housing and Community Development Section 2–102(a)(10) Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) BY repealing and reenacting, without amendments, Article – Human Services Section 5–101(a) through (c), 5–5A–02, and 5–5A–03 Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – Human Services Section 5–5A–01 Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – Human Services Section 5–5A–08 Annotated Code of Maryland (2019 Replacement Volume and 2025 Supplement) (As enacted by Section 3 of this Act) HOUSE BILL 1532 9 BY repealing and reenacting, with amendments, Article – Local Government Section 1–1320 Annotated Code of Maryland (2013 Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – Natural Resources Section 3–302 Annotated Code of Maryland (2023 Replacement Volume and 2025 Supplement) BY adding to Article – Public Utilities Section 2–124, 4–203.1, 7–109, 7–207.6, 7–207.7, 7–216.1(d), and 7–229;
7–232 through 7–234 to be under the new part “Part III.
Large Load Customers”;
and 7–306.4 and 7–321 Annotated Code of Maryland (2025 Replacement Volume and 2025 Supplement) BY repealing and reenacting, without amendments, Article – Public Utilities Section 3–106, 4–309, 7–207(g), 7–216.1(a)(1) and (5) and (c), 7–221, 7–306.2(a)(1) and (7) and (d)(1), 7–505(b)(1), 7–1001(a), (e), and (i), 7–1005(a), 7–1201(a), and 7–1302(a) Annotated Code of Maryland (2025 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – Public Utilities Section 4–212, 4–213, 4–504, 7–204, 7–207(a), (b)(3) and (4), (c), (d), (e), (f), and (h), 7–208, 7–222, 7–223, 7–225, 7–226, 7–227, 7–228, 7–306(a), (d), and (j), 7–306.2(d)(13), 7–505(b)(2), (c), and (d)(2)(ii)3., 7–510(d)(2) and (3), 7–510.3(o), 7–1006, 7–1007, 7–1201(g), 7–1216, 7–1220, 7–1224, 7–1225, 7–1302(b), and 7–1304(c) Annotated Code of Maryland (2025 Replacement Volume and 2025 Supplement) BY adding to Article – Real Property Section 14–134 Annotated Code of Maryland (2023 Replacement Volume and 2025 Supplement) BY repealing and reenacting, without amendments, Article – State Finance and Procurement HOUSE BILL 1532 Section 6–226(a)(2)(i) and (ii) and 13–218(a)(2) Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – State Finance and Procurement Section 6–226(a)(2)(iii)212.
and 213., 13–117, and 13–217 Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY adding to Article – State Finance and Procurement Section 6–226(a)(2)(iii)214.
and 13–218(f) Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY repealing and reenacting, without amendments, Article – State Government Section 9–2012(b), (c), and (d), 9–2016(a), (b), and (e), and 9–20B–01(a) and (b) Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Article – State Government Section 9–2012(e) and (f), 9–2016(f), and 9–20B–05 Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY adding to Article – State Government Section 9–20E–01 and 9–20E–02 to be under the new subtitle “Subtitle 20E.
Alternative Compliance Fee Auctions” Annotated Code of Maryland (2021 Replacement Volume and 2025 Supplement) BY repealing and reenacting, with amendments, Chapter 7 of the Acts of the General Assembly of the 2025 Special Session Section 2 BY repealing and reenacting, with amendments, Chapter 19 of the Acts of the General Assembly of the 2025 Special Session Section 2 BY repealing and reenacting, with amendments, Chapter 623 of the Acts of the General Assembly of 2025 Section 4 HOUSE BILL 1532 11 BY repealing and reenacting, with amendments, Chapter 624 of the Acts of the General Assembly of 2025 Section 4 SECTION 1.
BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, SECTION 1.
BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, That Section(s) 10–862 and the part “Part VII.
Short Title” of Article – Economic Development of the Annotated Code of Maryland be renumbered to be Section(s) 10–871 and the part “Part VIII.
Short Title”.
SECTION 2.
AND BE IT FURTHER ENACTED, That Section(s) 5–5A–08 through 5–5A–10 of Article – Human Services of the Annotated Code of Maryland be renumbered to be Section(s) 5–5A–09 through 5–5A–11, respectively.
SECTION 3.
AND BE IT FURTHER ENACTED, That Section(s) 7–512.1 of Article – Public Utilities of the Annotated Code of Maryland be transferred to be Section(s) 5–5A–08 of Article – Human Services of the Annotated Code of Maryland.
SECTION 4.
AND BE IT FURTHER ENACTED, That the Laws of Maryland read as follows:
Article – Economic Development 10–826.
(a) On or before December 1 of each year, the Center shall report to the Governor, the Administration, and, in accordance with § 2–1257 of the State Government Article, the General Assembly.
(b) The report shall include:
(1) a complete operating and financial statement covering the Center’s operations;
(2) a summary of the Center’s activities during the preceding fiscal year;
[and] (3) a summary of the Center’s activities specific to clean energ;
innovation AND (4) A SUMMARY OF THE C ENTER ’S ACTIVITIES SPECIFIC TO THE G REEN AND R ENEWABLE ENERGY E FFICIENCY FOR N ONPROFITS LOAN P ROGRAM ESTABLISHED UNDER § 10–863 OF THIS SUBTITLE ,INCLUDING :
(I) THE TOTAL NUMBER OF LOANS AWARDED ;
HOUSE BILL 1532 II) THE TOTAL MONETARY VALUE OF THE LOANS AWARDED ;
II) THE AVERAGE TERM OF LOANS IN THE LOAN PORTFOLIO ;
IV) THE ESTIMATED ANNUAL ENERGY SAVINGS , IN KILOWATT –HOURS ,RESULTING FROM MEASURES ASSOCIATED WITH LOANS IN THE LOAN PORTFOLIO ;AND V) THE ESTIMATED REDUCTION OF GREENHOUSE GAS EMISSIONS IN METRIC TONS ,ASSOCIATED WITH LOANS IN THE LOAN PORTFOLIO .
P ART VII.
REEN AND RENEWABLE ENERGY EFFICIENCY FOR NONPROFITS LOAN P ROGRAM .
10–862.
(A) IN THIS PART THE FOLLOWING WORDS HAVE THE MEANINGS INDICATED .
(B) “B ORROWER ” MEANS A NONPROFIT ORGANIZATION THAT APPLIES AND QUALIFIES FOR A LOAN UNDER THE PROGRAM .
(C) “F UND” MEANS THE GREEN AND RENEWABLE ENERGY E FFICIENCY FOR N ONPROFITS LOAN F UND .
(D) “N ONPROFIT ORGANIZATION ” MEANS AN ORGANIZATION THAT IS EXEMPT FROM FEDERAL INCOME TAX UNDER § 501(C)(3) OF THE INTERNAL REVENUE CODE .
(E) “P ROGRAM ”MEANS THE GREEN AND R ENEWABLE ENERGY E FFICIENCY FOR N ONPROFITS LOAN P ROGRAM .
(F) “Q UALIFYING ENERGY SYSTEM ”MEANS A SYSTEM THAT :
(1) GENERATES ELECTRICITY OR USABLE THERMAL ENERGY THAT IS USED TO MEET ON –SITE DEMAND;AND (2) ASSISTS THE S TATE IN MEETING THE ENVIRONMENTAL AND GREENHOUSE GAS REDUCTION GOALS UNDER TITLE 2, SUBTITLE 12 OF THE ENVIRONMENT ARTICLE.
10–863.
HOUSE BILL 1532 13 T HERE IS AGREEN AND RENEWABLE ENERGY EFFICIENCY FOR N ONPROFITS LOAN PROGRAM IN THE C ENTER .
10–864.
T HE PURPOSE OF THE PROGRAM IS TO PROVIDE FINANCIAL ASSISTANCE IN THE FORM OF NO –INTEREST LOANS TO NONPROFIT ORGANIZATIONS FOR :
(1) THE PLANNING ,PURCHASE ,AND INSTALLATION OF QUALIFYING ENERGY SYSTEMS IN THE S TATE;AND (2) ACTIONS THAT IMPROVE ENERGY EFFICIENCY, SUCH AS REPAIRING OR REPLACING WINDOWS , DOORS ,AND HEATING ,VENTILATION ,AND AIR–CONDITIONING SYSTEMS AND OTHER SIMILAR IMPROVEMENTS .
10–865.
T HE CENTER SHALL :
(1) MANAGE ,SUPERVISE ,AND ADMINISTER THE P ROGRAM ;
(2) ADOPT REGULATIONS TO ENSURE THAT LOANS PROVIDED TO NONPROFIT ORGANIZATIONS CARRY OUT THE PURPOSE OF THE P ROGRAM ;AND (3) ATTACH TO ANY LOAN SPECIFIC TERMS THAT ARE CONSIDERED NECESSARY TO ENSURE THAT THE PURPOSE OF THE PROGRAM IS FULFILLED .
10–866.
(A) (1) A BORROWER MUST FILE AN APPLICATION WITH THE CENTER TO RECEIVE A LOAN UNDER THE PROGRAM .
(2) THE APPLICATION MUST BE SIGNED BY THE CHIEF OPERATING OFFICER OR AN AUTHORIZED OFFICER OF THE NONPROFIT ORGANIZATION .
(B) THE APPLICATION MUST CONTAIN ANY INFORMATION THE CENTER DETERMINES IS NECESSARY ,INCLUDING :
(1) THE PROJECTED COST OF THE QUALIFYING ENERGY SYSTEM , ENERGY EFFICIENCY ACTION , OR TECHNICAL ASSISTANCE BEING FINANCED THROUGH THE LOAN ;
HOUSE BILL 1532 (2) THE LOCATION OF THE PROPERTY WHERE THE QUALIFYING ENERGY SYSTEM WILL BE INSTALLED OR AN ENERGY EFFICIENCY ACTION WILL OCCUR AND WHETHER THE PROPERTY IS OWNED OR LEASED BY THE APPLICANT ;
(3) () EVIDENCE THAT THE BORROWER :
1.
IS CURRENT ON ITS REGISTRATION STATUS WITH THE S ECRETARY OF STATE AT THE TIME THE BORROWER SUBMITS THE APPLICATION ;OR 2.
IS AN EXEMPT ORGANIZATION THAT IS COMPLYING WITH ANY FILING REQUIREMENTS OF THE S ECRETARY OF STATE RELATED TO EXEMPT ORGANIZATIONS ;
OR (I) CERTIFICATION THAT THE BORROWER IS NOT REQUIRED TO REGISTER OR FILE AS AN EXEMPT ORGANIZATION WITH THE S ECRETARY OF STATE BECAUSE THE BORROWER DOES NOT SOLICIT CHARITABLE CONTRIBUTIONS IN THE S TATE;AND (4) ANY ADDITIONAL INFORMATION RELATING TO THE BORROWER OR THE PROPOSED QUALIFYING ENERGY SYSTEM OR ENERGY EFFICIENCY ACTION BEING FINANCED THROUGH THE LOAN THAT MAY BE REQUIRED BY THE C ENTER TO ADMINISTER THE PROGRAM .
(C) T HE CENTER MAY APPROVE AN APPLICATION FOR A LOAN SPECIFIED IN §10–867( A)(1)OR (3) OF THIS SUBTITLE ONLY IF THE APPLICATION DEMONSTRATES THAT THE PROPOSED QUALIFYING ENERGY SYSTEM OR ENERGY EFFICIENCY ACTION IS ESTIMATED ,BASED ON PROJECTED ENERGY COSTS ,TO GENERATE ENERGY COST SAVINGS OVER THE USEFUL LIFE OF THE SYSTEM OR ENERGY EFFICIENCY ACTION THAT EQUAL OR EXCEED THE TOTAL AMORTIZED COST OF THE LOAN .
(D) IN APPROVING AN APPLICATION ,THE CENTER SHALL CONSIDER AND GIVE PRIORITY TO AN APPLICANT THAT HAS AN ANNUAL BUDGET OF $1,000,000OR LESS .
10–867.
(A) L OANS FROM THE F UND MAY BE USED FOR :
(1) THE PURCHASE AND INSTALLATION OF A QUALIFYING ENERGY SYSTEM ,INCLUDING ANY NECESSARY ANCILLARY MACHINERY , EQUIPMENT , OR FURNISHINGS ;
(2) TECHNICAL ASSISTANCE FOR THE PLANNING AND INSTALLATION OF A QUALIFYING ENERGY SYSTEM ;AND HOUSE BILL 1532 15 (3) ACTIONS THAT IMPROVE ENERGY EFFICIENCY, SUCH AS REPAIRING OR REPLACING WINDOWS , DOORS ,AND HEATING , VENTILATION,AND AIR–CONDITIONING SYSTEMS AND OTHER SIMILAR IMPROVEMENTS .
(B) E ACH BORROWER FOR A LOAN UNDER SUBSECTION (A)(1)OR (3) OF THIS SECTION SHALL CONTRIBUTE AT LEAST10% OF THE COST OF THE QUALIFYING ENERGY SYSTEM OR ENERGY EFFICIENCY ACTION .
(C) (1) L OANS MADE UNDER THE P ROGRAM SHALL BE REPAYABLE BY THE BORROWER IN ACCORDANCE WITH A SCHEDULE SET BY THE CENTER .
(2) T HE SCHEDULE SET BY THE C ENTER MAY BE ON A DEFERRED PAYMENT BASIS.
(D) (1) A BORROWER SHALL PROVIDE ASSURANCES FOR THE REPAYMENT OF A LOAN.
(2) T HE ASSURANCES :
(I) SHALL INCLUDE A PROMISSORY NOTE ;AND (I) MAY INCLUDE A PLAN FOR REPAYMENT .
(E) LOANS MAY BE MADE IN CONJUNCTION WITH OR IN ADDITION TO FINANCIAL ASSISTANCE PROVIDED THROUGH OTHER STATE OR FEDERAL PROGRAMS .
10–868.
(A) T HERE IS A GREEN AND R ENEWABLE E NERGY EFFICIENCY FOR N ONPROFITS LOAN FUND .
(B) T HEC ENTER SHALL ADMINISTER THE FUND .
(C) (1) T HE F UND IS A SPECIAL , NONLAPSING FUND THAT IS NOT SUBJECT TO § 7–302OF THES TATE FINANCE AND PROCUREMENT ARTICLE.
(2) T HEC ENTER SHALL HOLD THE FUND SEPARATELY AND ACCOUNT FOR THE FUND .
(D) T HEF UND CONSISTS OF:
(1) MONEY APPROPRIATED IN THE STATE BUDGET TO THE FUND ;
HOUSE BILL 1532 (2) MONEY TRANSFERRED FROM THE STRATEGIC E NERGY INVESTMENT FUND ESTABLISHED UNDER § 9–20B–05OF THE STATE G OVERNMENT ARTICLE ;
(3) MONEY RECEIVED FROM ANY PUBLIC OR PRIVATE SOURCE ;
(4) INTEREST AND INVESTMENT EARNINGS OF THE FUND ;AND (5) REPAYMENTS AND PREPAYMENTS ON LOANS MADE FROM THE FUND .
(E) (1) IN FISCAL YEAR 2028, THE GOVERNOR MAY INCLUDE IN THE ANNUAL BUDGET BILL AN APPROPRIATION OF $5,000,000FOR THE F UND .
(2) IN FISCAL YEAR 2029, THE GOVERNOR MAY INCLUDE IN THE ANNUAL BUDGET BILL AN APPROPRIATION EQUAL TO AT LEAST $5,000,000MINUS THE AMOUNT IN THE FUND AS OF JUNE 30 OF THE IMMEDIATELY PRECEDING FISCAL YEAR .
(F) THE FUND MAY BE USED ONLY :
(1) TO PAY THE EXPENSES OF THE PROGRAM ;AND (2) TO PROVIDE LOANS TO ELIGIBLE BORROWERS UNDER THE PROGRAM .
(G) (1) THE C ENTER SHALL INVEST AND REINVEST THE MONEY OF THE FUND IN THE SAME MANNER AS OTHER STATE MONEY HELD BY THE CENTER MAY BE INVESTED .
(2) ANY INVESTMENT EARNINGS OF THE FUND SHALL BE PAID INTO THE FUND .
(3) ANY REPAYMENT ON LOANS MADE FROM THE FUND SHALL BE PAID INTO THE FUND .
10–869.
RESERVED .
10–870.
RESERVED .
Article – Environment 2–1209.
HOUSE BILL 1532 17 (A) THE D EPARTMENT SHALL PREPARE AN ANNUAL REPORT ON THE GREENHOUSE GAS EMISSIONS REDUCTIONS ACHIEVED AS A RESULT OF THE ADOPTION OF ELECTRIC VEHICLES IN THE STATE .
(B) ON OR BEFORE D ECEMBER 31, 2027, AND EACH DECEMBER 31 THEREAFTER ,THE DEPARTMENT SHALL SUBMIT THE REPORT REQUIRED UNDER SUBSECTION (A)OF THIS SECTION ,IN ACCORDANCE WITH § 2–1257 OF THE STATE G OVERNMENT ARTICLE ,TO THE S ENATE COMMITTEE ON EDUCATION , ENERGY , AND THE ENVIRONMENT AND THE HOUSE E NVIRONMENT AND TRANSPORTATION C OMMITTEE .
Article – Housing and Community Development 2–102.
(a) The Department shall:
(10) develop and implement a weatherization program in accordance with Title 4 of this article and administer the low–income weatherization component of the electric universal service program in accordance w[§ 7–512.1 of the Public Utilities ] §icle 5–5A–08 OF THE H UMAN SERVICES ARTICLE .
Article – Human Services 5–101.
(a) In this title the following words have the meanings indicated.
(b) “Administration” means the Family Investment Administration.
(c) “Department” means the Department of Human Services.
5–5A–01.
(a) In this subtitle the following words have the meanings indicated.
(B) “COMMISSION ”MEANS THE PUBLIC S ERVICE COMMISSION .
[(b] C) “Energy emergency” means a lack of fuel or the imminent discontinuation of energy services supplied by a fuel vendor or utility vendor that will endanger health, safety, or welfare.
[(c] D) “Fuel vendor” means a person that distributes, transports, produces, or offers for sale coal products, fuel oil, kerosene, bottled gas, propane, or wood for fuel use or consumption in the State.
HOUSE BILL 1532 [(d)] E ) “Office” means the Office of Home Energy Programs.
[(e)] F) “Program” means the Energy Assistance Program.
[(f] (G) “Utility vendor” means a person that distributes, transports, or produces natural gas or electricity for use or consumption in the State.
5–5A–02.
There is an Office of Home Energy Programs in the Administration.
5–5A–03.
The purpose of the Office is to carry out this subtitle.
5–5A–08.
(a) (1) (I) [The Commission shall establish]T HERE IS an electric universal service program [to assist electric customers with annual incomes at or below 200% of the federal poverty lev]lIN THE O FFICE .
(II) THE O FFICE SHALL IMPLEMENT AND ADMINISTER THE ELECTRIC UNIVERSAL SERVICE PROGRAM .
(III) T HE PURPOSE OF THE ELECTRIC UNIVERSAL SERVICE PROGRAM IS TO ASSIST ELECTRIC CUSTOMERS WITH ANNUAL INCOMES AT OR BELOW 200% OF THE FEDERAL POVERTY LEVEL .
(2) The components of the electric universal service program shall include:
(i) bill assistance;
(ii) low–income residential weatherization;
and (iii) the retirement of arrearages for electric customers who have not received assistance in retiring arrearages under theELECTRIC universal service program within the preceding 5 fiscal years.
(3) The Department of Housing and Community Development is responsible for administering the low–income residential weatherization component of the electric universal service program.
(4) [(i) The Department of Human Services, through the Office of Home Energy Programs, is responsible for administering the bill assistance and the arrearage retirement components of the electric universal service program.
HOUSE BILL 1532 19 (ii] I) The[Department of Human Service] OFFICE may:
1.
establish minimum and maximum benefits available to an electric customer under the bill assistance and arrearage retirement components;
and 2.
coordinate benefits under the electric universal service program with benefits under the Maryland Energy Assistance Program and other available energy assistance programs.
(II) B EGINNING JANUARY 1, 2027, THE OFFICE SHALL AUTHORIZE BENEFITS UNDER THE ELECTRIC UNIVERSAL SERVICE PROGRAM FOR AN ELECTRIC CUSTOMER WHO MEETS THE ELIGIBILITY REQUIREMENTS FOR THE PROGRAM BUT WHO DOES NOT MEET THE ELIGIBILITY REQUIREMENTS FOR THE FEDERAL LOW INCOME HOME ENERGY A SSISTANCE PROGRAM .
(II) T HE OFFICE SHALL ADOPT REGULATIONS GOVERNING ELIGIBILITY FOR BENEFITS UNDER THE ELECTRIC UNIVERSAL SERVICE PROGRAM .
(5) The [Department of Human Service] OFFICE may, with input from a panel or roundtable of interested parties, contract to assist in administering the bill assistance and the arrearage retirement components of the electric universal service program.
(6) The Commission has oversight responsibility for the bill assistance and the arrearage retirement components of the electric universal service program and any other funds expended under this section.
(7) In a specific case, the electric universal service program may waive the income eligibility limitation under paragraph (1) of this subsection in order to provide assistance to an electric customer who would qualify for a similar waiver u[the Maryland Energy Assistance Program established under Title 5, Subtitle 5A of the Human Services Artic]ANOTHER PROGRAM ESTABLISHED UNDER THIS SUBTITLE .
(8) (i) If an applicant for bill assistance or arrearage retirement is to be denied due to deficient documentation[Department of Human Service] OFFICE shall:
1.
promptly provide notice of the deficiency to the applicant;
and 2.
afford the applicant ample opportunity of not less than 3 months to cure the deficiency.
(ii) An electric company may not begin the process to terminate service to an applicant while the applicant is curing a deficiency under this paragraph.
HOUSE BILL 1532 (9) Notwithstanding paragraph (2)(iii) of this subsection, any assistance received for arrearage retirement by a customer in calendar years 2020 and 2021 may not be counted toward the limitation on the number of times the customer may receive assistance for arrearage retirement.
(b) (1) All customers shall contribute to the funding of the electric universal service program through a charge collected by each electric company.
(2) The Commission shall determine a fair and equitable allocation for collecting the charges among all customer classes pursuant to subsection (e) of this section.
(3) Except as provided in paragraph (4) of this subsection, in accordance with subsection (f)(6) of this section, any unexpended bill assistance and arrearage retirement funds returned to customers under subsection (f) of this section shall be returned to each customer class as a credit in the same proportion that the customer class contributed charges to the fund.
(4) The Department [of Human Services ]shall expend any unexpended bill assistance and arrearage funds that were collected in fiscal years 2010 through 2017, in excess of the total amount authorized under subsection (e) of this section, for one or more of the following purposes:
(i) bill assistance and the retirement of arrearages for customers who are eligible to receive assistance at the time services are provided;
(ii) targeted and enhanced low–income residential weatherization designed to remediate households that are considered ineligible to participate in other State energy efficiency programs due to significant health and safety hazards;
(iii) an arrearage management program for low–income customers in arrears, including providing credits or matching payments for customers who make timely payments on current bills;
or (iv) an arrearage prevention program for low–income customers.
(5) An electric company shall recover electric universal service program costs in accordance with § 7–512 of[this subtitl]THE P UBLIC U TILITIES A RTICLE .
(6) As determined by the Office [of Home Energy Programs ], bill assistance payments to an electric company may be on a monthly basis for each customer.
(7) The Commission shall determine the allocation of the electric universal service charge among the generation, transmission, and distribution rate components of all classes.
HOUSE BILL 1532 21 (8) The Commission may not assess the electric universal service surcharge on a per kilowatt–hour basis.
(c) (1) On or before January 1 of each year, the Commission shall report, subject to § 2–1257 of the State Government Article, to the General Assembly on the electric universal service program, including:
(i) subject to subsection (e) of this section, a recommendation on the total amount of funds for the ELECTRIC UNIVERSAL SERVICE program for the following fiscal year based on:
1.
the level of participation in and the amounts expended on bill assistance and arrearage retirement during the preceding fiscal year;
2.
how bill assistance and arrearage retirement payments were calculated during the preceding fiscal year;
3.
the projected needs for the bill assistance and the arrearage retirement components for the next fiscal year;
and 4.
the amount of any bill assistance or arrearage retirement surplus carried over in the electric universal service program fund under subsection (f)(6)(i) of this section;
(ii) for bill assistance, the total amount of need, as determined by the Commission, for electric customers with annual incomes at or below 175% of the federal poverty level and the basis for this determination;
(iii) the amount of funds needed, as determined by the Commission, to retire arrearages for electric customers who have not received assistance in retiring arrearages under the electric universal service program within the preceding 7 fiscal years, and the basis for this determination;
(iv) the amount of funds needed, as determined by the Commission, for bill assistance and arrearage retirement, respectively, for customers for whom income limitations may be waived under subsection (a)(7) of this section, and the basis for each determination;
(v) the impact on customers’ rates, including the allocation among customer classes, from collecting the total amount recommended by the Commission under item (i) of this paragraph;
and (vi) the impact of using other federal poverty level benchmarks on costs and the effectiveness of the electric universal service program.
HOUSE BILL 1532 (2) (i) To assist the Commission in preparing its recommendations under paragraph (1) of this subsection, the Offic[of Home Energy Programs ] shall report to the Commission each year on:
1.
the number of customers and the amount of distributions made to fuel customers under the Maryland Energy Assistance Program established under [Title 5, Subtitle 5A of the Human Services Articl]THIS SUBTITLE , identified by funding source and fuel source;
2.
the cost of outreach and education materials provided by the Office[of Home Energy Programs ]for the electric universal service program;
and 3.
the amount of money that the Department [of Human Services]receives, and is projected to receive, for low–income energy assistance from:
A.
the Maryland Strategic Energy Investment Fund under § 9–20B–05 of the State Government Article;
B.
with respect to electric customers only, the Maryland Energy Assistance Program;
and C.
any other federal, State, local, or private source.
(ii) The Office[of Home Energy Programs ] may satisfy the reporting requirement of subparagraph (i)1 of this paragraph by providing the Commission with a copy of material that contains the required information and that the Offi[of Home Energy Programs ]submits to the federal government.
(iii) The Commission shall include the information provided by the Office[of Home Energy Programs ]under subparagraph (i) of this paragraph in its report to the General Assembly under paragraph (1) of this subsection.
(3) Subject to subsection (d)(2) of this section, the Commission shall include the information provided by the Department of Housing and Community Development under subsection (d)(1) of this section in its report to the General Assembly under paragraph (1) of this subsection.
(4) The electric universal service program shall be subject to audit by the Office of Legislative Audits in accordance with §§ 2–1220 through 2–1227 of the State Government Article.
(d) (1) On or before January 1 of each year, the Department of Housing and Community Development shall report, in accordance with § 2–1257 of the State Government Article, to the General Assembly on the low–income residential weatherization component of the electric universal service program, including:
HOUSE BILL 1532 23 (i) the amount of funds expended during the preceding fiscal year;
(ii) the level of participation during the preceding fiscal year, including the number of households served in each area of the State;
and (iii) the types of projects, including the average cost per unit, provided to households during the preceding fiscal year.
(2) The Department of Housing and Community Development may satisfy the reporting requirement under paragraph (1) of this subsection by requesting the Commission to include the information in the Commission’s report required under subsection (c) of this section and providing the information to the Commission by the date specified by the Commission.
(e) The total amount of funds to be collected for the electric universal service program each year shall be $37 million, allocated in the following manner:
(1) $27.4 million shall be collected from the industrial and commercial classes;
and (2) $9.6 million shall be collected from the residential class.
(f) (1) In this subsection, “fund” means the electric universal service program fund.
(2) There is an electric universal service program fund.
(3) (i) 1.
The Comptroller shall collect the revenue collected by electric companies under subsection (b) of this section and place the revenue into the fund.
2.
The General Assembly may appropriate funds supplemental to the funds collected under subsubparagraph 1 of this subparagraph.
(ii) The fund is a continuing, nonlapsing fund that is not subject to § 7–302 of the State Finance and Procurement Article.
(iii) The purpose of the fund is to assist electric customers as provided in subsection (a)(1) of this section.
(4) The Department [of Human Services ], with oversight by the Commission, shall disburse the bill assistance and arrearage retirement funds in accordance with the provisions of this section.
(5) The Comptroller annually shall disburse up to $1,000,000 of low–income residential weatherization funds to the Department of Housing and Community Development, as provided in the State budget.
HOUSE BILL 1532 (6) (i) At the end of a given fiscal year, any unexpended bill assistance and arrearage retirement funds that were collected for that fiscal year shall be retained in the fund and shall be made available for disbursement through the first 6 months of the next fiscal year to customers who:
1.
qualify for assistance from the fund during the given fiscal year;
2.
apply for assistance from the fund before the end of the given fiscal year;
and 3.
remain eligible for assistance at the time services are provided.
(ii) If the Commission determines that an extension is needed, the Commission may extend up to an additional 6 months the period in which unexpended bill assistance and arrearage retirement funds may be made available for disbursement under subparagraph (i) of this paragraph.
(iii) 1.
Any bill assistance and arrearage retirement funds collected for a given fiscal year that are retained under subparagraph (i) of this paragraph and that remain unexpended at the end of the period allowed under subparagraphs (i) and (ii) of this paragraph shall be returned to each customer class in the proportion that the customer class contributed charges to the fund for the given fiscal year in the form of a credit toward the charge assessed in the following fiscal year.
2.
If the Commission determines that it is impractical to establish a rate credit for the amount to be returned for a given fiscal year to customers under subsubparagraph 1 of this subparagraph, the Commission:
A.
may defer the return for not more than 2 additional fiscal years;
and B.
shall combine the returned amount for that fiscal year with amounts to be returned for the following fiscal years when calculating the rate credit for the final fiscal year of the period.
(g) (1) If a party to a merger or acquisition of an electric company or an affiliate of an electric company is required to distribute a credit to the customers in the electric company’s service territory under an agreement with the Commission in connection with the merger or acquisition, the Commission shall consider the adequacy of the current funding of the electric universal service program in providing assistance to customers who qualify under this section.
(2) Any funds deposited into the electric universal service program fund as a result of an agreement with the Commission in connection with a merger or acquisition of HOUSE BILL 1532 25 an electric company or an affiliate of an electric company are in addition to, and may not substitute for, funds collected under subsection (e) of this section.
(h) (1) An arrearage prevention program under subsection (b)(4)(iv) of this section is intended to prevent or reduce arrearages for low–income customers who have participated in a low–income residential weatherization program.
(2) (i) The ARREARAGE PREVENTION program is intended as a one–time grant of money to establish ongoing arrearage prevention activities in the State.
(ii) The Department of Human Services ], in consultation with the Commission, will select for thARREARAGE PREVENTION program up to two public or private entities as program recipients to administer the program.
(iii) At least oneARREARAGE PREVENTION program recipient must primarily serve customers in a major urban area of the State.
(3) [A] AN ARREARAGE PREVENTION program recipient must demonstrate significant efforts to:
(i) secure additional private investment in rooftop solar installation, including the use ofARREARAGE PREVENTION program money for credit enhancement, direct project support, or support for program recipients and customers;
and (ii) provide employment in solar installation to unemployed and underemployed individuals, with preference for those who reside in the local jurisdiction where the installations will occur.
(4) The ARREARAGE PREVENTION program may include the installation of rooftop solar electricity generation equipment after energy efficiency measures at the residential property have been completed.
Article – Local Government 1–1320.
(a) (1) In this section the following words have the meanings indicated.
(2) “Administration” means the Maryland Energy Administration.
(3) “Residential energy storage system” means a system, on a residential customer’s side of the meter, used to store electrical energy, or mechanical, chemical, or thermal energy that was once electrical energy, for use as electrical energy at a later date or in a process that offsets electricity use at peak times.
HOUSE BILL 1532 (4) “Residential solar energy system” means any configuration of solar energy devices that collects and distributes solar energy for the purpose of generating electricity and that has a single residential interconnection with the electrical grid.
(5) “R ESTRICTION ON USE ” HAS THE MEANING STATED IN § 2–126OF THE REAL P ROPERTY ARTICLE .
(6) “SOLAR PERMITTING FEE ” MEANS A FEE EQUAL TO THE SUM OF ALL CHARGES IMPOSED BY A COUNTY OR MUNICIPALITY , INCLUDING CHARGES IMPOSED BY A PROVIDER OF SOLAR PERMITTING SOFTWARE ,IN CONNECTION WITH AN APPLICATION FOR A RESIDENTIAL SOLAR ENERGY SYSTEM .
(5)] (7) “Solar permitting software” m[:ns (i) the most recent version of a web–based platform, developed by the National Renewable Energy Laboratory, that provides a standard portal for receiving and processing residential solar energy system and residential energy storage system permit information;
or (ii) automated software that functions to support the tracking and approval of residential building permits for residential solar energy systems, residential energy storage systems, main electrical panel upgrades, and main electrical p]nel devices SOFTWARE OR A COMBINATION OF SOFTWARE THAT :
(I) AUTOMATES PLAN REVIEW FOR RESIDENTIAL SOLAR ENERGY SYSTEMS TO THE MOST RECENT VERSION OF , AS APPLICABLE :
1.
THE M ARYLAND B UILDING PERFORMANCE S TANDARDS ;
2.
THE N ATIONAL ELECTRICAL C ODE , INCLUDING LEGALLY ADOPTED LOCAL AMENDMENTS ;AND 3.
LOCALLY ADOPTED BUILDING CODES ;
(I) PRODUCES CODE –COMPLIANT APPROVALS ;
(II) ISSUES A CODE –COMPLIANT PERMIT ;
(IV) ACCEPTS ONLINE PAYMENTS FOR ANY PERMITTING FEES IMPOSED ;
(V) ISSUES PERMITS OR PERMIT REVISIONS IMMEDIATELY ON RECEIPT OF ONLINE SUBMISSION OF PERMITTING FEE PAYMENTS ,IF APPLICABLE ;
HOUSE BILL 1532 27 (VI) IS CAPABLE OF PROCESSING A MAJORITY OF RESIDENTIAL SOLAR ENERGY SYSTEM APPLICATIONS ;
AND (VII) WHEN A PERMIT IS ISSUED ,IMMEDIATELY NOTIFIES A COUNTY OR MUNICIPALITY ,AS APPLICABLE ,OF THE ISSUANCE OF THE PERMIT AND ALLOWS ACCESS TO APPROVED APPLICATION MATERIALS .
(b) (1) This section applies to all counties and municipalities.
(2) T HIS SECTION DOES NOT APPLY TO A RESTRICTION ON USE ON :
(I) HISTORIC PROPERTY THAT IS LISTED IN OR DETERMINED BY THE D IRECTOR OF THE M ARYLAND HISTORICAL TRUST TO BE ELIGIBLE FOR INCLUSION IN THE M ARYLAND R EGISTER OF H ISTORIC P ROPERTIES ;OR (I) PROPERTY LOCATED WITHIN A DISTRICT DESIGNATED BY THE APPLICABLE LOCAL JURISDICTION TO BE OF HISTORIC SIGNIFICANCE IN ACCORDANCE WITH § 8–105OF THE LAND USE A RTICLE.
(c) (1) Subject to subsection (d) of this section and except as provided in subsection (e) of this section, on or before Augus[2025] 2027, each county and municipality shall implement solar permitting software for features supporting the [trackin] APPLICATION SUBMISSION ,TRACKING , and approval of residential building permits for:
(1)] (I) residential solar energy systems;
(2)] (I) residential energy storage systems;
(3)] (II) main electrical panel upgrades;
and (4)] (IV) main electrical panel derates.
(2) A COUNTY OR MUNICIPALITY SHALL :
(I) COMPLETE A REMOTE OR IN–PERSON INSPECTION REQUIRED FOR A PROJECT PERMITTED BY SOLAR PERMITTING SOFTWARE WITHIN AN AVERAGE OF 5 BUSINESS DAYS AFTER RECEIVING A PROPERLY COMPLETED REQUEST FOR INSPECTION ;AND (I) MAKE PUBLICLY AVAILABLE ANNUAL DATA FOR THE AVERAGE INSPECTION TIME FOR PROJECTS PERMITTED BY SOLAR PERMITTING SOFTWARE .
HOUSE BILL 1532 (3) R EVIEW OF A PERMIT APPLICATION TO INSTALL A RESIDENTIAL SOLAR ENERGY GENERATING SYSTEM THAT IS SUBMITTED USING SOLAR PERMITTING SOFTWARE SHALL BE LIMITED TO A DETERMINATION WHETHER THE APPLICATION MEETS ALL HEALTH AND SAFETY REQUIREMENTS UNDER S TATE AND LOCAL LAW .
(4) A COUNTY OR MUNICIPALITY SHALL COMPLETE ANY MANUAL REVIEW OF A SOFTWARE –APPROVED PERMIT WITHIN 5 BUSINESS DAYS AFTER THE PERMIT IS APPROVED .
(5) (I) THIS PARAGRAPH APPLIES ONLY TO A RESIDENTIAL SOLAR ENERGY SYSTEM :
1.
THAT IS OR WILL BE INSTALLED ON A RESIDENTIAL ROOFTOP ;AND 2.
WITH A GENERATING CAPACITY OF LESS THAN 20 KILOWATTS , AS MEASURED BY THE ALTERNATING CURRENT RATING OF THE SYSTEM S INVERTER .
(I) EXCEPT AS PROVIDED IN SUBPARAGRAPH (II) OF THIS PARAGRAPH ,BEGINNING A UGUST 1, 2027,A COUNTY OR MUNICIPALITY MAY NOT SET A PERMITTING FEE FOR PERMITS ISSUED BY SOLAR PERMITTING SOFTWARE THAT EXCEEDS $500 FOR RESIDENTIAL SOLAR ENERGY SYSTEMS .
(II) A THIRD –PARTY PAYMENT PROCESSING CHARGE MAY BE ASSESSED FOR PERMITS ISSUED BY SOLAR PERMITTING SOFTWARE IN ADDITION TO THE MAXIMUM PERMITTING FEE UNDER SUBPARAGRAPH (I) OF THIS PARAGRAPH .
(6) A N INSPECTOR MAY REVIEW CONSTRUCTION DOCUMENTS THAT ARE PRODUCED BY THE SOLAR PERMITTING SOFTWARE .
(d) A county or municipality may not be required to comply with the requirements of subsection (c) of this section if:
(1) the county or municipality does not require a permit for:
(i) residential solar energy systems;
or (ii) residential solar energy systems paired with a residential solar energy storage system;
or (2) as determined by the Administration, the automated software is no longer updated or maintained.
HOUSE BILL 1532 29 (e) The Administration shall delay the initial implementation or suspend the requirements of subsection (c) of this section if there are insufficient State or federal funds available to the Administration to provide financial support to a county or municipality implementing solar permitting softw[as defined in subsection (a)(5)(i) of t].s section (F) (1) SUBJECT TO PARAGRAPH (2) OF THIS SUBSECTION ,AN ELECTRIC COMPANY , OTHER THAN A MUNICIPAL ELECTRIC UTILITY OR A THIRD –PARTY CONTRACTOR FOR THE ELECTRIC COMPANY , SHALL PERFORM ANY METER DISCONNECTION AND RECONNECTION NECESSARY FOR THE INTERCONNECTION OF A RESIDENTIAL SOLAR ENERGY SYSTEM OR RESIDENTIAL ENERGY STORAGE SYSTEM WITHIN 5 BUSINESS DAYS AFTER RECEIVING A PROPERLY COMPLETED REQUEST FROM THE OWNER OR INSTALLER OF THE SYSTEM .
(2) A N ELECTRIC COMPANY MAY AUTHORIZE QUALIFIED PERSONNEL WHO ARE NOT ASSOCIATED WITH THE ELECTRIC COMPANY TO PERFORM ANY METER DISCONNECTION AND RECONNECTION NECESSARY FOR THE INTERCONNECTION OF A RESIDENTIAL SOLAR ENERGY SYSTEM OR A RESIDENTIAL ENERGY STORAGE SYSTEM .
(3) T HIS SUBSECTION MAY NOT BE CONSTRUED TO ALTER REQUIREMENTS FOR SMALL GENERATOR FACILITY INTERCONNECTION STANDARDS ESTABLISHED BY THE PUBLIC SERVICE C OMMISSION .
(G) THE A TTORNEY GENERAL MAY SEEK JUDICIAL ENFORCEMENT AGAINST A COUNTY OR MUNICIPALITY THAT FAILS TO COMPLY WITH THIS SECTION .
Article – Natural Resources 3–302.
(a) (1) There is an Environmental Trust Fund.
(2) (i) For the purpose of this subtitle, there is established as an added cost of electricity distributed to retail electric customers within the State, an environmental surcharge per kilowatt hour of electric energy distributed in the State to be paid by any electric company as defined in § 1–101 of the Public Utilities Article.
(ii) The Public Service Commission shall impose the surcharge per kilowatt hour of electric energy distributed to retail electric customers within the State and shall authorize the electric companies to add the full amount of the surcharge to retail electric customers’ bills.
(iii) To the extent that the surcharge is not collected from retail electric customers, the surcharge shall be deemed a cost of distribution and shall be allowed and computed as such, together with other allowable expenses, for rate–making purposes.
HOUSE BILL 1532 (iv) Revenues from the surcharge shall be collected by the Comptroller and placed in the Fund.
(b) (1) (i) The Secretary, in consultation with the Director of the Maryland Energy Administration, annually shall coordinate the preparation of a budget required to carry out the provisions of this subtitle.
(ii) On approval of the budget by the General Assembly, the Public Service Commission shall establish the amount of the surcharge per kilowatt hour for the fiscal year beginning July 1, 1972, and for each subsequent fiscal year.
(2) Notwithstanding any other provisions of this subtitle, the amount of the surcharge for each account for each retail electric customer may not exceed the lesser of 0.15 mill per kilowatt hour or $1,000 per month and the surcharge may not continue beyond fiscal year 2030.
(3) (i) The Comptroller shall maintain the method of collection of the surcharge from the companies and the collections shall accrue to the Fund.
(ii) The Department shall credit against the amount required to be paid into the Environmental Trust Fund by each electric company an amount equal to 0.75% of the total surcharge attributed to each company on the basis of the electricity distributed within Maryland.
(c) (1) (i) The Secretary shall administer the Fund.
(ii) The Fund is subject to the provisions for financial management and budgeting established by the Department of Budget and Management.
(iii) Any investment earnings of the Fund shall be credited to the General Fund of the State.
(iv) The Fund is a special, nonlapsing fund that is not subject to § 7–302 of the State Finance and Procurement Article.
(v) Except as provided in paragraph (2) of this subsection, the money in the Fund shall be used to carry out the provisions of this subtitle as provided for in the budget.
(vi) For the purposes of this subtitle, the Secretary, in consultation with the Director of the Maryland Energy Administration, may execute appropriate contracts with any State or federal agency, research organization, industry, or academic institution to conduct the necessary research, construct or acquire, or both, real property including physical predictive models, laboratories, buildings, land, and appurtenances, or support the technological development of extraordinary systems related to power plants designed to minimize environmental impact.
HOUSE BILL 1532 31 (vii) The Secretary may utilize available expertise in any other State unit in the development, execution, and management of contracts and agreements on projects relating to their areas of prime responsibility.
(2) Money in the Fund may be used for administrative costs calculated in accordance with § 1–103(b)(2) of this article.
(d) (1) The Maryland Energy Administration shall receive administrative and fiscal support from the Fund for studies relating to the conservation or production of electric energy.
(2) Fiscal support to the Maryland Energy Administration from the Fund may not exceed $250,000 in any fiscal year.
(3] The Chesapeake Bay Trust shall receive $375,000 from the Fund each fiscal year for the purpose of funding energy conservation projects through the Thomas V.
Mike Miller, Jr., Chesapeake Conservation and Climate Corps Program, as provided under §§ 8–1913 through 8–1924 of this article.
(e) The Legislative Auditor may conduct post audits of a fiscal and compliance nature of the Fund and of the appropriations and expenditures made for the purposes of this subtitle.
The cost of the fiscal portion of the post audit examinations shall be an operating cost of the Fund.
Article – Public Utilities 2–124.
(A) IT IS THE INTENT OF THE GENERAL A SSEMBLY THAT THE COMMISSION :
(1) INCORPORATE KEYWORD SEARCH FUNCTIONALITY FOR , AT A MINIMUM ,MATERIALS PUBLISHED ON THE C OMMISSION S WEBSITE ON AND AFTER J ULY 1, 2026,INCLUDING KEYWORD SEARCH FUNCTIONALITY WITHIN :
(I) THE CASE AND MAILLOG SEARCH ;
(II) EACH CASE ;
(II) EACH RULEMAKING ;AND (IV) TO THE EXTENT PRACTICABLE ,EACH PUBLICATION ;AND (2) DEVELOP A LANDING PAGE TEMPLATE FOR MAJOR PROCEEDINGS , INCLUDING RATE CASES , THAT VISUALLY TRACKS THE MAJOR PROCEEDING THROUGH EACH STEP OF THE PROCESS .
HOUSE BILL 1532 (B) THE C OMMISSION SHALL DEVELOP DASHBOARDS TO TRACK PROGRESS TOWARD MAJOR S TATE ENERGY PROGRAMS AND GOALS UNDER COMMISSION OVERSIGHT ,INCLUDING :
(1) NET ENERGY METERING ;AND (2) THE STATEWIDE ENERGY STORAGE GOAL UNDER § 7–216.1 OF THIS ARTICLE .
(C) AT THE REQUEST OF THE C OMMISSION , TATE AGENCIES ,INCLUDING THE MARYLAND ENERGY ADMINISTRATION , THE DEPARTMENT OF N ATURAL R ESOURCES ,AND THE D EPARTMENT OF THE E NVIRONMENT , SHALL PROVIDE TO THE COMMISSION ANY PUBLICLY DISCLOSABLE INFORMATION NECESSARY FOR THE C OMMISSION TO ACCURATELY TRACK THE PROGRESS AND GOALS IN THE DASHBOARD REQUIRED UNDER SUBSECTION (B)OF THIS SECTION .
3–106.
(a) If a person timely files, the person may apply to intervene in a proceeding before the Commission.
(b) The Commission shall grant leave to intervene unless the Commission concludes that:
(1) the parties to the proceeding adequately represent the interest of the person seeking to intervene;
or (2) the issues that the person seeks to raise are irrelevant or immaterial.
(c) (1) An intervenor has all the rights of a party to a proceeding.
(2) In a proceeding before the Commission, an individual who is an intervenor may represent himself or herself.
4–203.1.
(A) (1) T HIS SECTION APPLIES ONLY TO A PUBLIC SERVICE COMPANY THAT IS AN INVESTOR –OWNED ELECTRIC COMPANY , A GAS COMPANY , OR A COMBINATION GAS AND ELECTRIC COMPANY .
(2) T HIS SECTION DOES NOT APPLY TO A MUNICIPAL ELECTRIC UTILITY OR AN ELECTRIC COOPERATIVE .
HOUSE BILL 1532 33 (B) N ADDITION TO THE REQUIREMENTS SET FORTH IN § 4–203 OF THIS SUBTITLE , WHEN A PUBLIC SERVICE COMPANY INITIATES A BASE RATE PROCEEDING OR ANOTHER PROCEEDING THAT MAY LEAD TO A DISTRIBUTION COST INCREASE IN EXCESS OF 3.0% FOR ITS CUSTOMERS SERVED UNDER A RESIDENTIAL TARIFF ,THE PUBLIC SERVICE COMPANY SHALL PROVIDE THOSE CUSTOMERS ,THROUGH LINKS ON PHYSICAL OR DIGITAL CUSTOMER BILLS ,LINKS IN SEPARATE E –MAILS ,OR LINKS IN ANY OTHER FORM OF COMMUNICATION DETERMINED ACCEPTABLE BY THE C OMMISSION ,WITH NOTIFICATION THAT :
(1) THE PUBLIC SERVICE COMPANY IS INITIATING THE PROCEEDING ;
AND (2) INFORMATION ABOUT THE PROCEEDING IS OR WILL BE AVAILABLE ON THE COMMISSION ’S WEBSITE .
(C) A PUBLIC SERVICE COMPANY SHALL INCLUDE IN EACH RESIDENTIAL CUSTOMER S BILL AND AUTOMATIC PAYMENT E –MAIL THE FOLLOWING STATEMENT :
“THE M ARYLAND G ENERAL ASSEMBLY ESTABLISHED THE PUBLIC SERVICE C OMMISSION TO REGULATE PUBLIC SERVICE COMPANIES DOING BUSINESS IN M ARYLAND , TO ENSURE THEIR ACTIVITIES ARE CONSISTENT WITH THE PUBLIC INTEREST .
FOR INFORMATION ON HOW TO PARTICIPATE IN OR OBSERVE A PROCEEDING BEFORE THE PUBLIC SERVICE COMMISSION , PLEASE VISIT THE P UBLIC SERVICE COMMISSION ’S WEBSITE.”.
4–212.
(a) (1) In this section the following words have the meanings indicated.
(2) “Contract capacity” means the amount of monthly peak load requirements:
(i) that is mutually agreed to by an electric company and a large load customer for each month remaining in a contract term after the load ramp period has ended;
and (ii) for which:
1.
the electric company agrees to provide all of the components of retail electric service subject to the terms and conditions in its tariffs;
and 2.
the large load customer agrees to purchase service at that load level for the stated term of the contract and under the same terms and conditions as those stated in the contract.
HOUSE BILL 1532 (3) “Large load customer” [means a commercial or industrial customer for retail electric service that:
(i) has or is projected to have an aggregate monthly demand of at least 100 megawatts;
and (ii) has or is projected to have a load factor of over 80%]HAS THE MEANING STATED IN § 7–232 OF THIS ARTICLE .
(4) “Load ramp period” means the period of time from commencement of service until a large load customer’s billing calculation is based on the full contract capacity.
(b) It is the intent of the General Assembly that residential retail electric customers in the State should not bear the financial risks associated with large load customers interconnecting to the electric system serving the State.
(c) (1) (i) On or before September 1, 2026, each investor–owned electric company and each electric cooperative shall submit to the Commission for approval a specific rate schedule for large load customers that accomplishes the intent of subsection (b) of this section.
(ii) Each municipal electric utility that receives an application for retail electric service from a large load customer shall submit to the Commission for approval a specific rate schedule for large load customers.
(2) (i) Service under a specific rate schedule shall be available to large load customers that will use, within the initial contract term:
1.
a monthly maximum demand of more than 100 ] 25 megawatts at a single location;
or 2.
an aggregated contract capacity in the electric company’s service territory of more tha[100 ] 25 megawatts.
(ii) Except as provided in subparagraph (iii) of this paragraph, large load customers that qualify for a specific rate schedule after the effective date of that schedule:
1.
shall take service under the specific rate schedule;
and 2.
may not be allowed to take service under any other existing schedule.
(iii) A specific rate schedule does not apply to the facility of an existing large load customer that has signed a service agreement before the effective date of the schedule if:
HOUSE BILL 1532 35 1.
the large load customer’s existing load does not expand by more than 25 megawatts at that facility under the existing service agreement;
or 2.
the large load customer does not sign a new service agreement to expand the facility’s load by more than 25 megawatts above the contract capacity of the existing service agreement.
(d) In making a determination on whether to approve a specific rate schedule submitted under subsection (c) of this section, the Commission shall consider whether the rate schedule:
(1) requires a large load customer to cover the just and reasonable costs associated with any electric transmission or distribution system buildout required to:
(i) interconnect the large load customer to the electric system serving the State;
or (ii) serve the large load customer;
(2) protects residential retail electric customers from the financial risks associated with large load customers through the use of:
(i) load ramp periods;
(ii) minimum billing demand for electric distribution and transmission service that is a high percentage of a large load customer’s contract capacity;
(iii) long–term contractual commitments and exit fees;
(iv) guarantee or collateral requirements;
and (v) penalties and reimbursement requirements for the large load customer if the large load customer delays or cancels a project after the electric company has begun buildout to accommodate the large load customer;
[and] (3) ALLOCATES TO THE LARGE LOAD CUSTOMER :
(I) ANY INCREASED OR AVOIDED COSTS THAT THE C OMMISSION DETERMINES HAVE BEEN CAUSED BY THE LARGE LOAD CUSTOMER , INCLUDING ANY INCREASED OR AVOIDED WHOLESALE COSTS SUCH AS :
1.
TRANSMISSION COSTS ;AND 2.
CAPACITY COSTS ;AND HOUSE BILL 1532 (I) NOTWITHSTANDING § 4–503( B) OF THIS TITLE AND AS AUTHORIZED UNDER FEDERAL LAW ,ANY DIRECT OR INDIRECT COSTS ,FEES ,AND OBLIGATIONS THAT ARE NORMALLY APPLIED TO RETAIL ELECTRIC CUSTOMERS IN THE SERVICE TERRITORY IN WHICH THE LARGE LOAD CUSTOMER IS LOCATED OR INTERCONNECTED IF THE COMMISSION DETERMINES THAT THE DIRECT OR INDIRECT COSTS , FEES ,AND OBLIGATIONS SHOULD BE ATTRIBUTABLE TO THE LARGE LOAD CUSTOMER ;AND (3)] (4) sufficiently ensures that the allocation of costs to large load customers under the schedule does not result in customers that are not large load customers unreasonably subsidizing the costs of large load customers under the schedule.
(e) T IS THE INTENT OF THE GENERAL ASSEMBLY THAT THE COSTS ALLOCATED TO A LARGE LOAD CUSTOMER IN ACCORDANCE WITH SUBSECTION (D)(3) OF THIS SECTION INCLUDE COSTS THAT ARE INCURRED BY A LARGE LOAD CUSTOMER THAT IS NOT PROVIDING 100% OF ITS ELECTRICITY NEEDS AND ARE ASSOCIATED WITH :
(1) CAPACITY PROCUREMENT ,INCLUDING BACKSTOP RELIABILITY PROCUREMENT ;AND (2) COSTS ASSOCIATED WITH THE INTERCONNECTION PROCESS , INCLUDING TRANSMISSION COSTS .
(F) Before signing a contract for service under a specific rate schedule submitted under subsection (c) of this section, a large load customer under the schedule is required to:
(1) submit a request for a load study to determine the necessary contract capacity for the large load customer and pay any applicable fees associated with the study;
(2) designate a specific site where the large load customer’s project will be constructed and served by the electric company;
(3) own or have the exclusive right to use the land designated in item (2) of this subsection for the project;
and (4) meet any other requirements specified under the rate schedule.
[(f] G) (1) On or before June 1, 2026, the Commission shall adopt regulations to carry out this section.
(2) The regulations shall:
(i) establish minimum notice requirements and deadlines related to load study requests and contract terminations and adjustments;
HOUSE BILL 1532 37 (ii) if considered necessary by the Commission, specify common forms of acceptable collateral to satisfy the requirements of this section;
and (iii) establish deadlines related to completion of load studies and payment of fees.
(H) (1) B Y ORDER OR REGULATION ,THE COMMISSION SHALL :
(I) PROHIBIT BEHIND –THE–METER ENERGY STORAGE FACILITIES FROM BEING STUDIED BY AN ELECTRIC COMPANY AS AN ADDITIONAL LOAD UNDER A LOAD STUDY CONDUCTED UNDER THIS SECTION ;
(I) ESTABLISH REQUIREMENTS AND LIMITATIONS FOR CHARGING AND DISCHARGING BEHIND –THE –METER ENERGY STORAGE FACILITIES DURING PEAK DEMAND ;AND (II) SUBJECT TO PARAGRAPH (2) OF THIS SUBSECTION , ESTABLISH A VOLUNTARY LARGE –LOAD INTERRUPTIBLE INTERCONNECTION PROCESS FOR AN ELECTRIC COMPANY TO PROVIDE VOLUNTARY LARGE –LOAD INTERRUPTIBLE INTERCONNECTION SERVICE .
(2) (I) THE VOLUNTARY LARGE –LOAD INTERRUPTIBLE INTERCONNECTION PROCESS ESTABLISHED UNDER PARAGRAPH (1)II) OF THIS SUBSECTION SHALL INCLUDE :
1.
A LOAD STUDY THAT REFLECTS THE TERMS OF THE VOLUNTARY INTERRUPTIBLE INTERCONNECTION SERVICE ;AND 2.
METHODS TO ENSURE COMPLIANCE WITH THE VOLUNTARY LARGE –LOAD INTERRUPTIBLE INTERCONNECTION SERVICE .
(I) THE COMPLIANCE METHODS REQUIRED UNDER SUBPARAGRAPH (I)2OF THIS PARAGRAPH MAY INCLUDE THE IMPOSITION OF CIVIL PENALTIES FOR FAILURE TO COMPLY WITH THE VOLUNTARY LARGE –LOAD INTERRUPTIBLE INTERCONNECTION SERVICE .
4–309.
(a) (1) In this section the following words have the meanings indicated.
(2) “Eligible limited–income customer” means a residential customer of a utility company with annual income that:
(i) 1.
is at or below 175% of the federal poverty level;
or HOUSE BILL 1532 2.
for a customer at least 67 years of age, is at or below 200% of the federal poverty level;
or (ii) meets a broader designation approved by the Commission.
Show all 500 changed rows (460 more)
View plain text versions (2)
- Enrolled View text Current pdf
- Introduced Introduced (First Reader) pdf
Action History
-
Committee Report (House of Origin) — Favorable with Amendments
-
Hearing (Primary, House of Origin)
-
Third Reading (House of Origin) — Passed
-
First Reading (Opposite House)
-
Second Reading (House of Origin) — Passed with Amendments
-
First Reading (House of Origin)
Sponsors
- Speaker · Primary
- Delegate Holmes · Cosponsor
- Delegate Lewis · Cosponsor
- Delegate Marc Korman · Cosponsor
- Delegate David Fraser-Hidalgo · Cosponsor
- Delegate Nick Allen · Cosponsor
- Delegate Dylan Behler · Cosponsor
- Delegate Linda Foley · Cosponsor
- Delegate Michele Guyton · Cosponsor
- Delegate Anne Healey · Cosponsor
- Jeff Long · Cosponsor
- Delegate Darrell Odom · Cosponsor
- Delegate Dana Stein · Cosponsor
- Delegate Natalie Ziegler · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 13 co-sponsors · 178 not signed on · 115 voted No
Sponsors (1)
- Speaker
Co-sponsors (13)
- Delegate Holmes
- Delegate Lewis
- Delegate Marc Korman Democrat Voted No
- Delegate David Fraser-Hidalgo Democrat Voted No
- Delegate Nick Allen Democrat Voted No
- Delegate Dylan Behler Democrat Voted No
- Delegate Linda Foley Democrat Voted No
- Delegate Michele Guyton Democrat Voted No
- Delegate Anne Healey Democrat Voted No
- Jeff Long Democratic
- Delegate Darrell Odom Democrat Voted No
- Delegate Dana Stein Democrat Voted No
- Delegate Natalie Ziegler Democrat Voted No
Not signed on (178)
178 members have not signed on to this bill.
Show all 178 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Party not on file | 8 | 2 | 0 | 0 |
| Democratic | 92 | 0 | 0 | 3 |
| Republican | 5 | 25 | 0 | 6 |
| Total | 105 | 27 | 0 | 9 |
| % of votes cast | 74% | 19% | 0% | 6% |
How each member voted (141)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Party not on file | 4 | 1 | 0 | 0 |
| Democratic | 28 | 0 | 0 | 2 |
| Republican | 1 | 10 | 0 | 1 |
| Total | 33 | 11 | 0 | 3 |
| % of votes cast | 70% | 23% | 0% | 6% |
How each member voted (47)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 30 | 0 | 0 | 0 |
| Party not on file | 4 | 1 | 0 | 0 |
| Republican | 1 | 10 | 0 | 1 |
| Total | 35 | 11 | 0 | 1 |
| % of votes cast | 74% | 23% | 0% | 2% |
How each member voted (47)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Party not on file | 4 | 0 | 0 | 2 |
| Democratic | 26 | 0 | 0 | 4 |
| Republican | 8 | 4 | 0 | 0 |
| Total | 38 | 4 | 0 | 6 |
| % of votes cast | 79% | 8% | 0% | 13% |
How each member voted (48)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Party not on file | 9 | 1 | 0 | 0 |
| Democratic | 91 | 0 | 0 | 4 |
| Republican | 8 | 24 | 0 | 4 |
| Total | 108 | 25 | 0 | 8 |
| % of votes cast | 77% | 18% | 0% | 6% |
How each member voted (141)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Republican | 32 | 1 | 0 | 3 |
| Party not on file | 4 | 6 | 0 | 0 |
| Democratic | 0 | 90 | 0 | 5 |
| Total | 36 | 97 | 0 | 8 |
| % of votes cast | 26% | 69% | 0% | 6% |
How each member voted (141)
Committees
Frequently asked questions
- What does HB1532 do?
- Transferring the electric universal service program to the Office of Home Energy Programs and requiring the Office to authorize benefits under the program for certain electric customers; establishing the Green and Renewable Energy Efficiency for Nonprofits Loan Program in the Maryland Clean Energy Center; altering certain required procedures related to the permitting, inspection, and interconnection of certain residential solar energy systems; altering the uses of the Environmental Trust Fund; etc.
- Who sponsors HB1532?
- HB1532 is sponsored by Speaker, Delegate Holmes, Delegate Lewis, Delegate Marc Korman (Democrat), Delegate David Fraser-Hidalgo (Democrat), Delegate Nick Allen (Democrat), Delegate Dylan Behler (Democrat), Delegate Linda Foley (Democrat), Delegate Michele Guyton (Democrat), Delegate Anne Healey (Democrat), Jeff Long (Democratic), Delegate Darrell Odom (Democrat), Delegate Dana Stein (Democrat), and Delegate Natalie Ziegler (Democrat).
- What is the current status of HB1532?
- This bill has been enacted into law. Introduced February 13, 2026. Enacted.
- Where can I track HB1532?
- Track HB1532 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB1532
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB1532
Last checked for changes 9 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →