North Carolina 2025 Session Status: Passed Senate 24 R cosponsors

SB 261 — Energy Security and Affordability Act.

Last action — Passed 1st Reading

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill has passed the Senate. Introduced March 10, 2025. It now moves to the second chamber.

Next likely step: consideration and a floor vote in the House.

Odds of enactment

Moderate chance

Based on the sponsor, cosponsors, and committee posture, this bill has a moderate chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Advancing 58% · moderate confidence
  • Passed Senate

    Current position in the legislative process.

  • 24 sponsors

    2 primary, 22 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (24 R).

  • Cleared a recorded vote

    Passed 1 recorded vote so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Bill Text

What changed in the latest version

24 added · 25 removed

Plain-language change summary

In the amendment to Senate Bill 261, some language has been clarified and streamlined regarding the construction of new energy facilities. Specifically, the updated version emphasizes the need for proposed facilities, such as nuclear or wind energy, to not only meet renewable energy goals but also ensure the reliability of the electric grid. This change matters because it reinforces the focus on balancing renewable energy development with grid stability, which is essential for a reliable power supply as North Carolina transitions to more sustainable energy sources.

→
Previous
Latest
FILED SENATE GENERAL ASSEMBLY OF NORTH CAROLINA Mar 10, 2025 S.B.
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2025 S 1 SENATE BILL 261 Short Title:
261 SESSION 2025 PRINCIPAL CLERK S D SENATE BILL DRS35119-RI-13 Short Title:
A BILL TO BE ENTITLED AN ACT TO ELIMINATE THE INTERIM DATE FOR CARBON REDUCTION BY CERTAIN ELECTRIC PUBLIC UTILITIES AND TO ALLOW AN ALTERNATIVE COST RECOVERY MECHANISM FOR CONSTRUCTION WORK IN PROGRESS FOR BASELOAD ELECTRIC GENERATING FACILITIES.
Agriculture, Energy, and Environment March 11, 2025 A BILL TO BE ENTITLED AN ACT TO ELIMINATE THE INTERIM DATE FOR CARBON REDUCTION BY CERTAIN ELECTRIC PUBLIC UTILITIES AND TO ALLOW AN ALTERNATIVE COST RECOVERY MECHANISM FOR CONSTRUCTION WORK IN PROGRESS FOR BASELOAD ELECTRIC GENERATING FACILITIES.
The Utilities Commission shall take all reasonable steps to achieve a seventy percent (70%) reduction in emissions of carbon dioxide (CO2) emitted in the State from electric generating facilities owned or operated by electric public utilities from 2005 levels by the year 2030 and that result in carbon neutrality by the year 2050.
The Utilities Commission shall take all reasonable steps to achieve a seventy percent (70%) reduction in emissions of carbon dioxide (CO2) emitted in the State from electric generating facilities owned or operated byelectric public utilities from 2005 levels bythe year 2030 and that result in carbon neutrality by the year 2050.
Any new generation facilities or other resources selected by the Commission in order to achieve the authorized reduction goals goal for *DRS35119-RI-13* General Assembly Of North Carolina Session 2025 electric public utilities shall be owned and recovered on a cost of service basis by the applicable electric public utility except that:
Any new generation facilities or other resources selected by the Commission in order to achieve the authorized reduction goals goal for *S261-v-1* General Assembly Of North Carolina Session 2025 electric public utilities shall be owned and recovered on a cost of service basis by the applicable electric public utility except that:
To the extent that new solar generation is selected by the Commission, in adherencewith least cost requirements, thesolargenerationselected shall be subject to the following:
To the extent that new solar generation is selected bythe Commission, in adherencewith least cost requirements, thesolargenerationselected shall be subject to the following:
provided, however, the Commission shall not exceed the dates date specified to achieve the authorized carbon reduction goals goal by more than two years, except in the event the Commission authorizes construction of a nuclear facility or wind energy facility that would require additional time for completion due to technical, legal, logistical, or other factors beyond the control of the electric public utility, or in the event necessary to maintain the adequacy and reliability of the existing grid.
provided, however, the Commission shall not exceed the dates date specified to achieve the authorized carbon reduction goals goal by more than two years, except in the event the Commission authorizes construction of a nuclear facilityor wind energyfacilitythat would require additional time for completion due to technical, legal, logistical, or other factors beyond the control of the electric public utility, or in the event necessary to maintain the adequacy and reliability of the existing grid.
A certificate for the construction of generating facility by an electric public utility, as that term is defined by Page 2 DRS35119-RI-13 General Assembly Of North Carolina Session 2025 G.S.
A certificate for the construction of generating facility by an electric public utility, as that term is defined by Page 2 Senate Bill 261-First Edition General Assembly Of North Carolina Session 2025 G.S.
62-110.9,will maintainorimproveupon theadequacy andreliability of the existing grid, and that the construction and operation of the facility is in the public interest.
62-110.9,will maintainorimproveupon theadequacyand reliability of the existing grid, and that the construction and operation of the facilityis in the public interest.
(a) In fixing the rates for any public utility subject to the provisions of this Chapter, other than bus companies, motor carriers and certain water and sewer utilities, the Commission shall fix such rates as shall be fair both to the public utilities and to the consumer.
(a) In fixing the rates for any public utilitysubject to the provisions of this Chapter, other than bus companies, motor carriers and certain water and sewer utilities, the Commission shall fix such rates as shall be fair both to the public utilities and to the consumer.
For baseload electric generating facilities, if the Commission determines there is an overall cost-savings for customers over the life of the generating facility and a baseload electric generating facility has been subject to an annual ongoing review process pursuant to G.S.
For baseload electric generating facilities, if the Commission determines there is an overall cost-savings for customers over the life of the generatingfacilityand a baseload electric generatingfacilityhas been subject to an annual ongoing review process pursuant to G.S.
In DRS35119-RI-13 Page 3 General Assembly Of North Carolina Session 2025 determiningnetoperatingincomeforreturn,theCommissionshallnotinclude any capitalized allowance for funds used during construction on the construction work in progress included in the utility's rate base.
In Senate Bill 261-First Edition Page 3 General Assembly Of North Carolina Session 2025 determiningnetoperatingincomeforreturn,theCommissionshallnotinclude any capitalized allowance for funds used during construction on the construction work in progress included in the utility's rate base.
62-133 the actual costs it has incurred in constructing a generating facility in reliance on a certificate issued under this section as provided in this subsection, unless new evidence is discovered (i) that could not have been discovered by due diligence at an earlier time and (ii) that reasonably tends to show that a previous determination by the Commission that a material item of cost was just and reasonable and prudently incurred was erroneous.
62-133 the actual costs it has incurred in constructing a generating facilityin reliance on a certificate issued under this section as provided in this subsection, unless new evidence is discovered (i) that could not have been discovered by due diligence at an earlier time and (ii) that reasonably tends to show that a previous determination by the Commission that a material item of cost was just and reasonable and prudently incurred was erroneous.
(f2) If the construction of a facility is cancelled, including cancellation as a result of modification or revocation of the certificate under subsection (e1) of this section, and the construction of the facility has been subject to ongoing review under subsection (f), absent newly Page 4 DRS35119-RI-13 General Assembly Of North Carolina Session 2025 discovered evidence (i) that could not have been discovered by due diligence at an earlier time and (ii) that reasonably tends to show that a previous determination by the Commission that a material item of cost was just and reasonable and prudently incurred was erroneous, the public utility shall recover through rates in a general rate case conducted pursuant to G.S.
(f2) If the construction of a facility is cancelled, including cancellation as a result of modification or revocation of the certificate under subsection (e1) of this section, and the construction of the facilityhas been subject to ongoing review under subsection (f), absent newly Page 4 Senate Bill 261-First Edition General Assembly Of North Carolina Session 2025 discovered evidence (i) that could not have been discovered by due diligence at an earlier time and (ii) that reasonably tends to show that a previous determination by the Commission that a material item of cost was just and reasonable and prudently incurred was erroneous, the public utility shall recover through rates in a general rate case conducted pursuant to G.S.
The petition shall contain a showing of need for the facility, an estimate of the construction costs, and the proposed construction schedule for the facility.
The petition shall contain a showingof need for the facility, an estimate of the construction costs, and the proposed construction schedule for the facility.
In making its determinations under this section, the Commission may consider whether the state in which the facility will besitedhas issued acertificateorlicenseforconstructionofthefacilityandapproved a construction cost estimate and construction schedule for the facility.
In making its determinations under this section, the Commission may consider whether the state in which the facilitywill besited has issued acertificateorlicenseforconstruction ofthefacilityand approved a construction cost estimate and construction schedule for the facility.
62-133(b)(1)c., the costs of construction that were actually incurred prior to the cancellation and are found by the Commission to be reasonable and prudent, as provided in subsections (f2) and (f3) of G.S.
62-133(b)(1)c., the costs of construction that were actuallyincurred prior to the cancellation and are found by the Commission to be reasonable and prudent, as provided in subsections (f2) and (f3) of G.S.
DRS35119-RI-13 Page 5 General Assembly Of North Carolina Session 2025 SECTION 4.
Senate Bill 261-First Edition Page 5 General Assembly Of North Carolina Session 2025 SECTION 4.
Page 6 DRS35119-RI-13
Page 6 Senate Bill 261-First Edition
View plain text versions (2)

Action History

  1. Passed 1st Reading

  2. Ref To Com On Rules, Calendar, and Operations of the House

  3. Regular Message Sent To House

  4. Regular Message Received From Senate

  5. Passed 2nd Reading

  6. Passed 3rd Reading

  7. Reptd Fav

  8. Passed 1st Reading

  9. Ref to Agriculture, Energy, and Environment. If fav, re-ref to Rules and Operations of the Senate

  10. Reptd Fav

  11. Re-ref Com On Rules and Operations of the Senate

  12. Filed

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

2 sponsors · 22 co-sponsors · 155 not signed on · 12 voted No

Sponsors (2)

Co-sponsors (22)

Not signed on (155)

155 members have not signed on to this bill.

Show all 155 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Second Reading

Passed 31 Yea · 12 Nay · 7 Other
Party YeaNayPresentNot Voting
Democratic 31205
Republican 27002
Unaffiliated 1000
Total 311207
% of votes cast 62%24%0%14%
How each member voted (50)
Member Party Vote
P. Newton — Yea
Caleb Theodros Democratic Nay
Dan Blue Democratic Yea
DeAndrea Salvador Democratic Not Voting
Gale Adcock Democratic Nay
Gladys A. Robinson Democratic Nay
Graig Meyer Democratic Nay
Jay J. Chaudhuri Democratic Nay
Joyce Waddell Democratic Yea
Julie Mayfield Democratic Nay
Kandie D. Smith Democratic Nay
Lisa Grafstein Democratic Nay
Michael Garrett Democratic Not Voting
Mujtaba A. Mohammed Democratic Nay
Natalie S. Murdock Democratic Not Voting
Paul A. Lowe, Jr. Democratic Yea
Sophia Chitlik Democratic Nay
Sydney Batch Democratic Not Voting
Terence Everitt Democratic Nay
Val Applewhite Democratic Not Voting
Woodson Bradley Democratic Nay
Amy S. Galey Republican Yea
Benton G. Sawrey Republican Yea
Bill Rabon Republican Yea
Bob Brinson Republican Yea
Bobby Hanig Republican Yea
Brad Overcash Republican Yea
Brent Jackson Republican Yea
Carl Ford Republican Yea
Dana Jones Republican Yea
Danny Earl Britt, Jr. Republican Yea
David W. Craven, Jr. Republican Yea
Eddie D. Settle Republican Not Voting
Jim Burgin Republican Yea
Kevin Corbin Republican Yea
Lisa S. Barnes Republican Yea
Mark Hollo Republican Yea
Michael A. Lazzara Republican Yea
Michael V. Lee Republican Yea
Norman W. Sanderson Republican Yea
Paul Newton Republican Yea
Phil Berger Republican Yea
Ralph Hise Republican Yea
Steve Jarvis Republican Yea
Timothy D. Moffitt Republican Yea
Todd Johnson Republican Not Voting
Tom McInnis Republican Yea
Vickie Sawyer Republican Yea
W. Ted Alexander Republican Yea
Warren Daniel Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors SB 261?
SB 261 is sponsored by Benton G. Sawrey (Republican), Norman W. Sanderson (Republican), Brad Overcash (Republican), Paul Newton (Republican), Timothy D. Moffitt (Republican), Tom McInnis (Republican), Michael V. Lee (Republican), Michael A. Lazzara (Republican), Steve Jarvis (Republican), Mark Hollo (Republican), Ralph Hise (Republican), Amy S. Galey (Republican), Carl Ford (Republican), Warren Daniel (Republican), David W. Craven, Jr. (Republican), Jim Burgin (Republican), Bob Brinson (Republican), W. Ted Alexander (Republican), Lisa S. Barnes (Republican), Phil Berger (Republican), Brent Jackson (Republican), Todd Johnson (Republican), and Dana Jones (Republican).
What is the current status of SB 261?
This bill has passed the Senate. Introduced March 10, 2025. It now moves to the second chamber.
Where can I track SB 261?
Track SB 261 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 261

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 261

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →