HB 1718 — relative to authorizing energy storage in connection with net metering.
Last action — Signed by Governor Ayotte 07/10/2026; Chapter 309; eff. I. Secs 1.4.7.8 eff prov sec 9 II. Rem eff 1/1/2027
-
✓Introduced
-
✓In Committee
-
✓Passed House
-
✓Passed Senate
-
✓To Executive
-
6Enacted
This bill has been enacted into law. Introduced December 12, 2025. Enacted.
Signed by Governor Kelly Ayotte (Republican) on July 16, 2026.
Odds of enactment
High chanceBased on the sponsor, cosponsors, and committee posture, this bill has a high chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
-
Enacted
Current position in the legislative process.
-
10 sponsors
1 primary, 9 co-sponsors signed on.
-
Bipartisan support
Sponsored across 2 parties (7 R · 3 D) — cross-party backing.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
In plain language
This bill allows energy storage systems to be used with net metering.
The legislation authorizes the integration of energy storage solutions alongside net metering, enabling more efficient energy use. This supports renewable energy producers in managing their energy generation and usage.
What this means for you
- Consumers: If you use renewable energy, you can now store excess energy for future use or sell it back.
Summary
relative to authorizing energy storage in connection with net metering.
Bill Text
What changed in the latest version
94 added · 154 removedPlain-language change summary
The latest version of Bill HB 1718 makes several important updates, including clarifying definitions related to customer energy storage systems. One key change is that the Department of Energy is now given the authority to establish rules regarding these storage systems, which could streamline regulations and support the use of renewable energy. Additionally, the Public Utilities Commission (PUC) is authorized to set terms for compensating energy exports that come solely from renewable sources. This matters because it helps promote the use of renewable energy and improves incentives for customers who generate their own power.
CHAPTER 309 HB 1718-FN - VERSIONFINAL ADOPTEDVERSION BY BOTH BODIES 19Feb2026...
Watters, Dist 4 COMMITTEE:
CHAPTER 309 HB 1718-FN - VERSIONFINAL ADOPTEDVERSION BY BOTH BODIES 19Feb2026...
1309:1 Limited Electrical Energy Producers Definitions.DefinitionsAmend RSA 362-A:1-a, II-b to read as follows:
Amend RSA 362-A:1-a, II-b to read as follows:
2309:2 New Paragraph;
3309:3 Customer Energy Storage Systems.
4309:4 New Paragraph;
HB 1718-FN - VERSION ADOPTED BY BOTH BODIES - Page 2 - XXIV.
The commission may determine terms and conditions for how a customer-generator may use and be compensated for exports to the grid from energy storage added to renewable energy CHAPTER 309 HB 1718-FN - FINAL VERSION - Page 2 - generation sources in conjunction with net metering and related tariff provisions.
The commission shall require such energy storage, if configured to allow electricity to be exported to the grid, to be charged only from such generation facility, unless charging is under the control of an entity other than the customer-generatorcustomer- generator or as otherwise authorized by the commission in an adjudicated proceeding.
5309:5 Customer Energy Storage;
6309:6 Customer Energy Storage Systems;
(b) New Hampshire's consumers of electricity have a right to install, interconnect, and use energy storage systems on their property, subject to appropriate size and safety requirements established by the [commission]department,[commission] department, without the burden of unnecessary restrictions or regulations and without unduly discriminatory rates or fees, provided that such storage systems conform to local zoning ordinances and building codes.
7309:7 Limited Electrical Energy Producers Definitions.AmendDefinitionsAmend RSA 362-A:1-a, II-b to read as follows:
HB309:8 1718-FN - VERSION ADOPTED BY BOTH BODIES - Page 3 - 8 New Paragraph;
The commission shall require such energy storage, if configured to allow electricity to be exported to the grid, to be charged only CHAPTER 309 HB 1718-FN - FINAL VERSION - Page 3 - from such generation facility, unless charging is under the control of an entity other than the customer-generatorcustomer- generator or as otherwise authorized by the commission in an adjudicated proceeding.
9309:9 Contingency.
10309:10 Effective Date.
LBAApproved: 26-3131 5/18/26 HB 1718-FN- FISCAL NOTE AS AMENDED BY THE SENATE (AMENDMENT # 2026-1909s) AN ACT relative to authorizing energy storage in connection with net metering.
FISCALJuly IMPACT:10, 2026 Effective Date:
ThisI. bill does not provide funding, nor does it authorize new positions.
EstimatedSections State1,4,7, Impact FY 2026 FY 2027 FY 2028 FY 2029 Revenue $0 $0 $0 $0 Revenue Fund(s) None Indeterminable Indeterminable Indeterminable Increase Increase Increase $64,000 $131,000+ $137,000+ (Utility (Utility (Utility Expenditures* $0 Assessments) Assessments) Assessments) Indeterminable Indeterminable Indeterminable Increase Increase Increase (State's utility (State's utility (State's utility costs) costs) costs) Funding Source(s) Utility Assessments under RSA 363-A:1, General Fund, Highway Fund, and Various8 Agencyeffective Fundsas Appropriations*provided $0in $0section $09 $0II. Funding Source(s) None *Expenditure = Cost of bill *Appropriation = Authorized funding to cover cost of bill Estimated Political Subdivision Impact FY 2026 FY 2027 FY 2028 FY 2029 County Revenue $0 $0 $0 $0 County Expenditures $0 Indeterminable Indeterminable Indeterminable Increase Increase Increase Local Revenue $0 $0 $0 $0 Local Expenditures $0 Indeterminable Indeterminable Indeterminable Increase Increase Increase METHODOLOGY:
ThisRemainder billeffective authorizesJanuary energy1, storage2027 to be added to net-metered renewable generation systems without affecting eligibility size limits, provided the storage system is charged solely from the renewable generation facility when exporting electricity to the grid unless otherwise authorized by the Public Utilities Commission (PUC).
The bill also authorizes the PUC to determine the terms and conditions under which customer-generators may use and be compensated for exports to the grid from energy storage connected to renewable energy generation sources in conjunction with net metering and related tariff provisions.
In addition, the bill clarifies statutory provisions related to customer energy storage systems.
The Department of Energy states this bill updates the definition of eligible customer generator to allow energy storage to be added to and charged solely from a renewable generation facility without affecting the one megawatt size limit.
The Department indicates these changes align with its current administrative responsibilities and that reviewing net metering applications under the updated criteria would not require additional staff or resources.
Additionally, the Department states it is not possible to determine the fiscal impact on electricity costs, net metering compensation, or Class II renewable energy certificate obligations, and notes that costs could increase or decrease depending on system configuration.
Because the State accounts for approximately 1% of total electricity purchases, an electric rate increase of $0.001 per kilowatt hour would result in an estimated State cost increase of about $77,000 per year.
The Public Utilities Commission states this bill would require rulemaking and adjudicatory proceedings to establish terms and conditions for compensation of exports from storage systems charged solely from renewable energy.
The Commission indicates it currently employs and is authorized to employ one full-time classified utility analyst, who is working at or near the position’s maximum utilization rate.
Accordingly, the Commission anticipates needing one additional Miscellaneous Business Operations Specialist (13-1190 MISC BUS OPS SPECS-5 SOC11-06) beginning January 1, 2027 to assist the Commission with analyzing, establishing, and administering alternative net metering utility tariffs for energy storage systems.
The Commission estimates annual expenditures of $64,000 in FY 2027 (part year), $131,000 in FY 2028, and $137,000 in FY 2029, funded through the Utility Assessment under RSA 363-A:1.
To the extent utility assessments increase county and local utility expenditures could also see an increase.
AGENCIES CONTACTED:
Department of Energy and Public Utilites Commission
View plain text versions (6)
- Chaptered CHAPTERED FINAL VERSION Current pdf
- Version adopted by both bodies View text pdf
- Amended As Amended by the House pdf
- Amended As Amended by the Senate pdf
- Amended As Amended by the Senate (2nd) pdf
- Introduced View text pdf
Action History
-
Signed by Governor Ayotte 07/10/2026; Chapter 309; eff. I. Secs 1.4.7.8 eff prov sec 9 II. Rem eff 1/1/2027
-
Enrolled (in recess of) 06/04/2026
-
Enrolled Adopted, VV, (In recess 06/04/2026); SJ 15
-
Enrolled Bill Amendment # 2026-2157e: AA VV (in recess of) 06/04/2026 HJ 15
-
Enrolled Bill Amendment # 2026-2157e Adopted, VV, (In recess of 06/04/2026); SJ 14
-
House Concurs with Senate Amendment 2026-1909s and 2026-1791s (Reps. Vose, Weyler): MA VV 05/21/2026 HJ 14 P. 22
-
Ought to Pass with Amendment # 2026-1909s, MA, VV; OT3rdg; 05/14/2026; SJ 12
-
Committee Amendment # 2026-1909s, AA, VV; 05/14/2026; SJ 12
-
Committee Report: Ought to Pass with Amendment # 2026-1909s, 05/14/2026, Vote 7-0; SC 18A
-
Ought to Pass with Amendment # 2026-1791s, MA, VV; Refer to Finance Rule 4-5; 05/07/2026; SJ 11
-
Sen. Watters Floor Amendment # 2026-1791s, AA, VV; 05/07/2026; SJ 11
-
Committee Amendment # 2026-1714s, AF, VV; 05/07/2026; SJ 11
-
HB 1718 was Removed from the Consent Calendar; 05/07/2026; SJ 11
-
Committee Report: Ought to Pass with Amendment # 2026-1714s, 05/07/2026; Vote 5-0; CC; SC 17
-
Hearing: 04/09/2026, Room 103, SH, 02:00 pm; SC 13
-
Introduced 03/26/2026 and Referred to Energy and Natural Resources; SJ 7
-
Ought to Pass: MA VV 03/26/2026 HJ 9 P. 3
-
Committee Report: Ought to Pass 03/17/2026 (Vote 25-0; CC)
-
Executive Session: 03/17/2026 10:00 am GP 230
-
Division I Work Session: 03/09/2026 10:00 am GP 230
-
Referred to Finance 02/19/2026 HJ 5 P. 102
-
Ought to Pass with Amendment 2026-0582h: MA VV 02/19/2026 HJ 5 P. 102
-
Amendment # 2026-0582h: AA VV 02/19/2026 HJ 5 P. 102
-
Committee Report: Ought to Pass with Amendment # 2026-0582h 02/09/2026 (Vote 17-0; RC) HC 7 P. 38
-
Executive Session: 02/09/2026 11:00 am GP 229
-
Public Hearing: 01/29/2026 02:00 pm GP 158
-
==CANCELLED== Executive Session: 01/27/2026 03:00 pm GP 229
-
==CANCELLED== Public Hearing: 01/26/2026 02:00 pm GP 229
-
Introduced 01/07/2026 and referred to Science, Technology and Energy HJ 1 P. 32
Sponsors
- Thomas Cormen · Cosponsor
- Howard Pearl · Cosponsor
- JD Bernardy · Cosponsor
- Kat McGhee · Cosponsor
- John Schneller · Cosponsor
- Michael Vose · Primary
- Douglas Thomas · Cosponsor
- David Watters · Cosponsor
- Michael Harrington · Cosponsor
- Rita Mattson · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 9 co-sponsors · 405 not signed on
Sponsors (1)
- Michael Vose Republican
Co-sponsors (9)
- Thomas Cormen Democrat
- Howard Pearl Republican
- JD Bernardy Republican
- Kat McGhee Democrat
- John Schneller Republican
- Douglas Thomas Republican
- David Watters Democrat
- Michael Harrington Republican
- Rita Mattson Republican
Not signed on (405)
405 members have not signed on to this bill.
Show all 405 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does HB 1718 do?
- relative to authorizing energy storage in connection with net metering.
- Who sponsors HB 1718?
- HB 1718 is sponsored by Thomas Cormen (Democrat), Howard Pearl (Republican), JD Bernardy (Republican), Kat McGhee (Democrat), John Schneller (Republican), Michael Vose (Republican), Douglas Thomas (Republican), David Watters (Democrat), Michael Harrington (Republican), and Rita Mattson (Republican).
- What is the current status of HB 1718?
- This bill has been enacted into law. Introduced December 12, 2025. Enacted.
- Where can I track HB 1718?
- Track HB 1718 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB 1718
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB 1718
Last checked for changes 2 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →