Maine 131st Legislature (2023-2024) Status: Enacted Sponsors 1 D

LD 952 — An Act To Create A 21St-Century Electric Grid

Last action — Signed by Governor

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed House
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced March 02, 2023. Enacted.

Signed by Governor Janet Mills (Democratic) on June 22, 2023.

Bill Text

What changed in the latest version

139 added · 59 removed

Plain-language change summary

The updated version of the bill specifies that the Governor's Energy Office will issue a request for proposals and select a third-party consultant to conduct a two-part study on establishing a distribution system operator (DSO) by January 1, 2024. It also clarifies the roles of the DSO, including overseeing integrated system planning for all electric grids in the state, operating the grids for efficiency and reliability, administering a transparent market for distributed energy resources, and facilitating the achievement of greenhouse gas reduction obligations. This change focuses on defining the process for selecting a consultant and details the responsibilities of the DSO in managing Maine's electric grid.

→
Previous
Latest
131st MAINE LEGISLATURE FIRST REGULAR SESSION-2023 Legislative Document No.
APPROVED CHAPTER JUNE 22, 2023 67 BY GOVERNOR RESOLVES STATE OF MAINE _____ IN THE YEAR OF OUR LORD TWO THOUSAND TWENTY-THREE _____ H.P.
952 H.P.
599 - L.D.
599 House of Representatives, March 2, 2023 An Act to Create a 21st-Century Electric Grid Reference to the Committee on Energy, Utilities and Technology suggested and ordered printed.
952 Resolve, to Create a 21st-Century Electric Grid Sec.1.
ROBERT B.
DistributionsystemoperatorfortheState.Resolved:
HUNT Clerk Presented by Representative RUNTE of York.
That,byJanuary 1, 2024, the Governor's Energy Office, referred to in this resolve as "the office," shall issue a request for proposals and select a 3rd-party consultant, referred to in this resolve as "the consultant," that meets the requirements of section 5, to conduct a 2-part study regarding the establishment of a distribution system operator.
Cosponsored by Representative:
For the purposes of this resolve, "distribution system operator," or "DSO," means an entity designed to serve the following roles for the State:
ZEIGLER of Montville, Senator:
VITELLI of Sagadahoc.
Printed on recycled paper Be it enacted by the People of the State of Maine as follows:
CONCEPT DRAFT SUMMARY This bill is a concept draft pursuant to Joint Rule 208.
This bill would establish the Maine Independent Distribution System Operators or "DSO," which would integrate and consolidate efforts that now span several state agencies and ensure all electric grids in Maine are operated to optimize efficiency, equity, reliability and customer service.
The DSO, which would report to the Public Utilities Commission, would accomplish this by overseeing integrated system planning for all electric grids in Maine and interconnecting the systems.
The DSO would have the same roles as the independent system operator of the New England region, or "ISO-NE":
electric grid operation, market administration and power system planning.
Scope of duties.
Oversee integrated system planning for all electric grids in the State, including coordinating energy planning efforts across state agencies;
The scope of the DSO's duties would include the following:
2.
Operate all electric grids in the State to ensure optimum operations, efficiency, equity, affordability, reliability and customer service;
3.
Administer an open and transparent market for distributed energy resources;
and 4.
Facilitate the achievement of the greenhouse gas reduction obligations and climate policies pursuant to the Maine Revised Statutes, Title 38, section 576‑A and section 577, subsection 1.
The office shall ensure meaningful opportunities for stakeholder engagement to inform the consultant's work at appropriate times during each part of the study.
Sec.
2.
DSO initial study.
Resolved:
That the consultant selected by the office shall conduct an initial study to evaluate whether a DSO could be designed to achieve the following objectives:
1.
A demonstrable reduction in electricity costs for customers;
2.
Improved electric system reliability and performance in the State;
and 3.
Accelerated achievement of the State's climate goals and growth of distributed energy resources.
The consultant's initial study under this section must include a conclusion regarding whether a DSO can be designed to achieve the objectives identified in this section.
The consultant shall provide its initial study to the office for review.
Page 1 - 131LR1065(04) Sec.
3.
DSO study part 2.
Resolved:
That, if the consultant's initial study concludes that a DSO can be designed to achieve the objectives set out in section 2 and the office agrees with that conclusion after review and evaluation of the initial study, the office shall authorize the consultant to proceed with the 2nd part of the study in accordance with this section.
Show all 109 changed rows (69 more)
Previous
Latest
1.
The consultant, in conducting part 2 of the study, shall develop a DSO design proposal and identify the scope and characteristics of the DSO, which may include:
Act as the sole interface with the ISO-NE;
Acting as the primary interface between the New England independent system operator, referred to in this resolve as "ISO-NE," and electricity transmission grids in the State;
Operate an open market for distributed generation, functioning similarly to how ISO-NE’s wholesale power market operates.
Operating an open market for distributed energy resources, modeled on ISO-NE's wholesale power market, to provide market incentives, including, pricing that includes a valuation of system and societal benefits as well as the commodity value of the electricity for new renewable distributed energy resources, including, but not limited to, solar, wind, biomass, electricity storage and microgrids;
Such a market would provide market- based incentives for growth in renewable distributed energy resources, such as solar, wind, biomass and storage and microgrids.
The market would not simply be for the commodity supply value of the electricity but would include its nonenergy values;
Reviewandapproveintegratedsystemdesignsforallutilitiestooptimizeoperation, meet electric grid modernization goals and provide the basis for revenue requirements related to system upgrade capital recovery;
Conducting statewide integrated distribution system planning that:
(1) Includes review and approval of integrated distribution system designs for all transmission and distribution utilities to optimize operation, meet electric grid modernization goals, optimize interconnections and provide the basis for revenue requirements related to recovery of investments in system upgrades;
and (2) Incorporates nonwires alternatives, load management and energy efficiency programs, along with traditional investments in infrastructure to ensure reliability and efficient integration of distributed energy resources;
Assume the role of the nonwires alternative coordinator for the Office of the Public Advocate;
Informing distributed energy resource market participants regarding locational capacity mapping;
Establish and manage energy efficiency programs;
Scheduling and controlling energy storage system discharge within the distribution grids, including vehicle-to-grid systems;
Operate demand response and demand management programs;
Acquiring and sharing real-time data used to operate earnings adjustment mechanisms for investor-owned transmission and distribution utilities;
Operate vehicle-to-grid systems, including charging management and charging stations, that would allow electric vehicle batteries to function as storage devices, charging during times of low demand on the electric grid and providing that stored energy to the electric grid during times of high demand;
Optimizing operations, infrastructure growth, demand management and energy efficiency programs for all transmission and distribution utilities using real-time data;
Acquire and share real-time data used to operate earnings adjustment mechanisms for investor-owned utilities in order to optimize demand management and energy efficiency programs.
Providing a detailed delineation of functions and responsibilities of the DSO, transmission and distribution utilities and government and quasi-governmental agencies, including regulatory, planning, ownership and market administration functions.
The DSO design may not include the acquisition or ownership of any transmission and distribution utility assets.
Sec.
4.
Final report and analysis.
Resolved:
That, if a design proposal is developed in accordance with section 3, the office shall evaluate the proposal and prepare a final report and recommendation including the following elements:
Page 2 - 131LR1065(04) 1.
Identification of the costs and benefits of creating the DSO, including the staffing and budget needed for operation of the DSO;
Analysis.
A description of the DSO's role in accelerating the achievement of the State's climate goals and growth of distributed energy resources;
Prior to establishing the DSO, this bill would require the Efficiency Maine Trust to oversee an analysis by a 3rd-party consultant to:
3.
Identification of potential improvements in electric system reliability and performance that the DSO would bring to the State;
4.
An evaluation of whether and how the DSO would affect equity in energy access and affordability throughout the State;
5.Theoffice'srecommendationsregardingwhethertheStateshouldestablishtheDSO;
and 6.
If the office recommends that the State establish the DSO:
Identify costs and benefits of creating the DSO;
Identification of the state agency within which the DSO might best be established;
Determine what steps would be required to develop the DSO;
Suggested changes to electric rate-making policy and regulations that may be necessary to implement the DSO;
Page 1 - 131LR1065(01) C.
C.
Assess the DSO's role in accelerating the achievement of Maine’s climate action goals and growth in distributed energy resources;
A description of the regulatory authority, if any, that should be provided to the DSO;
D.
and D.
Identify potential improvements in system reliability and performance;
A description of the steps necessary to establish the DSO, including legislation for its implementation.
E.
Sec.
Incorporate a system design that ensures energy equity;
5.
and F.
Consultant qualifications.
Estimate the staffing and budget needed for operation.
Resolved:
The analysis would be required to be completed by January 2024.
That the consultant with which the office contracts under section 1 must be an expert in the development of new energy markets with experience in the management of energy programs designed to increase distributed energy resources and to accelerate the transition to beneficial electrification.
The bill would also provide funding to the Efficiency Maine Trust for the analysis.
The consultant or members of the consultant team must demonstrate:
Page 2 - 131LR1065(01)
1.
Experience in energy system transformation through projects involving the integration of grid design and regulation, using systems thinking and stakeholder engagement;
2.
Experience in alternative regulatory frameworks, such as performance-based regulation, retail and wholesale market design that provide equitable programs for a low- carbon electric grid;
3.
A comprehensive understanding of integration issues related to distributed energy resources, energy storage and electric vehicles, demand-side management and advanced price signals;
4.
Through references from at least 3 jurisdictions, experience in policy and structure redesign work performed for jurisdictions of a similar size to the State;
and 5.
Through case studies of prior work, experience in the development of clean technology in ways that integrate stakeholder perspectives in regulatory and policy proceedings.
Sec.
6.
Funding.
Resolved:
That the office shall seek to fund the initial study under section 2 and part 2 of the study under section 3 with federal funds.
The office shall pursue all federal funding opportunities that the office determines could be used to fund the study.
For any portions of the study that cannot be funded through federal funds, the office shall Page 3 - 131LR1065(04) submit a request to the Public Utilities Commission for the amounts necessary to fully fund the study.
The office may request from the commission up to $200,000 to fund the initial study and up to $100,000 to fund part 2 of the study under section 3.
Notwithstanding the Maine Revised Statutes, Title 35-A, section 117, subsection 3 and to the extent that funds are available, the commission shall distribute the requested funds to the office from the Public Utilities Commission Reimbursement Fund established by Title 35-A, section 117.
Sec.
7.
Report.
Resolved:
That, if the consultant does not conclude that a DSO can be designed to achieve the objectives in section 2, the office shall present the initial study to the joint standing committee of the Legislature having jurisdiction over energy matters within 60 days of the completion of the consultant's initial study.
If the office authorizes part 2 of the study in accordance with section 3, by January 1, 2025, the office shall present the initial study developed by the consultant in accordance with section 2, part 2 of the study and the office's final report and recommendation in accordance with section 4 to the joint standing committee of the Legislature having jurisdiction over energy matters.
The committee may report out a bill to the 132nd Legislature in 2025 related to the subject matter of the report.
Page 4 - 131LR1065(04)
View plain text versions (3)

Action History

  1. Signed by Governor

  2. FINALLY PASSED, in concurrence.

  3. Sent for concurrence. ORDERED SENT FORTHWITH.

  4. FINALLY PASSED.

  5. Under suspension of the Rules, READ A SECOND TIME and PASSED TO BE ENGROSSED AS AMENDED by Committee Amendment "A" (H-369) in concurrence

  6. Committee Amendment "A" (H-369) READ and ADOPTED

  7. READ ONCE

  8. On motion by Senator LAWRENCE of York The Majority Ought to Pass As Amended Report ACCEPTED in concurrence

  9. Reports READ

  10. Sent for concurrence. ORDERED SENT FORTHWITH.

  11. The Bill was PASSED TO BE ENGROSSED as Amended by Committee Amendment "A" (H-369).

  12. Under suspension of the rules, the Bill was given its SECOND READING without REFERENCE to the Committee on Bills in the Second Reading.

  13. Committee Amendment "A" (H-369) was READ and ADOPTED.

  14. The Bill was READ ONCE.

  15. On motion of Representative ZEIGLER of Montville, the Majority Ought to Pass as Amended Report was ACCEPTED.

  16. Reports READ.

  17. Reported Out - OTP-AM/ONTP

  18. Voted - Divided Report

  19. Work Session Held

  20. Carried over, in the same posture, to any special or regular session of the 131st Legislature, pursuant to Joint Order SP 594.

  21. The Bill was REFERRED to the Committee on ENERGY, UTILITIES AND TECHNOLOGY in concurrence

  22. Sent for concurrence. ORDERED SENT FORTHWITH.

  23. The Bill was REFERRED to the Committee on ENERGY, UTILITIES AND TECHNOLOGY.

  24. Committee on Energy, Utilities and Technology suggested and ordered printed.

Sponsors

  • Stanley ZEIGLER · Cosponsor
  • Eloise VITELLI · Cosponsor
  • Walter Runte · Primary

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 2 co-sponsors · 0 not signed on

Sponsors (1)

Co-sponsors (2)

  • Stanley ZEIGLER
  • Eloise VITELLI

Not signed on (0)

None.

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors LD 952?
LD 952 is sponsored by Stanley ZEIGLER, Eloise VITELLI, and Walter Runte (Democrat).
What is the current status of LD 952?
This bill has been enacted into law. Introduced March 02, 2023. Enacted.
Where can I track LD 952?
Track LD 952 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on LD 952

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of LD 952

Last checked for changes 22 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →