New Hampshire 2026 Session Status: Passed House Bipartisan · 6 R · 4 D cosponsors

HB 1478 — requiring the department of environmental services to revise the rules for proposed new landfills.

Last action — Refer to Interim Study, RC 13Y-9N, MA; 05/07/2026; SJ 11

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has passed the House. Introduced December 04, 2025. It now moves to the second chamber.

Next likely step: consideration and a floor vote in the Senate.

Odds of enactment

Moderate chance

Based on the sponsor, cosponsors, and committee posture, this bill has a moderate chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Likely to advance 74% · high confidence
  • Passed House

    Current position in the legislative process.

  • 10 sponsors

    1 primary, 9 co-sponsors signed on.

  • Bipartisan support

    Sponsored across 2 parties (6 R · 4 D) — cross-party backing.

  • Cleared a recorded vote

    Passed 1 recorded vote so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

requiring the department of environmental services to revise the rules for proposed new landfills.

Bill Text

What changed in the latest version

55 added · 68 removed

Plain-language change summary

The recent amendments to Bill HB 1478 strengthen regulations around the siting of new landfills in New Hampshire. The updated bill now specifically emphasizes the need for thorough subsurface investigations, ensuring that any proposed landfill site is adequately evaluated for potential contamination of drinking water sources. Importantly, the requirement for 24-hour on-site personnel during landfill operations has been removed, which could affect oversight and emergency response capabilities at these facilities. These changes aim to better protect public water resources while regulating landfill safety standards.

→
Previous
Latest
HB 1478-FN - AS INTRODUCED SESSION 26-2908 08/05 HOUSE BILL 1478-FN AN ACT requiring the department of environmental services to revise the rules for proposed new landfills.
HB 1478-FN - AS AMENDED BY THE HOUSE 11Mar2026...
0975h SESSION 26-2908 08/05 HOUSE BILL 1478-FN AN ACT requiring the department of environmental services to revise the rules for proposed new landfills.
HB 1478-FN - AS INTRODUCED 26-2908 08/05 STATE OF NEW HAMPSHIRE In the Year of Our Lord Two Thousand Twenty-Six AN ACT requiring the department of environmental services to revise the rules for proposed new landfills.
HB 1478-FN - AS AMENDED BY THE HOUSE 11Mar2026...
0975h 26-2908 08/05 STATE OF NEW HAMPSHIRE In the Year of Our Lord Two Thousand Twenty-Six AN ACT requiring the department of environmental services to revise the rules for proposed new landfills.
No permit shall be issued by any division of the department for the siting of a new landfill if any part of the actual solid waste disposal area is proposed to be located sufficiently close to any existing drinking water well, perennial river, lake, or coastal water of New Hampshire, as defined in RSA 483-B:4, XVI, such that groundwater on the landfill site would be able to reach the water body within 5 years of migrating off-site due to any leak, spill, or other failure.
No solid waste permit shall be issued by any division of the department for the siting of a new landfill if any part of the actual solid waste disposal area is proposed to be located sufficiently close to any existing drinking water well, perennial river, lake, or coastal water of New Hampshire, as defined in RSA 483-B:4, XVI, such that groundwater on the landfill site would be able to reach the water body within 5 years of migrating off-site due to any leak, spill, or other failure.
The velocity shall be estimated by calculating the 95th percentile HB 1478-FN - AS INTRODUCED - Page 2 - upper confidence limit of the mean measured rate, using the formula recommended by the United States Environmental Protection Agency at EPA 600-R-97/006.
The velocity shall be estimated by calculating the 95th percentile HB 1478-FN - AS AMENDED BY THE HOUSE - Page 2 - upper confidence limit of the mean measured rate, using the formula recommended by the United States Environmental Protection Agency at EPA 600-R-97/006.
The department shall not issue a permit for a new landfill or landfill expansion unless the applicant conducts subsurface investigations in sufficient numbers and locations to properly describe the surficial stratigraphy and the bedrock beneath and adjacent to the proposed solid waste boundary, at least to the depth of any aquifers currently used to provide drinking water to residents.
The department shall not issue a permit for a new landfill unless the applicant conducts subsurface investigations in sufficient numbers and locations to properly describe the surficial stratigraphy and the bedrock beneath and adjacent to the proposed solid waste boundary, at least to the depth of any aquifers currently used to provide drinking water to residents.
All landfill facilities shall have at least one employee or contracted personnel at the site 24 hours a day, 365 days per year, beginning from the date the landfill begins accepting waste and continuing until final closure.
No permit shall be granted for a new landfill unless undisturbed in-situ soils for 20 feet immediately beneath the footprint and underneath all leachate storage and transfer infrastructure have a maximum saturated hydraulic conductivity of 1 x 10^-4 centimeters per second(cm/sec) or less.
XX.
No permit shall be granted for a landfill unless undisturbed in-situ soils for 20 feet immediately beneath the footprint and underneath all leachate storage and transfer infrastructure have a maximum saturated hydraulic conductivity of 1 x 10^-4 centimeters per second(cm/sec) or less.
XX.
No permit shall be granted for a new landfill unless the subgrade below the liner consists of soil with a saturated hydraulic conductivity of 1 x 10^-4 cm/sec or less.
No permit shall be granted for a landfill unless the subgrade below the liner consists of soil with a saturated hydraulic conductivity of 1 x 10^-4 cm/sec or less.
All references to number-year storm events regarding new landfill permitting requirements in relation to design, construction, and leachate management shall have the minimum value of a 50-year storm margin of safety.
HB 1478-FN - AS INTRODUCED - Page 3 - XXII.
All references to number-year storm events regarding solid waste landfill permitting requirements in relation to design, maintenance, leachate management, etc., shall have the value of a 100-year storm with a 50 percent margin of safety.
XXIII.
The department shall incorporate the "Ford Act" found at 40 C.F.R.
258 into landfill permitting requirements, specifically the provision limiting the construction or establishment of municipal solid waste landfills within 6 miles of certain smaller public airports.
IX.
HB 1478-FN - AS AMENDED BY THE HOUSE - Page 3 - IX.
LBA 26-2908 11/30/25 HB 1478-FN- FISCAL NOTE AS INTRODUCED AN ACT requiring the department of environmental services to revise the rules for proposed new landfills.
LBA 26-2908 3/31/26 HB 1478-FN- FISCAL NOTE AS AMENDED BY THE HOUSE (AMENDMENT # 2026-0975h) AN ACT requiring the department of environmental services to revise the rules for proposed new landfills.
Estimated Political Subdivision Impact FY 2026 FY 2027 FY 2028 FY 2029 County Revenue $0 $0 $0 $0 County Expenditures $0 $0 $0 $0 Local Revenue $0 $0 $0 $0 Indeterminable Indeterminable Indeterminable Local Expenditures $0 Increase $10,000 Increase $10,000 Increase $10,000 to $600,000 to $600,000 to $600,000 METHODOLOGY:
Estimated Political Subdivision Impact FY 2026 FY 2027 FY 2028 FY 2029 Local Revenue $0 $0 $0 $0 Indeterminable Indeterminable Indeterminable Local Expenditures $0 $10,000 to $10,000 to $10,000 to $100,000 $100,000 $100,000 METHODOLOGY:
This bill requires the Department of Environmental Services (DES) to revise its landfill siting, design, operation, and closure rules, including new setback, groundwater travel-time, subsurface investigation, hydraulic conductivity, and staffing requirements for all new landfill proposals.
This bill requires the Department of Environmental Services to revise its landfill siting and groundwater protection rules for proposed new landfills, including new setback, groundwater travel-time, subsurface investigation, and hydraulic conductivity requirements.
DES states this bill will result in an increase in local expenditures.
The Department of Environmental Services (DES) states this bill will result in an increase in local expenditures.
The impact varies depending on whether a municipality currently owns or operates a landfill and whether it chooses to expand an existing landfill or propose a new one.
The impact varies depending on whether a municipality currently owns a landfill and whether it chooses to expand an existing landfill or propose a new one.
DES provided the following ranges:
1.
1.Municipalities that own a non-RCRA Subtitle D landfill and seek to expand it • Estimated additional cost:
Municipalities that own a non-RCRA Subtitle D landfill and seek to expand it may incur additional costs ranging from $10,000 to $100,000 in any year such expansion occurs due to expanded subsurface investigations required under the bill.
$10,000 to $100,000 per year • These costs stem from expanded subsurface investigations required under the bill.
Municipalities that own and operate a landfill (any type) •Estimated additional cost:
Municipalities that do not currently own a landfill but seek to site a new one may incur one-time costs ranging from $10,000 to $100,000 for expanded subsurface investigations and groundwater analysis.
$100,000 to $500,000 per year • This cost reflects the bill’s requirement that landfill facilities maintain on-site personnel 24 hours per day, 365 days per year, from the start of waste acceptance through final closure.
Additionally, the Department states there is no additional cost to the State as existing staff will absorb any work required to update rules within its current budget.
3.
Municipalities that do not currently own a landfill but seek to site a new one • One-time siting cost:
$10,000 to $100,000 for expanded subsurface investigations and groundwater work.
• Annual operational cost:
$100,000 to $500,000 per year for mandatory on-site staffing requirements.
DES notes that no counties currently own or operate landfills, therefore, there is no county fiscal impact.
View plain text versions (2)

Action History

  1. Refer to Interim Study, RC 13Y-9N, MA; 05/07/2026; SJ 11

  2. Committee Report: Referred to Interim Study, 05/07/2026, Vote 4-1; SC 17

  3. Hearing: 04/14/2026, Room 103, SH, 09:30 am; SC 14

  4. Introduced 03/12/2026 and Referred to Energy and Natural Resources; SJ 7

  5. Ought to Pass with Amendment 2026-0975h: MA VV 03/11/2026 HJ 7 P. 34

  6. Amendment # 2026-0975h: AA VV 03/11/2026 HJ 7 P. 34

  7. Committee Report: Ought to Pass with Amendment # 2026-0975h 03/03/2026 (Vote 12-1; CC) HC 10 P. 17

  8. Executive Session: 03/03/2026 10:15 am GP 153

  9. Full Committee Work Session: 03/03/2026 10:15 am GP 153

  10. Public Hearing: 02/24/2026 01:00 pm GP 153

  11. Introduced 01/07/2026 and referred to Environment and Agriculture HJ 1 P. 22

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 9 co-sponsors · 405 not signed on · 7 voted No

Sponsors (1)

Co-sponsors (9)

Not signed on (405)

405 members have not signed on to this bill.

Show all 405 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Refer to Interim Study

Passed 13 Yea · 9 Nay · 2 Other
Party YeaNayPresentNot Voting
Republican 13102
Democrat 0800
Total 13902
% of votes cast 54%38%0%8%
How each member voted (24)
Member Party Vote
Cindy Rosenwald Democrat Nay
David Watters Democrat Nay
Debra Altschiller Democrat Nay
Donovan Fenton Democrat Nay
Pat Long Democrat Nay
Rebecca Perkins Kwoka Democrat Nay
Suzanne Prentiss Democrat Nay
Tara Reardon Democrat Nay
Bill Gannon Republican Yea
Daniel Innis Republican Yea
Daryl Abbas Republican Yea
David Rochefort Republican Nay
Denise Ricciardi Republican Not Voting
Howard Pearl Republican Yea
James Gray Republican Yea
Keith Murphy Republican Yea
Kevin Avard Republican Not Voting
Mark McConkey Republican Yea
Regina Birdsell Republican Yea
Ruth Ward Republican Yea
Sharon Carson Republican Yea
Tim McGough Republican Yea
Timothy Lang Republican Yea
Victoria Sullivan Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 1478 do?
requiring the department of environmental services to revise the rules for proposed new landfills.
Who sponsors HB 1478?
HB 1478 is sponsored by David Rochefort (Republican), Nicholas Germana (Democrat), Kelley Potenza (Republican), Seth King (Republican), Donovan Fenton (Democrat), Denise Ricciardi (Republican), Judy Aron (Republican), Anita Burroughs (Democrat), Liz Barbour (Republican), and James Gruber (Democrat).
What is the current status of HB 1478?
This bill has passed the House. Introduced December 04, 2025. It now moves to the second chamber.
Where can I track HB 1478?
Track HB 1478 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 1478

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 1478

Last checked for changes about 1 month ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →