SB205 — Underground Damage Prevention Program; One-Call Notification System, further provided for complex or large projects, sunset extended
Last action — Enacted
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
✓Passed Senate
-
✓Passed House
-
✓To Executive
-
6Enacted
This bill has been enacted into law. Introduced March 18, 2026. Enacted.
Signed by Governor Kay Ivey (Republican) on March 18, 2026.
Summary
Telecommunications & Utilities
The summary published with the bill.
Bill Text
What changed in the latest version
1014 added · 995 removedPlain-language change summary
The amended version of SB205 includes a new section, 37-15-4.2, which adds specific underground damage prevention requirements for excavators before starting complex or large projects. It also extends the sunset clause related to the Underground Damage Prevention Program and updates the language in existing sections to align with current style. These changes aim to enhance public safety and ensure better protection of underground facilities during excavation activities.
SB205 INTRODUCEDENROLLED SB205 FKRHRC5-1FKRHRC5-3 By Senator Allen RFD:
22-Jan-26 Page 0 FKRHRC5-1SB205 01/21/2026Enrolled ZAKEnrolled, (L)maAn 2025-3686Act, 23 4Relating SYNOPSIS:to the Underground Damage Prevention Program;
Under existing law, the Underground Damage Prevention Program exists to administer the One-Call Notification System to safeguard against injury and loss of life due to excavation or demolition and to protect underground facilities from costly damage and the interruption of utility or other services to the general public.
This bill would establish various procedures for excavators to follow prior to commencing complex or large projects and would extend the statutory sunset clause pertaining to the program.
This bill would also make nonsubstantive, technical revisions to update the existing code language to current style.
A BILL TO BE ENTITLED AN ACT Relating to the Underground Damage Prevention Program;
and to add Section 37-15-4.2 Page 1 SB205 INTRODUCED to the Code of Alabama 1975, to provide various underground damage prevention requirements for excavators before commencing complex or large projects;
Information about an operator's underground facilities which is provided to a person by an operator and must be accurate to within 18 inches measured horizontally from the outside edge of each side of such operator's facility, or a strip of land 18 inches either side of the operator's field mark or the Page 1 SB205 Enrolled marked width of the facility plus 18 inches on each side of the marked width of the facility.
The Underground Damage Prevention Page 2 SB205 INTRODUCED Board created under Section 37-15-10.1.
Any person contracted with an Page 2 SB205 Enrolled operator specifically to determine and mark the approximate location of the operator's utility lines that exist within the area specified by a notice served on the "One-Call Notification System." (6)(7) DAMAGE.
Includes, but is not limited to, the substantial weakening of structural or lateral support of an underground facility, penetration or destruction of any Page 3 SB205 INTRODUCED underground facility's protective coating, housing, or other protective device, and the partial or complete severance (partial or complete) of any underground facility, but does not apply to any operator's abandoned underground facility.
Any communication to the "One-Call Notification System," specifically to request existing underground facilities to be 95 located for bidding, predesign, or advance planning purposes.
Page 3 SB205 Enrolled (10)(11) EXCAVATE or EXCAVATION.
The term includes, but is not limited to, augering, backfilling, blasting, boring, digging, ditching, dredging, drilling, grading, marine construction, pile-driving, plowing-in, pulling-in, Page 4 SB205 INTRODUCED ripping, scraping, sub-soiling, trenching, and tunneling.tunneling on or below the ground or submerged under water.
Excavate or excavation 95 b.
Routine railroad maintenance activities conducted within the track structure and its adjacent right-of-way, Page 4 SB205 Enrolled provided the activities are performed by railroad employees or railroad contractors and are carried out with reasonable care so as to protect any underground facilities placed in the railroad right-of-way by agreement with the railroad.
Page 5 SB205 INTRODUCED 3.
Activities carried out by those responsible for publicly maintained roadways when utilizing unmechanized tools or equipment on its property or on its right-of-way.right-of-way when carried out with reasonable care so as to protect any utility facilities placed in the right-of-way by permit and carried out within the limits of any original excavation on the traveled way, shoulder, or drainage ditches of a public road, street, or highway.
The use of unmechanized tools or equipment by or on Page 5 SB205 Enrolled behalf of a member operator to a depth not greater than 18 inches for repairing, connecting, protecting, or routine maintenance of the member operator's underground facilities.
Page 6 SB205 INTRODUCED (13)(15) IMPLIED EASEMENT.
Page 6 SB205 Enrolled (16)(18) MEMBER.
An area or territory which Page 7 SB205 INTRODUCED an operator designates as the area where the operator wishes to receive notifications for any excavation in that area.
Any person, governmental agency, or political subdivision, or its agents, who owns or operates a Page 7 SB205 Enrolled public or private underground facility which furnishes services, information, or materials, or transports or transmits electric energy, light, water, steam, oil, gases, gas, mixture of gases, petroleum, petroleum products, hazardous or flammable liquids, toxic or corrosive fluids and gases, or items of like nature, and telecommunications, cable television, water, drainage, sewage, or other systems of like nature.
Page 8 SB205 INTRODUCED (22)(24) PERSON.
Maintenance work on a roadway that is not done pursuant to a contract awarded by a state or local government through a bid process for which Page 8 SB205 Enrolled plan drawings have been developed in advance or work for which detailed and specific scheduling is not possible or feasible, except that maintenance work that complies with subparagraph (11)b.1.
The intentional refusal or failure to perform, or comply with, a duty created or Page 9 SB205 INTRODUCED imposed by this chapter or by the rules adopted pursuant to this chapter.
to Page 9 SB205 Enrolled 5:00 p.m.
(b) Before commencing any excavation or demolition operation prohibited by Section 37-15-3, each person Page 10 SB205 INTRODUCED responsible for the excavation or demolition shall give telephonic or electronic notice of the intent to excavate or demolish to the underground facility operator or the "One-Call Notification System" acting on behalf of the operator at least two but not more than 10 working days prior to the start of the proposed excavation, not including the day of notification, and at least two working days but not more than 30 calendar days, not including the day of notification, prior to the start of demolition or any blasting operations for either excavation or demolition.
(c) The notice required by subsection (b) must contain the name, address, and telephone number of the person responsible for the excavation or the demolition and the person giving notice, the proposed starting date and time, the type of excavation or demolition operation to be conducted, Page 10 SB205 Enrolled the location of the proposed excavation or demolition with sufficient details to enable the operator to locate same with reasonable certainty, and whether or not explosives are to be used.
(d) Notification to the One-Call Notification System of Page 11 SB205 INTRODUCED an intent to excavate shall be valid for a period of 20 working days from the proposed starting date given for excavation, and the notice to demolish shall be valid for a period of 30 working days from the starting date given.
(e) When engaged in an extensive and contiguous construction, demolition, or excavation activity, working agreements may be established to accomplish the intent and purpose of this chapter between operators, public agencies, and contractors after initial compliance with the notification Page 11 SB205 Enrolled provisions of this chapter.
(h)(g) Except for those persons submitting design or survey locate requests, no person, including an operator, shall request markings of a site through the One-Call Notification System that meets the operational requirements as Page 12 SB205 INTRODUCED described in subsection (a) of Section 37-15-5(a), unless excavation is scheduled to commence.
(3) The damage is a proximate result of the operator's Page 12 SB205 Enrolled failure to locate its underground facilities as required by Section 37-15-6." "§37-15-4.1 (a) Any person may submit a design or survey locate request to the One-Call Notification System.
The request shall state the name, address, and telephone number, and facsimile number of the person who has submitted the design or survey locate Page 13 SB205 INTRODUCED request and the company name of the project owner.
(3) Allowing the person submitting the design or survey locate request or any other authorized person to inspect or Page 13 SB205 Enrolled copy the drawings or other records for all underground facilities within the proposed area of excavation.
(3) Operators with more than 25,000 customers or 500 Page 14 SB205 INTRODUCED miles of facilities, that are not members, must join the One-Call Notification System by January 1, 2021.
(6)(3) If an operator of an underground facility fails Page 14 SB205 Enrolled to become a member of the One-Call Notification System, as required by this chapter, and that failure is a cause of damage to that underground facility caused by a person who has complied with this chapter and has have exercised reasonable care in the performance of the excavations that has caused damage to the underground facility, the operator has no right of recovery against the person for the damage to that underground facility.
(b) Between April 18, 1994, and January 1, 1995, or any time thereafter, any Any nonprofit non-profit corporation, public corporation, or governmental entity desiring to become the One-Call Notification System shall apply to the Alabama Public Service Commission for a certificate of public Page 15 SB205 INTRODUCED convenience and necessity, verifying under oath that the applicant meets the requirements of this chapter.
The Alabama Public Service Commission shall revoke a certificate if the non-profit nonprofit corporation, public corporation, or governmental entity ceases to meet the requirements as set Page 15 SB205 Enrolled forth in this chapter.
(e) Operators of underground natural gas or hazardous Page 16 SB205 INTRODUCED liquid pipeline facilities or the One-Call Notification System acting on their behalf shall develop and implement a public awareness and damage prevention program to educate the general public, excavators, and operators about the availability and use of the One-Call Notification System as required in applicable federal regulations and the requirements of this chapter.
Show all 81 changed lines (41 more)
(g) An adequate record of notifications shall be maintained by the underground facility operator or the One-Call Notification System in order to document timely Page 16 SB205 Enrolled compliance with this chapter.
(j) All members of the One-Call Notification System shall provide the One-Call Notification System with the Page 17 SB205 INTRODUCED following information:
(l) All members of the One-Call Notification System who have changes, additions, or new installations of buried Page 17 SB205 Enrolled facilities within the boundaries of the State of Alabama shall notify the One-Call Notification System of changes in the information required in subdivision (1) of subsection (j)(1), within 30 days of the completion of such change, addition, or new installation." "§37-15-6 (a)(1) Each operator served with notice in accordance with Section 37-15-4, with underground facilities in the area, shall mark or cause to be marked or otherwise provide the approximate location of the operator's underground facilities by marking in a manner as prescribed herein prior to the proposed start of excavation, demolition, or blasting.
If any underground facilities become damaged due to an operator Page 18 SB205 INTRODUCED furnishing inaccurate information as to the approximate location of the facilities, through no fault of the operator, then the civil liabilities imposed by this chapter do not apply.
A person excavating is not liable for any damage to an underground facility under the exemption in this subdivision if the excavation or demolition is performed with Page 18 SB205 Enrolled reasonable care as noted in Section 37-15-8, and the excavator uses detection equipment or other acceptable means to determine the location of the underground facilities.
Page 19 SB205 INTRODUCED (b) When marking the approximate location of underground facilities, the operator shall follow the color code designation in accordance with the latest edition of the American Public Works Association Uniform Color Code.
(d) Each operator, upon determining that no underground Page 19 SB205 Enrolled facility is present on the tract or parcel of land or upon completion of the marking of the location of any underground facilities on the tract or parcel of land, shall provide a positive response with information to the One-Call Notification System in accordance with the procedures developed by the One-Call Notification System.
(e) If all operators notified on the locate request have submitted a positive response that indicates a closed or completed response by the operator to the One-Call Notification System prior to the proposed excavation date, the excavator who made the request, upon verifying the closed or completed status in the positive response system, may begin work prior to the proposed date of excavation given, while Page 20 SB205 INTRODUCED following all requirements of Section 37-15-8 or other applicable portions of this chapter The requirement for providing a positive response shall become effective January 1, 2021.
(f)(g) Any contract locator acting on behalf of an Page 20 SB205 Enrolled operator is subject to this section." "§37-15-8 In addition to the notification requirements of Section 37-15-4, each person responsible for an excavation or demolition operation designated in Section 37-15-3, when performing excavation or demolition within the tolerance zone, shall do all of the following to avoid damage to or minimize interference with the underground facilities:
(2) Maintain a clearance of at least 18 inches between Page 21 SB205 INTRODUCED any underground facility and the cutting edge or point of mechanized equipment.
(4)(5) Protect and preserve the markings of approximate locations of underground facilities until those markings are no longer required for proper and safe excavation or demolition." "§37-15-9 (a) Each person responsible for any excavation or Page 21 SB205 Enrolled demolition operation that results in any damage to an underground facility, immediately upon discovery of such damage, shall notify the operator of such facility of the location of the damage or the One-Call Notification System operating on behalf of the underground facility owner and shall allow the operator reasonable time to accomplish any necessary repairs before completing the excavation or demolition in the immediate area of the damage to such facility.
(b) In addition to subsection (a), each person responsible for any excavation or demolition shall immediately report to the operator or the One-Call Notification System operating on behalf of the underground facility owner and Page 22 SB205 INTRODUCED appropriate law enforcement agencies and fire departments any damage to an underground facility that results in escaping flammable, corrosive, explosive, or toxic liquids or gas and shall take reasonable actions necessary to protect persons or property and to minimize safety hazards until those law enforcement agencies and fire departments and the operator arrive at the underground facility.
Reports must be submitted annually to the system, no later than March 31 for the prior calendar year by the deadline date established for the prior year reporting, or more frequently at the option and sole Page 22 SB205 Enrolled discretion of the operator.
(d) A public agency shall not be liable for physical or other damages that occur to an underground facility during the course of performing routine roadway maintenance when the underground facility was installed within the public right-of-way in violation of the public agency's requirements or not in accordance with the utility permit under which the installation was performed." "§37-15-10 Page 23 SB205 INTRODUCED (a) Any person who violates this chapter, or the rules adopted under this chapter, shall be subject to a civil penalty as follows:
(3) For a third or subsequent violation within a 12-month period, the violator shall complete a course of training concerning compliance with this chapter and pay a Page 23 SB205 Enrolled civil penalty in an amount not to exceed three thousand dollars ($3,000) per incident.
For those instances in which training is ordered, if the person is a firm, partnership, association, corporation, limited liability company, joint Page 24 SB205 INTRODUCED venture, department, or subdivision of the state or other governmental entity or any other body or organization, it may be required that at least one manager or supervisor thereof attend any training.
Page 24 SB205 Enrolled (e) The Underground Damage Prevention Fund is created within the State Treasury, to be administered by the authority.
The expenditures of monies in the Underground Damage Prevention Fund shall be at the Page 25 SB205 INTRODUCED discretion of the authority board to carry out its duties under this chapter.
however However, these materials are Page 25 SB205 Enrolled discoverable in civil actions arising from the facts herein.
Page 26 SB205 INTRODUCED (j) Any person who willfully or maliciously removes or otherwise destroys a marking used by an operator to mark the location of any underground facility, except in the ordinary course of excavation, is guilty of a Class C misdemeanor.
Page 26 SB205 Enrolled (b) The authority shall may utilize the services of the Alabama Public Service Commission to provide administrative support for the authority, or the authority may contract with a third-party administrator, subject to the concurrence by the authority board.
Page 27 SB205 INTRODUCED (c) The authority shall be composed of a board of underground facility protection stakeholders.
Page 27 SB205 Enrolled (10) Professional excavator industry.
(d) The Governor shall appoint the stakeholder representatives selected from qualified persons as provided in subsection (c) with the exception of the stakeholder representatives from the Alabama Attorney General's office, the Alabama Public Service Commission - gas pipeline safety, Page 28 SB205 INTRODUCED and the Alabama State Department of Transportation, who shall be appointed by the head of the respective agency.
Page 28 SB205 Enrolled (f) The board shall elect an executive committee made up of five representatives from the authority board as provided in this section excluding those entities representing a state agency, who will be responsible for levying civil penalties and taking actions as described in Section 37-15-10, this section, and Section 37-15-10.2.
Participation by such means shall Page 29 SB205 INTRODUCED constitute presence in person at a meeting for all purposes.
Page 29 SB205 Enrolled (5) Evaluate and revise the enforcement program process and penalty structure by adopting rules if the current structure does not meet the purpose and intent of this chapter or federal law.
(k) Nothing in this chapter shall grant the authority jurisdiction over damage to utilities located above the Page 30 SB205 INTRODUCED ground.
(c) Upon receipt of a complaint of a violation of this chapter, the administrator, operating on behalf of the Page 30 SB205 Enrolled authority, shall provide notice to the reported violator advising that a complaint of violation has been made setting out the time and place of the alleged violation, the identity of who reported the violation, his or her right to file a written response within 14 days, and his or her right to appeal from an adverse decision.
(f) The administrator, operating on behalf of the Page 31 SB205 INTRODUCED authority, shall notify the complainant and the reported violator of any penalty assessed.
There shall be no presumption of correctness attached to any finding of fact or any assessment of a penalty that is appealed to the authority Page 31 SB205 Enrolled board, and the proceedings and hearing before the authority board shall be tried de novo.
Page 32 SB205 INTRODUCED (k) A person aggrieved by the final order, within 30 days from the date of the final order, may seek judicial review in the circuit court by filing a notice of appeal.
The Alabama Open Meetings Act shall apply to all meetings and judicial hearings required pursuant to this chapter, except for those meetings Page 32 SB205 Enrolled of the authority in which the initial determination of violation and recommended fine is discussed and determined.
§37-15-4.2 (a) The excavator for an excavation project that qualifies for a complex or large project shall provide the underground facility operator, via the one-call notification Page 33 SB205 INTRODUCED center, with notice of the planned complex or large project not less than five working days prior to the planned complex or large project pre-excavation planning meeting.
(b) The excavator, operators, and locators involved in Page 33 SB205 Enrolled the complex or large project shall negotiate in good faith to reach a working agreement, which shall include, but not be limited to, the agreed upon scope of work, timeline for excavation activity, and location completion schedule.
(d) An excavator's knowing failure to designate a qualifying project as a complex or large project subject to this section and an excavator or operator's failure to comply Page 34 SB205 INTRODUCED with a working agreement shall be subject to the enforcement provisions of Section 37-15-10.
Page 3534 SB205 Enrolled ________________________________________________ President and Presiding Officer of the Senate ________________________________________________ Speaker of the House of Representatives SB205 Senate 19-Feb-26 I hereby certify that the within Act originated in and passed the Senate, as amended.
Patrick Harris, Secretary.
House of Representatives Passed:
05-Mar-26 By:
Senator Allen Page 35
Show all 81 changed rows (41 more)
Action History
-
Enacted
Sponsors
- Gerald H. Allen · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 139 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (139)
139 members have not signed on to this bill.
Show all 139 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| R | 27 | 0 | 0 | 0 |
| D | 8 | 0 | 0 | 0 |
| Total | 35 | 0 | 0 | 0 |
| % of votes cast | 100% | 0% | 0% | 0% |
How each member voted (35)
| Member | Party | Vote |
|---|---|---|
| Bobby D. Singleton | D | Yea |
| Kirk Hatcher | D | Yea |
| Linda Coleman-Madison | D | Yea |
| Merika Coleman | D | Yea |
| Robert Stewart | D | Yea |
| Rodger M. Smitherman | D | Yea |
| Vivian Davis Figures | D | Yea |
| William M. Beasley | D | Yea |
| Andrew Jones | R | Yea |
| April Weaver | R | Yea |
| Arthur Orr | R | Yea |
| Chris Elliott | R | Yea |
| Clyde Chambliss | R | Yea |
| Dan Roberts | R | Yea |
| David Sessions | R | Yea |
| Donnie Chesteen | R | Yea |
| Garlan Gudger | R | Yea |
| Gerald H. Allen | R | Yea |
| Greg Albritton | R | Yea |
| J. T. 'Jabo' Waggoner | R | Yea |
| Jack W. Williams | R | Yea |
| Jay Hovey | R | Yea |
| Josh Carnley | R | Yea |
| Keith Kelley | R | Yea |
| Lance Bell | R | Yea |
| Larry Stutts | R | Yea |
| Matt Woods | R | Yea |
| Randy Price | R | Yea |
| Sam Givhan | R | Yea |
| Shay Shelnutt | R | Yea |
| Steve Livingston | R | Yea |
| Tim Melson | R | Yea |
| Tom Butler | R | Yea |
| Wes Kitchens | R | Yea |
| Will Barfoot | R | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| R | 27 | 0 | 0 | 0 |
| D | 8 | 0 | 0 | 0 |
| Total | 35 | 0 | 0 | 0 |
| % of votes cast | 100% | 0% | 0% | 0% |
How each member voted (35)
| Member | Party | Vote |
|---|---|---|
| Bobby D. Singleton | D | Yea |
| Kirk Hatcher | D | Yea |
| Linda Coleman-Madison | D | Yea |
| Merika Coleman | D | Yea |
| Robert Stewart | D | Yea |
| Rodger M. Smitherman | D | Yea |
| Vivian Davis Figures | D | Yea |
| William M. Beasley | D | Yea |
| Andrew Jones | R | Yea |
| April Weaver | R | Yea |
| Arthur Orr | R | Yea |
| Chris Elliott | R | Yea |
| Clyde Chambliss | R | Yea |
| Dan Roberts | R | Yea |
| David Sessions | R | Yea |
| Donnie Chesteen | R | Yea |
| Garlan Gudger | R | Yea |
| Gerald H. Allen | R | Yea |
| Greg Albritton | R | Yea |
| J. T. 'Jabo' Waggoner | R | Yea |
| Jack W. Williams | R | Yea |
| Jay Hovey | R | Yea |
| Josh Carnley | R | Yea |
| Keith Kelley | R | Yea |
| Lance Bell | R | Yea |
| Larry Stutts | R | Yea |
| Matt Woods | R | Yea |
| Randy Price | R | Yea |
| Sam Givhan | R | Yea |
| Shay Shelnutt | R | Yea |
| Steve Livingston | R | Yea |
| Tim Melson | R | Yea |
| Tom Butler | R | Yea |
| Wes Kitchens | R | Yea |
| Will Barfoot | R | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| R | 22 | 0 | 0 | 5 |
| D | 5 | 0 | 0 | 3 |
| Total | 27 | 0 | 0 | 8 |
| % of votes cast | 77% | 0% | 0% | 23% |
How each member voted (35)
| Member | Party | Vote |
|---|---|---|
| Bobby D. Singleton | D | Not Voting |
| Kirk Hatcher | D | Not Voting |
| Linda Coleman-Madison | D | Yea |
| Merika Coleman | D | Not Voting |
| Robert Stewart | D | Yea |
| Rodger M. Smitherman | D | Yea |
| Vivian Davis Figures | D | Yea |
| William M. Beasley | D | Yea |
| Andrew Jones | R | Yea |
| April Weaver | R | Yea |
| Arthur Orr | R | Yea |
| Chris Elliott | R | Yea |
| Clyde Chambliss | R | Yea |
| Dan Roberts | R | Yea |
| David Sessions | R | Yea |
| Donnie Chesteen | R | Yea |
| Garlan Gudger | R | Yea |
| Gerald H. Allen | R | Yea |
| Greg Albritton | R | Not Voting |
| J. T. 'Jabo' Waggoner | R | Yea |
| Jack W. Williams | R | Not Voting |
| Jay Hovey | R | Not Voting |
| Josh Carnley | R | Yea |
| Keith Kelley | R | Yea |
| Lance Bell | R | Yea |
| Larry Stutts | R | Yea |
| Matt Woods | R | Yea |
| Randy Price | R | Not Voting |
| Sam Givhan | R | Yea |
| Shay Shelnutt | R | Yea |
| Steve Livingston | R | Yea |
| Tim Melson | R | Not Voting |
| Tom Butler | R | Yea |
| Wes Kitchens | R | Yea |
| Will Barfoot | R | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| R | 22 | 0 | 0 | 5 |
| D | 5 | 0 | 0 | 3 |
| Total | 27 | 0 | 0 | 8 |
| % of votes cast | 77% | 0% | 0% | 23% |
How each member voted (35)
| Member | Party | Vote |
|---|---|---|
| Bobby D. Singleton | D | Not Voting |
| Kirk Hatcher | D | Not Voting |
| Linda Coleman-Madison | D | Yea |
| Merika Coleman | D | Not Voting |
| Robert Stewart | D | Yea |
| Rodger M. Smitherman | D | Yea |
| Vivian Davis Figures | D | Yea |
| William M. Beasley | D | Yea |
| Andrew Jones | R | Yea |
| April Weaver | R | Yea |
| Arthur Orr | R | Yea |
| Chris Elliott | R | Yea |
| Clyde Chambliss | R | Yea |
| Dan Roberts | R | Yea |
| David Sessions | R | Yea |
| Donnie Chesteen | R | Yea |
| Garlan Gudger | R | Yea |
| Gerald H. Allen | R | Yea |
| Greg Albritton | R | Not Voting |
| J. T. 'Jabo' Waggoner | R | Yea |
| Jack W. Williams | R | Not Voting |
| Jay Hovey | R | Not Voting |
| Josh Carnley | R | Yea |
| Keith Kelley | R | Yea |
| Lance Bell | R | Yea |
| Larry Stutts | R | Yea |
| Matt Woods | R | Yea |
| Randy Price | R | Not Voting |
| Sam Givhan | R | Yea |
| Shay Shelnutt | R | Yea |
| Steve Livingston | R | Yea |
| Tim Melson | R | Not Voting |
| Tom Butler | R | Yea |
| Wes Kitchens | R | Yea |
| Will Barfoot | R | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| R | 22 | 0 | 0 | 5 |
| D | 5 | 0 | 0 | 3 |
| Total | 27 | 0 | 0 | 8 |
| % of votes cast | 77% | 0% | 0% | 23% |
How each member voted (35)
| Member | Party | Vote |
|---|---|---|
| Bobby D. Singleton | D | Not Voting |
| Kirk Hatcher | D | Not Voting |
| Linda Coleman-Madison | D | Yea |
| Merika Coleman | D | Not Voting |
| Robert Stewart | D | Yea |
| Rodger M. Smitherman | D | Yea |
| Vivian Davis Figures | D | Yea |
| William M. Beasley | D | Yea |
| Andrew Jones | R | Yea |
| April Weaver | R | Yea |
| Arthur Orr | R | Yea |
| Chris Elliott | R | Yea |
| Clyde Chambliss | R | Yea |
| Dan Roberts | R | Yea |
| David Sessions | R | Yea |
| Donnie Chesteen | R | Yea |
| Garlan Gudger | R | Yea |
| Gerald H. Allen | R | Yea |
| Greg Albritton | R | Not Voting |
| J. T. 'Jabo' Waggoner | R | Yea |
| Jack W. Williams | R | Not Voting |
| Jay Hovey | R | Not Voting |
| Josh Carnley | R | Yea |
| Keith Kelley | R | Yea |
| Lance Bell | R | Yea |
| Larry Stutts | R | Yea |
| Matt Woods | R | Yea |
| Randy Price | R | Not Voting |
| Sam Givhan | R | Yea |
| Shay Shelnutt | R | Yea |
| Steve Livingston | R | Yea |
| Tim Melson | R | Not Voting |
| Tom Butler | R | Yea |
| Wes Kitchens | R | Yea |
| Will Barfoot | R | Yea |
Committees
Frequently asked questions
- What does SB205 do?
- Telecommunications & Utilities
- Who sponsors SB205?
- SB205 is sponsored by Gerald H. Allen (R).
- What is the current status of SB205?
- This bill has been enacted into law. Introduced March 18, 2026. Enacted.
- Where can I track SB205?
- Track SB205 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB205
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB205
Last checked for changes 5 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →