HB 4481 — WV Load Forecast Accountability Act
Last action — Communicated to Senate
-
1Introduced
-
2In Committee
-
3Passed House of Delegates
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill died with 2026 Session. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there are no live odds of enactment. It would have to be reintroduced in the current session to move again.
Summary
WV Load Forecast Accountability Act
Bill Text
What changed in the latest version
35 added · 1 removedPlain-language change summary
The recent amendments to HB 4481 introduce the "Electric Load Forecast Accountability Act," which emphasizes the need for accurate electricity demand forecasting in West Virginia. Key changes include giving the Public Service Commission the authority to review and validate load forecasts submitted by utilities and to coordinate with regional organizations for better planning. This is important as it aims to ensure reliable electricity supply, save consumers from unnecessary costs, and enhance transparency in how electricity needs are assessed—critical factors as demand grows due to new technologies like data centers and electric vehicles. The act also establishes protections for confidential data related to these forecasts, ensuring sensitive customer information is safeguarded.
HB4481 S EIM AMTAM 3-10Kraus3-9Kraus 7502 The Committee on Energy, Industry, and Mining moved to amend the bill by striking out theeverything titleafter andthe substitutingenacting thereforclause aand newinserting title,in tolieu readthereof asthe follows:Eng.following:
Com.ARTICLE 2J.
Sub.ELECTRIC LOAD FORECAST ACCOUNTABILITY ACT.
for House§24-2J-1. Bill 4481—A Bill to amend the Code of West Virginia, 1931, as amended by adding two new articles, designated §24-2J-1, §24-2J-2, §24-2J-3, §24-2J-4, §24-2J-5, §24-2J-6, §24-9-1, §24-9-2, §24-9-3, §24-9-4, §24-9-5, §24-9-6, §24-9-7, §24-9-8, §24-9-9, and §24-9-10, all relating to generation of electricity;
creatingShort thetitle. Electric Load Forecast Accountability Act and the West Virginia First Energy Act;
providing This shortarticle titles,is findings,and purposes,may andbe definitions;cited as the "Electric Load Forecast Accountability Act".
providing oversight§24-2J-2. and reporting by the Public Service Commission concerning electric load forecasting;
providingLegislative accessfindings to and protectionspurpose. from disclosure of confidential documents;
requiring (a) certainThe reportingLegislature finds that:(1) Recent reports by PJM Interconnection, LLC have highlighted that electricity demand across the PJM footprint, including West Virginia, is projected to grow due to data centers, electrification of vehicles and definingbuildings, certainand reportother contents;large load additions;(2) PJM relies upon estimates submitted by utilities and other companies across its system to estimate future electricity needs, which have associated costs;(3) Accurate load forecasting ensures adequate electric supply and protects West Virginia consumers from unnecessary costs caused by electrical resource mismanagement;
creatingand(4) aThe sunsetcurrent date;process by which entities submit load estimates to PJM, requires confidence and transparency so policymakers, regulators, and stakeholders can make the best possible decisions.(b) The purpose of this article is to provide the Public Service Commission of West Virginia the authority and responsibility, in accordance with its existing powers under §24-1-1 et seq.
settingof certainthis minimumcode, operationalto:(1) utilizationReview goaland forvalidate coal-firedload generationforecasts submitted by West Virginia utilities and providingother incentivescompanies forto attainment;PJM;(2) Coordinate with PJM and other states to ensure accurate planning and prevent duplicative counting of projects;
providingand(3) certainAccess protectionsall againstrelevant prematureand terminationnecessary ofmaterials, certainincluding electricconfidential generatingagreements facilitiesnecessary andto placingmaintain limitationeffective onoversight. announcements of such termination;
restricting(c) certainAs recoupmentused ofin certainthis expenditureschapter, associated“PMJ” withmeans certainthe intermittent-generationPJM resources;Interconnection, LLC regional transmission organization. §24-2J-3.
requiringOversight certain utilities to include in their integrated resource plans an analysis of coalload andforecasting. natural-gas utilization, maintenance, and life-extension;
directing(a) useThe Public Service Commission shall, pursuant to its authority under this code, investigate methodologies, data, and assumptions used to develop load forecasts submitted to the commission and to PJM.(b) As part of moneysthe ininvestigation, the Electriccommission Gridshall:(1) StabilizationReview all materials, data sets, and Securityfilings Fund;provided by utilities to the commission and to PJM which concern load forecasting, as authorized by §24-1-1 et seq.
requiringof certainthis coordinationcode;(2) betweenEvaluate Publicthe Serviceaccuracy, Commissionconsistency, and Publictransparency Energyof Authority;forecasting methods and assumptions;(3) Review and audit specific load interconnection requests filed with PJM to ensure that only those projects that have a high likelihood of being developed are included in load forecasts.
expandingAs powers,part duties,of andthis responsibilitiesevaluation, the commission shall consider financial commitments of Publicthe Energyinterconnecting Authority;customer for its project and milestones such as executed agreements or deposits;(4) Coordinate directly with PJM to ensure that West Virginia’s utility forecasts are incorporated into PJM’s regional planning on a fair, accurate, and non-duplicative basis;
providingand(5) certainWork oversightjointly ofwith PJM marketand participationother state utility commissions or entities within the PJM footprint to ensure that new large loads and resourcecustomer planning;contracts are not incorrectly counted across jurisdictions and recommend policies and legal changes to improve load forecasting. §24-2J-4.
requiringConfidentiality. certain electric utilities to perform operational analysis and maintain operational plan;
providing (a) operationalThe planPublic criteria;Service Commission may review and access any contracts, agreements, or commitments between interconnecting customers, prospective customers, and West Virginia utilities that impact load forecasting assumptions.(b) Electric utilities shall provide the contracts, agreements, or commitments contemplated by this section to the commission upon request, subject to appropriate confidentiality protections.
providingThis certainsection Publicdoes Servicenot Commissionaffect any non-disclosure agreement between a utility and Publican Energyexisting Authorityor oversightperspective customer that prohibits disclosures without the customer’s consent.(c) Notwithstanding any provision of operationalthis plans;code to the contrary, including the West Virginia Freedom of Information Act, individual customer data obtained by the commission from a utility or directly from a customer is confidential and exempt from public disclosure.
requiringThis certainexemption electricapplies utilitiesto data of the individual customers or potential customers pertaining to maintainbusiness minimumplans, supplyfacility locations, capacity and energy requirements, and timing of certainthe resources;need for such requirements.
andThe requiringcommission certainshall orders,protect directives,such anddata requirementsfrom topublic implementdisclosure without the act. AdoptedRejectedneed for hearings or public input regarding the lawfulness of protecting the data from public disclosure.
This exemption applies to individual customer plans and data provided to the commission directly by the customer or acquired, estimated, modeled, or developed by a utility and provided to the commission.(d) The commission may aggregate data limited to capacity and energy requirements and make the aggregate data public, provided that it is determined solely by the commission in its discretion and without the need to conduct any hearing, that the aggregated data includes a sufficiently large and diverse sample of customers, and that a knowledgeable person, using publicly available information or reasonable analytical methods, could not infer, reconstruct, nor approximate the capacity of energy requirement or other protected information of any individual customer. §24-2J-5.
Reporting.
(a) The Public Service Commission shall compile and publish on its website a written report on or before December 31, 2026, and annually thereafter, concerning the implementation of this article and its findings, progress, and recommendations.(b) The report shall describe:(1) The commission’s efforts to implement this article during the prior year;(2) Findings from its review of load forecasting processes and materials submitted by West Virginia utilities to PJM, including any identified inaccuracies or recommendations for utility improvements;(3) Any coordination undertaken with PJM and other states to prevent duplicative counting of projects and customer contracts;(4) Recommendations for legislative or regulatory changes to further improve load forecasting oversight and reliability;
and(5) Any other information determined by the commission to be relevant to adopting sound public policy concerning electrical resource planning. §24-2J-6.
Sunset date.
The Electric Load Forecast Accountability Act established in this article shall sunset on December 31, 2031, unless sooner reenacted by the Legislature.
ARTICLE 9.
WEst Virginia First Energy Act.
§24-9-1 West Virginia First Energy Act;
legislative findings;
purpose;
definitions.
(a) This article is and may be cited as the “West Virginia First Energy Act”.(b) The Legislature finds as follows:(1) Coal-fired and natural-gas-fired electric generation are essential to West Virginia’s reliability, affordability, and energy security;(2) For decades, West Virginia maintained some of the most stable electric rates in the nation due to the consistent use of in-state coal generation;(3) As the utilization of coal-fired generation has declined and greater dependence has developed on out-of-state and intermittent sources, West Virginia’s electric rates have become increasingly volatile, threatening both affordability and reliability;(4) United States President Donald J.
Trump issued Executive Order Numbers 14154 and 14156, declaring a National Energy Emergency, directing the federal government to unleash American energy production, and pledging to reverse federal initiatives and regulations that undermine domestic fossil energy, including coal, and to restore policies that support affordable, reliable energy production for American families and industry;(5) President Trump’s National Energy Emergency directives recognize that:(A) Coal, natural gas, and other domestic fossil energy resources are central to national security, grid reliability, and economic competitiveness;
and(B) West Virginia’s abundant coal and natural-gas resources provide the foundation of dispatchable generation needed to maintain year-round reliability, economic competitiveness, and protection from external market disruptions;(6) President Trump, through his National Energy Dominance Council and the federal Environmental Protection Agency, is revamping all policies and regulations impacting coal-fired electric generators so they can run more efficiently, for greater duration at optimum operation, and thus contribute more to West Virginia’s energy output, coal-related employment levels, and overall economic health;(7) In enacting House Bill 2014 (2025 Regular Session), the Legislature incorporated provisions in §24-2-19 of this code requiring in-state coal-fired electric generators to file revised integrated resource plans specifying the necessary plant upgrades and improvements so their plants can operate well beyond their scheduled retirement dates at higher operating capacity levels;(8) Matters generally related to homeland security and national defense are of paramount importance to West Virginia and its residents and coal-fired power plants provide optimal protection and resiliency toward state security and uninterrupted power supplies for household, industrial, and military applications;
and(9) In 2023, the Public Energy Authority was reactivated to provide needed assistance to the state’s coal and natural gas industries and coal-based electric generation but has not been given the proper support and resources to achieve its purpose, intent, and desired results.(c) The purpose of this article is to:(1) Restore electric rate stability through the continued utilization of in-state coal generation;(2) Preserve employment and investment in West Virginia’s coal and natural gas industries;(3) Coordinate with the Electric Grid Stabilization and Security Fund to sustain dependable baseload and mid-load generation capacity statewide;
and(4) Empower the Public Energy Authority to collect and assemble real-time knowledge of in-state electric-generating facilities, their continuous output of power, and the upgrades completed or planned for plants to achieve a higher capacity factor and optimum performance;
Show all 98 changed lines (58 more)
(d) As used in this article:“Coal-fired facility” means a coal-fired electric-generating facility that is regulated by the Public Service Commission;“Dispatchable, non-intermittent replacement resource" means a coal-fired or natural gas-fired electric generating unit that is physically located in West Virginia and capable of continuous operation regardless of weather conditions or time of day;“PJM” means the PJM Interconnection LLC regional transmission organization;
and“Public Energy Authority” means the West Virginia Public Energy Authority created in §5D-1-4 of this code.
§24-9-2.
Minimum operational utilization requirement for coal-fired generation.
(a) Each coal-fired facility located in West Virginia that supplies regulated utilities shall strive to achieve a minimum 69 percent utilization rate, measured on a 12-month rolling average.(b) This utilization standard does not apply to natural gas-fired generation, which serves as a load-following and reliability-balancing resource within the state’s dispatchable fleet.(c) Monthly utilization data for coal-fired facilities shall be reported to the Public Service Commission and Public Energy Authority in a manner prescribed by rules promulgated by the commission in conjunction with the Public Energy Authority.(d) A coal-fired facility’s failure to maintain the minimum utilization level constitutes noncompliance with this article.(e) The commission, in consultation with the Public Energy Authority, shall promulgate rules within 100 days of the effective date of this section to establish a rate recovery program based on a utility’s good faith effort to maintain the 69 percent capacity factor program.
At a minimum, the program shall assign a percentage of cost recovery to each range of compliance comprised of increments of 10 percentage points.
Any time a utility is not generating electricity due to a planned outage for upgrades or necessary maintenance is not factored into the calculation used to measure compliance and corresponding rate recovery with this section.
§24-9-3.
Protection against premature retirement.
(a) A utility may not retire, deactivate, or otherwise reduce the capacity of any coal-fired or natural gas-fired electric generating facility without prior approval of the Public Service Commission and Public Energy Authority.
The commission may approve such an action only if it finds that:(1) The change will not:(A) Increase retail rates;(B) Increase exposure to wholesale market volatility;
and(C) Reduce grid reliability or resource adequacy;
and(2) An in-state, dispatchable, non-intermittent replacement resource of equal or greater capacity is already operational and available on the West Virginia grid at the time of the proposed retirement, deactivation, or reduction.(b) Unauthorized retirement, deactivation, or reduction is a violation of this section that is enforceable by the commission.
§24-9-4.
Restrictions on intermittent resource investment.
(a) A utility regulated by the Public Service Commission may not include in rate base, seek regulated rate of return on, nor obtain cost recovery for any capital expenditure associated with construction, acquisition, expansion, or repowering of any new intermittent generation resource, including wind or solar.(b) Any utility subject to but not in compliance with §24-9-2 or §24-9-3 of this code is prohibited from entering into a power purchase agreement for any new intermittent generation resource, including wind or solar.(c) The commission may not approve cost recovery for intermittent resource generation unless the utility demonstrates that the investment:(1) Does not increase retail rates;(2) Does not increase reliance on PJM wholesale markets;
and(3) Does not reduce seasonal reliability.(d) The burden of proof rests solely on the utility to demonstrate the provisions of subsection (c) of this section.
§24-9-5.
Rate increases contingent on compliance.
The Public Service Commission may consider or approve any rate increase only as is consistent with the utility’s compliance with §24-9-2 of this code.
§24-9-6.
Electric grid stabilization and security fund coordination.
Notwithstanding any provision of this code to the contrary, moneys from the Electric Grid Stabilization and Security Fund, created in §5B-2N-1 et seq.
of this code, shall be used to stabilize generation costs and to support life-extension projects, fuel-security infrastructure, and grid-balancing measures, but may not be used for decommissioning or closing operating units.
§24-9-7.
Oversight of PJM market participation and resource planning.
(a) The Public Service Commission and the Public Energy Authority shall evaluate each PJM capacity auction and ensure West Virginia generating units participate to maximize ratepayer benefit and limit exposure to market volatility.
To the extent allowable by PJM market rules, any generating unit located in West Virginia with a capacity factor greater than 80 percent as listed by PJM on the date of enactment shall be designated an essential reliability resource for purposes of state oversight and participation.(b) Each regulated utility shall include coal and natural gas utilization, maintenance, and life-extension analysis in its integrated resource plan.(c) The commission shall promulgate rules or adopt orders to implement this section and ensure alignment with state reliability and affordability goals.
§24-9-8.
Public utility requirements;
operation plans;
reporting.
(a) Any coal-fired utility shall perform an operational analysis of each coal-fired unit within its plan or system of generators to identify feasible and technological upgrades to improve performance and extend efficient plant life cycle.(b) On or before January 1, 2027, each utility shall submit the findings of its operational analysis to the Public Service Commission and Public Energy Authority along with the operation plan required by this section.
A utility’s integrated resource plan required by §24-2-19 of this code will satisfy the initial submission requirement of this section.
The operational plan shall be updated annually thereafter.(c) The commission may not consider an application for cost recovery until the Public Energy Authority accepts the operational plan and determines that it is administratively complete and authentic.(d) For purposes of fuel and grid resiliency and homeland security, on or before January 1, 2027, any utility generating electric power for industrial or residential consumption within the state shall establish, and thereafter maintain, a minimum 30-day supply of the base fuel used to generate electricity.(e) Operational plan;
minimum requirements.
— At a minimum, the operational plan shall contain the following:(1) The plant fuel supply for the generation of electricity;
(2) The total distribution of electricity for each plant;
(3) How coal supply levels are to be maintained for each plant, including all fuel supply contracts and a complete listing of fuel suppliers;
(4) All necessary plant upgrades to be proposed, started, or completed over the ensuing three-year cycle along with all pertinent contractors, including a copy of the scope of work and beginning and completion dates;
(5) The status of all upgrades completed, announced, or previously incorporated into the plan for any previous cycle;
(6) A maintenance schedule of all routine, scheduled, or planned maintenance along with a record of all unplanned or nonscheduled events leading to or causing emergency or needed maintenance;
(7) An up-to-date accounting of all expenditures or costs which have been recovered or for which an application for recovery has been submitted;
and(8) Information on any grants or low interest loans received from any state or federal agency.
(f) The commission shall coordinate with each utility and the Public Energy Authority and may require utilities to submit any documents, records, or data necessary to ensure accurate calculation and reporting under this article.
§24-9-9.
Additional duties of Public Energy Authority.
(a) In addition to those specified in §5D-1-1 et seq.
of this code, the Public Energy Authority has the following powers, duties, and responsibilities to ensure electric grid stability and homeland security:(1) Meet with every public utility operating within this state to:
(A) Ascertain the general condition of each plant;
(B) Ascertain implementation of the operational plan;(C) Consult with the plant operator to solicit any information required to verify progress completed on the most recently approved operational plan;
and(D) Verify the 30-day base fuel supply as required by §24-9-8 of this code;
and(2) At least annually, submit a report of its inspection findings and overall condition of public utilities operating within the state to the Department of Homeland Security’s Division of Emergency Management, the Public Service Commission, and the Joint Committee on Government and Finance.(b) Before any public utility publicly announces the retirement of a coal-fired unit, proposed shutdown of a coal-fired unit, closure of a plant, or proposed sale of a plant to another operator, the plant operator or public utility shall:(1) Provide notice of the impending action to the Public Energy Authority, Department of Homeland Security’s Division of Emergency Management, Public Service Commission, and Joint Committee on Government and Finance;
and (2) Receive approval for the impending action from the Public Energy Authority and Public Service Commission.(c) The provisions of subsection (b) of this section do not apply where a plant would require emergency deenergization or shutdown for imminent danger or public safety.
§24-9-10.
Implementation.
The Public Service Commission, in consultation with the Public Energy Authority, shall issue such general orders, directives, and requirements as are necessary to implement and enforce the provisions of this article.
The commission may require utilities to file data, reports, plans, or other information as necessary to ensure compliance with this article. AdoptedRejected
Show all 98 changed rows (58 more)
View plain text versions (5)
- hb4481 s eim am 3-9 adopted.htm View text html
- hb4481 s eim amt 3-10 adopted.htm View text Current html
- Committee Substitute Engrossed Committee Substitute pdf
- Committee Substitute View text pdf
- Introduced Introduced Version pdf
Action History
-
Filed for introduction
-
To Energy and Public Works
-
Introduced in House
-
To House Energy and Public Works
-
Markup Discussion
-
By substitute, do pass
-
On 1st reading, Special Calendar
-
Read 1st time
-
On 2nd reading, Special Calendar
-
Read 2nd time
-
On 3rd reading, Special Calendar
-
Read 3rd time
-
Passed House (Roll No. 182)
-
Communicated to Senate
-
Introduced in Senate
-
To Energy, Industry, and Mining
-
To Energy, Industry, and Mining
-
Reported do pass, with amendment and title amendment
-
Immediate consideration
-
Read 1st time
-
On 2nd reading
-
Read 2nd time
-
Committee amendment adopted (Voice vote)
-
On 3rd reading
-
Read 3rd time
-
Passed Senate with amended title (Roll No. 480)
-
Senate requests House to concur
-
House received Senate message
-
House refused to concur and requested Senate to recede (Roll No. 507)
-
Communicated to Senate
Sponsors
- James Robert "JB" Akers II · Primary
- Clay Riley · Cosponsor
- Bob Fehrenbacher · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 2 co-sponsors · 149 not signed on · 7 voted No
Sponsors (1)
- James Robert "JB" Akers II Republican
Co-sponsors (2)
- Clay Riley Republican
- Bob Fehrenbacher Republican
Not signed on (149)
149 members have not signed on to this bill.
Show all 149 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
Roll call published as PDF — view source.
Roll call published as PDF — view source.
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Republican | 24 | 5 | 0 | 0 |
| Democrat | 1 | 3 | 0 | 0 |
| Unaffiliated | 1 | 0 | 0 | 0 |
| Total | 26 | 8 | 0 | 0 |
| % of votes cast | 76% | 24% | 0% | 0% |
How each member voted (34)
| Member | Party | Vote |
|---|---|---|
| MR PRESIDENT | — | Yea |
| Anitra Hamilton | Democrat | Nay |
| Mike Woelfel | Democrat | Nay |
| Mike Woelfel | Democrat | Yea |
| Rick Garcia | Democrat | Nay |
| Ben Queen | Republican | Yea |
| Carl Martin | Republican | Yea |
| Chris Phillips | Republican | Yea |
| Chris Rose | Republican | Yea |
| Chris Rose | Republican | Yea |
| Dean Jeffries | Republican | Yea |
| Eric Tarr | Republican | Yea |
| Eric Tarr | Republican | Nay |
| Glenn Jeffries | Republican | Yea |
| Jack Woodrum | Republican | Nay |
| Jack Woodrum | Republican | Nay |
| Jay Taylor | Republican | Yea |
| Jimmy Willis | Republican | Yea |
| Mark R. Maynard | Republican | Yea |
| Mike Oliverio | Republican | Yea |
| Patricia Rucker | Republican | Yea |
| Patricia Rucker | Republican | Yea |
| Robbie Morris | Republican | Yea |
| Rollan A. Roberts | Republican | Yea |
| Rollan A. Roberts | Republican | Yea |
| Rupie Phillips | Republican | Yea |
| Rupie Phillips | Republican | Yea |
| Ryan Weld | Republican | Nay |
| Ryan Weld | Republican | Yea |
| Tom Takubo | Republican | Nay |
| Tom Takubo | Republican | Yea |
| Tom Willis | Republican | Yea |
| Trenton Barnhart | Republican | Yea |
| Trenton Barnhart | Republican | Yea |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Republican | 84 | 0 | 0 | 4 |
| Democrat | 8 | 0 | 0 | 1 |
| Unaffiliated | 2 | 0 | 0 | 1 |
| Total | 94 | 0 | 0 | 6 |
| % of votes cast | 94% | 0% | 0% | 6% |
How each member voted (100)
| Member | Party | Vote |
|---|---|---|
| Flanigan | — | Yea |
| Linville | — | Yea |
| Kump | — | Not Voting |
| Anitra Hamilton | Democrat | Yea |
| Evan Hansen | Democrat | Yea |
| Hollis Lewis | Democrat | Yea |
| John Williams | Democrat | Yea |
| Kayla Young | Democrat | Yea |
| Mike Pushkin | Democrat | Yea |
| Rick Garcia | Democrat | Yea |
| Sean Hornbuckle | Democrat | Yea |
| Shawn Fluharty | Democrat | Not Voting |
| Adam Burkhammer | Republican | Yea |
| Adam Vance | Republican | Not Voting |
| Andy Shamblin | Republican | Yea |
| Betsy Kelly | Republican | Yea |
| Bill Bell | Republican | Yea |
| Bill Ridenour | Republican | Yea |
| Bob Fehrenbacher | Republican | Yea |
| Bryan Smith | Republican | Not Voting |
| Bryan Ward | Republican | Yea |
| Carl "Bill" Roop | Republican | Yea |
| Carl Martin | Republican | Yea |
| Charles Sheedy | Republican | Yea |
| Chris Phillips | Republican | Yea |
| Christopher W. Toney | Republican | Yea |
| Chuck Horst | Republican | Yea |
| Clay Riley | Republican | Yea |
| D. Rolland Jennings | Republican | Yea |
| Dana Ferrell | Republican | Yea |
| Dave Foggin | Republican | Yea |
| David Cannon | Republican | Yea |
| David Green | Republican | Yea |
| David McCormick | Republican | Yea |
| Dean Jeffries | Republican | Yea |
| Doug Smith | Republican | Yea |
| Elias Coop-Gonzalez | Republican | Yea |
| Eric Brooks | Republican | Yea |
| Erica Moore | Republican | Yea |
| Evan Worrell | Republican | Yea |
| Gary G. Howell | Republican | Yea |
| Geno Chiarelli | Republican | Yea |
| George Miller | Republican | Yea |
| George Street | Republican | Yea |
| Gregory A. Watt | Republican | Yea |
| Guy Ward | Republican | Yea |
| Henry Dillon | Republican | Yea |
| Ian T. Masters | Republican | Yea |
| James Robert "JB" Akers II | Republican | Yea |
| Jarred Cannon | Republican | Yea |
| Jeff Campbell | Republican | Yea |
| Jeff Eldridge | Republican | Yea |
| Jeffrey Stephens | Republican | Yea |
| Jim Butler | Republican | Yea |
| Jimmy Willis | Republican | Yea |
| Joe Ellington | Republican | Yea |
| Joe Funkhouser | Republican | Yea |
| Joe Parsons | Republican | Yea |
| Joe Statler | Republican | Yea |
| John Jordan | Republican | Yea |
| John Paul Hott | Republican | Yea |
| Jonathan Kyle | Republican | Yea |
| Jonathan Pinson | Republican | Yea |
| Jordan Bridges | Republican | Yea |
| Jordan Maynor | Republican | Yea |
| Josh Holstein | Republican | Yea |
| Kathie Hess Crouse | Republican | Yea |
| Keith Marple | Republican | Yea |
| Laura Kimble | Republican | Yea |
| Lisa White | Republican | Yea |
| Lori Dittman | Republican | Yea |
| Margitta Mazzocchi | Republican | Yea |
| Mark Dean | Republican | Yea |
| Mark Zatezalo | Republican | Yea |
| Marshall W. Clay | Republican | Yea |
| Marty Gearheart | Republican | Yea |
| Matthew Rohrbach | Republican | Yea |
| Michael Amos | Republican | Yea |
| Michael Hite | Republican | Yea |
| Michael Hornby | Republican | Yea |
| Mickey Petitto | Republican | Yea |
| Pat McGeehan | Republican | Yea |
| Patrick Lucas | Republican | Yea |
| Phil Mallow | Republican | Yea |
| Ray Canterbury | Republican | Yea |
| Rick Hillenbrand | Republican | Yea |
| Roger Hanshaw | Republican | Yea |
| Roy Cooper | Republican | Yea |
| Ryan Browning | Republican | Yea |
| S. Chris Anders | Republican | Yea |
| Sarah Drennan | Republican | Yea |
| Scot C. Heckert | Republican | Yea |
| Stanley Adkins | Republican | Yea |
| Tresa Howell | Republican | Yea |
| Tristan Leavitt | Republican | Not Voting |
| Vacant1 | Republican | Not Voting |
| Vernon Criss | Republican | Yea |
| Walter Hall | Republican | Yea |
| Wayne Clark | Republican | Yea |
| William Anderson | Republican | Yea |
Subjects
Frequently asked questions
- What does HB 4481 do?
- WV Load Forecast Accountability Act
- Who sponsors HB 4481?
- HB 4481 is sponsored by James Robert "JB" Akers II (Republican), Clay Riley (Republican), and Bob Fehrenbacher (Republican).
- What is the current status of HB 4481?
- This bill died with 2026 Session. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track HB 4481?
- Track HB 4481 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB 4481
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB 4481
Last checked for changes about 1 month ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →