SB 443 — relative to wastewater engineering.
Last action — Enrolled (in recess of) 04/23/2026 HJ 11 P. 82
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
✓Passed Senate
-
✓Passed House
-
✓To Executive
-
6Enacted
This bill has been enacted into law. Introduced November 21, 2025. Enacted.
Signed by Governor Kelly Ayotte (Republican) on May 12, 2026.
In plain language
The bill updates regulations for wastewater engineering and permit requirements.
This bill gives the Department of Environmental Services new rulemaking authority regarding wastewater infrastructure plans and permits. It requires the filing of plans, sets design standards, and establishes a sewer connection permit program.
Summary
relative to wastewater engineering.
Bill Text
What changed in the latest version
53 added · 50 removedPlain-language change summary
The final version of SB 443 introduces new rulemaking authority for reviewing and approving wastewater infrastructure plans and sewer connection permits. Notably, it removes the requirement for at least 30 days' notice before beginning construction and clarifies that the state can review and approve all related engineering documents critical for pollution control projects. These changes are significant because they streamline the approval process for wastewater projects, potentially speeding up construction and enhancing environmental protections.
CHAPTER 62 SB 443 - VERSIONFINAL ADOPTEDVERSION BY BOTH BODIES SESSION 26-2235 08/06 SENATE BILL 443 AN ACT relative to wastewater engineering.
CHAPTER 62 SB 443 - VERSIONFINAL ADOPTEDVERSION BY BOTH BODIES 26-2235 08/06 STATE OF NEW HAMPSHIRE In the Year of Our Lord Two Thousand Twenty-Six AN ACT relative to wastewater engineering.
162:1 Duties of Department;
262:2 Duties of the Department;
[Innovative/alternative waste treatment systems shall include solar and such other systems as shall be identified or accepted by the department.] To [reject, if necessary, or modify and] review and approve or deny as deemed necessary for the purposes of the state water pollution control program all engineering or other documents associated with the design and construction of pollution control projects and perform such other related engineering or inspectional work as will provide for proper design, construction and operation of the facilities involved, and take such other action as the department deems necessary, including but not limited to establishing a permitting program, to maximize the effectiveness of sewerage and other pollution control facilities, both proposed and in construction.[Theconstruction. department is authorized to purchase professional liability insurance annually in order to provide coverage in connection with resident construction engineering services which may be made available to municipalities by the department for projects undertaken with benefit of a federal grant under the provisions of this chapter;
[The department is authorized to purchase professional liability insurance annually in order to provide coverage in connection with resident construction engineering services which may be made available to municipalities by the department for projects undertaken with benefit of a federal grant under the provisions of this chapter;
362:3 Duties of the Department;
To review and provide conditions for industrial discharge permits issued by municipalities or sewer utility districts if such discharges are not to an Environmental Protection Agency approved pretreatment program. SB 443 - VERSION ADOPTED BY BOTH BODIES - Page 2 - IX-c.
To review and approve or deny as deemed necessary plans, specifications and engineering documents associated with the request to discharge additional sewage or industrial wastes to a municipal sewer system through administration of a sewer connection permit program. 4CHAPTER 62 SB 443 - FINAL VERSION - Page 2 - 62:4 New Paragraphs;
Requirements under RSA 485-A:4, IX-bIX-b, relative to industrial discharge permits.
562:5 New Paragraph;
662:6 Rulemaking.
The requirements for permits under RSA 485-A:4, IX, XVI-aXVI-a, and XVI-b.
762:7 Effective Date.
Approved:
May 08, 2026 Effective Date:
July 07, 2026
View plain text versions (3)
- Chaptered CHAPTERED FINAL VERSION Current pdf
- Version adopted by both bodies View text pdf
- Introduced View text pdf
Compared against the N.H. Revised Statutes Annotated as published AI-generated reading aid — verify against the official bill.
The bill modifies the duties of the Department regarding wastewater systems by updating requirements for plan submissions and incorporating specific rulemaking authority.
-
RSA 485-A:4, VI
at least 30 days prior to the beginning of constructionThe requirement for filing plans with the department has been shortened by removing the 30-day advance notice.
-
RSA 485-A:4, IX
Innovative/alternative waste treatment systems shall include solar and such other systems as shall be identified or accepted by the department. The department is authorized to purchase professional liability insurance annually in order to provide coverage in connection with resident construction engineering services which may be made available to municipalities by the department for projects undertaken with benefit of a federal grant under the provisions of this chapter; provided, however, that no construction engineering services shall be provided to any municipality with a population of greater than 5,000 according to the office of planning and development estimate for that even decade year preceding project application to the department or when the estimated project costs exceed $2,000,000.Specific limitations on innovative/alternative systems and liability insurance for engineering services have been removed.
-
RSA 485-A:4, IX-b
To review and provide conditions for industrial discharge permits issued by municipalities or sewer utility districts if such discharges are not to an Environmental Protection Agency approved pretreatment program.
New authority has been added for the review and conditions of industrial discharge permits.
-
RSA 485-A:4, IX-c
To review and approve or deny as deemed necessary plans, specifications and engineering documents associated with the request to discharge additional sewage or industrial wastes to a municipal sewer system through administration of a sewer connection permit program.
New authority has been added for the review of plans associated with discharging additional sewage or industrial wastes.
-
RSA 485-A:6, III-a
Requirements under RSA 485-A:4, IX-b, relative to industrial discharge permits.
New rulemaking requirements for industrial discharge permits have been established.
-
RSA 485-A:6, III-b
Requirement under RSA 485-A:4, IX-c, relative to administration of a sewer connection permit program.
New rulemaking requirements for the sewer connection permit program have been added.
-
RSA 485-A:6, X-a
The requirements for permits under RSA 485-A:4, IX, XVI-a, and XVI-b.
The rulemaking section has been updated to include new requirements for permits.
Action History
-
Enrolled (in recess of) 04/23/2026 HJ 11 P. 82
-
Signed by the Governor on 05/08/2026; Chapter 62; Effective 07/07/2026
-
Enrolled Adopted, VV, (In recess 04/23/2026); SJ 11
-
Ought to Pass: MA VV 04/09/2026 HJ 10
-
Committee Report: Ought to Pass 03/25/2026 (Vote 15-0; CC)
-
Executive Session: 03/25/2026 10:00 am GP 228
-
Public Hearing: 03/25/2026 01:00 pm GP 228
-
Introduced (in recess of) 03/12/2026 and referred to Resources, Recreation and Development HJ 8 P. 114
-
Ought to Pass: MA, VV; OT3rdg; 03/12/2026; SJ 6
-
Committee Report: Ought to Pass, 03/12/2026; Vote 5-0; CC; SC 9
-
Hearing: 01/20/2026, Room 103, SH, 09:30 am; SC 1
-
Introduced 01/07/2026 and Referred to Energy and Natural Resources; SJ 1
Sponsors
- Ron C Dunn · Cosponsor
- Howard Pearl · Cosponsor
- Donovan Fenton · Cosponsor
- Timothy Lang · Cosponsor
- Denise Ricciardi · Primary
- Bill Gannon · Cosponsor
- Regina Birdsell · Cosponsor
- Thomas L Buco · Cosponsor
- David Watters · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 8 co-sponsors · 408 not signed on
Sponsors (1)
- Denise Ricciardi Republican
Co-sponsors (8)
- Ron C Dunn
- Howard Pearl Republican
- Donovan Fenton Democrat
- Timothy Lang Republican
- Bill Gannon Republican
- Regina Birdsell Republican
- Thomas L Buco
- David Watters Democrat
Not signed on (408)
408 members have not signed on to this bill.
Show all 408 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
- Senate Energy and Natural Resources Referred November 21, 2025
- House Resources, Recreation and Development Referred March 16, 2026
Frequently asked questions
- What does SB 443 do?
- relative to wastewater engineering.
- Who sponsors SB 443?
- SB 443 is sponsored by Ron C Dunn, Howard Pearl (Republican), Donovan Fenton (Democrat), Timothy Lang (Republican), Denise Ricciardi (Republican), Bill Gannon (Republican), Regina Birdsell (Republican), Thomas L Buco, and David Watters (Democrat).
- What is the current status of SB 443?
- This bill has been enacted into law. Introduced November 21, 2025. Enacted.
- Where can I track SB 443?
- Track SB 443 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 443
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 443
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →