Pennsylvania 2025_0 Regular Session Status: Passed House Bipartisan · 55 D · 2 R cosponsors

HB 2380 — An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for energy storage procurement.

Last action — Referred to CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, Oct. 13, 2026

Track this bill free

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has passed the House. Introduced May 21, 2026. It now moves to the second chamber.

Next likely step: consideration and a floor vote in the Senate.

Prognosis

Advancing 58% · high confidence

Where this bill stands today.

Odds of enactment

Moderate

How often bills like it became law.

  • Passed House

    Current position in the legislative process.

  • 57 sponsors

    1 primary, 56 co-sponsors signed on.

  • Bipartisan support

    Sponsored across 2 parties (55 D · 2 R) — cross-party backing.

  • Mixed recorded votes

    1 passed, 1 failed in recorded votes so far.

Prognosis reads this bill's own signals — stage, sponsorship breadth, committee status, recorded votes and cross-state momentum. Odds come from a model trained on which bills have become law.

In plain language

The bill involves energy storage procurement to reduce utility bills.

This bill amends public utility regulations to facilitate the use of grid-scale battery storage. It aims to help lower utility bills for consumers by optimizing energy storage.

What this means for you
  • Consumers: This bill could lead to reduced utility bills through the implementation of energy storage solutions.

Summary

Reducing utility bills by utilizing grid-scale battery storage

Bill Text

What changed in the latest version

297 added · 523 removed

Plain-language change summary

The latest version of Bill HB 2380 has been amended to increase the total capacity goal for energy storage systems from 3,000 to 3,500 megawatts and has extended the deadline for achieving this goal from July 1, 2033, to July 1, 2035. Additionally, it now specifies that the storage capacity must include 500 megawatts for multiday storage, alongside the existing requirements for short- and long-duration storage. These changes aim to enhance the reliability and flexibility of Pennsylvania's energy grid, particularly during peak demand times.

→
Previous
Latest
PRIOR PRINTER'S NO.
PRINTER'S NO.
3424 PRINTER'S NO.
3424 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL Session of No.
3630 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL Session of No.
2380 2026 INTRODUCED BY RIVERA, FIEDLER, WEBSTER, OTTEN, WAXMAN, SANCHEZ, HILL-EVANS, CEPEDA-FREYTIZ, HOHENSTEIN, PROBST, PIELLI, VENKAT, McNEILL, VITALI, NEILSON, INGLIS, BOROWSKI, BOYD, MAYES, CURRY, CIRESI AND STEELE, MAY 21, 2026 REFERRED TO COMMITTEE ON ENERGY, MAY 21, 2026 AN ACT Amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for energy storage procurement.
2380 2026 INTRODUCED BY RIVERA, FIEDLER, WEBSTER, OTTEN, WAXMAN, SANCHEZ, HILL-EVANS, CEPEDA-FREYTIZ, HOHENSTEIN, PROBST, PIELLI, VENKAT, McNEILL, VITALI, NEILSON, INGLIS, BOROWSKI, BOYD, MAYES, CURRY, CIRESI, STEELE, RABB, MALAGARI, MAZZOCCO, KRAJEWSKI, FRANKEL, FRIEL, SALISBURY, FREEMAN, O'MARA, SHUSTERMAN, BRENNAN AND KHAN, MAY 21, 2026 AS REPORTED FROM COMMITTEE ON ENERGY, HOUSE OF REPRESENTATIVES, AS AMENDED, JUNE 17, 2026 AN ACT AmeConsolidated Statutes, in restructuring of electric utility industry, providing for energy storage procurement.
(a) Energy storage program.--The commission shall require each electric distribution company to establish an energy storage program that is designed to achieve at least 3,000 3,500 <-- total megawatts of capacity in the aggregate from front-of-the- meter energy storage systems by July 1, 2033 31, 2035.
(a) Energy storage program.--The commission shall require each electric distribution company to establish an energy storage program that is designed to achieve at least 3,000 total megawatts of capacity in the aggregate from front-of-the-meter energy storage systems by July 1, 2033.
The total <-- megawatts of capacity shall consist of at least 2,000 megawatts of short-duration storage and, 1,000 megawatts of long-duration <-- storage.
The total megawatts of capacity shall consist of at least 2,000 megawatts of short- duration storage and 1,000 megawatts of long-duration storage.
AND 500 MEGAWATTS OF MULTIDAY STORAGE.
(b) Allocation of capacity targets.--Within 60 days of the effective date of this subsection, the commission shall calculate and assign each electric distribution company's apportioned share of the 3,000 total megawatts of capacity for short-duration storage and long-duration storage in a manner consistent with subsection (a).
<-- (B) PERMITTED USES.--AN ELECTRIC DISTRIBUTION COMPANY SHALL UTILIZE THE DISTRIBUTION-CONNECTED AND TRANSMISSION-CONNECTED ENERGY STORAGE SYSTEMS PROCURED UNDER THIS SECTION TO PERFORM GRID SERVICES DURING PEAK OR OFF-PEAK DEMAND PERIODS, INCLUDING THE FOLLOWING:
The commission's calculations shall be based on the service load and annual system peak demand of each applicable electric distribution company's service territory, in addition to any other criteria that the commission determines to be appropriate.
(1) PEAK DEMAND REDUCTION AND PEAK LOAD MANAGEMENT.
(c) Target modifications.-- (1) The commission may adjust or modify the apportioned share of energy storage system capacity under subsection (b) for each electric distribution company if there is a demonstrated lack of commercially available energy storage systems or procurement proposals received, as determined by the commission.
(2) FREQUENCY REGULATION, VOLTAGE SUPPORT AND OTHER ANCILLARY SERVICES.
(2) If found by the commission to be in the public interest, the commission may establish a cap on the total megawatts of energy storage system capacity that may be procured or owned by an electric distribution company under this section.
(3) AVOIDING OR DEFERRING TRADITIONAL CAPITAL INVESTMENTS ON THE DISTRIBUTION SYSTEM OR TRANSMISSION SYSTEM.
(4) BACKUP GENERATION SERVICES DURING OUTAGES OR OTHER ELECTRIC SERVICE DISRUPTIONS.
(5) EXCEPT FOR DISTRIBUTION-CONNECTED STORAGE, PARTICIPATION IN THE WHOLESALE ENERGY, CAPACITY OR ANCILLARY MARKETS OF THE REGIONAL TRANSMISSION ORGANIZATION IN WHICH THE ELECTRIC DISTRIBUTION COMPANY PARTICIPATES.
(6) ANY OTHER GRID SERVICES APPROVED BY THE COMMISSION TO BENEFIT RATEPAYERS AND IMPROVE THE RELIABILITY OF THE DISTRIBUTION OR TRANSMISSION SYSTEM.
(C) SYSTEM RELIABILITY ASSESSMENT.-- (1) WITHIN 180 DAYS OF THE EFFECTIVE DATE OF THIS SECTION, EACH ELECTRIC DISTRIBUTION COMPANY SHALL CONDUCT AND SUBMIT AN ASSESSMENT TO THE COMMISSION ON THE RELIABILITY OF THE DISTRIBUTION AND TRANSMISSION SYSTEM WITHIN THE ELECTRIC DISTRIBUTION COMPANY'S SERVICE TERRITORY.
(2) THE COMMISSION'S CALCULATIONS AND ASSIGNMENT OF CAPACITY TARGETS UNDER SUBSECTION (D) SHALL BE BASED ON THE COMMISSION'S REVIEW AND FINDINGS FROM THE ASSESSMENT COMPLETED UNDER THIS SUBSECTION, INCLUDING THE ASSIGNMENT OF 20260HB2380PN3630 - 2 - SPECIFIC TARGETS FOR DISTRIBUTION-CONNECTED AND TRANSMISSION- CONNECTED ENERGY STORAGE SYSTEMS BASED ON THE IDENTIFIED RELIABILITY NEEDS DESCRIBED IN THE ASSESSMENT.
(3) THE ASSESSMENT SHALL IDENTIFY, AT MINIMUM, THE FOLLOWING:
(I) SPECIFIC AREAS OF THE DISTRIBUTION SYSTEM AND TRANSMISSION SYSTEM WITH SYSTEM CONSTRAINTS AND CONGESTION POINTS.
(II) THE RELIABILITY NEEDS OF THE TRANSMISSION AND DISTRIBUTION SYSTEM THAT MAY BE ADDRESSED BY THE PROCUREMENT OF ENERGY STORAGE SYSTEMS, INCLUDING SHORT- DURATION, LONG-DURATION AND MULTIDAY STORAGE.
(III) AN ANALYSIS OF THE MEGAWATTS OR MEGAWATT-HOURS OF CAPACITY FROM ENERGY STORAGE SYSTEMS NEEDED TO SERVE AS A COST-EFFECTIVE ALTERNATIVE TO TRADITIONAL CAPITAL INVESTMENTS ON THE DISTRIBUTION AND TRANSMISSION SYSTEM.
(IV) AN ANALYSIS TO DETERMINE THE TECHNICAL FEASIBILITY OF THE PROCUREMENT OF DISTRIBUTION-CONNECTED AND TRANSMISSION-CONNECTED ENERGY STORAGE SYSTEMS TO PROVIDE GRID SERVICES OR ADDRESS THE RELIABILITY NEEDS OF THE TRANSMISSION AND DISTRIBUTION SYSTEM.
(V) AN ANALYSIS OF THE MOST PRACTICAL AND COST- EFFECTIVE APPLICATIONS OF SHORT-DURATION, LONG-DURATION AND MULTIDAY DURATION STORAGE ON THE DISTRIBUTION AND TRANSMISSION SYSTEM TO IMPROVE SYSTEM PERFORMANCE AND DELIVER COST SAVINGS TO RATEPAYERS.
(VI) ANY OTHER INFORMATION OR SUPPORTING DATA REQUIRED BY THE COMMISSION TO PROPERLY CALCULATE THE APPORTIONED SHARE OF ENERGY STORAGE CAPACITY FOR EACH ELECTRIC DISTRIBUTION COMPANY.
20260HB2380PN3630 - 3 - (b) (D) Allocation of capacity targets.--Within 60 days of <-- the effective date of this subsection, FOLLOWING THE SUBMISSION <-- OF AN ASSESSMENT UNDER SUBSECTION (C), the commission shall calculate and assign each electric distribution company's apportioned share of the 3,000 3,500 total megawatts of capacity <-- for short-duration storage and, long-duration storage AND <-- MULTIDAY STORAGE in a manner consistent with subsection (a).
The <-- commission's calculations shall be based on the service load and annual system peak demand of each applicable electric distribution company's service territory, in addition to any other criteria that the commission determines to be appropriate.
(c) (E) Target modifications.-- <-- (1) The commission may adjust or modify the apportioned share of energy storage system capacity under subsection (b) <-- (D) for each electric distribution company if there is a <-- demonstrated lack of commercially available energy storage systems or procurement proposals received, as determined by the commission.
(2) If found by the commission to be in the public interest, the commission may establish a cap on the total megawatts of energy storage system capacity that may be procured or owned by an electric distribution company under <-- this section.
20260HB2380PN3630 - 4 - (d) Competitive procurement.--Subject to approval by the <-- commission, each electric distribution company shall use an open, fair and nondiscriminatory competitive procurement process, including the use of auctions or requests for proposals, to reach the company's apportioned share of the total megawatts of capacity as described under subsection (b).
(d) Competitive procurement.--Subject to approval by the commission, each electric distribution company shall use an open, fair and nondiscriminatory competitive procurement process, including the use of auctions or requests for 20260HB2380PN3424 - 2 - proposals, to reach the company's apportioned share of the total megawatts of capacity as described under subsection (b).
(4) THE COMMISSION MAY ADJUST THE PROCUREMENT SCHEDULE <-- UNDER SUBSECTION (F) IF THERE IS A DEMONSTRATED LACK OF COMMERCIALLY AVAILABLE ENERGY STORAGE SYSTEMS OR PROCUREMENT PROPOSALS RECEIVED, AS DETERMINED BY THE COMMISSION, OR ANY EXTERNAL DELAYS BEYOND CONTROL OF THE ELECTRIC DISTRIBUTION COMPANY, INCLUDING ANY IMPACTS TO THE PROCUREMENT CYCLE ATTRIBUTABLE TO PJM INTERCONNECTION, LLC.
(e) Use of independent monitor.--The commission shall appoint an independent evaluator to monitor and report on each competitive procurement process under subsection (d).
(F) COMPETITIVE PROCUREMENT.-- (1) SUBJECT TO APPROVAL BY THE COMMISSION, EACH ELECTRIC DISTRIBUTION COMPANY SHALL USE AN OPEN, FAIR AND NONDISCRIMINATORY COMPETITIVE PROCUREMENT PROCESS, INCLUDING THE USE OF AUCTIONS OR REQUESTS FOR PROPOSALS, TO REACH THE COMPANY'S APPORTIONED SHARE OF THE TOTAL MEGAWATTS OF CAPACITY AS DESCRIBED UNDER SUBSECTION (D).
An independent evaluator shall have access to all information and data relating to the competitive procurement process, provided that all proprietary information shall remain confidential.
(2) THE COMMISSION SHALL REVIEW EACH ELECTRIC DISTRIBUTION COMPANY'S PROPOSED COMPETITIVE PROCUREMENT PROCESS AND SOLICIT FEEDBACK FROM STAKEHOLDERS FOR ANY POTENTIAL ADJUSTMENTS PRIOR TO EACH PROCUREMENT.
(3) UNDER THE COMPETITIVE PROCUREMENT PROCESS, EACH ELECTRIC DISTRIBUTION COMPANY SHALL ISSUE A SOLICITATION FOR ENERGY STORAGE SYSTEM PROJECTS AND OPEN BIDDING TO INDEPENDENT POWER PRODUCERS IN ORDER TO REACH THE TOTAL MEGAWATTS OF CAPACITY REQUIRED UNDER SUBSECTION (A).
(4) EACH ELECTRIC DISTRIBUTION COMPANY SHALL PROCURE A 20260HB2380PN3630 - 5 - MINIMUM OF 100 MEGAWATTS FOR EACH PROCUREMENT, REGARDLESS OF THE ELECTRIC DISTRIBUTION COMPANY'S APPORTIONED SHARE OF CAPACITY DETERMINED BY THE COMMISSION.
(e) (G) Use of independent monitor.--The commission shall <-- appoint an independent evaluator to monitor and report on each competitive procurement process under subsection (d) (F).
An <-- independent evaluator shall have access to all information and data relating to the competitive procurement process, provided that all proprietary information shall remain confidential.
(f) (H) Schedule.--Each electric distribution company shall <-- enter into cost-effective long-term purchase contracts OF AT <-- LEAST 15 YEARS for the company's apportioned share of the 3,000 <-- 3,500 total megawatts of capacity under subsection (a) in <-- accordance with the following schedule:
(f) Schedule.--Each electric distribution company shall enter into cost-effective long-term purchase contracts for the company's apportioned share of the 3,000 total megawatts of capacity under subsection (a) in accordance with the following schedule:
20260HB2380PN3630 - 6 - (1) By July 31, 2028 2029, at least 500 megawatts of <-- transmission-connected short-duration storage and, 100 <-- megawatts of distribution-connected short-duration storage AND 100 MEGAWATTS OF TRANSMISSION-CONNECTED LONG-DURATION <-- STORAGE shall be procured, including existing energy storage systems.
(1) By July 31, 2028, at least 500 megawatts of 20260HB2380PN3424 - 3 - transmission-connected short-duration storage and 100 megawatts of distribution-connected short-duration storage shall be procured, including existing energy storage systems.
(2) By July 31, 2029 2031, at least AN ADDITIONAL 500 <-- megawatts of transmission-connected short-duration storage, <-- 200 MEGAWATTS OF TRANSMISSION-CONNECTED LONG-DURATION STORAGE AND 100 MEGAWATTS OF MULTIDAY STORAGE shall be procured.
(2) By July 31, 2029, at least 500 megawatts of transmission-connected short-duration storage shall be procured.
(3) By July 1, 2030, at least 500 31, 2033, AT LEAST AN <-- ADDITIONAL 500 megawatts of transmission-connected short- duration storage, 300 MEGAWATTS OF TRANSMISSION-CONNECTED <-- LONG-DURATION STORAGE AND 200 MEGAWATTS OF MULTIDAY STORAGE shall be procured.
(3) By July 1, 2030, at least 500 megawatts of transmission-connected short-duration storage shall be procured.
(4) By July 31, 2033 2035, all remaining energy storage <-- systems capacity shall be procured, including AT LEAST 400 <-- total megawatts OF DISTRIBUTION-CONNECTED short-duration <-- storage and 1,000 megawatts of long-duration storage., 400 <-- MEGAWATTS OF TRANSMISSION-CONNECTED LONG-DURATION STORAGE AND 200 MEGAWATTS OF MULTIDAY STORAGE.
(4) By July 31, 2033, all remaining energy storage systems capacity shall be procured, including 400 total megawatts short-duration storage and 1,000 megawatts of long- duration storage.
Show all 95 changed rows (55 more)
Previous
Latest
(g) (I) Procurement standards.--For the purposes of <-- subsection (d) (F), each electric distribution company shall <-- comply with the following competitive procurement requirements:
(g) Procurement standards.--For the purposes of subsection (d), each electric distribution company shall comply with the following competitive procurement requirements:
(1) FOR EACH COMPETITIVE PROCUREMENT PROCESS, EACH <-- ELECTRIC DISTRIBUTION COMPANY SHALL ESTABLISH AN OPEN AND TRANSPARENT STAKEHOLDER PROCESS WITH THE COMMISSION, PROSPECTIVE BIDDERS AND STAKEHOLDERS TO REVIEW THE PROPOSED TERMS, PROCEDURES, REQUIREMENTS AND OTHER INFORMATION RELATED TO THE COMPETITIVE PROCUREMENT PROCESS.
(1) For each competitive procurement process, each electric distribution company shall provide an initial description of the following information to prospective bidders:
20260HB2380PN3630 - 7 - (1) (2) For each competitive procurement process, each <-- electric distribution company shall provide an initial description of the following information to prospective bidders:
(iii) The qualifications and experience required for submitting bids under the competitive procurement process.
20260HB2380PN3424 - 4 - (iii) The qualifications and experience required for submitting bids under the competitive procurement process.
(2) (3) Each electric distribution company shall select <-- and award the lowest responsible bidder BIDDERS THAT <-- REPRESENT THE BEST VALUE under a competitive procurement process based on evaluating, but not limited to, the following criteria:
(2) Each electric distribution company shall select and award the lowest responsible bidder under a competitive procurement process based on evaluating, but not limited to, the following criteria:
20260HB2380PN3630 - 8 - (i) The cost-effectiveness to ratepayers over the course of the term of the contract after taking into consideration the benefits to the distribution and transmission system.
(i) The cost-effectiveness to ratepayers over the course of the term of the contract after taking into consideration the benefits to the distribution and transmission system.
(vi) The proximity to the distribution or transmission system experiencing constraints or congestion.
20260HB2380PN3424 - 5 - (vi) The proximity to the distribution or transmission system experiencing constraints or congestion.
(3) Each (4) IF THE COST-EFFECTIVENESS AND VALUE OF <-- SERVICES ARE COMPARABLE TO OTHER QUALIFIED BIDDERS, EACH electric distribution company shall prioritize the evaluation <-- of GIVE PRIORITY TO a qualified bidder that demonstrates any <-- of the following:
(3) Each electric distribution company shall prioritize the evaluation of a qualified bidder that demonstrates any of the following:
(i) For construction, expansion, rehabilitation, renovation or site work performed on energy storage system, all contractors and subcontractors comply with fair wage standards, including compliance with the provisions of the act of August 15, 1961 (P.L.987, 20260HB2380PN3630 - 9 - No.442), known as the Pennsylvania Prevailing Wage Act.
(i) For construction, expansion, rehabilitation, renovation or site work performed on energy storage system, all contractors and subcontractors comply with fair wage standards, including compliance with the provisions of the act of August 15, 1961 (P.L.987, No.442), known as the Pennsylvania Prevailing Wage Act.
(h) Decommissioning.--Each contract agreement entered into <-- under this section shall include provisions requiring the owner or operator to provide a decommissioning plan for the procured energy storage systems, including the recycling or reuse of all qualifying components of each system.
(h) Decommissioning.--Each contract agreement entered into under this section shall include provisions requiring the owner or operator to provide a decommissioning plan for the procured energy storage systems, including the recycling or reuse of all qualifying components of each system.
(J) DECOMMISSIONING AND SAFETY.--EACH CONTRACT AGREEMENT <-- ENTERED INTO UNDER THIS SECTION SHALL INCLUDE PROVISIONS REQUIRING THE OWNER OR OPERATOR TO:
(i) Ownership.--The energy storage systems procured under the program shall be owned by a combination of the electric distribution company and third-party developers.
(1) PROVIDE A DECOMMISSIONING PLAN FOR THE PROCURED ENERGY STORAGE SYSTEMS, INCLUDING THE RECYCLING OR REUSE OF ALL QUALIFYING COMPONENTS OF EACH SYSTEM TO THE EXTENT THAT THE RECYCLING AND REUSE CAN BE REASONABLY ACHIEVED BY EXISTING COMMERCIAL PRACTICES.
(2) COMPLY WITH THE NATIONAL FIRE PROTECTION ASSOCIATION 855 STANDARD IN EFFECT ON THE EFFECTIVE DATE OF THIS SECTION FOR THE INSTALLATION OF STATIONARY ENERGY STORAGE SYSTEMS, IF APPLICABLE, TO THE CHEMISTRY OF THE ENERGY STORAGE SYSTEM.
(K) CONFIDENTIAL INFORMATION.--A THIRD-PARTY DEVELOPER THAT PARTICIPATES IN A COMPETITIVE PROCUREMENT PROCESS TO ENTER INTO A CONTRACT WITH AN ELECTRIC DISTRIBUTION COMPANY UNDER THIS SECTION SHALL NOT DISCLOSE, DISTRIBUTE OR OTHERWISE MAKE AVAILABLE ANY INFORMATION RELATING TO THE OPERATIONS OF THE ELECTRIC GRID WITHOUT THE CONSENT OF THE ELECTRIC DISTRIBUTION 20260HB2380PN3630 - 10 - COMPANY.
A VIOLATION OF THIS SUBSECTION SHALL BE SUBJECT TO ENFORCEMENT BY THE COMMISSION UNDER CHAPTER 33 (RELATING TO VIOLATIONS AND PENALTIES).
(i) (L) Ownership.--The energy storage systems procured <-- under the program shall be owned by a combination of the <-- electric distribution company and third-party developers.
(1) An electric distribution company may enter into bilateral agreements under a competitive procurement process to construct, own and operate distribution-connected energy storage systems to reach part of the company's apportioned share of the 3,000 total megawatts of capacity under subsection (b).
(1) An electric distribution company may enter into 20260HB2380PN3424 - 6 - bilateral agreements under a competitive procurement process to construct, own and operate distribution-connected energy storage systems to reach part of the company's apportioned share of the 3,000 total megawatts of capacity under subsection (b).
THIRD- <-- PARTY DEVELOPERS.
(j) Commission approval.--The commission, in consultation with the independent evaluator under subsection (e), shall establish procedures to review all proposed contracts prior to the execution of the contract with the lowest responsible bidder.
AN ELECTRIC DISTRIBUTION COMPANY MAY NOT OWN THE ENERGY STORAGE SYSTEMS CONSTRUCTED OR PROCURED TO COMPLY WITH THE REQUIREMENTS OF THIS SECTION.
(j) (M) Commission approval.--The commission, in <-- consultation with the independent evaluator under subsection (e) <-- (G), shall establish procedures to review all proposed contracts <-- 20260HB2380PN3630 - 11 - prior to the execution of the contract with the lowest <-- responsible WINNING bidder.
<-- (1) An electric distribution company shall file a proposed contract with the commission and provide sufficient documentation to permit the commission to conduct the review required under paragraph (3), including the cost-benefit analysis used to determine the cost-effectiveness of the procurement and methods used to select a qualified bidder.
(1) An electric distribution company shall file a proposed contract with the commission and provide sufficient documentation to permit the commission to conduct the review required under paragraph (3), including the cost-benefit analysis used to determine the cost-effectiveness of the procurement and methods used to select a qualified bidder.
(i) The cost-effectiveness of the contract terms and impact on ratepayer affordability., INCLUDING <-- CONSIDERATION OF THE FOLLOWING:
(i) The cost-effectiveness of the contract terms and 20260HB2380PN3424 - 7 - impact on ratepayer affordability.
(A) AVOIDED OR DEFERRED TRANSMISSION, DISTRIBUTION, GENERATION AND OTHER TRADITIONAL INFRASTRUCTURE UPGRADE COSTS, INCLUDING THE EXTENT TO WHICH THE ENERGY STORAGE SYSTEM FUNCTIONS AS A NONWIRES ALTERNATIVE.
(B) SYSTEM EFFICIENCY AND OPERATIONAL BENEFITS, INCLUDING CONGESTION REDUCTION, PEAK LOAD REDUCTION, REDUCTION OF MARGINAL LINE LOSSES, PROVISION OF VOLTAGE SUPPORT AND REACTIVE POWER SERVICES, MITIGATION OF LOCALIZED SYSTEM CONSTRAINTS AND INCREASED DISTRIBUTED ENERGY RESOURCE HOSTING CAPACITY.
(C) RELIABILITY AND RESILIENCY BENEFITS, INCLUDING ENHANCEMENT OF SYSTEM RELIABILITY IN CONSTRAINED OR HIGH-RISK AREAS AND BENEFITS TO DISTRIBUTION CUSTOMERS.
(D) MARKET AND RATEPAYER SAVINGS, INCLUDING 20260HB2380PN3630 - 12 - REDUCTION IN THE ELECTRIC DISTRIBUTION COMPANY'S OBLIGATION TO PROCURE CAPACITY IN PJM INTERCONNECTION, LLC, THROUGH MEASURABLE REDUCTIONS IN PEAK LOAD CONTRIBUTION THAT RESULT IN REDUCED INSTALLED CAPACITY OBLIGATIONS CONSISTENT WITH THE MARKET RULES OF PJM INTERCONNECTION, LLC.
(E) THE AVAILABILITY AND UTILIZATION OF APPLICABLE FEDERAL OR STATE TAX CREDITS OR EXEMPTIONS.
and <-- (iii) the bid selection and solicitation process are found to be fair, objective and nondiscriminatory by the 20260HB2380PN3630 - 13 - independent evaluator.;
and (iii) the bid selection and solicitation process are found to be fair, objective and nondiscriminatory by the independent evaluator.
AND <-- (IV) THE PROCUREMENT OF THE ENERGY STORAGE SYSTEM DEMONSTRATES THE ABILITY TO PROVIDE MEASURABLE RELIABILITY, RESILIENCY OR PEAK DEMAND REDUCTION BENEFITS TO THE DISTRIBUTION SYSTEM.
An electric distribution company shall have 60 days to file a modified proposed contract with the commission.
An electric distribution company shall have 60 20260HB2380PN3424 - 8 - days to file a modified proposed contract with the commission.
(k) (N) Annual report.-- <-- (1) Each electric distribution company shall submit an annual report to the commission relating to the progress and results of the energy storage program within each electric distribution service territory.
(k) Annual report.-- (1) Each electric distribution company shall submit an annual report to the commission relating to the progress and results of the energy storage program within each electric distribution service territory.
(iii) The location and ownership status each energy <-- storage system procured.
(iii) The location and ownership status each energy storage system procured.
20260HB2380PN3630 - 14 - (iv) (III) Evaluation of the cost-effectiveness of <-- program expenditures.
(iv) Evaluation of the cost-effectiveness of program expenditures.
(v) (IV) Any other information required by the <-- commission.
(v) Any other information required by the commission.
(2) Beginning five years after the effective date of this paragraph and annually thereafter, the commission shall submit a report to the CONSUMER PROTECTION AND PROFESSIONAL <-- LICENSURE COMMITTEE OF THE SENATE, THE CONSUMER PROTECTION, TECHNOLOGY AND UTILITIES COMMITTEE OF THE HOUSE OF REPRESENTATIVES, THE Environmental Resources and Energy Committee of the Senate and the Energy Committee of the House of Representatives.
(2) Beginning five years after the effective date of this paragraph and annually thereafter, the commission shall submit a report to the Environmental Resources and Energy Committee of the Senate and the Energy Committee of the House of Representatives.
(l) Cost recovery.--An electric distribution company may <-- recover on a full and current basis from customers, through a reconcilable adjustment clause under section 1307 (relating to sliding scale of rates;
(l) Cost recovery.--An electric distribution company may recover on a full and current basis from customers, through a reconcilable adjustment clause under section 1307 (relating to 20260HB2380PN3424 - 9 - sliding scale of rates;
(O) COST RECOVERY.-- <-- 20260HB2380PN3630 - 15 - (1) AN ELECTRIC DISTRIBUTION COMPANY MAY RECOVER ON A FULL AND CURRENT BASIS FROM CUSTOMERS, THROUGH A RECONCILABLE ADJUSTMENT CLAUSE UNDER SECTION 1307 (RELATING TO SLIDING SCALE OF RATES;
(n) Definitions.--As used in this section, the following words and phrases shall have the meanings given to them in this subsection unless the context clearly indicates otherwise:
ADJUSTMENTS), ALL REASONABLE AND PRUDENT COSTS IN THE PROCUREMENT OF ENERGY STORAGE SYSTEMS UNDER A COMPETITIVE PROCUREMENT PROCESS UNDER THIS SECTION, AS APPROVED BY THE COMMISSION.
(2) ANY DECREASED REVENUES OF AN ELECTRIC DISTRIBUTION COMPANY DUE TO CHANGES IN ENERGY DEMAND OR AVOIDED INFRASTRUCTURE COSTS SHALL NOT BE A RECOVERABLE COST UNDER A RECONCILABLE AUTOMATIC ADJUSTMENT CLAUSE.
(3) THE COMMISSION SHALL PROMULGATE RULES OR REGULATIONS TO ENSURE THAT ALL AVOIDED INFRASTRUCTURE COSTS AND REVENUES GENERATED THROUGH PARTICIPATION IN WHOLESALE MARKETS ARE CREDITED IN FULL AGAINST THE RECOVERABLE COSTS UNDER A RECONCILABLE ADJUSTMENT CLAUSE.
FOR THE PURPOSES OF THIS PARAGRAPH, EACH ELECTRIC DISTRIBUTION COMPANY SHALL ESTABLISH A METHODOLOGY FOR CALCULATING THE AVOIDED INFRASTRUCTURE COSTS OF THE DISTRIBUTION SYSTEM AND TRANSMISSION SYSTEM ATTRIBUTABLE TO THE SERVICES OF THE PROCURED ENERGY STORAGE SYSTEMS.
(4) THE COMMISSION SHALL ESTABLISH A COST ALLOCATION METHODOLOGY TO ENSURE THAT:
(I) ALL RECOVERABLE COSTS ARE FINANCED BY THE SAME CUSTOMER CLASS THAT WILL RECEIVE DIRECT BENEFITS FROM THE SERVICES ATTRIBUTABLE TO THE PROCUREMENT OF ENERGY STORAGE SYSTEMS.
(II) THE DISTRIBUTION SYSTEM BENEFITS ATTRIBUTABLE TO EACH CUSTOMER CLASS ARE REFLECTED.
(III) THE ALLOCATION OF COSTS ACCOUNT FOR ALL 20260HB2380PN3630 - 16 - EXISTING SURCHARGES AND COMMISSION-APPROVED TARIFFS APPLICABLE TO THE PEAK DEMANDS OF LARGE INDUSTRIAL AND COMMERCIAL CUSTOMERS.
(P) APPLICABILITY.--THIS SECTION SHALL NOT APPLY TO:
(1) AN ELECTRIC DISTRIBUTION COMPANY WITH FEWER THAN 500,000 CUSTOMERS.
(2) ENERGY STORAGE SYSTEMS WITH LESS THAN 50 KILOWATTS OF CAPACITY.
(Q) CONSTRUCTION.--NOTHING IN THIS SECTION SHALL BE CONSTRUED TO CONFLICT OR SUPERSEDE THE JURISDICTION OF THE FEDERAL ENERGY REGULATORY COMMISSION OR THE RULES OR TARIFFS OF THE INDEPENDENT SYSTEM OPERATOR OR ITS FUNCTIONAL EQUIVALENT.
(n) (R) Definitions.--As used in this section, the following <-- words and phrases shall have the meanings given to them in this subsection unless the context clearly indicates otherwise:
"FRONT-OF-THE-METER ENERGY STORAGE SYSTEM." AN ENERGY <-- STORAGE SYSTEM INTERCONNECTED TO THE DISTRIBUTION OR TRANSMISSION SYSTEM AND CAPABLE OF PARTICIPATING IN THE WHOLESALE MARKET OR DISTRIBUTION SYSTEM GRID SERVICES.
"Long-duration storage." An energy storage system that is capable of dispatching energy at the system's full rated nameplate capacity for a period of 10 hours or more.
"Long-duration storage." An energy storage system that is 20260HB2380PN3630 - 17 - capable of dispatching energy at the system's full rated nameplate capacity for a period of 10 hours or more.
20260HB2380PN3424 - 10 - "Short-duration storage." An energy storage system that is capable of dispatching energy at the system's full rated nameplate capacity for a period greater than two hours but less than 10 hours.
"MULTIDAY STORAGE." AN ENERGY STORAGE SYSTEM THAT IS CAPABLE <-- OF DISPATCHING ENERGY AT ITS FULL RATED NAMEPLATE CAPACITY FOR A PERIOD OF 24 HOURS OR MORE.
"Short-duration storage." An energy storage system that is capable of dispatching energy at the system's full rated nameplate capacity for a period greater than two hours but less than 10 hours.
20260HB2380PN3630 - 18 -
20260HB2380PN3424 - 11 -
View plain text versions (2)

How this bill changes current law

7 changes Share ↗

AI-generated reading aid from the bill's amendatory text — verify against the official bill.

This bill establishes requirements for electric distribution companies in Pennsylvania to procure energy storage capacity, increasing specific targets and introducing diverse types of storage.

  • § 2807.1

    3,000 → 3,500

    The total megawatts capacity requirement is increased from 3,000 to 3,500 megawatts.

  • § 2807.1

    July 1, 2033 → July 1, 2035

    The deadline for achieving the total megawatts capacity is extended from 2033 to 2035.

  • § 2807.1

    1,000 megawatts of long-duration storage. → 1,000 megawatts of long-duration storage and 500 megawatts of multiday storage.

    The specific capacity requirements now include an addition of 500 megawatts of multiday storage.

  • § 2807.1

    OF AT LEAST 15 YEARS

    Long-term purchase contracts requirement is enforced for energy storage capacity with no minimum duration mentioned.

  • § 2807.1

    short-duration storage and, 1,000 megawatts of long-duration storage. → short-duration storage, long-duration storage and multiday storage.

    Different types of storage are explicitly mentioned as part of the procurement requirements.

  • § 2807.1

    At least 500 megawatts of transmission-connected short-duration storage and 100 megawatts of distribution-connected short-duration storage. → At least 500 megawatts of transmission-connected short-duration storage, 100 megawatts of distribution-connected short-duration storage, and 100 megawatts of transmission-connected long-duration storage.

    The procurement schedule is updated to specify additional types and amounts of storage that must be procured.

  • § 2807.1

    the commission shall calculate and assign each electric distribution company's apportioned share of the 3,000 total megawatts of capacity for short-duration storage and, long-duration storage in a manner consistent with subsection (a). → the commission shall calculate and assign each electric distribution company's apportioned share of the 3,500 total megawatts of capacity for short-duration storage, long-duration storage and multiday storage.

    The apportioned shares of capacity will now reflect the increased total capacity and include multiday storage.

Action History

  1. Referred to CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, Oct. 13, 2026

  2. In the Senate

  3. (Remarks see House Journal Page ), Oct. 5, 2026

  4. Third consideration and final passage, Oct. 5, 2026 (116-86)

  5. Re-reported as committed, Oct. 5, 2026

  6. (Remarks see House Journal Page ), Sept. 30, 2026

  7. Re-committed to APPROPRIATIONS, Sept. 30, 2026

  8. Second consideration, Sept. 30, 2026

  9. Removed from table, Sept. 29, 2026

  10. Laid on the table, Sept. 8, 2026

  11. Re-reported as committed, Sept. 8, 2026

  12. Re-committed to RULES, June 17, 2026

  13. First consideration, June 17, 2026

  14. Reported as amended, June 17, 2026

  15. Referred to ENERGY, May 21, 2026

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 56 co-sponsors · 196 not signed on · 134 voted No

Sponsors (1)

Co-sponsors (56)

Not signed on (196)

196 members have not signed on to this bill.

Show all 196 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

FINAL PASSAGE

Passed 116 Yea · 86 Nay · 1 Other
Party YeaNayPresentNot Voting
Democratic 103000
Republican 138601
Total 1168601
% of votes cast 57%42%0%0%
How each member voted (203)
Member Party Vote
Abigail Salisbury Democratic Yea
Aerion Abney Democratic Yea
Amen Brown Democratic Yea
Ana Tiburcio Democratic Yea
Andre D. Carroll Democratic Yea
Anita Astorino Kulik Democratic Yea
Anthony A. Bellmon Democratic Yea
Arvind Venkat Democratic Yea
Ben Waxman Democratic Yea
Benjamin V. Sanchez Democratic Yea
Brandon Dukes Democratic Yea
Brandon J. Markosek Democratic Yea
Brian Munroe Democratic Yea
Bridget M. Kosierowski Democratic Yea
Carol Hill-Evans Democratic Yea
Carol Kazeem Democratic Yea
Chris Pielli Democratic Yea
Christina D. Sappey Democratic Yea
Christopher M. Rabb Democratic Yea
Dan Frankel Democratic Yea
Dan Goughnour Democratic Yea
Dan K. Williams Democratic Yea
Daniel J. Deasy Democratic Yea
Danielle Friel Otten Democratic Yea
Danilo Burgos Democratic Yea
Darisha K. Parker Democratic Yea
Dave Madsen Democratic Yea
David M. Delloso Democratic Yea
Ed Neilson Democratic Yea
Eddie Day Pashinski Democratic Yea
Elizabeth Fiedler Democratic Yea
Emily Kinkead Democratic Yea
Frank Burns Democratic Yea
G. Roni Green Democratic Yea
Gina H. Curry Democratic Yea
Greg Scott Democratic Yea
Greg Vitali Democratic Yea
Heather Boyd Democratic Yea
Ismail Smith-Wade-El Democratic Yea
Jacklyn Rusnock Democratic Yea
Jared G. Solomon Democratic Yea
Jason Dawkins Democratic Yea
Jeanne McNeill Democratic Yea
Jen Mazzocco Democratic Yea
Jennifer O'Mara Democratic Yea
Jessica Benham Democratic Yea
Jim Haddock Democratic Yea
Jim Prokopiak Democratic Yea
Joanna E. McClinton Democratic Yea
Joe Ciresi Democratic Yea
Joe McAndrew Democratic Yea
Joe Webster Democratic Yea
Johanny Cepeda-Freytiz Democratic Yea
John C. Inglis III Democratic Yea
Jordan A. Harris Democratic Yea
Jose Giral Democratic Yea
Joseph C. Hohenstein Democratic Yea
Justin C. Fleming Democratic Yea
Keith S. Harris Democratic Yea
Kristine C. Howard Democratic Yea
Kyle Donahue Democratic Yea
Kyle J. Mullins Democratic Yea
La'Tasha D. Mayes Democratic Yea
Leanne Krueger Democratic Yea
Lindsay Powell Democratic Yea
Lisa A. Borowski Democratic Yea
Liz Hanbidge Democratic Yea
Malcolm Kenyatta Democratic Yea
Mandy Steele Democratic Yea
Manuel Guzman Democratic Yea
Mary Jo Daley Democratic Yea
MaryLouise Isaacson Democratic Yea
Matthew D. Bradford Democratic Yea
Maureen E. Madden Democratic Yea
Melissa Cerrato Democratic Yea
Melissa L. Shusterman Democratic Yea
Michael H. Schlossberg Democratic Yea
Morgan Cephas Democratic Yea
Nancy Guenst Democratic Yea
Napoleon J. Nelson Democratic Yea
Nathan Davidson Democratic Yea
Nikki Rivera Democratic Yea
Pat Gallagher Democratic Yea
Patrick J. Harkins Democratic Yea
Paul Friel Democratic Yea
Paul Takac Democratic Yea
Perry S. Warren Democratic Yea
Peter Schweyer Democratic Yea
Regina G. Young Democratic Yea
Rick Krajewski Democratic Yea
Robert E. Merski Democratic Yea
Robert F. Matzie Democratic Yea
Robert Freeman Democratic Yea
Ryan A. Bizzarro Democratic Yea
Scott Conklin Democratic Yea
Sean Dougherty Democratic Yea
Steve Samuelson Democratic Yea
Steven R. Malagari Democratic Yea
Tarah Probst Democratic Yea
Tarik Khan Democratic Yea
Tim Brennan Democratic Yea
Tim Briggs Democratic Yea
Tina M. Davis Democratic Yea
Aaron Bernstine Republican Nay
Abby Major Republican Nay
Alec J. Ryncavage Republican Nay
Andrea C. Verobish Republican Nay
Andrew Kuzma Republican Nay
Ann Flood Republican Nay
Barbara Gleim Republican Nay
Brad Roae Republican Nay
Brenda M. Pugh Republican Nay
Brett R. Miller Republican Yea
Brian C. Rasel Republican Nay
Brian Smith Republican Nay
Bryan Cutler Republican Nay
Bud Cook Republican Nay
Carl Walker Metzgar Republican Nay
Catherine I Wallen Republican Nay
Chad G. Reichard Republican Nay
Charity Grimm Krupa Republican Nay
Clint Owlett Republican Nay
Craig T. Staats Republican Nay
Craig Williams Republican Not Voting
Dallas Kephart Republican Nay
Dan Moul Republican Nay
Dane Watro Republican Nay
David H. Rowe Republican Nay
David H. Zimmerman Republican Nay
David M. Maloney Republican Nay
Donna Scheuren Republican Nay
Doyle Heffley Republican Nay
Eric Davanzo Republican Nay
Eric J. Weaknecht Republican Nay
Eric R. Nelson Republican Nay
Gary W. Day Republican Nay
George H Margetas Republican Nay
Jack Rader Republican Nay
Jacob D. Banta Republican Nay
James B. Struzzi Republican Nay
Jamie Barton Republican Nay
Jamie L. Flick Republican Nay
Jamie Walsh Republican Nay
Jason Ortitay Republican Nay
Jeff Olsommer Republican Nay
Jeremy Shaffer Republican Yea
Jesse Topper Republican Nay
Jill N. Cooper Republican Nay
Jim Rigby Republican Nay
Joanne Stehr Republican Nay
Joe Emrick Republican Yea
Joe Hamm Republican Nay
Joe Hogan Republican Yea
Joe Kerwin Republican Nay
John A. Lawrence Republican Nay
John A. Schlegel Republican Nay
Jonathan Fritz Republican Nay
Joseph D'Orsie Republican Nay
Josh Bashline Republican Nay
Joshua D. Kail Republican Nay
Kate A. Klunk Republican Nay
Kathleen C. Tomlinson Republican Yea
Kathy L. Rapp Republican Nay
Keith J. Greiner Republican Nay
Kerry A. Benninghoff Republican Nay
Kristin Marcell Republican Yea
Leslie Rossi Republican Nay
Marc S. Anderson Republican Nay
Marci Mustello Republican Nay
Mark M. Gillen Republican Yea
Marla Brown Republican Nay
Martin T. Causer Republican Nay
Martina A. White Republican Yea
Michael Stender Republican Nay
Mike Armanini Republican Nay
Mike Jones Republican Nay
Milou Mackenzie Republican Nay
Mindy Fee Republican Nay
Natalie Mihalek Republican Yea
Parke Wentling Republican Nay
Perry A. Stambaugh Republican Nay
R. Lee James Republican Nay
Rich Irvin Republican Nay
Rob W. Kauffman Republican Nay
Robert Leadbeter Republican Nay
Roman Kozak Republican Nay
Russ Diamond Republican Nay
Ryan Warner Republican Nay
Scott Barger Republican Nay
Shelby Labs Republican Yea
Sheryl M. Delozier Republican Nay
Stephanie Borowicz Republican Nay
Steven C. Mentzer Republican Yea
Thomas H. Kutz Republican Nay
Thomas L. Mehaffie Republican Yea
Tim Twardzik Republican Nay
Timothy J. O'Neal Republican Nay
Timothy R. Bonner Republican Nay
Tina Pickett Republican Nay
Tom Jones Republican Nay
Valerie S. Gaydos Republican Yea
Wendy Fink Republican Nay
Zachary Mako Republican Nay

Official roll call →

Floor vote

Failed 100 Yea · 103 Nay
Party YeaNayPresentNot Voting
Democratic 010300
Republican 100000
Total 10010300
% of votes cast 49%51%0%0%
How each member voted (203)
Member Party Vote
Abigail Salisbury Democratic Nay
Aerion Abney Democratic Nay
Amen Brown Democratic Nay
Ana Tiburcio Democratic Nay
Andre D. Carroll Democratic Nay
Anita Astorino Kulik Democratic Nay
Anthony A. Bellmon Democratic Nay
Arvind Venkat Democratic Nay
Ben Waxman Democratic Nay
Benjamin V. Sanchez Democratic Nay
Brandon Dukes Democratic Nay
Brandon J. Markosek Democratic Nay
Brian Munroe Democratic Nay
Bridget M. Kosierowski Democratic Nay
Carol Hill-Evans Democratic Nay
Carol Kazeem Democratic Nay
Chris Pielli Democratic Nay
Christina D. Sappey Democratic Nay
Christopher M. Rabb Democratic Nay
Dan Frankel Democratic Nay
Dan Goughnour Democratic Nay
Dan K. Williams Democratic Nay
Daniel J. Deasy Democratic Nay
Danielle Friel Otten Democratic Nay
Danilo Burgos Democratic Nay
Darisha K. Parker Democratic Nay
Dave Madsen Democratic Nay
David M. Delloso Democratic Nay
Ed Neilson Democratic Nay
Eddie Day Pashinski Democratic Nay
Elizabeth Fiedler Democratic Nay
Emily Kinkead Democratic Nay
Frank Burns Democratic Nay
G. Roni Green Democratic Nay
Gina H. Curry Democratic Nay
Greg Scott Democratic Nay
Greg Vitali Democratic Nay
Heather Boyd Democratic Nay
Ismail Smith-Wade-El Democratic Nay
Jacklyn Rusnock Democratic Nay
Jared G. Solomon Democratic Nay
Jason Dawkins Democratic Nay
Jeanne McNeill Democratic Nay
Jen Mazzocco Democratic Nay
Jennifer O'Mara Democratic Nay
Jessica Benham Democratic Nay
Jim Haddock Democratic Nay
Jim Prokopiak Democratic Nay
Joanna E. McClinton Democratic Nay
Joe Ciresi Democratic Nay
Joe McAndrew Democratic Nay
Joe Webster Democratic Nay
Johanny Cepeda-Freytiz Democratic Nay
John C. Inglis III Democratic Nay
Jordan A. Harris Democratic Nay
Jose Giral Democratic Nay
Joseph C. Hohenstein Democratic Nay
Justin C. Fleming Democratic Nay
Keith S. Harris Democratic Nay
Kristine C. Howard Democratic Nay
Kyle Donahue Democratic Nay
Kyle J. Mullins Democratic Nay
La'Tasha D. Mayes Democratic Nay
Leanne Krueger Democratic Nay
Lindsay Powell Democratic Nay
Lisa A. Borowski Democratic Nay
Liz Hanbidge Democratic Nay
Malcolm Kenyatta Democratic Nay
Mandy Steele Democratic Nay
Manuel Guzman Democratic Nay
Mary Jo Daley Democratic Nay
MaryLouise Isaacson Democratic Nay
Matthew D. Bradford Democratic Nay
Maureen E. Madden Democratic Nay
Melissa Cerrato Democratic Nay
Melissa L. Shusterman Democratic Nay
Michael H. Schlossberg Democratic Nay
Morgan Cephas Democratic Nay
Nancy Guenst Democratic Nay
Napoleon J. Nelson Democratic Nay
Nathan Davidson Democratic Nay
Nikki Rivera Democratic Nay
Pat Gallagher Democratic Nay
Patrick J. Harkins Democratic Nay
Paul Friel Democratic Nay
Paul Takac Democratic Nay
Perry S. Warren Democratic Nay
Peter Schweyer Democratic Nay
Regina G. Young Democratic Nay
Rick Krajewski Democratic Nay
Robert E. Merski Democratic Nay
Robert F. Matzie Democratic Nay
Robert Freeman Democratic Nay
Ryan A. Bizzarro Democratic Nay
Scott Conklin Democratic Nay
Sean Dougherty Democratic Nay
Steve Samuelson Democratic Nay
Steven R. Malagari Democratic Nay
Tarah Probst Democratic Nay
Tarik Khan Democratic Nay
Tim Brennan Democratic Nay
Tim Briggs Democratic Nay
Tina M. Davis Democratic Nay
Aaron Bernstine Republican Yea
Abby Major Republican Yea
Alec J. Ryncavage Republican Yea
Andrea C. Verobish Republican Yea
Andrew Kuzma Republican Yea
Ann Flood Republican Yea
Barbara Gleim Republican Yea
Brad Roae Republican Yea
Brenda M. Pugh Republican Yea
Brett R. Miller Republican Yea
Brian C. Rasel Republican Yea
Brian Smith Republican Yea
Bryan Cutler Republican Yea
Bud Cook Republican Yea
Carl Walker Metzgar Republican Yea
Catherine I Wallen Republican Yea
Chad G. Reichard Republican Yea
Charity Grimm Krupa Republican Yea
Clint Owlett Republican Yea
Craig T. Staats Republican Yea
Craig Williams Republican Yea
Dallas Kephart Republican Yea
Dan Moul Republican Yea
Dane Watro Republican Yea
David H. Rowe Republican Yea
David H. Zimmerman Republican Yea
David M. Maloney Republican Yea
Donna Scheuren Republican Yea
Doyle Heffley Republican Yea
Eric Davanzo Republican Yea
Eric J. Weaknecht Republican Yea
Eric R. Nelson Republican Yea
Gary W. Day Republican Yea
George H Margetas Republican Yea
Jack Rader Republican Yea
Jacob D. Banta Republican Yea
James B. Struzzi Republican Yea
Jamie Barton Republican Yea
Jamie L. Flick Republican Yea
Jamie Walsh Republican Yea
Jason Ortitay Republican Yea
Jeff Olsommer Republican Yea
Jeremy Shaffer Republican Yea
Jesse Topper Republican Yea
Jill N. Cooper Republican Yea
Jim Rigby Republican Yea
Joanne Stehr Republican Yea
Joe Emrick Republican Yea
Joe Hamm Republican Yea
Joe Hogan Republican Yea
Joe Kerwin Republican Yea
John A. Lawrence Republican Yea
John A. Schlegel Republican Yea
Jonathan Fritz Republican Yea
Joseph D'Orsie Republican Yea
Josh Bashline Republican Yea
Joshua D. Kail Republican Yea
Kate A. Klunk Republican Yea
Kathleen C. Tomlinson Republican Yea
Kathy L. Rapp Republican Yea
Keith J. Greiner Republican Yea
Kerry A. Benninghoff Republican Yea
Kristin Marcell Republican Yea
Leslie Rossi Republican Yea
Marc S. Anderson Republican Yea
Marci Mustello Republican Yea
Mark M. Gillen Republican Yea
Marla Brown Republican Yea
Martin T. Causer Republican Yea
Martina A. White Republican Yea
Michael Stender Republican Yea
Mike Armanini Republican Yea
Mike Jones Republican Yea
Milou Mackenzie Republican Yea
Mindy Fee Republican Yea
Natalie Mihalek Republican Yea
Parke Wentling Republican Yea
Perry A. Stambaugh Republican Yea
R. Lee James Republican Yea
Rich Irvin Republican Yea
Rob W. Kauffman Republican Yea
Robert Leadbeter Republican Yea
Roman Kozak Republican Yea
Russ Diamond Republican Yea
Ryan Warner Republican Yea
Scott Barger Republican Yea
Shelby Labs Republican Yea
Sheryl M. Delozier Republican Yea
Stephanie Borowicz Republican Yea
Steven C. Mentzer Republican Yea
Thomas H. Kutz Republican Yea
Thomas L. Mehaffie Republican Yea
Tim Twardzik Republican Yea
Timothy J. O'Neal Republican Yea
Timothy R. Bonner Republican Yea
Tina Pickett Republican Yea
Tom Jones Republican Yea
Valerie S. Gaydos Republican Yea
Wendy Fink Republican Yea
Zachary Mako Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 2380 do?
Reducing utility bills by utilizing grid-scale battery storage
Who sponsors HB 2380?
HB 2380 is sponsored by Nikki Rivera (Democratic), Elizabeth Fiedler (Democratic), Joe Webster (Democratic), Danielle Friel Otten (Democratic), Ben Waxman (Democratic), Benjamin V. Sanchez (Democratic), Carol Hill-Evans (Democratic), Johanny Cepeda-Freytiz (Democratic), Joseph C. Hohenstein (Democratic), Tarah Probst (Democratic), Chris Pielli (Democratic), Arvind Venkat (Democratic), Jeanne McNeill (Democratic), Greg Vitali (Democratic), Ed Neilson (Democratic), John C. Inglis III (Democratic), Lisa A. Borowski (Democratic), Heather Boyd (Democratic), La'Tasha D. Mayes (Democratic), Gina H. Curry (Democratic), Joe Ciresi (Democratic), Mandy Steele (Democratic), Christopher M. Rabb (Democratic), Steven R. Malagari (Democratic), Jen Mazzocco (Democratic), Rick Krajewski (Democratic), Dan Frankel (Democratic), Paul Friel (Democratic), Abigail Salisbury (Democratic), Robert Freeman (Democratic), Jennifer O'Mara (Democratic), Melissa L. Shusterman (Democratic), Tim Brennan (Democratic), Tarik Khan (Democratic), Tim Briggs (Democratic), Liz Hanbidge (Democratic), Steve Samuelson (Democratic), MaryLouise Isaacson (Democratic), Mark M. Gillen (Republican), Andre D. Carroll (Democratic), Mary Jo Daley (Democratic), Joe Hogan (Republican), Paul Takac (Democratic), Christina D. Sappey (Democratic), Robert E. Merski (Democratic), Greg Scott (Democratic), Darisha K. Parker (Democratic), Jared G. Solomon (Democratic), Kyle J. Mullins (Democratic), Brian Munroe (Democratic), Dan K. Williams (Democratic), Kyle Donahue (Democratic), Jacklyn Rusnock (Democratic), Kristine C. Howard (Democratic), Tina M. Davis (Democratic), Dave Madsen (Democratic), and G. Roni Green (Democratic).
What is the current status of HB 2380?
This bill has passed the House. Introduced May 21, 2026. It now moves to the second chamber.
Where can I track HB 2380?
Track HB 2380 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 2380

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 2380

Last checked for changes 4 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →