HB 2296 — An Act amending the act of November 26, 1978 (P.L.1375, No.325), known as the Dam Safety and Encroachments Act, further providing for definitions; and providing for siting of wetland replacement.

Last action — Referred to ENVIRONMENTAL AND NATURAL RESOURCE PROTECTION, March 18, 2026

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the House. Introduced March 18, 2026. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the House.

Summary

Ensuring Wetland Replacement Efforts Stay Local

Bill Text

How this bill changes current law

10 changes Share ↗

AI-generated reading aid from the bill's amendatory text — verify against the official bill.

This bill adds definitions related to wetlands and establishes siting requirements for wetland replacement in the Dam Safety and Encroachments Act.

  • Section 3

    "Wetland." An area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances does support, a prevalence of vegetation typically adapted for life in saturated soil conditions, including swamps, marshes, bogs and similar areas.

    This adds a definition of 'wetland' to Pennsylvania law.

  • Section 10.1. Siting of wetland replacement.

    This introduces a new section that outlines specific requirements for siting wetland replacement.

  • (a) Whenever there is construction of replacement wetland resources to compensate for unavoidable wetland impacts as a result of permitting actions or as a measure to mitigate the effects of violations, the wetland replacement actions shall adhere to the following siting requirements:

    This sets the context for the siting requirements for wetland replacement.

  • (1) Wetland replacement shall occur, where possible, immediately adjacent to the wetland affected by the obstruction or encroachment.

    This requires wetland replacement to be as close as possible to the impacted area.

  • (2) If the location of the wetland replacement site in accordance with paragraph (1) is not practicable or feasible, every effort shall be made to locate the wetland replacement site along or adjacent to the watercourse that receives benefit from the impacted wetland system.

    This provides an alternative siting option if the first option is not feasible.

  • (3) If the location of the wetland replacement site in accordance with paragraph (2) is not practicable or feasible, the site shall be located within the watershed of that watercourse.

    This further specifies where wetland replacement should occur if previous options are not practical.

  • (4) If a suitable site cannot be found to meet the criteria under paragraphs (1), (2) and (3), the department shall consider locating the replacement site adjacent to the next higher order stream or watercourse in the watershed.

    This gives a fallback option for siting replacement wetlands.

  • (5) The department shall reject a wetland replacement proposal for construction in a watershed other than that where the loss has occurred unless all suitable locations have been exhausted.

    This limits wetland replacement to the original watershed unless no other options are available.

  • (6) If the wetland impact occurs within a designated coastal zone management area, the wetland replacement shall be undertaken in that coastal zone management area.

    This mandates that wetland replacement be done within the same coastal zone if the impact occurs there.

  • (b) If the wetland replacement occurs anywhere other than immediately adjacent to the wetland affected by the obstruction or encroachment, the department shall require documentation of why it was not practicable or feasible to locate the wetland replacement site adjacent to the impacted wetland.

    This requires justification for any wetland replacement site not adjacent to the impacted area.

Action History

  1. Referred to ENVIRONMENTAL AND NATURAL RESOURCE PROTECTION, March 18, 2026

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 5 co-sponsors · 247 not signed on

Sponsors (1)

Co-sponsors (5)

Not signed on (247)

247 members have not signed on to this bill.

Show all 247 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 2296 do?
Ensuring Wetland Replacement Efforts Stay Local
Who sponsors HB 2296?
HB 2296 is sponsored by Dan K. Williams (Democratic), Tarah Probst (Democratic), Robert Freeman (Democratic), Maureen E. Madden (Democratic), Carol Hill-Evans (Democratic), and Lisa A. Borowski (Democratic).
What is the current status of HB 2296?
This bill is in committee in the House. Introduced March 18, 2026. It must pass committee before a floor vote.
Where can I track HB 2296?
Track HB 2296 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 2296

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 2296

Last checked for changes 5 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →