Pennsylvania 2025_0 Regular Session Status: Passed House 23 D cosponsors

HB 2264 — An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for virtual power plant program.

Last action — Referred to CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, June 24, 2026

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has passed the House. Introduced March 05, 2026. It now moves to the second chamber.

Next likely step: consideration and a floor vote in the Senate.

Odds of enactment

Moderate chance

Based on the sponsor, cosponsors, and committee posture, this bill has a moderate chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Advancing 58% · moderate confidence
  • Passed House

    Current position in the legislative process.

  • 23 sponsors

    1 primary, 22 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (23 D).

  • Cleared a recorded vote

    Passed 1 recorded vote so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

In plain language

The bill establishes a program for Virtual Power Plants in Pennsylvania.

This legislation creates a Virtual Power Plant (VPP) program within Pennsylvania's electric utility industry. The program aims to enhance energy efficiency and management by aggregating distributed energy resources.

What this means for you
  • Consumers: This means potential improvements in energy efficiency and cost savings on electricity for consumers.

Summary

Establishing a Virtual Power Plant (VPP) Program

Bill Text

What changed in the latest version

298 added · 357 removed

Plain-language change summary

The recent changes to HB 2264 clarify the requirements for electric distribution companies when proposing new plans. Notably, they must now include a reasonable enrollment target to encourage market participation, and the commission will provide detailed reasons if they disapprove a proposal. This matters because it aims to enhance accountability and ensure that new proposals effectively engage with the community, potentially leading to more efficient energy solutions.

→
Previous
Latest
PRIOR PRINTER'S NO.
PRINTER'S NO.
2962 PRINTER'S NO.
2962 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL Session of No.
3369 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL Session of No.
2264 2026 INTRODUCED BY DAVIDSON, RIVERA, FIEDLER, WAXMAN, KHAN, HILL- EVANS, OTTEN, INGLIS, MAYES, BOROWSKI, SANCHEZ, CEPEDA- FREYTIZ, MADDEN, KAZEEM, CIRESI AND FLEMING, MARCH 4, 2026 REFERRED TO COMMITTEE ON ENERGY, MARCH 5, 2026 AN ACT AmeConsolidated Statutes, in restructuring of electric utility industry, providing for virtual power plant program.
2264 2026 INTRODUCED BY DAVIDSON, RIVERA, FIEDLER, WAXMAN, KHAN, HILL- EVANS, OTTEN, INGLIS, MAYES, BOROWSKI, SANCHEZ, CEPEDA- FREYTIZ, MADDEN, KAZEEM, CIRESI, FLEMING, PIELLI, MUNROE AND D.
WILLIAMS, MARCH 4, 2026 AS REPORTED FROM COMMITTEE ON ENERGY, HOUSE OF REPRESENTATIVES, AS AMENDED, MAY 6, 2026 AN ACT Amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for virtual power plant program.
(2) THE ELECTRIC DISTRIBUTION COMPANY SHALL DEMONSTRATE <-- THAT THE PROPOSAL IS COST EFFECTIVE USING A COST-BENEFIT ANALYSIS DETERMINED BY THE COMMISSION, WHICH SHALL INCLUDE AN ANALYSIS OF THE ELECTRIC DISTRIBUTION COMPANY'S ESTIMATED ADMINISTRATIVE COSTS.
(2) The commission shall approve or disapprove a proposal submitted under subsection (a) within 180 days after submission.
(2) (3) The commission shall approve or disapprove a <-- proposal submitted under subsection (a) within 180 days after submission.
(3) (4) A proposal submitted under subsection (a) shall <-- include a reasonable enrollment target for the electric distribution company to achieve in collaboration with contracted third-party distributed energy resource management system providers and device installers.
(3) A proposal submitted under subsection (a) shall include a reasonable enrollment target for the electric distribution company to achieve in collaboration with contracted third-party distributed energy resource management system providers and device installers.
(1) Permit a customer with an eligible technology to enroll in the program through an aggregator or the electric 20260HB2264PN3369 - 2 - distribution company.
(1) Permit a customer with an eligible technology to enroll in the program through an aggregator or the electric distribution company.
(2) To the extent practicable, include a mechanism to <-- incorporate existing demand response programs.
(2) To the extent practicable, include a mechanism to incorporate existing demand response programs.
(3) (2) Provide compensable grid services for each <-- eligible technology that a participant may provide, including local and system peak demand response and the avoidance or deferral of transmission or distribution upgrades or capacity expansion.
(3) Provide compensable grid services for each eligible technology that a participant may provide, including local and system peak demand response and the avoidance or deferral 20260HB2264PN2962 - 2 - of transmission or distribution upgrades or capacity expansion.
(4) (3) Establish operational parameters for grid <-- services by distributed energy resource type, including all of the following:
(4) Establish operational parameters for grid services by distributed energy resource type, including all of the following:
(i) The minimum and maximum number of grid events during which the electric distribution company OR <-- PARTICIPATING AGGREGATOR may dispatch enrolled distributed energy resources.
(i) The minimum and maximum number of grid events during which the electric distribution company may dispatch enrolled distributed energy resources.
(v) A maximum duration of three hours for a grid 20260HB2264PN3369 - 3 - event.
(v) A maximum duration of three hours for a grid event.
(5) (4) Provide for an aggregator to perform all of the <-- following:
(5) Provide for an aggregator to perform all of the 20260HB2264PN2962 - 3 - following:
(iv) Receive OR MANAGE performance-based <-- compensation or other appropriate compensation from the electric distribution company.
(iv) Receive performance-based compensation or other appropriate compensation from the electric distribution company.
(6) (5) Provide for measurement and verification of <-- battery performance directly from the inverter without requiring installation of an additional meter and provide other measurement standards for eligible technologies, subject to commission approval.
(6) Provide for measurement and verification of battery performance directly from the inverter without requiring installation of an additional meter and provide other measurement standards for eligible technologies, subject to commission approval.
(7) (6) Provide for an upfront payment, performance- <-- based compensation or both for the full value of grid services at the locations where eligible technologies are utilized.
(7) Provide for an upfront payment, performance-based compensation or both for the full value of grid services at the locations where eligible technologies are utilized.
The commission may approve reasonable mechanisms to disenroll a customer for continued nonperformance but may not <-- impose a penalty for nonperformance.
The commission may approve reasonable mechanisms to disenroll a customer for continued nonperformance but may not impose a penalty for nonperformance.
(8) (7) Provide enhanced upfront payments for low-income <-- customers and customers located in historically disadvantaged communities in addition to performance-based compensation.
(8) Provide enhanced upfront payments for low-income customers and customers located in historically disadvantaged communities in addition to performance-based compensation.
The commission may approve enhanced upfront payment rates 20260HB2264PN3369 - 4 - under this paragraph and shall coordinate with State agency officials to make funding available from the Inflation Reduction Act of 2022 (Public Law 117-169, 136 Stat.
The commission may approve enhanced upfront payment rates under this paragraph and shall coordinate with State agency officials to make funding available from the Inflation Reduction Act of 2022 (Public Law 117-169, 136 Stat.
(9) (8) Permit a participant to maintain the <-- performance-based rate applicable at the time of enrollment for a minimum of five years and permit the participant to reenroll after the five-year period at the applicable rate for additional five-year terms.
(9) Permit a participant to maintain the performance- 20260HB2264PN2962 - 4 - based rate applicable at the time of enrollment for a minimum of five years and permit the participant to reenroll after the five-year period at the applicable rate for additional five-year terms.
(10) In addition to performance-based compensation, <-- provide that each kilowatt hour of energy exported from an enrolled eligible technology under the program shall be credited to the enrolled customer at the full retail value at the time of export, regardless of the export compensation rate specified in the customer's current interconnection tariff.
(10) In addition to performance-based compensation, provide that each kilowatt hour of energy exported from an enrolled eligible technology under the program shall be credited to the enrolled customer at the full retail value at the time of export, regardless of the export compensation rate specified in the customer's current interconnection tariff.
(9) PROHIBIT A PARTICIPANT FROM RECEIVING COMPENSATION <-- UNDER THE PROGRAM FOR A GRID SERVICE THAT IS SIMULTANEOUSLY COMPENSATED UNDER A FEDERAL, REGIONAL TRANSMISSION 20260HB2264PN3369 - 5 - ORGANIZATION OR ELECTRIC DISTRIBUTION COMPANY DEMAND RESPONSE OR LOAD MANAGEMENT PROGRAM UNLESS THE GRID SERVICE IS SEPARATE AND DISTINCT FROM THOSE PERFORMED UNDER THE PROGRAM.
(12) Prohibit an electric distribution company from requiring collateral from a program participant.
(12) (10) Prohibit an electric distribution company from <-- requiring collateral from a program participant.
(11) ALLOW ELIGIBLE DEMAND RESPONSE RESOURCES LOCATED AT <-- COMMERCIAL AND INDUSTRIAL SITES TO PARTICIPATE IN THE PROGRAM.
(2) THE COMMISSION SHALL ENSURE THAT EACH PROGRAM DOES <-- NOT INTERFERE WITH WHOLESALE ENERGY, CAPACITY OR ANCILLARY SERVICE MARKETS AND OPERATES IN A MANNER CONSISTENT WITH THE MARKET RULES OF THE REGIONAL TRANSMISSION ORGANIZATION IN WHICH THE APPLICABLE ELECTRIC DISTRIBUTION COMPANY PARTICIPATES.
(2) The commission shall establish reasonable and appropriate standards to protect the interests of program participants, including requirements for registration forms, opt-out procedures, standard contract terms and conditions, 20260HB2264PN2962 - 5 - payment terms, warranties and disclosure forms.
(2) (3) The commission shall establish reasonable and <-- appropriate standards to protect the interests of program participants, including requirements for registration forms, opt-out procedures, standard contract terms and conditions, payment terms, warranties and disclosure forms.
(3) The commission shall ensure an electric distribution company uses a transparent and competitive procurement process for aggregator virtual power plant services.
(3) (4) The commission shall ensure an electric <-- distribution company uses a transparent and competitive procurement process for aggregator virtual power plant services.
(4) The commission shall establish standards and procedures governing energy data held by participants and electric distribution companies that must be shared with aggregators or other third parties to ensure efficient operation of a program.
(4) (5) The commission shall establish standards and <-- procedures governing energy data held by participants and electric distribution companies that must be shared with 20260HB2264PN3369 - 6 - aggregators or other third parties to ensure efficient operation of a program.
(5) (6) For good cause shown, the commission may delay, <-- for a reasonable period, the deadline for an electric distribution company to comply with this section.
(5) For good cause shown, the commission may delay, for a reasonable period, the deadline for an electric distribution company to comply with this section.
(7) IN ADDITION TO RECEIVING PERFORMANCE-BASED <-- COMPENSATION, THE COMMISSION SHALL ADOPT RULES OR PROMULGATE REGULATIONS TO COMPENSATE THE ENERGY EXPORTED FROM ENROLLED DEVICES AT A VALUE COMMENSURATE WITH THE BENEFITS PROVIDED TO THE ELECTRIC GRID AT THE TIME OF EXPORT.
(e) Competitive services.--A program shall be administered in a manner that does not discriminate against or hinder the ability of a competitive aggregator to participate in the program or to offer comparable products or services to customers.
(8) THE COMMISSION SHALL REQUIRE EACH ELECTRIC DISTRIBUTION COMPANY TO USE ADVANCED METERING INFRASTRUCTURE HOURLY USAGE FOR THE FOLLOWING:
(f) Electric distribution company eligibility.--An electric distribution company may offer program enrollment directly to a customer in addition to aggregator offerings.
(I) TO CALCULATE EACH CUSTOMER'S PEAK LOAD CONTRIBUTION AND NETWORK SERVICE PEAK LOAD CONTRIBUTION.
(II) TO PERFORM A CUSTOMER'S LOAD SETTLEMENT IN THE REGIONAL TRANSMISSION ORGANIZATION IN WHICH THE APPLICABLE ELECTRIC DISTRIBUTION COMPANY PARTICIPATES.
(e) Competitive services.--A program shall be administered <-- SERVICES.-- <-- (1) A PROGRAM SHALL BE ADMINISTERED in a manner that does not discriminate against or hinder the ability of a competitive aggregator to participate in the program or to offer comparable products or services to customers.
(2) AN ELECTRIC DISTRIBUTION COMPANY MAY NOT PROMOTE OR <-- ADVERTISE THE PROGRAM IN A MANNER THAT GIVES UNREASONABLE PREFERENCE TO THE ELECTRIC DISTRIBUTION COMPANY OVER COMPETITIVE AGGREGATOR OFFERINGS.
20260HB2264PN3369 - 7 - (f) Electric distribution company eligibility.--An electric distribution company may offer program enrollment directly to a customer in addition to aggregator offerings.
An electric distribution company may not delay program implementation due to a lack of public utility-owned third-party management system or device installer capability.
An electric distribution company may not delay program implementation due to a lack of public utility-owned third-party management system or device 20260HB2264PN2962 - 6 - installer capability.
20260HB2264PN3369 - 8 - (4) THE COMMISSION MAY ESTABLISH ANNUAL CAPS ON THE <-- TOTAL PROGRAM COSTS RECOVERABLE FROM RATEPAYERS IF THE RATE CAP IS IN THE PUBLIC INTEREST AND DOES NOT SIGNIFICANTLY REDUCE FUTURE PARTICIPATION IN THE PROGRAM.
Show all 59 changed rows (19 more)
Previous
Latest
(2) Within 270 days after the effective date of this paragraph, the commission shall, by regulation or order, establish all of the following:
(2) Within 270 days after the effective date of this paragraph, the commission shall, by regulation or order, 20260HB2264PN2962 - 7 - establish all of the following:
(iii) Financial awards equal to or greater than the <-- rate of return generated from traditional public utility capital investment required to meet the targets of the performance incentives established under this subsection.
(iii) Financial awards equal to or greater than the rate of return generated from traditional public utility capital investment required to meet the targets of the performance incentives established under this subsection.
(iv) (III) Financial penalties for failure to meet <-- targets established under this subsection.
(iv) Financial penalties for failure to meet targets established under this subsection.
(v) (IV) New targets for subsequent five-year <-- periods.
(v) New targets for subsequent five-year periods.
20260HB2264PN3369 - 9 - (vi) (V) Additional targets and incentives for each <-- additional grid service adopted and approved for implementation under subsection (c).
(vi) Additional targets and incentives for each additional grid service adopted and approved for implementation under subsection (c).
(4) AN EVALUATION OF THE COST EFFECTIVENESS OF <-- EXPENDITURES.
(4) Recommendations to increase program participation.
(4) (5) Recommendations to increase program <-- participation.
(5) Other information requested by the commission.
(5) (6) Other information requested by the commission.
20260HB2264PN2962 - 8 - (k) Applicability.--This section shall not apply to an electric distribution company with less than 100,000 customers.
<-- (k) Applicability.--This section shall not apply to an electric distribution company with less than 100,000 customers.
"Battery." An energy storage device and associated equipment 20260HB2264PN3369 - 10 - that operates together to comply with program requirements.
"Battery." An energy storage device and associated equipment that operates together to comply with program requirements.
"Distributed energy resource." An eligible technology device <-- A TECHNOLOGY located behind the customer's meter that provides <-- energy or energy management capabilities for the customer or the grid.
"Distributed energy resource." An eligible technology device located behind the customer's meter that provides energy or energy management capabilities for the customer or the grid.
"Eligible technology." Technology A DISTRIBUTED ENERGY <-- RESOURCE owned by a customer or third party and installed behind the customer's meter that is capable of being activated or dispatched under a virtual power plant program to address a grid event.
"Eligible technology." Technology owned by a customer or third party and installed behind the customer's meter that is capable of being activated or dispatched under a virtual power plant program to address a grid event.
"Emergency event." A grid event identified by an electric distribution company for which notice is given in less than 24 hours.
20260HB2264PN2962 - 9 - "Emergency event." A grid event identified by an electric distribution company for which notice is given in less than 24 hours.
20260HB2264PN3369 - 11 - "Full retail value." The value of electric energy credited to a participant at the retail rate, including the generation, capacity, transmission and distribution components of the electric distribution company's approved tariff.
"Full retail value." The value of electric energy credited to a participant at the retail rate, including the generation, capacity, transmission and distribution components of the electric distribution company's approved tariff.
"Grid service." A capacity, energy or ancillary service OR <-- SERVICE RELATING TO THE TRANSMISSION OR DISTRIBUTION SYSTEM that supports grid operations.
"Grid service." A capacity, energy or ancillary service that supports grid operations.
"Performance-based compensation." A system of payments made to participants based on the value of electricity dispatched or saved through activating enrolled resources during a grid event., WHICH MAY INCLUDE A RESERVATION PAYMENT PER KILOWATT OR <-- PERFORMANCE PAYMENT PER KILOWATT HOUR OR BOTH.
"Performance-based compensation." A system of payments made to participants based on the value of electricity dispatched or saved through activating enrolled resources during a grid event.
"Performance-based rate." The performance-based compensation rate paid to participants based on the performance of enrolled resources providing one or more grid services during a grid event.
20260HB2264PN2962 - 10 - "Performance-based rate." The performance-based compensation rate paid to participants based on the performance of enrolled resources providing one or more grid services during a grid event.
20260HB2264PN3369 - 12 - "Virtual power plant." An aggregation of distributed energy resources enrolled through an aggregator or an electric distribution company that are operated in coordination to provide one or more grid services.
"Virtual power plant." An aggregation of distributed energy resources enrolled through an aggregator or an electric distribution company that are operated in coordination to provide one or more grid services.
20260HB2264PN3369 - 13 -
20260HB2264PN2962 - 11 -
View plain text versions (2)

Action History

  1. Referred to CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, June 24, 2026

  2. In the Senate

  3. (Remarks see House Journal Page ), June 16, 2026

  4. Third consideration and final passage, June 16, 2026 (107-95)

  5. Re-reported as committed, June 16, 2026

  6. Re-committed to APPROPRIATIONS, June 15, 2026

  7. Second consideration, June 15, 2026

  8. Removed from table, June 10, 2026

  9. Laid on the table, May 6, 2026

  10. First consideration, May 6, 2026

  11. Reported as amended, May 6, 2026

  12. Referred to ENERGY, March 5, 2026

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 22 co-sponsors · 230 not signed on · 95 voted No

Sponsors (1)

Co-sponsors (22)

Not signed on (230)

230 members have not signed on to this bill.

Show all 230 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

FINAL PASSAGE

Passed 107 Yea · 95 Nay
Party YeaNayPresentNot Voting
Democratic 102000
Republican 59500
Total 1079500
% of votes cast 53%47%0%0%
How each member voted (202)
Member Party Vote
Abigail Salisbury Democratic Yea
Aerion Abney Democratic Yea
Amen Brown Democratic Yea
Ana Tiburcio Democratic Yea
Andre D. Carroll Democratic Yea
Anita Astorino Kulik Democratic Yea
Anthony A. Bellmon Democratic Yea
Arvind Venkat Democratic Yea
Ben Waxman Democratic Yea
Benjamin V. Sanchez Democratic Yea
Brandon J. Markosek Democratic Yea
Brian Munroe Democratic Yea
Bridget M. Kosierowski Democratic Yea
Carol Hill-Evans Democratic Yea
Carol Kazeem Democratic Yea
Chris Pielli Democratic Yea
Christina D. Sappey Democratic Yea
Christopher M. Rabb Democratic Yea
Dan Frankel Democratic Yea
Dan Goughnour Democratic Yea
Dan K. Williams Democratic Yea
Daniel J. Deasy Democratic Yea
Danielle Friel Otten Democratic Yea
Danilo Burgos Democratic Yea
Darisha K. Parker Democratic Yea
Dave Madsen Democratic Yea
David M. Delloso Democratic Yea
Ed Neilson Democratic Yea
Eddie Day Pashinski Democratic Yea
Elizabeth Fiedler Democratic Yea
Emily Kinkead Democratic Yea
Frank Burns Democratic Yea
G. Roni Green Democratic Yea
Gina H. Curry Democratic Yea
Greg Scott Democratic Yea
Greg Vitali Democratic Yea
Heather Boyd Democratic Yea
Ismail Smith-Wade-El Democratic Yea
Jacklyn Rusnock Democratic Yea
Jared G. Solomon Democratic Yea
Jason Dawkins Democratic Yea
Jeanne McNeill Democratic Yea
Jen Mazzocco Democratic Yea
Jennifer O'Mara Democratic Yea
Jessica Benham Democratic Yea
Jim Haddock Democratic Yea
Jim Prokopiak Democratic Yea
Joanna E. McClinton Democratic Yea
Joe Ciresi Democratic Yea
Joe McAndrew Democratic Yea
Joe Webster Democratic Yea
Johanny Cepeda-Freytiz Democratic Yea
John C. Inglis III Democratic Yea
Jordan A. Harris Democratic Yea
Jose Giral Democratic Yea
Joseph C. Hohenstein Democratic Yea
Justin C. Fleming Democratic Yea
Keith S. Harris Democratic Yea
Kristine C. Howard Democratic Yea
Kyle Donahue Democratic Yea
Kyle J. Mullins Democratic Yea
La'Tasha D. Mayes Democratic Yea
Leanne Krueger Democratic Yea
Lindsay Powell Democratic Yea
Lisa A. Borowski Democratic Yea
Liz Hanbidge Democratic Yea
Malcolm Kenyatta Democratic Yea
Mandy Steele Democratic Yea
Manuel Guzman Democratic Yea
Mary Jo Daley Democratic Yea
MaryLouise Isaacson Democratic Yea
Matthew D. Bradford Democratic Yea
Maureen E. Madden Democratic Yea
Melissa Cerrato Democratic Yea
Melissa L. Shusterman Democratic Yea
Michael H. Schlossberg Democratic Yea
Morgan Cephas Democratic Yea
Nancy Guenst Democratic Yea
Napoleon J. Nelson Democratic Yea
Nathan Davidson Democratic Yea
Nikki Rivera Democratic Yea
Pat Gallagher Democratic Yea
Patrick J. Harkins Democratic Yea
Paul Friel Democratic Yea
Paul Takac Democratic Yea
Perry S. Warren Democratic Yea
Peter Schweyer Democratic Yea
Regina G. Young Democratic Yea
Rick Krajewski Democratic Yea
Robert E. Merski Democratic Yea
Robert F. Matzie Democratic Yea
Robert Freeman Democratic Yea
Ryan A. Bizzarro Democratic Yea
Scott Conklin Democratic Yea
Sean Dougherty Democratic Yea
Steve Samuelson Democratic Yea
Steven R. Malagari Democratic Yea
Tarah Probst Democratic Yea
Tarik Khan Democratic Yea
Tim Brennan Democratic Yea
Tim Briggs Democratic Yea
Tina M. Davis Democratic Yea
Aaron Bernstine Republican Nay
Abby Major Republican Nay
Alec J. Ryncavage Republican Nay
Andrea C. Verobish Republican Nay
Andrew Kuzma Republican Nay
Ann Flood Republican Nay
Barbara Gleim Republican Nay
Brad Roae Republican Nay
Brenda M. Pugh Republican Nay
Brett R. Miller Republican Nay
Brian C. Rasel Republican Nay
Brian Smith Republican Nay
Bryan Cutler Republican Nay
Bud Cook Republican Nay
Carl Walker Metzgar Republican Nay
Catherine I Wallen Republican Nay
Chad G. Reichard Republican Nay
Charity Grimm Krupa Republican Nay
Clint Owlett Republican Nay
Craig T. Staats Republican Nay
Craig Williams Republican Nay
Dallas Kephart Republican Nay
Dan Moul Republican Nay
Dane Watro Republican Nay
David H. Rowe Republican Nay
David H. Zimmerman Republican Nay
David M. Maloney Republican Nay
Donna Scheuren Republican Nay
Doyle Heffley Republican Nay
Eric Davanzo Republican Nay
Eric J. Weaknecht Republican Nay
Eric R. Nelson Republican Nay
Gary W. Day Republican Yea
George H Margetas Republican Nay
Jack Rader Republican Nay
Jacob D. Banta Republican Nay
James B. Struzzi Republican Nay
Jamie Barton Republican Nay
Jamie L. Flick Republican Nay
Jamie Walsh Republican Nay
Jason Ortitay Republican Nay
Jeff Olsommer Republican Nay
Jeremy Shaffer Republican Nay
Jesse Topper Republican Nay
Jill N. Cooper Republican Nay
Jim Rigby Republican Nay
Joanne Stehr Republican Nay
Joe Emrick Republican Yea
Joe Hamm Republican Nay
Joe Hogan Republican Yea
Joe Kerwin Republican Nay
John A. Lawrence Republican Nay
John A. Schlegel Republican Nay
Jonathan Fritz Republican Nay
Joseph D'Orsie Republican Nay
Josh Bashline Republican Nay
Joshua D. Kail Republican Nay
Kate A. Klunk Republican Nay
Kathleen C. Tomlinson Republican Yea
Kathy L. Rapp Republican Nay
Keith J. Greiner Republican Nay
Kerry A. Benninghoff Republican Nay
Kristin Marcell Republican Nay
Leslie Rossi Republican Nay
Marc S. Anderson Republican Nay
Marci Mustello Republican Nay
Mark M. Gillen Republican Nay
Marla Brown Republican Nay
Martin T. Causer Republican Nay
Martina A. White Republican Nay
Michael Stender Republican Nay
Mike Armanini Republican Nay
Mike Jones Republican Nay
Milou Mackenzie Republican Nay
Mindy Fee Republican Nay
Natalie Mihalek Republican Nay
Parke Wentling Republican Nay
Perry A. Stambaugh Republican Nay
R. Lee James Republican Nay
Rich Irvin Republican Nay
Rob W. Kauffman Republican Nay
Robert Leadbeter Republican Nay
Roman Kozak Republican Nay
Russ Diamond Republican Nay
Ryan Warner Republican Nay
Scott Barger Republican Nay
Shelby Labs Republican Nay
Sheryl M. Delozier Republican Nay
Stephanie Borowicz Republican Nay
Steven C. Mentzer Republican Nay
Thomas H. Kutz Republican Nay
Thomas L. Mehaffie Republican Yea
Tim Twardzik Republican Nay
Timothy J. O'Neal Republican Nay
Timothy R. Bonner Republican Nay
Tina Pickett Republican Nay
Tom Jones Republican Nay
Valerie S. Gaydos Republican Nay
Wendy Fink Republican Nay
Zachary Mako Republican Nay

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 2264 do?
Establishing a Virtual Power Plant (VPP) Program
Who sponsors HB 2264?
HB 2264 is sponsored by Joe Ciresi (Democratic), Jim Prokopiak (Democratic), Nathan Davidson (Democratic), Nikki Rivera (Democratic), Elizabeth Fiedler (Democratic), Ben Waxman (Democratic), Tarik Khan (Democratic), Carol Hill-Evans (Democratic), Danielle Friel Otten (Democratic), John C. Inglis III (Democratic), La'Tasha D. Mayes (Democratic), Lisa A. Borowski (Democratic), Benjamin V. Sanchez (Democratic), Johanny Cepeda-Freytiz (Democratic), Maureen E. Madden (Democratic), Carol Kazeem (Democratic), Justin C. Fleming (Democratic), Chris Pielli (Democratic), Brian Munroe (Democratic), Heather Boyd (Democratic), Tina M. Davis (Democratic), Jacklyn Rusnock (Democratic), and Dan K. Williams (Democratic).
What is the current status of HB 2264?
This bill has passed the House. Introduced March 05, 2026. It now moves to the second chamber.
Where can I track HB 2264?
Track HB 2264 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 2264

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 2264

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →