HB 2264 — An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for virtual power plant program.
Last action — Referred to CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, June 24, 2026
-
✓Introduced
-
✓In Committee
-
3Passed House
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill has passed the House. Introduced March 05, 2026. It now moves to the second chamber.
Next likely step: consideration and a floor vote in the Senate.
Odds of enactment
Moderate chanceBased on the sponsor, cosponsors, and committee posture, this bill has a moderate chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
-
Passed House
Current position in the legislative process.
-
23 sponsors
1 primary, 22 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (23 D).
-
Cleared a recorded vote
Passed 1 recorded vote so far.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
In plain language
The bill establishes a program for Virtual Power Plants in Pennsylvania.
This legislation creates a Virtual Power Plant (VPP) program within Pennsylvania's electric utility industry. The program aims to enhance energy efficiency and management by aggregating distributed energy resources.
What this means for you
- Consumers: This means potential improvements in energy efficiency and cost savings on electricity for consumers.
Summary
Establishing a Virtual Power Plant (VPP) Program
Bill Text
What changed in the latest version
298 added · 357 removedPlain-language change summary
The recent changes to HB 2264 clarify the requirements for electric distribution companies when proposing new plans. Notably, they must now include a reasonable enrollment target to encourage market participation, and the commission will provide detailed reasons if they disapprove a proposal. This matters because it aims to enhance accountability and ensure that new proposals effectively engage with the community, potentially leading to more efficient energy solutions.
PRIOR PRINTER'S NO.
2962 PRINTER'STHE NO.GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL Session of No.
33692264 THE2026 GENERALINTRODUCED ASSEMBLYBY OFDAVIDSON, PENNSYLVANIARIVERA, HOUSEFIEDLER, BILLWAXMAN, SessionKHAN, HILL- EVANS, OTTEN, INGLIS, MAYES, BOROWSKI, SANCHEZ, CEPEDA- FREYTIZ, MADDEN, KAZEEM, CIRESI AND FLEMING, MARCH 4, 2026 REFERRED TO COMMITTEE ON ENERGY, MARCH 5, 2026 AN ACT AmeConsolidated Statutes, in restructuring of No.electric utility industry, providing for virtual power plant program.
2264 2026 INTRODUCED BY DAVIDSON, RIVERA, FIEDLER, WAXMAN, KHAN, HILL- EVANS, OTTEN, INGLIS, MAYES, BOROWSKI, SANCHEZ, CEPEDA- FREYTIZ, MADDEN, KAZEEM, CIRESI, FLEMING, PIELLI, MUNROE AND D.
WILLIAMS, MARCH 4, 2026 AS REPORTED FROM COMMITTEE ON ENERGY, HOUSE OF REPRESENTATIVES, AS AMENDED, MAY 6, 2026 AN ACT Amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for virtual power plant program.
(2) THEThe ELECTRICcommission DISTRIBUTIONshall COMPANYapprove SHALLor DEMONSTRATEdisapprove <--a THATproposal THEsubmitted PROPOSALunder ISsubsection COST(a) EFFECTIVEwithin USING180 Adays COST-BENEFITafter ANALYSISsubmission. DETERMINED BY THE COMMISSION, WHICH SHALL INCLUDE AN ANALYSIS OF THE ELECTRIC DISTRIBUTION COMPANY'S ESTIMATED ADMINISTRATIVE COSTS.
(2) (3) The commission shall approve or disapprove a <-- proposal submitted under subsection (a) within 180 days after submission.
(3) (4) A proposal submitted under subsection (a) shall <-- include a reasonable enrollment target for the electric distribution company to achieve in collaboration with contracted third-party distributed energy resource management system providers and device installers.
(1) Permit a customer with an eligible technology to enroll in the program through an aggregator or the electric 20260HB2264PN3369 - 2 - distribution company.
(2) To the extent practicable, include a mechanism to <-- incorporate existing demand response programs.
(3) (2) Provide compensable grid services for each <-- eligible technology that a participant may provide, including local and system peak demand response and the avoidance or deferral 20260HB2264PN2962 - 2 - of transmission or distribution upgrades or capacity expansion.
(4) (3) Establish operational parameters for grid <-- services by distributed energy resource type, including all of the following:
(i) The minimum and maximum number of grid events during which the electric distribution company OR <-- PARTICIPATING AGGREGATOR may dispatch enrolled distributed energy resources.
(v) A maximum duration of three hours for a grid 20260HB2264PN3369 - 3 - event.
(5) (4) Provide for an aggregator to perform all of the <--20260HB2264PN2962 - 3 - following:
(iv) Receive OR MANAGE performance-based <-- compensation or other appropriate compensation from the electric distribution company.
(6) (5) Provide for measurement and verification of <-- battery performance directly from the inverter without requiring installation of an additional meter and provide other measurement standards for eligible technologies, subject to commission approval.
(7) (6) Provide for an upfront payment, performance-performance-based <-- based compensation or both for the full value of grid services at the locations where eligible technologies are utilized.
The commission may approve reasonable mechanisms to disenroll a customer for continued nonperformance but may not <-- impose a penalty for nonperformance.
(8) (7) Provide enhanced upfront payments for low-income <-- customers and customers located in historically disadvantaged communities in addition to performance-based compensation.
The commission may approve enhanced upfront payment rates 20260HB2264PN3369 - 4 - under this paragraph and shall coordinate with State agency officials to make funding available from the Inflation Reduction Act of 2022 (Public Law 117-169, 136 Stat.
(9) (8) Permit a participant to maintain the <--performance- performance-based20260HB2264PN2962 - 4 - based rate applicable at the time of enrollment for a minimum of five years and permit the participant to reenroll after the five-year period at the applicable rate for additional five-year terms.
(10) In addition to performance-based compensation, <-- provide that each kilowatt hour of energy exported from an enrolled eligible technology under the program shall be credited to the enrolled customer at the full retail value at the time of export, regardless of the export compensation rate specified in the customer's current interconnection tariff.
(9)(12) PROHIBITProhibit Aan PARTICIPANTelectric FROMdistribution RECEIVINGcompany COMPENSATIONfrom <--requiring UNDERcollateral THEfrom PROGRAMa FORprogram Aparticipant. GRID SERVICE THAT IS SIMULTANEOUSLY COMPENSATED UNDER A FEDERAL, REGIONAL TRANSMISSION 20260HB2264PN3369 - 5 - ORGANIZATION OR ELECTRIC DISTRIBUTION COMPANY DEMAND RESPONSE OR LOAD MANAGEMENT PROGRAM UNLESS THE GRID SERVICE IS SEPARATE AND DISTINCT FROM THOSE PERFORMED UNDER THE PROGRAM.
(12) (10) Prohibit an electric distribution company from <-- requiring collateral from a program participant.
(11) ALLOW ELIGIBLE DEMAND RESPONSE RESOURCES LOCATED AT <-- COMMERCIAL AND INDUSTRIAL SITES TO PARTICIPATE IN THE PROGRAM.
(2) THEThe COMMISSIONcommission SHALLshall ENSUREestablish THATreasonable EACHand PROGRAMappropriate DOESstandards <--to NOTprotect INTERFEREthe WITHinterests WHOLESALEof ENERGY,program CAPACITYparticipants, ORincluding ANCILLARYrequirements SERVICEfor MARKETSregistration ANDforms, OPERATESopt-out INprocedures, Astandard MANNERcontract CONSISTENTterms WITHand THEconditions, MARKET20260HB2264PN2962 RULES- OF5 THE- REGIONALpayment TRANSMISSIONterms, ORGANIZATIONwarranties INand WHICHdisclosure THEforms. APPLICABLE ELECTRIC DISTRIBUTION COMPANY PARTICIPATES.
(2) (3) The commission shall establishensure reasonablean andelectric <--distribution appropriatecompany standardsuses toa protecttransparent theand interestscompetitive ofprocurement programprocess participants, including requirements for registrationaggregator forms,virtual opt-outpower procedures,plant standardservices. contract terms and conditions, payment terms, warranties and disclosure forms.
(3) (4) The commission shall ensureestablish anstandards electricand <--procedures distributiongoverning companyenergy usesdata aheld transparentby participants and competitiveelectric procurementdistribution processcompanies forthat aggregatormust virtualbe powershared plantwith services.aggregators or other third parties to ensure efficient operation of a program.
(4) (5) The commission shall establish standards and <-- procedures governing energy data held by participants and electric distribution companies that must be shared with 20260HB2264PN3369 - 6 - aggregators or other third parties to ensure efficient operation of a program.
(5) (6) For good cause shown, the commission may delay, <-- for a reasonable period, the deadline for an electric distribution company to comply with this section.
(7)(e) INCompetitive ADDITIONservices.--A TOprogram RECEIVINGshall PERFORMANCE-BASEDbe <--administered COMPENSATION,in THEa COMMISSIONmanner SHALLthat ADOPTdoes RULESnot ORdiscriminate PROMULGATEagainst REGULATIONSor TOhinder COMPENSATEthe THEability ENERGYof EXPORTEDa FROMcompetitive ENROLLEDaggregator DEVICESto ATparticipate Ain VALUEthe COMMENSURATEprogram WITHor THEto BENEFITSoffer PROVIDEDcomparable TOproducts THEor ELECTRICservices GRIDto ATcustomers. THE TIME OF EXPORT.
(8)(f) THEElectric COMMISSIONdistribution SHALLcompany REQUIREeligibility.--An EACHelectric ELECTRICdistribution DISTRIBUTIONcompany COMPANYmay TOoffer USEprogram ADVANCEDenrollment METERINGdirectly INFRASTRUCTUREto HOURLYa USAGEcustomer FORin THEaddition FOLLOWING:to aggregator offerings.
(I) TO CALCULATE EACH CUSTOMER'S PEAK LOAD CONTRIBUTION AND NETWORK SERVICE PEAK LOAD CONTRIBUTION.
(II) TO PERFORM A CUSTOMER'S LOAD SETTLEMENT IN THE REGIONAL TRANSMISSION ORGANIZATION IN WHICH THE APPLICABLE ELECTRIC DISTRIBUTION COMPANY PARTICIPATES.
(e) Competitive services.--A program shall be administered <-- SERVICES.-- <-- (1) A PROGRAM SHALL BE ADMINISTERED in a manner that does not discriminate against or hinder the ability of a competitive aggregator to participate in the program or to offer comparable products or services to customers.
(2) AN ELECTRIC DISTRIBUTION COMPANY MAY NOT PROMOTE OR <-- ADVERTISE THE PROGRAM IN A MANNER THAT GIVES UNREASONABLE PREFERENCE TO THE ELECTRIC DISTRIBUTION COMPANY OVER COMPETITIVE AGGREGATOR OFFERINGS.
20260HB2264PN3369 - 7 - (f) Electric distribution company eligibility.--An electric distribution company may offer program enrollment directly to a customer in addition to aggregator offerings.
An electric distribution company may not delay program implementation due to a lack of public utility-owned third-party management system or device 20260HB2264PN2962 - 6 - installer capability.
20260HB2264PN3369 - 8 - (4) THE COMMISSION MAY ESTABLISH ANNUAL CAPS ON THE <-- TOTAL PROGRAM COSTS RECOVERABLE FROM RATEPAYERS IF THE RATE CAP IS IN THE PUBLIC INTEREST AND DOES NOT SIGNIFICANTLY REDUCE FUTURE PARTICIPATION IN THE PROGRAM.
Show all 59 changed lines (19 more)
(2) Within 270 days after the effective date of this paragraph, the commission shall, by regulation or order, 20260HB2264PN2962 - 7 - establish all of the following:
(iii) Financial awards equal to or greater than the <-- rate of return generated from traditional public utility capital investment required to meet the targets of the performance incentives established under this subsection.
(iv) (III) Financial penalties for failure to meet <-- targets established under this subsection.
(v) (IV) New targets for subsequent five-year <-- periods.
20260HB2264PN3369 - 9 - (vi) (V) Additional targets and incentives for each <-- additional grid service adopted and approved for implementation under subsection (c).
(4) ANRecommendations EVALUATIONto OFincrease THEprogram COSTparticipation. EFFECTIVENESS OF <-- EXPENDITURES.
(4) (5) RecommendationsOther toinformation increaserequested programby <--the participation.commission.
(5)20260HB2264PN2962 (6)- Other8 information- requested(k) byApplicability.--This thesection commission.shall not apply to an electric distribution company with less than 100,000 customers.
<-- (k) Applicability.--This section shall not apply to an electric distribution company with less than 100,000 customers.
"Battery." An energy storage device and associated equipment 20260HB2264PN3369 - 10 - that operates together to comply with program requirements.
"Distributed energy resource." An eligible technology device <-- A TECHNOLOGY located behind the customer's meter that provides <-- energy or energy management capabilities for the customer or the grid.
"Eligible technology." Technology A DISTRIBUTED ENERGY <-- RESOURCE owned by a customer or third party and installed behind the customer's meter that is capable of being activated or dispatched under a virtual power plant program to address a grid event.
20260HB2264PN2962 - 9 - "Emergency event." A grid event identified by an electric distribution company for which notice is given in less than 24 hours.
20260HB2264PN3369 - 11 - "Full retail value." The value of electric energy credited to a participant at the retail rate, including the generation, capacity, transmission and distribution components of the electric distribution company's approved tariff.
"Grid service." A capacity, energy or ancillary service OR <-- SERVICE RELATING TO THE TRANSMISSION OR DISTRIBUTION SYSTEM that supports grid operations.
"Performance-based compensation." A system of payments made to participants based on the value of electricity dispatched or saved through activating enrolled resources during a grid event.,event. WHICH MAY INCLUDE A RESERVATION PAYMENT PER KILOWATT OR <-- PERFORMANCE PAYMENT PER KILOWATT HOUR OR BOTH.
20260HB2264PN2962 - 10 - "Performance-based rate." The performance-based compensation rate paid to participants based on the performance of enrolled resources providing one or more grid services during a grid event.
20260HB2264PN3369 - 12 - "Virtual power plant." An aggregation of distributed energy resources enrolled through an aggregator or an electric distribution company that are operated in coordination to provide one or more grid services.
20260HB2264PN336920260HB2264PN2962 - 1311 -
Show all 59 changed rows (19 more)
Action History
-
Referred to CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, June 24, 2026
-
In the Senate
-
(Remarks see House Journal Page ), June 16, 2026
-
Third consideration and final passage, June 16, 2026 (107-95)
-
Re-reported as committed, June 16, 2026
-
Re-committed to APPROPRIATIONS, June 15, 2026
-
Second consideration, June 15, 2026
-
Removed from table, June 10, 2026
-
Laid on the table, May 6, 2026
-
First consideration, May 6, 2026
-
Reported as amended, May 6, 2026
-
Referred to ENERGY, March 5, 2026
Sponsors
- Joe Ciresi · Cosponsor
- Jim Prokopiak · Cosponsor
- Nathan Davidson · Primary
- Nikki Rivera · Cosponsor
- Elizabeth Fiedler · Cosponsor
- Ben Waxman · Cosponsor
- Tarik Khan · Cosponsor
- Carol Hill-Evans · Cosponsor
- Danielle Friel Otten · Cosponsor
- John C. Inglis III · Cosponsor
- La'Tasha D. Mayes · Cosponsor
- Lisa A. Borowski · Cosponsor
- Benjamin V. Sanchez · Cosponsor
- Johanny Cepeda-Freytiz · Cosponsor
- Maureen E. Madden · Cosponsor
- Carol Kazeem · Cosponsor
- Justin C. Fleming · Cosponsor
- Chris Pielli · Cosponsor
- Brian Munroe · Cosponsor
- Heather Boyd · Cosponsor
- Tina M. Davis · Cosponsor
- Jacklyn Rusnock · Cosponsor
- Dan K. Williams · Cosponsor
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 22 co-sponsors · 230 not signed on · 95 voted No
Sponsors (1)
- Nathan Davidson Democratic
Co-sponsors (22)
- Joe Ciresi Democratic
- Jim Prokopiak Democratic
- Nikki Rivera Democratic
- Elizabeth Fiedler Democratic
- Ben Waxman Democratic
- Tarik Khan Democratic
- Carol Hill-Evans Democratic
- Danielle Friel Otten Democratic
- John C. Inglis III Democratic
- La'Tasha D. Mayes Democratic
- Lisa A. Borowski Democratic
- Benjamin V. Sanchez Democratic
- Johanny Cepeda-Freytiz Democratic
- Maureen E. Madden Democratic
- Carol Kazeem Democratic
- Justin C. Fleming Democratic
- Chris Pielli Democratic
- Brian Munroe Democratic
- Heather Boyd Democratic
- Tina M. Davis Democratic
- Jacklyn Rusnock Democratic
- Dan K. Williams Democratic
Not signed on (230)
230 members have not signed on to this bill.
Show all 230 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 102 | 0 | 0 | 0 |
| Republican | 5 | 95 | 0 | 0 |
| Total | 107 | 95 | 0 | 0 |
| % of votes cast | 53% | 47% | 0% | 0% |
How each member voted (202)
| Member | Party | Vote |
|---|---|---|
| Abigail Salisbury | Democratic | Yea |
| Aerion Abney | Democratic | Yea |
| Amen Brown | Democratic | Yea |
| Ana Tiburcio | Democratic | Yea |
| Andre D. Carroll | Democratic | Yea |
| Anita Astorino Kulik | Democratic | Yea |
| Anthony A. Bellmon | Democratic | Yea |
| Arvind Venkat | Democratic | Yea |
| Ben Waxman | Democratic | Yea |
| Benjamin V. Sanchez | Democratic | Yea |
| Brandon J. Markosek | Democratic | Yea |
| Brian Munroe | Democratic | Yea |
| Bridget M. Kosierowski | Democratic | Yea |
| Carol Hill-Evans | Democratic | Yea |
| Carol Kazeem | Democratic | Yea |
| Chris Pielli | Democratic | Yea |
| Christina D. Sappey | Democratic | Yea |
| Christopher M. Rabb | Democratic | Yea |
| Dan Frankel | Democratic | Yea |
| Dan Goughnour | Democratic | Yea |
| Dan K. Williams | Democratic | Yea |
| Daniel J. Deasy | Democratic | Yea |
| Danielle Friel Otten | Democratic | Yea |
| Danilo Burgos | Democratic | Yea |
| Darisha K. Parker | Democratic | Yea |
| Dave Madsen | Democratic | Yea |
| David M. Delloso | Democratic | Yea |
| Ed Neilson | Democratic | Yea |
| Eddie Day Pashinski | Democratic | Yea |
| Elizabeth Fiedler | Democratic | Yea |
| Emily Kinkead | Democratic | Yea |
| Frank Burns | Democratic | Yea |
| G. Roni Green | Democratic | Yea |
| Gina H. Curry | Democratic | Yea |
| Greg Scott | Democratic | Yea |
| Greg Vitali | Democratic | Yea |
| Heather Boyd | Democratic | Yea |
| Ismail Smith-Wade-El | Democratic | Yea |
| Jacklyn Rusnock | Democratic | Yea |
| Jared G. Solomon | Democratic | Yea |
| Jason Dawkins | Democratic | Yea |
| Jeanne McNeill | Democratic | Yea |
| Jen Mazzocco | Democratic | Yea |
| Jennifer O'Mara | Democratic | Yea |
| Jessica Benham | Democratic | Yea |
| Jim Haddock | Democratic | Yea |
| Jim Prokopiak | Democratic | Yea |
| Joanna E. McClinton | Democratic | Yea |
| Joe Ciresi | Democratic | Yea |
| Joe McAndrew | Democratic | Yea |
| Joe Webster | Democratic | Yea |
| Johanny Cepeda-Freytiz | Democratic | Yea |
| John C. Inglis III | Democratic | Yea |
| Jordan A. Harris | Democratic | Yea |
| Jose Giral | Democratic | Yea |
| Joseph C. Hohenstein | Democratic | Yea |
| Justin C. Fleming | Democratic | Yea |
| Keith S. Harris | Democratic | Yea |
| Kristine C. Howard | Democratic | Yea |
| Kyle Donahue | Democratic | Yea |
| Kyle J. Mullins | Democratic | Yea |
| La'Tasha D. Mayes | Democratic | Yea |
| Leanne Krueger | Democratic | Yea |
| Lindsay Powell | Democratic | Yea |
| Lisa A. Borowski | Democratic | Yea |
| Liz Hanbidge | Democratic | Yea |
| Malcolm Kenyatta | Democratic | Yea |
| Mandy Steele | Democratic | Yea |
| Manuel Guzman | Democratic | Yea |
| Mary Jo Daley | Democratic | Yea |
| MaryLouise Isaacson | Democratic | Yea |
| Matthew D. Bradford | Democratic | Yea |
| Maureen E. Madden | Democratic | Yea |
| Melissa Cerrato | Democratic | Yea |
| Melissa L. Shusterman | Democratic | Yea |
| Michael H. Schlossberg | Democratic | Yea |
| Morgan Cephas | Democratic | Yea |
| Nancy Guenst | Democratic | Yea |
| Napoleon J. Nelson | Democratic | Yea |
| Nathan Davidson | Democratic | Yea |
| Nikki Rivera | Democratic | Yea |
| Pat Gallagher | Democratic | Yea |
| Patrick J. Harkins | Democratic | Yea |
| Paul Friel | Democratic | Yea |
| Paul Takac | Democratic | Yea |
| Perry S. Warren | Democratic | Yea |
| Peter Schweyer | Democratic | Yea |
| Regina G. Young | Democratic | Yea |
| Rick Krajewski | Democratic | Yea |
| Robert E. Merski | Democratic | Yea |
| Robert F. Matzie | Democratic | Yea |
| Robert Freeman | Democratic | Yea |
| Ryan A. Bizzarro | Democratic | Yea |
| Scott Conklin | Democratic | Yea |
| Sean Dougherty | Democratic | Yea |
| Steve Samuelson | Democratic | Yea |
| Steven R. Malagari | Democratic | Yea |
| Tarah Probst | Democratic | Yea |
| Tarik Khan | Democratic | Yea |
| Tim Brennan | Democratic | Yea |
| Tim Briggs | Democratic | Yea |
| Tina M. Davis | Democratic | Yea |
| Aaron Bernstine | Republican | Nay |
| Abby Major | Republican | Nay |
| Alec J. Ryncavage | Republican | Nay |
| Andrea C. Verobish | Republican | Nay |
| Andrew Kuzma | Republican | Nay |
| Ann Flood | Republican | Nay |
| Barbara Gleim | Republican | Nay |
| Brad Roae | Republican | Nay |
| Brenda M. Pugh | Republican | Nay |
| Brett R. Miller | Republican | Nay |
| Brian C. Rasel | Republican | Nay |
| Brian Smith | Republican | Nay |
| Bryan Cutler | Republican | Nay |
| Bud Cook | Republican | Nay |
| Carl Walker Metzgar | Republican | Nay |
| Catherine I Wallen | Republican | Nay |
| Chad G. Reichard | Republican | Nay |
| Charity Grimm Krupa | Republican | Nay |
| Clint Owlett | Republican | Nay |
| Craig T. Staats | Republican | Nay |
| Craig Williams | Republican | Nay |
| Dallas Kephart | Republican | Nay |
| Dan Moul | Republican | Nay |
| Dane Watro | Republican | Nay |
| David H. Rowe | Republican | Nay |
| David H. Zimmerman | Republican | Nay |
| David M. Maloney | Republican | Nay |
| Donna Scheuren | Republican | Nay |
| Doyle Heffley | Republican | Nay |
| Eric Davanzo | Republican | Nay |
| Eric J. Weaknecht | Republican | Nay |
| Eric R. Nelson | Republican | Nay |
| Gary W. Day | Republican | Yea |
| George H Margetas | Republican | Nay |
| Jack Rader | Republican | Nay |
| Jacob D. Banta | Republican | Nay |
| James B. Struzzi | Republican | Nay |
| Jamie Barton | Republican | Nay |
| Jamie L. Flick | Republican | Nay |
| Jamie Walsh | Republican | Nay |
| Jason Ortitay | Republican | Nay |
| Jeff Olsommer | Republican | Nay |
| Jeremy Shaffer | Republican | Nay |
| Jesse Topper | Republican | Nay |
| Jill N. Cooper | Republican | Nay |
| Jim Rigby | Republican | Nay |
| Joanne Stehr | Republican | Nay |
| Joe Emrick | Republican | Yea |
| Joe Hamm | Republican | Nay |
| Joe Hogan | Republican | Yea |
| Joe Kerwin | Republican | Nay |
| John A. Lawrence | Republican | Nay |
| John A. Schlegel | Republican | Nay |
| Jonathan Fritz | Republican | Nay |
| Joseph D'Orsie | Republican | Nay |
| Josh Bashline | Republican | Nay |
| Joshua D. Kail | Republican | Nay |
| Kate A. Klunk | Republican | Nay |
| Kathleen C. Tomlinson | Republican | Yea |
| Kathy L. Rapp | Republican | Nay |
| Keith J. Greiner | Republican | Nay |
| Kerry A. Benninghoff | Republican | Nay |
| Kristin Marcell | Republican | Nay |
| Leslie Rossi | Republican | Nay |
| Marc S. Anderson | Republican | Nay |
| Marci Mustello | Republican | Nay |
| Mark M. Gillen | Republican | Nay |
| Marla Brown | Republican | Nay |
| Martin T. Causer | Republican | Nay |
| Martina A. White | Republican | Nay |
| Michael Stender | Republican | Nay |
| Mike Armanini | Republican | Nay |
| Mike Jones | Republican | Nay |
| Milou Mackenzie | Republican | Nay |
| Mindy Fee | Republican | Nay |
| Natalie Mihalek | Republican | Nay |
| Parke Wentling | Republican | Nay |
| Perry A. Stambaugh | Republican | Nay |
| R. Lee James | Republican | Nay |
| Rich Irvin | Republican | Nay |
| Rob W. Kauffman | Republican | Nay |
| Robert Leadbeter | Republican | Nay |
| Roman Kozak | Republican | Nay |
| Russ Diamond | Republican | Nay |
| Ryan Warner | Republican | Nay |
| Scott Barger | Republican | Nay |
| Shelby Labs | Republican | Nay |
| Sheryl M. Delozier | Republican | Nay |
| Stephanie Borowicz | Republican | Nay |
| Steven C. Mentzer | Republican | Nay |
| Thomas H. Kutz | Republican | Nay |
| Thomas L. Mehaffie | Republican | Yea |
| Tim Twardzik | Republican | Nay |
| Timothy J. O'Neal | Republican | Nay |
| Timothy R. Bonner | Republican | Nay |
| Tina Pickett | Republican | Nay |
| Tom Jones | Republican | Nay |
| Valerie S. Gaydos | Republican | Nay |
| Wendy Fink | Republican | Nay |
| Zachary Mako | Republican | Nay |
Subjects
Frequently asked questions
- What does HB 2264 do?
- Establishing a Virtual Power Plant (VPP) Program
- Who sponsors HB 2264?
- HB 2264 is sponsored by Joe Ciresi (Democratic), Jim Prokopiak (Democratic), Nathan Davidson (Democratic), Nikki Rivera (Democratic), Elizabeth Fiedler (Democratic), Ben Waxman (Democratic), Tarik Khan (Democratic), Carol Hill-Evans (Democratic), Danielle Friel Otten (Democratic), John C. Inglis III (Democratic), La'Tasha D. Mayes (Democratic), Lisa A. Borowski (Democratic), Benjamin V. Sanchez (Democratic), Johanny Cepeda-Freytiz (Democratic), Maureen E. Madden (Democratic), Carol Kazeem (Democratic), Justin C. Fleming (Democratic), Chris Pielli (Democratic), Brian Munroe (Democratic), Heather Boyd (Democratic), Tina M. Davis (Democratic), Jacklyn Rusnock (Democratic), and Dan K. Williams (Democratic).
- What is the current status of HB 2264?
- This bill has passed the House. Introduced March 05, 2026. It now moves to the second chamber.
- Where can I track HB 2264?
- Track HB 2264 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB 2264
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB 2264
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →