Pennsylvania 2025_0 Regular Session Status: Passed House 44 D cosponsors

HB 1834 — An Act providing for the regulation of commercial data centers; imposing duties on the Pennsylvania Public Utility Commission, the Department of Human Services and the Pennsylvania Energy Development Authority; establishing the Data Center Low-Income Home Energy Assistance Program Enhancement Account and the Pennsylvania Energy Independence Account; providing for clean firm energy requirements, contract filing, commission review, disclosure requirements, backup generation standards, curtailment standards and certification and expedited interconnection for commercial data centers bringing incremental clean firm energy resources; and imposing penalties.

Last action — Referred to CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, March 31, 2026

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has passed the House. Introduced September 04, 2025. It now moves to the second chamber.

Next likely step: consideration and a floor vote in the Senate.

Odds of enactment

Moderate chance

Based on the sponsor, cosponsors, and committee posture, this bill has a moderate chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Advancing 42% · moderate confidence
  • Passed House

    Current position in the legislative process.

  • 44 sponsors

    1 primary, 43 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (44 D).

  • Mixed recorded votes

    1 passed, 1 failed in recorded votes so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

Data Centers and Consumers

Bill Text

What changed in the latest version

149 added · 692 removed

Plain-language change summary

In the latest version of Bill HB 1834, the focus on regulating commercial data centers has been clarified, specifically emphasizing their energy demands and operational purposes. The bill establishes a Data Center LIHEAP Enhancement Fund to support low-income households with energy costs associated with these data centers. This change matters because it directly ties the regulation of energy use from large data centers to efforts in assisting vulnerable communities with energy affordability. By ensuring that data centers contribute to funding support for low-income residents, the bill aims to balance economic growth in technology with social responsibility.

→
Previous
Latest
PRIOR PRINTER'S NO.
PRINTER'S NO.
2257 PRINTER'S NO.
2257 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL Session of No.
2846 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL Session of No.
1834 2025 INTRODUCED BY MATZIE, INGLIS, DEASY, NEILSON, MULLINS, HADDOCK, DONAHUE, PROBST, HILL-EVANS, GIRAL, SANCHEZ, CURRY, D.
1834 2025 INTRODUCED BY MATZIE, INGLIS, DEASY, NEILSON, MULLINS, HADDOCK, D.
WILLIAMS, DAVIDSON AND HOWARD, SEPTEMBER 2, 2025 REFERRED TO COMMITTEE ON ENERGY, SEPTEMBER 4, 2025 AN ACT Providing for regulation of commercial data centers by the Pennsylvania Public Utility Commission, for recovery of costs, for contributions to the Low-Income Home Energy Assistance Program, for renewable energy requirements and for Enhancement Fund;
WILLIAMS, DAVIDSON, HOWARD, FRANKEL, MALAGARI, BOROWSKI, BOYD, PROKOPIAK, SCOTT, MARKOSEK, STEELE, SMITH-WADE-EL, CIRESI AND FREEMAN, SEPTEMBER 2, 2025 AS REPORTED FROM COMMITTEE ON ENERGY, HOUSE OF REPRESENTATIVES, AS AMENDED, FEBRUARY 2, 2026 AN ACT Providing for regulation of commercial data centers by the <-- Pennsylvania Public Utility Commission, for recovery of costs, for contributions to the Low-Income Home Energy Assistance Program, for renewable energy requirements and for filing and enforcement;
and imposing duties on the PennsylvaniaAP Public Utility Commission and the Department of Human Services.
establishing the Data Center LIHEAP Public Utility Commission and the Department of Humanania Services.
(3) The commission may promulgate temporary regulations 20250HB1834PN2846 - 2 - that are not subject to:
(3) The commission may promulgate temporary regulations that are not subject to:
(i) Section 612 of the act of April 9, 1929 (P.L.177, No.175), known as The Administrative Code of 1929.
20250HB1834PN2257 - 2 - (i) Section 612 of the act of April 9, 1929 (P.L.177, No.175), known as The Administrative Code of 1929.
20250HB1834PN2846 - 3 - (6) Measures to prevent circumvention of the commercial data center threshold through multiple facilities, interconnection points or metering points.
(6) Measures to prevent circumvention of the commercial 20250HB1834PN2257 - 3 - data center threshold through multiple facilities, interconnection points or metering points.
20250HB1834PN2846 - 4 - (1) Payments made under subsection (c).
(1) Payments made under subsection (c).
(2) Interest accrued on the money in the fund.
20250HB1834PN2257 - 4 - (2) Interest accrued on the money in the fund.
(2) The public utility shall include with the filing 20250HB1834PN2846 - 5 - sufficient documentation to permit the commission to conduct the review under paragraph (3).
(2) The public utility shall include with the filing sufficient documentation to permit the commission to conduct 20250HB1834PN2257 - 5 - the review under paragraph (3).
PROVIDING FOR REGULATION OF LARGE LOAD USERS BY THE PENNSYLVANIA <-- PUBLIC UTILITY COMMISSION, FOR COST RESPONSIBILITY, FOR CONTRIBUTIONS TO THE LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM, FOR RENEWABLE ENERGY REQUIREMENTS AND FOR CONTRACT FILING, COMMISSION REVIEW AND ENFORCEMENT;
20250HB1834PN2257 - 6 -
ESTABLISHING THE DATA CENTER LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM ACCOUNT;
AND IMPOSING DUTIES ON THE PENNSYLVANIA PUBLICDENCE UTILITY COMMISSION, THE DEPARTMENT OF HUMAN SERVICES AND THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY.
THE GENERAL ASSEMBLY OF THE COMMONWEALTH OF PENNSYLVANIA HEREBY ENACTS AS FOLLOWS:
SECTION 1.
SHORT TITLE.
THIS ACT SHALL BE KNOWN AND MAY BE CITED AS THE DATA CENTER ACT.
SECTION 2.
DEFINITIONS.
THE FOLLOWING WORDS AND PHRASES WHEN USED IN THIS ACT SHALL HAVE THE MEANINGS GIVEN TO THEM IN THIS SECTION UNLESS THE 20250HB1834PN2846 - 6 - CONTEXT CLEARLY INDICATES OTHERWISE:
"COMMISSION." THE PENNSYLVANIA PUBLIC UTILITY COMMISSION.
"COMMUNITY ENERGY FACILITY." A FACILITY THAT COMPLIES WITH THE TERMS NECESSARY TO ACHIEVE DESIGNATION AS A COMMUNITY ENERGY FACILITY UNDER A STATE LAW ENACTED ON OR AFTER THE EFFECTIVE DATE OF THIS DEFINITION ESTABLISHING A COMMUNITY ENERGY PROGRAM IN THIS COMMONWEALTH.
"ELECTRIC DISTRIBUTION COMPANY." AS DEFINED IN 66 PA.C.S.
§ 2803 (RELATING TO DEFINITIONS).
"ELECTRIC SERVICE." ALL INTERCONNECTION SERVICES AND OTHER REQUIRED ELEMENTS PROVIDED BY AN ELECTRIC DISTRIBUTION COMPANY FOR THE JURISDICTIONAL TRANSMISSION AND DISTRIBUTION OF ELECTRICITY.
THE TERM SHALL BE CONSTRUED IN A MANNER CONSISTENT WITH THE MEANING OF SERVICE AS DEFINED IN 66 PA.C.S.
§ 102 (RELATING TO DEFINITIONS) AS IT APPLIES TO PUBLIC UTILITIES.
"ENERGY-EFFICIENT HEAT PUMP." AN ELECTRIC HEAT PUMP THAT MEETS OR EXCEEDS THE HIGHEST EFFICIENCY TIER, EXCLUDING ANY ADVANCED TIER, ESTABLISHED BY THE CONSORTIUM FOR ENERGY EFFICIENCY AS OF THE EFFECTIVE DATE OF THIS DEFINITION OR A FUNCTIONALLY EQUIVALENT PROGRAM DESIGNATED BY THE DEPARTMENT OF ENVIRONMENTAL PROTECTION.
"HIGH VOLTAGE." 69,000 VOLTS OR HIGHER.
"INTERRUPTIBLE RATE." A RATE PUBLISHED IN AN ELECTRIC DISTRIBUTION COMPANY'S TARIFF AND APPROVED BY THE COMMISSION AS JUST AND REASONABLE THAT AUTHORIZES THE ELECTRIC DISTRIBUTION COMPANY TO CURTAIL SERVICE TO CUSTOMERS TAKING SERVICE UNDER THE RATE DURING A REGIONAL SUPPLY SHORTAGE OR IN RESPONSE TO A PROJECTED REGIONAL SUPPLY SHORTAGE, IN RESPONSE TO ACTUAL OR PROJECTED CONDITIONS ON THE BULK POWER SYSTEM AND UNDER OTHER CONDITIONS SPECIFIED IN THE RATE WHEN, IN THE ELECTRIC 20250HB1834PN2846 - 7 - DISTRIBUTION COMPANY'S DISCRETION, CURTAILMENT IS NECESSARY TO PROTECT ITS ABILITY TO PROVIDE FIRM ELECTRIC SERVICE TO CUSTOMERS SERVED UNDER OTHER TARIFF RATE SCHEDULES.
THE TERM INCLUDES A RATE THAT CONTAINS PROVISIONS FOR COORDINATION WITH A REGIONAL TRANSMISSION ORGANIZATION VOLUNTARY CURTAILMENT PROGRAM UNDER WHICH LOAD IS CURTAILED IN A PREEMERGENCY CONDITION.
"LARGE LOAD USER." A FACILITY, CAMPUS OF FACILITIES OR ARRAY OF INTERCONNECTED FACILITIES IN THIS COMMONWEALTH THAT MEETS ALL OF THE FOLLOWING:
(1) HAS A PEAK DEMAND OF 25 MEGAWATTS OR GREATER.
(2) IS INTERCONNECTED TO A PUBLIC UTILITY AT A SINGLE POINT OF INTERCONNECTION OR MULTIPLE INTERCONNECTION POINTS OR IS INTERCONNECTED TO MULTIPLE PUBLIC UTILITIES IN THIS COMMONWEALTH AT MULTIPLE INTERCONNECTION POINTS.
"LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM" OR "LIHEAP." A FEDERALLY FUNDED PROGRAM THAT PROVIDES FINANCIAL ASSISTANCE IN THE FORM OF CASH AND CRISIS GRANTS TO LOW-INCOME HOUSEHOLDS FOR HOME ENERGY BILLS AND IS ADMINISTERED BY THE DEPARTMENT OF HUMAN SERVICES.
"PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY." THE AUTHORITY ESTABLISHED UNDER SECTION 2803-C OF THE ACT OF APRIL 9, 1929 (P.L.177, NO.175), KNOWN AS THE ADMINISTRATIVE CODE OF 1929.
"PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT." THE RESTRICTED ACCOUNT ESTABLISHED UNDER SECTION 6(A).
"PUBLIC UTILITY." AS DEFINED IN 66 PA.C.S.
Show all 199 changed rows (159 more)
Previous
Latest
§ 102.
"RATEPAYER." A RETAIL CUSTOMER OF AN ELECTRIC DISTRIBUTION COMPANY THAT PURCHASES ELECTRIC SERVICE FOR CONSUMPTION.
"REGIONAL SUPPLY SHORTAGE." A CONDITION IN WHICH SUPPLY RESERVES ARE LESS THAN TARGET SUPPLY RESERVES AS DETERMINED BY THE REGIONAL TRANSMISSION ORGANIZATION, CONSISTENT WITH THE 20250HB1834PN2846 - 8 - RESOURCE ADEQUACY CRITERION OF A LOSS OF LOAD EXPECTATION OF ONE DAY IN 10 YEARS OR 0.1 DAYS PER YEAR FOR THE APPLICABLE REGION.
"REGIONAL TRANSMISSION ORGANIZATION" OR "RTO." AN ENTITY APPROVED BY THE FEDERAL ENERGY REGULATORY COMMISSION TO CONTROL AND OPERATE ELECTRIC TRANSMISSION FACILITIES IN INTERSTATE COMMERCE AND ENSURE NONDISCRIMINATORY ACCESS TO THOSE FACILITIES.
"RENEWABLE ENERGY." SOLAR ENERGY, WIND ENERGY, NUCLEAR ENERGY, GEOTHERMAL ENERGY, BIOMASS ENERGY, ENERGY GENERATED FROM A RENEWABLE NATURAL GAS DEVICE OR HYDROELECTRIC POWER.
"RENEWABLE NATURAL GAS DEVICE." A DEVICE THAT GENERATES ELECTRICITY RELYING UPON A FUEL SOURCE CONSISTING OF AT LEAST 75% BIODIESEL OR BIOGAS, INCLUDING BIOGAS DERIVED FROM MUNICIPAL SOLID WASTE, INDUSTRIAL WASTE, FOOD WASTE, WASTEWATER TREATMENT MATERIAL AND ANIMAL MANURE, RESULTING FROM THE DECOMPOSITION OF ORGANIC MATTER UNDER ANAEROBIC CONDITIONS, OR ANY METHANE RESOURCE CLASSIFIED AS A TIER I ALTERNATIVE ENERGY SOURCE AS DEFINED IN SECTION 2 OF THE ACT OF NOVEMBER 30, 2004 (P.L.1672, NO.213), KNOWN AS THE ALTERNATIVE ENERGY PORTFOLIO STANDARDS ACT, THE PRINCIPAL CONSTITUENTS OF WHICH ARE METHANE AND CARBON DIOXIDE, THAT HAS BEEN UPGRADED FOR USE IN PLACE OF FOSSIL NATURAL GAS, GASOLINE OR DIESEL FUEL.
"SMALL-SCALE ENERGY SYSTEM." A SYSTEM WITH A NAMEPLATE CAPACITY RATING THAT DOES NOT EXCEED TWO MEGAWATTS THAT GENERATES OR STORES ELECTRICITY BY MEANS OF SOLAR PANELS, BATTERIES OR RENEWABLE NATURAL GAS DEVICES, OR A COMBINATION OF THOSE RESOURCES.
THE TERM INCLUDES AN ENERGY-EFFICIENT HEAT PUMP INSTALLED AT A HOME OR RESIDENTIAL BUILDING, A SMALL BUSINESS AS DEFINED IN 62 PA.C.S.
§ 2102 (RELATING TO DEFINITIONS), A CHARITABLE ORGANIZATION AS DEFINED IN SECTION 3 OF THE ACT OF 20250HB1834PN2846 - 9 - DECEMBER 19, 1990 (P.L.1200, NO.202), KNOWN AS THE SOLICITATION OF FUNDS FOR CHARITABLE PURPOSES ACT, AN EDUCATIONAL INSTITUTION, A RELIGIOUS INSTITUTION, A MUNICIPAL BUILDING OR A STATE GOVERNMENT BUILDING.
"UNIVERSAL SERVICE AND ENERGY CONSERVATION." AS DEFINED IN 66 PA.C.S.
§ 2803 FOR ELECTRIC SERVICE AND 66 PA.C.S.
§ 2202 (RELATING TO DEFINITIONS) FOR NATURAL GAS SERVICE.
SECTION 3.
DUTIES OF COMMISSION.
(A) TEMPORARY REGULATIONS.-- (1) TO FACILITATE PROMPT IMPLEMENTATION OF THIS ACT, THE COMMISSION SHALL PROMULGATE TEMPORARY REGULATIONS NO LATER THAN 90 DAYS AFTER THE EFFECTIVE DATE OF THIS SUBSECTION.
(2) TEMPORARY REGULATIONS UNDER THIS SUBSECTION SHALL EXPIRE NO LATER THAN TWO YEARS AFTER PUBLICATION IN THE PENNSYLVANIA BULLETIN.
(3) THE COMMISSION MAY PROMULGATE TEMPORARY REGULATIONS UNDER THIS SUBSECTION THAT ARE NOT SUBJECT TO ANY OF THE FOLLOWING:
(I) SECTION 612 OF THE ACT OF APRIL 9, 1929 (P.L.177, NO.175), KNOWN AS THE ADMINISTRATIVE CODE OF 1929.
(II) SECTIONS 201, 202, 203, 204 AND 205 OF THE ACT OF JULY 31, 1968 (P.L.769, NO.240), REFERRED TO AS THE COMMONWEALTH DOCUMENTS LAW.
(III) SECTIONS 204(B) AND 301(10) OF THE ACT OF OCTOBER 15, 1980 (P.L.950, NO.164), KNOWN AS THE COMMONWEALTH ATTORNEYS ACT.
(IV) THE ACT OF JUNE 25, 1982 (P.L.633, NO.181), KNOWN AS THE REGULATORY REVIEW ACT.
(4) THE COMMISSION'S AUTHORITY TO PROMULGATE TEMPORARY 20250HB1834PN2846 - 10 - REGULATIONS UNDER THIS SUBSECTION SHALL EXPIRE TWO YEARS AFTER THE EFFECTIVE DATE OF THIS SUBSECTION.
AFTER THE EXPIRATION OF THIS AUTHORITY, THE COMMISSION SHALL PROMULGATE FINAL REGULATIONS IN ACCORDANCE WITH STATE LAW AND SUBSECTION (B).
(B) REQUIRED REGULATORY TOPICS.--REGULATIONS PROMULGATED UNDER SUBSECTION (A) SHALL INCLUDE PROVISIONS ADDRESSING ALL OF THE FOLLOWING:
(1) COMMERCIAL TERMS AND CONDITIONS BETWEEN LARGE LOAD USERS AND ELECTRIC DISTRIBUTION COMPANIES FOR HIGH VOLTAGE ELECTRIC SERVICE, INCLUDING ALL OF THE FOLLOWING:
(I) DEPOSITS OR FINANCIAL SECURITY REQUIRED FROM LARGE LOAD USERS.
(II) CALCULATIONS OF CONTRIBUTIONS IN AID OF CONSTRUCTION FOR DISTRIBUTION INFRASTRUCTURE OR DIRECT ASSIGNMENT THROUGH RATES OF COSTS FOR TRANSMISSION SERVICE.
(III) MINIMUM CONTRACT TERMS THAT REQUIRE A LARGE LOAD USER, IF THE LARGE LOAD USER CEASES OPERATIONS BEFORE SATISFYING THE MINIMUM CONTRACT TERMS, TO TAKE A MINIMUM LEVEL OF SERVICE SUFFICIENT TO GENERATE EXPECTED REVENUES THAT PROTECT OTHER CUSTOMERS.
THE ELECTRIC DISTRIBUTION COMPANY SHALL REQUIRE THE LARGE LOAD USER TO SECURE THE OBLIGATION UNDER THIS SUBPARAGRAPH BY A LETTER OF CREDIT OR OTHER COMPARABLE FINANCIAL INSTRUMENT THAT ENSURES PAYMENT IF THE LARGE LOAD USER CEASES OPERATIONS OR OTHERWISE FAILS TO SATISFY THE OBLIGATION.
(IV) LOAD RAMPING SCHEDULES TO ENSURE INFRASTRUCTURE ADEQUACY.
(V) EXIT FEES OR EARLY TERMINATION FEES.
20250HB1834PN2846 - 11 - (VI) MEASURES TO PREVENT CIRCUMVENTION OF THE LARGE LOAD USER THRESHOLD THROUGH MULTIPLE FACILITIES, INTERCONNECTION POINTS OR METERING POINTS.
(VII) TRACKING OF ALL COSTS, INCLUDING TRANSMISSION COSTS AND DISTRIBUTION COSTS, TO SERVE LARGE LOAD USERS AND VERIFICATION THAT REVENUES COLLECTED EXCEED COSTS INCURRED.
(VIII) AN END-OF-CONTRACT PROCESS THAT PROVIDES SUFFICIENT NOTICE OF A LARGE LOAD USER'S RENEWAL OR CLOSURE.
(2) CURTAILMENT OF A LARGE LOAD USER'S LOAD UNDER AN INTERRUPTIBLE RATE.
(3) STANDARDS GOVERNING COORDINATION OF AN ELECTRIC DISTRIBUTION COMPANY'S INTERRUPTIBLE RATE WITH AN RTO VOLUNTARY CURTAILMENT PROGRAM TO ENSURE STATEWIDE CONSISTENCY.
(4) CONDITIONS FOR INTERCONNECTION OF NEW LARGE LOAD USER LOAD AS NEW LOAD WHILE ENSURING CONTINUED PROVISION OF ELECTRIC SERVICE TO EXISTING CUSTOMERS THAT IS ADEQUATE, REASONABLE, REASONABLY CONTINUOUS AND WITHOUT UNREASONABLE INTERRUPTION OR DELAY.
FOR NEW INTERCONNECTIONS AND INCREMENTAL ADDITIONS OF LOAD ASSOCIATED WITH AN INTERCONNECTED LARGE LOAD USER, IF A REGIONAL SUPPLY SHORTAGE EXISTS OR IS LIKELY TO EXIST AS FORECASTED OR DETERMINED BY THE RTO IN WHICH THE ELECTRIC DISTRIBUTION SYSTEM PARTICIPATES, THE COMMISSION SHALL IMPOSE ONE OR MORE OF THE FOLLOWING CONDITIONS:
(I) REQUIRE THE LARGE LOAD USER TO TAKE ELECTRIC DISTRIBUTION SERVICE UNDER THE ELECTRIC DISTRIBUTION COMPANY'S INTERRUPTIBLE RATE.
20250HB1834PN2846 - 12 - (II) PERMIT FIRM ELECTRIC DISTRIBUTION SERVICE ON THE CONDITION THAT THE LARGE LOAD USER HAS BEEN CERTIFIED TO HAVE BROUGHT ITS OWN INCREMENTAL ENERGY RESOURCES AFTER PLACEMENT IN SERVICE OF THE ENERGY RESOURCE OR RESOURCES UNDER A CERTIFICATION PROGRAM ESTABLISHED BY THE COMMISSION, THE FEDERAL ENERGY REGULATORY COMMISSION OR THE RTO OR INDEPENDENT SYSTEM OPERATOR IN WHICH THE APPLICABLE PUBLIC UTILITY PARTICIPATES.
(III) A COMBINATION OF SUBPARAGRAPHS (I) AND (II).
(5) DISCLOSURE REQUIREMENTS UNDER SECTION 10.
(6) CURTAILMENT STANDARDS UNDER SECTION 11.
(7) CERTIFICATION AND EXPEDITED INTERCONNECTION STANDARDS UNDER SECTION 12.
(8) COST RESPONSIBILITY STANDARDS UNDER SECTION 4.
SECTION 4.
PROHIBITION ON COST SHIFTING AND RECOVERY OF COSTS.
(A) PROHIBITION ON CROSS-SUBSIDIZATION.--AN ELECTRIC DISTRIBUTION COMPANY MAY NOT RECOVER FROM RATEPAYERS OTHER THAN LARGE LOAD USERS, WHETHER THROUGH BASE RATES, RIDERS, SURCHARGES OR ANOTHER RATEMAKING MECHANISM, COSTS THAT MEET ALL OF THE FOLLOWING:
(1) THE COSTS ARE DIRECTLY ATTRIBUTABLE TO THE PROVISION OF ELECTRIC SERVICE TO A LARGE LOAD USER.
(2) THE COSTS WOULD NOT HAVE BEEN INCURRED BUT FOR THE ELECTRICITY DEMAND OF THE LARGE LOAD USER.
(B) RATE REVIEW AND ALLOCATION.--THE COMMISSION SHALL REVIEW RATES TO ENSURE THAT COSTS OF PROVIDING SERVICE TO A LARGE LOAD USER ARE NOT SUBSIDIZED BY ANOTHER CUSTOMER CLASS.
FOR RATE DETERMINATIONS, EACH ELECTRIC DISTRIBUTION COMPANY SERVING LARGE LOAD USERS SHALL HAVE THE FOLLOWING DUTIES:
(1) DO ONE OF THE FOLLOWING:
20250HB1834PN2846 - 13 - (I) ALLOCATE THE COSTS OF SERVING LARGE LOAD USERS TO LARGE LOAD USERS IN A MANNER EQUAL TO THE COSTS OF SERVING LARGE LOAD USERS, INCLUDING DIRECT COSTS AND INDIRECT COSTS ASSOCIATED WITH PROVIDING SERVICE TO LARGE LOAD USERS, WHETHER THROUGH NEW OR EXISTING FACILITIES.
(II) DIRECTLY ASSIGN THE COSTS OF SERVING A LARGE LOAD USER TO THE LARGE LOAD USER.
(2) MITIGATE THE RISK OF ALL OF THE FOLLOWING:
(I) OTHER ELECTRIC SERVICE CUSTOMERS PAYING COSTS ASSOCIATED WITH PROVIDING SERVICE TO LARGE LOAD USERS WHERE THE COSTS DO NOT BENEFIT OTHER CUSTOMER CLASSES.
(II) SHIFTING THE COSTS OF SERVING A LARGE LOAD USER TO OTHER ELECTRIC SERVICE CUSTOMERS, INCLUDING COSTS INCURRED BY AN ELECTRIC DISTRIBUTION COMPANY TO MEET LOAD REQUIREMENTS RESULTING FROM THE PROVISION OF ELECTRIC SERVICE TO A LARGE LOAD USER.
(C) COST-OF-SERVICE STUDY.--A PUBLIC UTILITY THAT SERVES OR IS REASONABLY EXPECTED TO SERVE LARGE LOAD USER LOAD SHALL SUBMIT A FULL COST-OF-SERVICE STUDY WHEN SEEKING A RATE INCREASE UNDER 66 PA.C.S.
§ 1308 (RELATING TO VOLUNTARY CHANGES IN RATES) TO SUPPORT THE PUBLIC UTILITY'S PROPOSED ALLOCATION OF SHARED COSTS OR INDIRECT COSTS THAT BENEFIT MULTIPLE CUSTOMER CLASSES, INCLUDING LARGE LOAD USERS.
(D) UNIVERSAL SERVICE AND ENERGY CONSERVATION PROGRAMS.--A PUBLIC UTILITY SHALL RECOVER FROM LARGE LOAD USERS COSTS INCURRED BY THE PUBLIC UTILITY IN CONNECTION WITH THE DEVELOPMENT, IMPLEMENTATION AND SUPPORT OF UNIVERSAL SERVICE AND ENERGY CONSERVATION PROGRAMS CONSISTENT WITH 66 PA.C.S.
§§ 2203(6), (7), (8), (9) AND (10) (RELATING TO STANDARDS FOR RESTRUCTURING OF NATURAL GAS UTILITY INDUSTRY) AND 2804(8) AND 20250HB1834PN2846 - 14 - (9) (RELATING TO STANDARDS FOR RESTRUCTURING OF ELECTRIC INDUSTRY) THROUGH A TARIFF RATE APPROVED BY THE COMMISSION.
(E) DURATION OF ALLOCATION AND RECOVERY STANDARDS.--THE COMMISSION SHALL ESTABLISH STANDARDS TO ENSURE THAT LARGE LOAD USER COST ALLOCATION AND RECOVERY ASSIGNS TO THE LARGE LOAD USER RESPONSIBLE FOR THE COSTS SPECIFIED UNDER SUBSECTION (A), INCLUDING CONSTRUCTION COSTS, ONGOING TRANSMISSION COSTS AND DISTRIBUTION COSTS, FOR A MINIMUM OF 10 YEARS IN A MANNER THAT SUPPORTS BUSINESS DEVELOPMENT IN THIS COMMONWEALTH WHILE MINIMIZING THE RISK OF STRANDED INFRASTRUCTURE COSTS, MAINTAINING CUSTOMER AFFORDABILITY AND MAINTAINING OVERALL SYSTEM RELIABILITY.
SECTION 5.
CONTRIBUTIONS TO LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM.
(A) LIHEAP ENHANCEMENT ACCOUNT.--THE DATA CENTER LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM ENHANCEMENT ACCOUNT IS ESTABLISHED AS A RESTRICTED ACCOUNT IN THE GENERAL FUND.
THE DEPARTMENT OF HUMAN SERVICES SHALL USE MONEY APPROPRIATED FROM THE ACCOUNT UNDER SUBSECTION (E) FOR A SUPPLEMENTAL PROGRAM TO ENHANCE LIHEAP.
THE SUPPLEMENTAL PROGRAM SHALL INCLUDE A SUMMER COOLING COMPONENT.
(B) SOURCES OF MONEY.--MONEY FROM THE FOLLOWING SOURCES SHALL BE DEPOSITED INTO THE ACCOUNT:
(1) PAYMENTS MADE UNDER SUBSECTION (C).
(2) INTEREST ACCRUED ON MONEY IN THE ACCOUNT.
(3) MONEY FROM ANOTHER SOURCE AUTHORIZED BY FEDERAL OR STATE LAW.
(C) ANNUAL PAYMENTS.-- (1) NO LATER THAN JUNE 1 OF EACH YEAR, EACH LARGE LOAD USER WITH AT LEAST 25 MEGAWATTS ANNUAL PEAK LOAD SHALL MAKE 20250HB1834PN2846 - 15 - PAYMENTS TO THE ACCOUNT AS FOLLOWS:
(I) $40,000 PER MEGAWATT OF ANNUAL PEAK LOAD UP TO AND INCLUDING 25 MEGAWATTS.
(II) FOR EACH ADDITIONAL MEGAWATT OF ANNUAL PEAK LOAD ABOVE 25 MEGAWATTS, AN ADDITIONAL $50,000 PER MEGAWATT.
(2) PAYMENTS UNDER THIS SUBSECTION SHALL BE REQUIRED FOR THE DURATION OF THE LOAD.
THE COMMISSION MAY ADJUST THE PAYMENT AMOUNTS PERIODICALLY.
(D) APPROPRIATION.--MONEY IN THE ACCOUNT IS APPROPRIATED TO THE DEPARTMENT OF HUMAN SERVICES ON A CONTINUING BASIS FOR THE PURPOSES OF THIS SECTION.
(E) REGULATIONS AND GUIDELINES.--THE DEPARTMENT OF HUMAN SERVICES MAY PROMULGATE REGULATIONS OR ISSUE GUIDELINES NECESSARY TO IMPLEMENT THIS SECTION.
SECTION 6.
PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT.
(A) ESTABLISHMENT.--THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT IS ESTABLISHED AS A RESTRICTED ACCOUNT IN THE GENERAL FUND.
THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY SHALL EXPEND MONEY FROM THE ACCOUNT FOR THE PURPOSES OF THIS ACT AND MAY ESTABLISH SEPARATE SUBACCOUNTS WITHIN THE ACCOUNT.
(B) SOURCES OF MONEY.--MONEY FROM THE FOLLOWING SOURCES SHALL BE DEPOSITED INTO THE ACCOUNT:
(1) MONEY APPROPRIATED OR TRANSFERRED BY THE GENERAL ASSEMBLY FOR DEPOSIT INTO THE ACCOUNT.
(2) FEDERAL FUNDING AVAILABLE FOR THE PURPOSES OF THIS ACT AS APPROPRIATED BY THE GENERAL ASSEMBLY FOR DEPOSIT INTO THE ACCOUNT.
(3) INTEREST AND OTHER AMOUNTS RESULTING FROM INVESTMENT OF MONEY IN THE ACCOUNT.
20250HB1834PN2846 - 16 - (4) GIFTS, GRANTS AND DONATIONS MADE TO THE ACCOUNT.
(C) ALLOCATION AND GEOGRAPHIC MINIMUMS.--MONEY IN THE ACCOUNT IS APPROPRIATED TO THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY ON A CONTINUING BASIS TO PROVIDE GRANTS, LOANS OR LOAN GUARANTEES TO FINANCE NEW SMALL-SCALE ENERGY SYSTEMS OR COMMUNITY ENERGY FACILITIES, SUBJECT TO THE FOLLOWING GEOGRAPHIC MINIMUMS:
(1) NO LESS THAN 25% OF THE VALUE OF THE PAYMENTS SHALL BE ALLOCATED TO PROJECTS WITHIN THE BOROUGH, TOWN OR CITY IN WHICH A LARGE LOAD USER IS LOCATED UNLESS THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY DETERMINES THAT INSUFFICIENT HIGH-QUALITY PROJECTS HAVE BEEN PROPOSED WITHIN THE BOROUGH, TOWN OR CITY AND PROVIDES NOTICE TO THE MAYOR OR GOVERNING BODY OF THE CITY, BOROUGH, TOWN OR TOWNSHIP AT LEAST 90 DAYS IN ADVANCE OF MAKING THE DETERMINATION.
(2) NO LESS THAN 50% OF THE VALUE OF THE PAYMENTS SHALL BE ALLOCATED TO PROJECTS WITHIN THE COUNTY IN WHICH THE LARGE LOAD USER IS LOCATED UNLESS THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY DETERMINES THAT INSUFFICIENT HIGH- QUALITY PROJECTS HAVE BEEN PROPOSED WITHIN THE COUNTY AND PROVIDES NOTICE TO THE GOVERNING BODY OF THE COUNTY AT LEAST 90 DAYS IN ADVANCE OF MAKING THE DETERMINATION.
(D) CONSTRUCTION LOANS.--THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY MAY PROVIDE A CONSTRUCTION LOAN UNDER THIS SECTION ONLY IF THE LOAN WILL BE THE SENIOR DEBT SECURED BY THE FACILITY AND DOES NOT EXCEED 60% OF THE FACILITY'S ESTIMATED CONSTRUCTION COST.
(E) APPLICATION CRITERIA.--THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY SHALL USE THE FOLLOWING CRITERIA TO EVALUATE A LOAN APPLICATION UNDER THIS SECTION:
20250HB1834PN2846 - 17 - (1) THE APPLICANT'S:
(I) QUALITY OF SERVICES AND MANAGEMENT.
(II) EFFICIENCY OF OPERATIONS.
(III) HISTORY OF OPERATIONS IN THIS COMMONWEALTH AND THE UNITED STATES.
(IV) RESOURCE OPERATION ATTRIBUTES.
(V) ABILITY TO ADDRESS REGIONAL NEEDS, LOCAL NEEDS AND RELIABILITY NEEDS.
(VI) ACCESS TO RESOURCES ESSENTIAL FOR OPERATING THE PROJECT FOR WHICH THE LOAN IS REQUESTED, INCLUDING LAND, WATER AND RELIABLE INFRASTRUCTURE AS APPLICABLE.
(VII) EVIDENCE OF CREDITWORTHINESS AND ABILITY TO REPAY THE LOAN ON THE TERMS ESTABLISHED IN THE LOAN AGREEMENT, INCLUDING TOTAL ASSETS, TOTAL LIABILITIES, NET WORTH AND CREDIT RATINGS ISSUED BY MAJOR CREDIT RATING AGENCIES.
(2) THE GENERATION CAPACITY AND ESTIMATED COSTS OF THE PROJECT FOR WHICH THE LOAN IS REQUESTED.
(3) OTHER FACTORS THE PENNSYLVANIA ENERGY DEVELOPMENT AUTHORITY CONSIDERS APPROPRIATE.
(F) MONTHLY PAYMENTS.--A LARGE LOAD USER PLACED INTO SERVICE ON OR AFTER THE EFFECTIVE DATE OF THIS SUBSECTION SHALL MAKE A MONTHLY PAYMENT TO THE PENNSYLVANIA ENERGY INDEPENDENCE ACCOUNT EQUAL TO 0.8¢ PER KILOWATT-HOUR OF ACTUAL ENERGY USAGE IN THE PRECEDING MONTH.
THE MONTHLY PAYMENT SHALL BE REDUCED TO 0.4¢ PER KILOWATT-HOUR IF THE LARGE LOAD USER IS CERTIFIED TO HAVE PROVIDED ITS OWN INCREMENTAL ENERGY RESOURCES AFTER PLACEMENT IN SERVICE OF THE ENERGY RESOURCE OR RESOURCES UNDER A PROGRAM ESTABLISHED BY THE COMMISSION, THE FEDERAL ENERGY REGULATORY COMMISSION OR THE RTO OR INDEPENDENT SYSTEM OPERATOR IN WHICH 20250HB1834PN2846 - 18 - THE APPLICABLE PUBLIC UTILITY PARTICIPATES.
SECTION 7.
RENEWABLE ENERGY REQUIREMENTS.
ON OR AFTER THE EFFECTIVE DATE OF THIS SECTION, ENERGY SUPPLIED TO LARGE LOAD USERS SHALL INCLUDE NOT LESS THAN 25% OF ELECTRICITY GENERATED FROM RENEWABLE ENERGY SOURCES.
SECTION 8.
CONTRACT FILING, COMMISSION REVIEW AND ENFORCEMENT.
(A) FILING REQUIRED.--AN ELECTRIC DISTRIBUTION COMPANY SHALL FILE WITH THE COMMISSION A COPY OF EACH ELECTRIC SERVICE CONTRACT EXECUTED WITH A LARGE LOAD USER ON OR AFTER THE EFFECTIVE DATE OF THIS SUBSECTION, INCLUDING THE FOLLOWING:
(1) A CONTRACT FOR ELECTRIC SERVICE BETWEEN A PUBLIC UTILITY AND A LARGE LOAD USER FOR HIGH VOLTAGE ELECTRIC SERVICE ENTERED INTO UNDER A COMMISSION-APPROVED RATE SCHEDULE FOR DISTRIBUTION SERVICE.
(2) A CONSTRUCTION SERVICES AGREEMENT, ENGINEERING AGREEMENT OR SIMILAR AGREEMENT BETWEEN A PUBLIC UTILITY AND A LARGE LOAD USER RELATING TO THE PUBLIC UTILITY'S HIGH VOLTAGE TRANSMISSION INFRASTRUCTURE OR DISTRIBUTION INFRASTRUCTURE.
(3) A CONSTRUCTION SERVICES AGREEMENT, ENGINEERING SERVICES AGREEMENT OR SIMILAR AGREEMENT BETWEEN A PUBLIC UTILITY AND A LARGE LOAD USER RELATING TO TRANSMISSION INFRASTRUCTURE THAT IS THE SUBJECT OF THE PUBLIC UTILITY'S APPLICATION FOR COMMISSION APPROVAL AND AUTHORIZATION TO LOCATE AND CONSTRUCT A TRANSMISSION LINE OR A PORTION OF A TRANSMISSION LINE WITH A DESIGN VOLTAGE GREATER THAN 100,000 VOLTS.
(B) DISTRIBUTION OF FILED CONTRACTS.--A PUBLIC UTILITY SHALL PROVIDE A COPY OF AN ELECTRIC SERVICE CONTRACT FILED UNDER THIS SECTION TO THE OFFICE OF CONSUMER ADVOCATE, THE OFFICE OF SMALL BUSINESS ADVOCATE AND BUREAU OF INVESTIGATION AND ENFORCEMENT 20250HB1834PN2846 - 19 - WITHIN THE COMMISSION, SUBJECT TO APPROPRIATE CONFIDENTIALITY PROTECTIVE AGREEMENTS OR ORDERS.
(C) SUPPORTING DOCUMENTATION.--AN ELECTRIC DISTRIBUTION COMPANY SHALL INCLUDE WITH THE FILING SUFFICIENT DOCUMENTATION TO PERMIT THE COMMISSION TO CONDUCT THE REVIEW UNDER SUBSECTION (D).
(D) COMMISSION REVIEW.--THE COMMISSION SHALL REVIEW EACH CONTRACT FILED UNDER THIS SECTION TO DETERMINE ALL OF THE FOLLOWING:
(1) THE IMPACT ON CONTINUED PROVISION OF ELECTRIC SERVICE THAT IS ADEQUATE, SAFE AND RELIABLE TO RESIDENTS AND BUSINESSES OF THIS COMMONWEALTH.
(2) THE IMPACT ON RATEPAYERS AND ELECTRIC BILL AFFORDABILITY FOR RESIDENTIAL CUSTOMERS AND COMMERCIAL CUSTOMERS.
THE IMPACT ON LOW-INCOME CUSTOMERS SHALL BE DETERMINED AS A SUBSET OF RESIDENTIAL CUSTOMERS.
(3) COMPLIANCE WITH SECTIONS 3, 4 AND 7.
SECTION 9.
ANNUAL REPORT.
(A) REPORT.--THE COMMISSION SHALL SUBMIT A WRITTEN REPORT TO THE GENERAL ASSEMBLY EACH YEAR FOR A MINIMUM OF 10 YEARS AND SHALL MAKE A PUBLIC VERSION OF THE REPORT AVAILABLE ON ITS PUBLICLY ACCESSIBLE INTERNET WEBSITE.
(B) CONTENTS.--THE REPORT SHALL DESCRIBE ALL OF THE FOLLOWING:
(1) THE COMMISSION'S EFFORTS TO IMPLEMENT THIS ACT DURING THE PRIOR YEAR.
(2) THE COMMISSION'S DETERMINATIONS UNDER SECTION 8(D) REGARDING THE IMPACT OF LARGE LOAD USERS ON CONTINUED PROVISION OF ADEQUATE, SAFE AND RELIABLE ELECTRIC SERVICE TO RESIDENTS AND BUSINESSES OF THIS COMMONWEALTH, THE IMPACT ON 20250HB1834PN2846 - 20 - RATEPAYERS AND ELECTRIC BILL AFFORDABILITY AND COMPLIANCE WITH SECTIONS 3, 4 AND 7.
(3) RECOMMENDATIONS FOR LEGISLATIVE CHANGES OR REGULATORY CHANGES TO FURTHER IMPROVE THE COMMISSION'S OVERSIGHT RESPONSIBILITIES UNDER THIS ACT.
SECTION 10.
DISCLOSURE REQUIREMENTS.
(A) INTERCONNECTION REQUESTS.--THE COMMISSION SHALL REQUIRE EACH PLANNED LARGE LOAD USER TO DISCLOSE TO THE COMMISSION, THE APPLICABLE ELECTRIC DISTRIBUTION COMPANY AND THE APPLICABLE RTO OR INDEPENDENT SYSTEM OPERATOR WHETHER THE PLANNED LARGE LOAD USER IS PURSUING A SUBSTANTIALLY SIMILAR REQUEST FOR ELECTRIC SERVICE WITHIN THIS COMMONWEALTH OR WITHIN THE APPLICABLE RTO OR INDEPENDENT SYSTEM OPERATOR, THE APPROVAL OF WHICH WOULD RESULT IN A MATERIAL CHANGE, A DELAY OR A WITHDRAWAL OF THE INTERCONNECTION REQUEST.
THE DISCLOSURE MAY WITHHOLD OR ANONYMIZE COMPETITIVELY SENSITIVE DETAILS.
THE COMMISSION SHALL PROHIBIT OR SET REASONABLE RESTRICTIONS ON THE SALE OR DISCLOSURE OF INFORMATION PROVIDED TO AN ELECTRIC DISTRIBUTION COMPANY UNDER THIS SUBSECTION.
(B) BACKUP GENERATION.--THE COMMISSION SHALL REQUIRE EACH PLANNED LARGE LOAD USER TO DISCLOSE TO THE COMMISSION, THE APPLICABLE ELECTRIC DISTRIBUTION COMPANY AND THE APPLICABLE RTO OR INDEPENDENT SYSTEM OPERATOR INFORMATION ABOUT THE PLANNED LARGE LOAD USER'S BACKUP GENERATION RESOURCES AND STORAGE RESOURCES AND THE CAPABILITY TO RELY ON BACKUP GENERATION RESOURCES OR STORAGE RESOURCES DURING PERIODS OF REQUIRED LOAD SHED OR CURTAILMENT, INCLUDING THE AMOUNT OF NOTICE REQUIRED TO DEPLOY BACKUP GENERATION RESOURCES OR STORAGE RESOURCES.
SECTION 11.
CURTAILMENT STANDARDS.
(A) DIRECTION TO LARGE LOAD USERS.--THE COMMISSION SHALL 20250HB1834PN2846 - 21 - REQUIRE ELECTRIC DISTRIBUTION COMPANIES, DURING PERIODS OF EMERGENCY CURTAILMENT OR MANUAL LOAD DUMP, TO DIRECT LARGE LOAD USERS TO DEPLOY BACKUP GENERATION RESOURCES OR STORAGE RESOURCES OR CURTAIL LOAD BEFORE CURTAILMENT OR MANUAL LOAD DUMP OF RESIDENTIAL CUSTOMERS OR SMALL COMMERCIAL CUSTOMERS.
(B) PRIORITY.--THE COMMISSION MAY REQUIRE AN ELECTRIC DISTRIBUTION COMPANY TO PRIORITIZE ISSUANCE OF A DIRECTION UNDER SUBSECTION (A) TO A LARGE LOAD USER THAT IS NOT CERTIFIED TO HAVE BROUGHT ITS OWN INCREMENTAL ENERGY RESOURCES AFTER PLACEMENT IN SERVICE OF THE ENERGY RESOURCE OR RESOURCES UNDER A PROGRAM ESTABLISHED BY THE COMMISSION, THE FEDERAL ENERGY REGULATORY COMMISSION OR THE RTO OR INDEPENDENT SYSTEM OPERATOR IN WHICH THE APPLICABLE PUBLIC UTILITY PARTICIPATES.
(C) ENVIRONMENTAL COMPLIANCE.--NOTHING IN THIS SECTION SHALL BE CONSTRUED TO AUTHORIZE OR REQUIRE A VIOLATION OF AN EMISSIONS LIMITATION UNDER FEDERAL OR STATE LAW OR A VIOLATION OF ANOTHER ENVIRONMENTAL REGULATION.
SECTION 12.
CERTIFICATION AND EXPEDITED INTERCONNECTION FOR LARGE LOAD USERS BRINGING INCREMENTAL ENERGY RESOURCES.
(A) CERTIFICATION PROGRAM.--THE COMMISSION SHALL ESTABLISH A PROGRAM TO CERTIFY LARGE LOAD USERS THAT HAVE BROUGHT OR PLAN TO BRING INCREMENTAL ENERGY RESOURCES.
CERTIFICATION SHALL BE BASED ON A BINDING FINANCIAL COMMITMENT BY A LARGE LOAD USER, INCLUDING A POWER PURCHASE AGREEMENT, TO ENABLE AN INCREMENTAL ENERGY RESOURCE OR RESOURCES EQUIVALENT ON A ONE-FOR-ONE ACCREDITED UNFORCED CAPACITY BASIS, INCLUDING A REASONABLE RESERVE MARGIN, TIED TO THE LARGE LOAD USER'S RAMP AND UTILIZATION SCHEDULE, THROUGH ANY COMBINATION OF THE FOLLOWING (1) PLACEMENT IN SERVICE OF A NEW GENERATION RESOURCE OR 20250HB1834PN2846 - 22 - COMBINED GENERATION AND STORAGE RESOURCE.
(2) UPRATE OR EXPANSION OF AN EXISTING GENERATION RESOURCE TO THE EXTENT OF THE UPRATED CAPACITY.
(3) PARTICIPATION IN A DEMAND RESPONSE PRODUCT, IF PARTICIPATION CONTINUES FOR THE DURATION OF THE CERTIFICATION PERIOD OR UNTIL THE LARGE LOAD USER HAS BROUGHT ADDITIONAL ENERGY CAPACITY EQUIVALENT TO THE CAPACITY VALUE OF THE DEMAND RESPONSE PRODUCT.
(4) ANOTHER INCREMENTAL ADDITION OF ACCREDITED UNFORCED CAPACITY AS MEASURED BY THE APPLICABLE RTO OR INDEPENDENT SYSTEM OPERATOR.
(B) INTERCONNECTION PRIORITY.--THE COMMISSION SHALL REQUIRE ELECTRIC DISTRIBUTION COMPANIES TO PRIORITIZE THE INTERCONNECTION OF LARGE LOAD USERS CERTIFIED UNDER SUBSECTION (A) AND, FOR INTERCONNECTIONS SUBJECT TO STATE JURISDICTION, TO PRIORITIZE THE INTERCONNECTION OF PAIRED GENERATION RESOURCES OR STORAGE RESOURCES ASSOCIATED WITH A CERTIFIED LARGE LOAD USER.
SECTION 13.
ENFORCEMENT.
A VIOLATION OF THIS ACT SHALL BE SUBJECT TO ENFORCEMENT BY THE COMMISSION UNDER 66 PA.C.S.
CH.
33 (RELATING TO VIOLATIONS AND PENALTIES).
SECTION 14.
CONSTRUCTION.
NOTHING IN THIS ACT SHALL BE CONSTRUED TO AUTHORIZE AN ELECTRIC DISTRIBUTION COMPANY TO OWN ELECTRIC GENERATION SUPPLY IN THIS COMMONWEALTH.
SECTION 15.
EFFECTIVE DATE.
THIS ACT SHALL TAKE EFFECT IN 60 DAYS.
20250HB1834PN2846 - 23 -
View plain text versions (3)

Action History

  1. Referred to CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, March 31, 2026

  2. In the Senate

  3. (Remarks see House Journal Page ), March 24, 2026

  4. Third consideration and final passage, March 24, 2026 (104-95)

  5. Re-reported as committed, March 24, 2026

  6. (Remarks see House Journal Page ), March 23, 2026

  7. Re-committed to APPROPRIATIONS, March 23, 2026

  8. Second consideration, with amendments, March 23, 2026

  9. Removed from table, Feb. 4, 2026

  10. Laid on the table, Feb. 2, 2026

  11. First consideration, Feb. 2, 2026

  12. Reported as amended, Feb. 2, 2026

  13. Referred to ENERGY, Sept. 4, 2025

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 43 co-sponsors · 209 not signed on · 152 voted No

Sponsors (1)

Co-sponsors (43)

Not signed on (209)

209 members have not signed on to this bill.

Show all 209 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

FINAL PASSAGE

Passed 104 Yea · 95 Nay · 1 Other
Party YeaNayPresentNot Voting
Democratic 102000
Republican 29401
Unaffiliated 0100
Total 1049501
% of votes cast 52%48%0%1%
How each member voted (200)
Member Party Vote
Rep. Stephenie Scialabba — Nay
Abigail Salisbury Democratic Yea
Aerion Abney Democratic Yea
Amen Brown Democratic Yea
Ana Tiburcio Democratic Yea
Andre D. Carroll Democratic Yea
Anita Astorino Kulik Democratic Yea
Anthony A. Bellmon Democratic Yea
Arvind Venkat Democratic Yea
Ben Waxman Democratic Yea
Benjamin V. Sanchez Democratic Yea
Brandon J. Markosek Democratic Yea
Brian Munroe Democratic Yea
Bridget M. Kosierowski Democratic Yea
Carol Hill-Evans Democratic Yea
Carol Kazeem Democratic Yea
Chris Pielli Democratic Yea
Christina D. Sappey Democratic Yea
Christopher M. Rabb Democratic Yea
Dan Frankel Democratic Yea
Dan Goughnour Democratic Yea
Dan K. Williams Democratic Yea
Daniel J. Deasy Democratic Yea
Danielle Friel Otten Democratic Yea
Danilo Burgos Democratic Yea
Darisha K. Parker Democratic Yea
Dave Madsen Democratic Yea
David M. Delloso Democratic Yea
Ed Neilson Democratic Yea
Eddie Day Pashinski Democratic Yea
Elizabeth Fiedler Democratic Yea
Emily Kinkead Democratic Yea
Frank Burns Democratic Yea
G. Roni Green Democratic Yea
Gina H. Curry Democratic Yea
Greg Scott Democratic Yea
Greg Vitali Democratic Yea
Heather Boyd Democratic Yea
Ismail Smith-Wade-El Democratic Yea
Jacklyn Rusnock Democratic Yea
Jared G. Solomon Democratic Yea
Jason Dawkins Democratic Yea
Jeanne McNeill Democratic Yea
Jen Mazzocco Democratic Yea
Jennifer O'Mara Democratic Yea
Jessica Benham Democratic Yea
Jim Haddock Democratic Yea
Jim Prokopiak Democratic Yea
Joanna E. McClinton Democratic Yea
Joe Ciresi Democratic Yea
Joe McAndrew Democratic Yea
Joe Webster Democratic Yea
Johanny Cepeda-Freytiz Democratic Yea
John C. Inglis III Democratic Yea
Jordan A. Harris Democratic Yea
Jose Giral Democratic Yea
Joseph C. Hohenstein Democratic Yea
Justin C. Fleming Democratic Yea
Keith S. Harris Democratic Yea
Kristine C. Howard Democratic Yea
Kyle Donahue Democratic Yea
Kyle J. Mullins Democratic Yea
La'Tasha D. Mayes Democratic Yea
Leanne Krueger Democratic Yea
Lindsay Powell Democratic Yea
Lisa A. Borowski Democratic Yea
Liz Hanbidge Democratic Yea
Malcolm Kenyatta Democratic Yea
Mandy Steele Democratic Yea
Manuel Guzman Democratic Yea
Mary Jo Daley Democratic Yea
MaryLouise Isaacson Democratic Yea
Matthew D. Bradford Democratic Yea
Maureen E. Madden Democratic Yea
Melissa Cerrato Democratic Yea
Melissa L. Shusterman Democratic Yea
Michael H. Schlossberg Democratic Yea
Morgan Cephas Democratic Yea
Nancy Guenst Democratic Yea
Napoleon J. Nelson Democratic Yea
Nathan Davidson Democratic Yea
Nikki Rivera Democratic Yea
Pat Gallagher Democratic Yea
Patrick J. Harkins Democratic Yea
Paul Friel Democratic Yea
Paul Takac Democratic Yea
Perry S. Warren Democratic Yea
Peter Schweyer Democratic Yea
Regina G. Young Democratic Yea
Rick Krajewski Democratic Yea
Robert E. Merski Democratic Yea
Robert F. Matzie Democratic Yea
Robert Freeman Democratic Yea
Ryan A. Bizzarro Democratic Yea
Scott Conklin Democratic Yea
Sean Dougherty Democratic Yea
Steve Samuelson Democratic Yea
Steven R. Malagari Democratic Yea
Tarah Probst Democratic Yea
Tarik Khan Democratic Yea
Tim Brennan Democratic Yea
Tim Briggs Democratic Yea
Tina M. Davis Democratic Yea
Aaron Bernstine Republican Nay
Abby Major Republican Nay
Alec J. Ryncavage Republican Nay
Andrew Kuzma Republican Nay
Ann Flood Republican Nay
Barbara Gleim Republican Nay
Brad Roae Republican Nay
Brenda M. Pugh Republican Nay
Brett R. Miller Republican Nay
Brian C. Rasel Republican Nay
Brian Smith Republican Nay
Bryan Cutler Republican Nay
Bud Cook Republican Nay
Carl Walker Metzgar Republican Nay
Chad G. Reichard Republican Nay
Charity Grimm Krupa Republican Nay
Clint Owlett Republican Nay
Craig T. Staats Republican Nay
Craig Williams Republican Nay
Dallas Kephart Republican Nay
Dan Moul Republican Nay
Dane Watro Republican Nay
David H. Rowe Republican Nay
David H. Zimmerman Republican Nay
David M. Maloney Republican Nay
Donna Scheuren Republican Nay
Doyle Heffley Republican Nay
Eric Davanzo Republican Nay
Eric J. Weaknecht Republican Nay
Eric R. Nelson Republican Nay
Gary W. Day Republican Nay
Jack Rader Republican Nay
Jacob D. Banta Republican Nay
James B. Struzzi Republican Nay
Jamie Barton Republican Nay
Jamie L. Flick Republican Nay
Jamie Walsh Republican Nay
Jason Ortitay Republican Nay
Jeff Olsommer Republican Nay
Jeremy Shaffer Republican Nay
Jesse Topper Republican Nay
Jill N. Cooper Republican Nay
Jim Rigby Republican Nay
Joanne Stehr Republican Nay
Joe Emrick Republican Nay
Joe Hamm Republican Nay
Joe Hogan Republican Yea
Joe Kerwin Republican Nay
John A. Lawrence Republican Nay
John A. Schlegel Republican Nay
Jonathan Fritz Republican Nay
Joseph D'Orsie Republican Nay
Josh Bashline Republican Nay
Joshua D. Kail Republican Nay
Kate A. Klunk Republican Nay
Kathleen C. Tomlinson Republican Yea
Kathy L. Rapp Republican Nay
Keith J. Greiner Republican Nay
Kerry A. Benninghoff Republican Nay
Kristin Marcell Republican Nay
Leslie Rossi Republican Nay
Marc S. Anderson Republican Nay
Marci Mustello Republican Nay
Mark M. Gillen Republican Nay
Marla Brown Republican Nay
Martin T. Causer Republican Nay
Martina A. White Republican Not Voting
Michael Stender Republican Nay
Mike Armanini Republican Nay
Mike Jones Republican Nay
Milou Mackenzie Republican Nay
Mindy Fee Republican Nay
Natalie Mihalek Republican Nay
Parke Wentling Republican Nay
Perry A. Stambaugh Republican Nay
R. Lee James Republican Nay
Rich Irvin Republican Nay
Rob W. Kauffman Republican Nay
Robert Leadbeter Republican Nay
Roman Kozak Republican Nay
Russ Diamond Republican Nay
Ryan Warner Republican Nay
Scott Barger Republican Nay
Shelby Labs Republican Nay
Sheryl M. Delozier Republican Nay
Stephanie Borowicz Republican Nay
Steven C. Mentzer Republican Nay
Thomas H. Kutz Republican Nay
Thomas L. Mehaffie Republican Nay
Tim Twardzik Republican Nay
Timothy J. O'Neal Republican Nay
Timothy R. Bonner Republican Nay
Tina Pickett Republican Nay
Tom Jones Republican Nay
Valerie S. Gaydos Republican Nay
Wendy Fink Republican Nay
Zachary Mako Republican Nay

Official roll call →

Floor vote

Failed 97 Yea · 102 Nay · 1 Other
Party YeaNayPresentNot Voting
Democratic 010200
Republican 96001
Unaffiliated 1000
Total 9710201
% of votes cast 49%51%0%1%
How each member voted (200)
Member Party Vote
Rep. Stephenie Scialabba — Yea
Abigail Salisbury Democratic Nay
Aerion Abney Democratic Nay
Amen Brown Democratic Nay
Ana Tiburcio Democratic Nay
Andre D. Carroll Democratic Nay
Anita Astorino Kulik Democratic Nay
Anthony A. Bellmon Democratic Nay
Arvind Venkat Democratic Nay
Ben Waxman Democratic Nay
Benjamin V. Sanchez Democratic Nay
Brandon J. Markosek Democratic Nay
Brian Munroe Democratic Nay
Bridget M. Kosierowski Democratic Nay
Carol Hill-Evans Democratic Nay
Carol Kazeem Democratic Nay
Chris Pielli Democratic Nay
Christina D. Sappey Democratic Nay
Christopher M. Rabb Democratic Nay
Dan Frankel Democratic Nay
Dan Goughnour Democratic Nay
Dan K. Williams Democratic Nay
Daniel J. Deasy Democratic Nay
Danielle Friel Otten Democratic Nay
Danilo Burgos Democratic Nay
Darisha K. Parker Democratic Nay
Dave Madsen Democratic Nay
David M. Delloso Democratic Nay
Ed Neilson Democratic Nay
Eddie Day Pashinski Democratic Nay
Elizabeth Fiedler Democratic Nay
Emily Kinkead Democratic Nay
Frank Burns Democratic Nay
G. Roni Green Democratic Nay
Gina H. Curry Democratic Nay
Greg Scott Democratic Nay
Greg Vitali Democratic Nay
Heather Boyd Democratic Nay
Ismail Smith-Wade-El Democratic Nay
Jacklyn Rusnock Democratic Nay
Jared G. Solomon Democratic Nay
Jason Dawkins Democratic Nay
Jeanne McNeill Democratic Nay
Jen Mazzocco Democratic Nay
Jennifer O'Mara Democratic Nay
Jessica Benham Democratic Nay
Jim Haddock Democratic Nay
Jim Prokopiak Democratic Nay
Joanna E. McClinton Democratic Nay
Joe Ciresi Democratic Nay
Joe McAndrew Democratic Nay
Joe Webster Democratic Nay
Johanny Cepeda-Freytiz Democratic Nay
John C. Inglis III Democratic Nay
Jordan A. Harris Democratic Nay
Jose Giral Democratic Nay
Joseph C. Hohenstein Democratic Nay
Justin C. Fleming Democratic Nay
Keith S. Harris Democratic Nay
Kristine C. Howard Democratic Nay
Kyle Donahue Democratic Nay
Kyle J. Mullins Democratic Nay
La'Tasha D. Mayes Democratic Nay
Leanne Krueger Democratic Nay
Lindsay Powell Democratic Nay
Lisa A. Borowski Democratic Nay
Liz Hanbidge Democratic Nay
Malcolm Kenyatta Democratic Nay
Mandy Steele Democratic Nay
Manuel Guzman Democratic Nay
Mary Jo Daley Democratic Nay
MaryLouise Isaacson Democratic Nay
Matthew D. Bradford Democratic Nay
Maureen E. Madden Democratic Nay
Melissa Cerrato Democratic Nay
Melissa L. Shusterman Democratic Nay
Michael H. Schlossberg Democratic Nay
Morgan Cephas Democratic Nay
Nancy Guenst Democratic Nay
Napoleon J. Nelson Democratic Nay
Nathan Davidson Democratic Nay
Nikki Rivera Democratic Nay
Pat Gallagher Democratic Nay
Patrick J. Harkins Democratic Nay
Paul Friel Democratic Nay
Paul Takac Democratic Nay
Perry S. Warren Democratic Nay
Peter Schweyer Democratic Nay
Regina G. Young Democratic Nay
Rick Krajewski Democratic Nay
Robert E. Merski Democratic Nay
Robert F. Matzie Democratic Nay
Robert Freeman Democratic Nay
Ryan A. Bizzarro Democratic Nay
Scott Conklin Democratic Nay
Sean Dougherty Democratic Nay
Steve Samuelson Democratic Nay
Steven R. Malagari Democratic Nay
Tarah Probst Democratic Nay
Tarik Khan Democratic Nay
Tim Brennan Democratic Nay
Tim Briggs Democratic Nay
Tina M. Davis Democratic Nay
Aaron Bernstine Republican Yea
Abby Major Republican Yea
Alec J. Ryncavage Republican Yea
Andrew Kuzma Republican Yea
Ann Flood Republican Yea
Barbara Gleim Republican Yea
Brad Roae Republican Yea
Brenda M. Pugh Republican Yea
Brett R. Miller Republican Yea
Brian C. Rasel Republican Yea
Brian Smith Republican Yea
Bryan Cutler Republican Yea
Bud Cook Republican Yea
Carl Walker Metzgar Republican Yea
Chad G. Reichard Republican Yea
Charity Grimm Krupa Republican Yea
Clint Owlett Republican Yea
Craig T. Staats Republican Yea
Craig Williams Republican Yea
Dallas Kephart Republican Yea
Dan Moul Republican Yea
Dane Watro Republican Yea
David H. Rowe Republican Yea
David H. Zimmerman Republican Yea
David M. Maloney Republican Yea
Donna Scheuren Republican Yea
Doyle Heffley Republican Yea
Eric Davanzo Republican Yea
Eric J. Weaknecht Republican Yea
Eric R. Nelson Republican Yea
Gary W. Day Republican Yea
Jack Rader Republican Yea
Jacob D. Banta Republican Yea
James B. Struzzi Republican Yea
Jamie Barton Republican Yea
Jamie L. Flick Republican Yea
Jamie Walsh Republican Yea
Jason Ortitay Republican Yea
Jeff Olsommer Republican Yea
Jeremy Shaffer Republican Yea
Jesse Topper Republican Yea
Jill N. Cooper Republican Yea
Jim Rigby Republican Yea
Joanne Stehr Republican Yea
Joe Emrick Republican Yea
Joe Hamm Republican Yea
Joe Hogan Republican Yea
Joe Kerwin Republican Yea
John A. Lawrence Republican Yea
John A. Schlegel Republican Yea
Jonathan Fritz Republican Yea
Joseph D'Orsie Republican Yea
Josh Bashline Republican Yea
Joshua D. Kail Republican Yea
Kate A. Klunk Republican Yea
Kathleen C. Tomlinson Republican Yea
Kathy L. Rapp Republican Yea
Keith J. Greiner Republican Yea
Kerry A. Benninghoff Republican Yea
Kristin Marcell Republican Yea
Leslie Rossi Republican Yea
Marc S. Anderson Republican Yea
Marci Mustello Republican Yea
Mark M. Gillen Republican Yea
Marla Brown Republican Yea
Martin T. Causer Republican Yea
Martina A. White Republican Not Voting
Michael Stender Republican Yea
Mike Armanini Republican Yea
Mike Jones Republican Yea
Milou Mackenzie Republican Yea
Mindy Fee Republican Yea
Natalie Mihalek Republican Yea
Parke Wentling Republican Yea
Perry A. Stambaugh Republican Yea
R. Lee James Republican Yea
Rich Irvin Republican Yea
Rob W. Kauffman Republican Yea
Robert Leadbeter Republican Yea
Roman Kozak Republican Yea
Russ Diamond Republican Yea
Ryan Warner Republican Yea
Scott Barger Republican Yea
Shelby Labs Republican Yea
Sheryl M. Delozier Republican Yea
Stephanie Borowicz Republican Yea
Steven C. Mentzer Republican Yea
Thomas H. Kutz Republican Yea
Thomas L. Mehaffie Republican Yea
Tim Twardzik Republican Yea
Timothy J. O'Neal Republican Yea
Timothy R. Bonner Republican Yea
Tina Pickett Republican Yea
Tom Jones Republican Yea
Valerie S. Gaydos Republican Yea
Wendy Fink Republican Yea
Zachary Mako Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB 1834 do?
Data Centers and Consumers
Who sponsors HB 1834?
HB 1834 is sponsored by Brandon J. Markosek (Democratic), Abigail Salisbury (Democratic), Steve Samuelson (Democratic), Tina M. Davis (Democratic), Malcolm Kenyatta (Democratic), Tim Brennan (Democratic), G. Roni Green (Democratic), Nikki Rivera (Democratic), Sean Dougherty (Democratic), Liz Hanbidge (Democratic), Nancy Guenst (Democratic), Rick Krajewski (Democratic), Tarik Khan (Democratic), Jennifer O'Mara (Democratic), Paul Takac (Democratic), Ben Waxman (Democratic), Jeanne McNeill (Democratic), Joe Webster (Democratic), Paul Friel (Democratic), Robert Freeman (Democratic), Joe Ciresi (Democratic), Ismail Smith-Wade-El (Democratic), Mandy Steele (Democratic), Greg Scott (Democratic), Jim Prokopiak (Democratic), Heather Boyd (Democratic), Lisa A. Borowski (Democratic), Steven R. Malagari (Democratic), Dan Frankel (Democratic), Kristine C. Howard (Democratic), Nathan Davidson (Democratic), Dan K. Williams (Democratic), Gina H. Curry (Democratic), Benjamin V. Sanchez (Democratic), Jose Giral (Democratic), Carol Hill-Evans (Democratic), Tarah Probst (Democratic), Kyle Donahue (Democratic), Jim Haddock (Democratic), Kyle J. Mullins (Democratic), Ed Neilson (Democratic), Daniel J. Deasy (Democratic), John C. Inglis III (Democratic), and Robert F. Matzie (Democratic).
What is the current status of HB 1834?
This bill has passed the House. Introduced September 04, 2025. It now moves to the second chamber.
Where can I track HB 1834?
Track HB 1834 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 1834

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 1834

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →