Louisiana 2026 Regular Session Status: Enacted 2 R cosponsors

HB 856 — TRANSPORTATION DEPT: Provides relative to Indefinite Delivery, Indefinite Quantity Construction Phase Contract (EN SEE FISC NOTE SG EX)

Last action — Signed by the Governor. Becomes Act No. 678.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. ✓
    Passed House
  4. ✓
    Passed Senate
  5. ✓
    To Executive
  6. 6
    Enacted

This bill has been enacted into law. Introduced February 27, 2026. Enacted.

Signed by Governor Jeff Landry (Republican) on June 01, 2026.

Odds of enactment

High chance

Based on the sponsor, cosponsors, and committee posture, this bill has a high chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Likely to advance 74% · moderate confidence
  • Enacted

    Current position in the legislative process.

  • 2 sponsors

    1 primary, 1 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (2 R).

  • Cleared a recorded vote

    Passed 3 recorded votes so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

In plain language

The bill concerns contracts for construction projects managed by the transportation department.

This legislation establishes guidelines for Indefinite Delivery, Indefinite Quantity Construction Phase Contracts for the transportation department. It aims to streamline the contracting process for construction work.

Bill Text

What changed in the latest version

226 added · 302 removed

Plain-language change summary

The bill HB 856 has had a reference to "ACT No. 678" removed. This change simplifies the text by eliminating a specific citation that may no longer be necessary. By making this adjustment, the bill can focus more clearly on its core provisions, which helps improve clarity and understanding for everyone reading it.

→
Previous
Latest
HLS 26RS-1054 REENGROSSED Regular Session HOUSE BILL NO.
ENROLLED Regular Session HOUSE BILL NO.
856 BY REPRESENTATIVES FONTENOT AND THOMPSON TRANSPORTATION DEPT:
856 BY REPRESENTATIVES FONTENOT AND THOMPSON AN ACT To amend and reenact R.S.
Provides relative to Indefinite Delivery, Indefinite Quantity Construction Phase Contract AN ACT To enact R.S.
44:4.1(B)(34) and to enact R.S.
48:250.5, relative to Indefinite Delivery, Indefinite Quantity Construction Phasecontracts;toauthorizetheDepartmentofTransportationandDevelopmentand the office of Louisiana HighwayConstruction to use Indefinite Delivery, Indefinite Quantity (ID/IQ) contracting for certain projects;
48:250.5, relative to Indefinite Delivery, Indefinite Quantityconstruction contracts;
to provide for single or multiple competitive low-bid and best value ID/IQ construction phase contracts including multiple work orders and multiple awards;
to authorize the Departmentof Transportation and Development and the office of Louisiana highwayconstruction, respectively, to use Indefinite Delivery, Indefinite Quantity (ID/IQ) contracting for certainprojects;to provideforsolicitation ofsingleormultiple competitivelow-bid and best value ID/IQ construction phase contracts including multiple work orders and multiple awards;
to provide for procedures and requirements for contracting;
to provide for procedures and requirements for procurement and contracting;
to provide for severability;
to provide for confidentiality of the evaluation process;
to provide contract term limits;
44:4.1(B)(34) is hereby amended and reenacted to read as follows:
§4.1.
Exceptions * * * B.
Thelegislaturefurtherrecognizesthatthereexistexceptions,exemptions, and limitations to the laws pertaining to public records throughout the revised statutesandcodesofthisstate.Therefore,thefollowingexceptions,exemptions,and limitations are hereby continued in effect by incorporation into this Chapter by citation:
* * * (34) R.S.
48:255.1 R.S.
48:250.5, 255.1 * * * Page 1 of 8 CODING:
Wordsinstruckthroughtypearedeletionsfromexistinglaw;wordsunderscored are additions.
HB NO.
856 ENROLLED Section 2.
R.S.
Indefinite Delivery, Indefinite Quantity Construction Phase Contracts A.
Indefinite Delivery, Indefinite Quantity construction contracts A.
Notwithstanding any other provision of law to the contrary or requirements of this Part, if the secretary and the executive director determines it is in the best interest of the taxpayers, the department and the office of Louisiana Highway Construction (OLHC) may procure and award indefinite Page 1 of 9 CODING:
Notwithstanding any other provision of law to the contrary, the requirements of this Part, if the secretary or the executive director of the office of Louisiana highway construction determines it is in the best interest of the public, the department or office of Louisiana highway construction may respectivelyprocure and award indefinite delivery, indefinite quantity construction contracts pursuant to the requirements of this Section for the maintenance, preservation, reconstruction, rehabilitation, repair, and construction projects let by the department and the office of Louisiana highway construction, respectively, and related incidental work.
Wordsinstruckthroughtypearedeletionsfromexistinglaw;wordsunderscored are additions.
HLS 26RS-1054 REENGROSSED HB NO.
856 delivery, indefinite quantity construction phase contracts pursuant to the requirementsofthisSectionforthemaintenance,preservation,reconstruction,repair, andconstructionprojectsletbythedepartmentandtheOLHC,andrelatedincidental work.
(1) "Best value"means a selection process in which proposals contain price and qualitative components and award of the indefinite delivery, indefinite quantity contract based upon a combination of price and qualitative considerations as provided in the solicitation documents.
(1) "Best value" means a selection process in which proposals contain price and qualitative components and award of one or multiple of the Indefinite Delivery, Indefinite Quantity contract is based upon a combination of price and qualitative considerations as provided in the solicitation documents.
(2) "Indefinite delivery, indefinite quantity (ID/IQ)" means a method of contracting that allows for deliveryof an indefinite quantityof services over a fixed duration under which deliveryof specific services is authorized by work orders.
(2) "Indefinite Delivery, Indefinite Quantity (ID/IQ)" means a method of contracting that allows for deliveryof an indefinite quantityof services over a fixed duration under which delivery of specific construction and construction-related services is authorized by work orders.
(3) "Indefinite delivery, indefinite quantity (ID/IQ) construction phase contract" means the contract awarded to an ID/IQ contractor pursuant to the requirements of this Section.
(3) "Indefinite Delivery, Indefinite Quantity (ID/IQ) construction contract" means the principal contract awarded to an ID/IQ contractor pursuant to the requirements of this Section.
(5) "Multiple award" means an ID/IQ procurement where awards of ID/IQ construction phase contracts for the same scope of services are made to multiple ID/IQ contractors through a single procurement.
Page 2 of 8 CODING:
(6) "Single award" means an ID/IQ procurement where award of the ID/IQ construction phase contract is made to a single ID/IQ contractor.
(7) "Work order" means a contract document issued for a definite scope of work pursuant to an ID/IQ construction phase contract.
A work order provides the location, time, and scope of work required and authorizes the ID/IQ contractor to deliver the scope of services described in the work order.
It also provides required pay items, quantities, and unit prices, as applicable.
Page 2 of 9 CODING:
HLS 26RS-1054 REENGROSSED HB NO.
HB NO.
856 C.
856 ENROLLED (5) "Multiple award" means an ID/IQ procurement where awards of ID/IQ construction contracts for the same scope of services are made to multiple ID/IQ contractors through a single procurement.
Forfederalaidprojects,thedepartmentandtheOLHC shall complywith all federal regulations that are conditions to federal assistance, including but not limited to provisions of 23 CFR Part 635, Subpart F, as amended.
(6) "Single award" means an ID/IQ procurement where award of the ID/IQ construction contract is made to a single ID/IQ contractor.
In the event of a conflict between applicable required federal regulations and the provisions of Title 48 and any state rules or regulations, the federal regulations shall control.
(7) "Work order" means a contract document issued for a definite scope of work pursuant to an ID/IQ construction contract.
A work order shall provide the location, time, and scope of work required and authorizes the ID/IQ contractor to deliver the scope of services described in the work order.
It also provides required pay items, quantities, and unit prices, as applicable.
C.
Show all 210 changed rows (170 more)
Previous
Latest
For federal aid projects, the department and the office of Louisiana highway construction, respectively, shall comply with all federal laws and regulations that are conditions to federal participation, including but not limited to provisions of 2 CFR 200 and 23 CFR Part 635, Subpart F, as amended.
In the event of a conflict between applicable required federal laws or regulations and the provisions of Title 48 and any state rules or regulations, the federal laws or regulations shall control on federal aid projects.
The legislature authorizes the department and the OLHC to use competitive low bid or best value, or anyother form of ID/IQ, to select a successful bidder or bidders.
Procurements pursuant to this Section may include single award or multiple award ID/IQ construction contracts.
Procurements under this Section may include single award or multiple award.
The legislature authorizes the department and the office of Louisiana highway construction to procure ID/IQ contractsusinglowbidandbestvaluemethods,andtoawardsuchcontractsandany resulting work orders using low bid or best value, as specified in the solicitation documents.
The procurement documents shall establish procedures for determining the successful bidder or bidders, such as best value evaluation factors where applicable.
All procurement documents issued bythe department and the office of Louisiana highway construction, respectively, including the NOI and RFP, shall indicate whether a single award or multiple awards will be made.
Materials separately acquired by the department or office of Louisiana highway construction may be provided to contractors for use under and as a condition of any ID/IQ contract.
Procurementand awardof ID/IQconstruction phase contracts shall meet the following requirements:
Procurement and award of ID/IQ construction contacts shall meet the following requirements:
(1) Single award ID/IQ construction phase contracts which will be awarded onalowbidbasisshallfolloweithertheadvertisementforlowbidcontractssetforth in R.S.
Page 3 of 8 CODING:
48:255 or the requirements for advertisements set forth in this Section.
If a single-award, low-bid ID/IQ construction phase contract is advertised pursuant to R.S.
48:255, award may also be made pursuant to R.S.
48:255.
If award is made pursuanttoR.S.48:255,thedepartmentandtheOLHCarenotrequiredtofollowthe provisions of this Section.
(2)(a) Prior to the award of any multiple award ID/IQ construction phase contractorasingleawardID/IQconstructionphasecontractnot advertisedpursuant to R.S.
48:255, the department and the OLHC shall issue a "notice of intent" (NOI) through advertisementon its designatedwebpageto requestlettersofinterest(LOI).
All notices shall be advertised a minimum of ten days prior to the deadline for receiptofresponses.
TheNOIshallcontainadescriptionoftheID/IQservicesto be procured.
The department and the OLHC mayreadvertise the NOIusing additional media or publications to solicit additional responses if the number of responses received by the department and the OLHC are deemed inadequate to encourage competition.
Page 3 of 9 CODING:
HLS 26RS-1054 REENGROSSED HB NO.
HB NO.
856 (b) Following receipt of letters of interest, the department and the OLHC shall issue a "request for proposals" (RFP) to contractors that submit an LOI.
856 ENROLLED (1) Single award ID/IQ construction contracts procured on a low-bid basis may be advertised and awarded using one of the following methods:
The RFP shall include instructions for development and submittal of proposals, a description of how proposals will be evaluated, and estimated quantities and unit prices, and shall comply with the requirements of this Section.
(a) In accordance with R.S.
All procurement documents issued by the department and the OLHC, including the NOI and RFP, shall indicate whether a single award or multiple awards will be made.
48:252 and 255 for award to the lowest responsive and responsible bidder.
(b) In accordance with the advertisement and award procedures set forth in this Section.
(2) Multiple-award ID/IQ construction contracts may be procured on a low bid or best value basis, as determined by the department and office of Louisiana highway construction, respectively.
Such procurements shall be conducted in accordancewithapplicableLouisianapublicbidandprocurementlawsincludingthe requirements for advertisements and the procedures set forth in this Section.
(3)(a) The procurement of any multiple-award ID/IQ construction contract or a single award ID/IQ construction contract not advertised and awarded pursuant to R.S.
48:252 and 255, shall commence with the department and the office of Louisiana highway construction, respectively, issuing a "notice of intent" (NOI) through advertisement on their designated webpages to request letters of interest (LOI).TheNOIshallbeadvertisedforatleasttenbusinessdayspriortothedeadline for submission of LOI and shall include a description of the ID/IQ services to be procured.ThedepartmentandtheofficeofLouisianahighwayconstructionmayalso readvertise the NOI using additional media or publications and may readvertise as necessary if the number of responses received is deemed insufficient to ensure adequate competition.
(b) After the deadline for submission of LOI for a single-award or multiple-award ID/IQ construction contract,the department and office of Louisiana highwayconstruction shall issue a Request for Proposals ("RFP") to all contractors that submitted an LOI.
The RFP shall include instructions for proposal preparation andsubmission,adescriptionoftheevaluationmethodology,andshallcomplywith the requirements of this Section.
48:253 shall be specified in the department and the OLHC's standard specifications or special provisions.
48:253 shall be specified in the department and the office of Louisiana highway construction's standard Page 4 of 8 CODING:
The department and the OLHC may waive the requirement for bid bonds for procurements under this Section.
(d) The assistant secretaryfor project delivery, with the concurrence of the secretary, and the executive director of the OLHC shall establish an evaluation committee for evaluation of proposals received by the department and the OLHC.
Theevaluationcommitteemay,initsdiscretion,beassistedbyotherdepartmentand OLHC personnel and external advisors in the evaluation of proposThe.
evaluation committee shall evaluate proposals as described in the RFP and make a recommendation of award to the secretary and executive director.
The secretary, executive director, or their designees shall make the final determination of award.
F.
The department and the OLHC may include the following items in its procurement documents or contract:
(1) Payment of mobilization or demobilization costs and the method for determining mobilization and demobilization reimbursement if the department and the OLHC opts to award those costs separate from an individual work order.
(2) The method for determining price escalation or de-escalation.
(3) Special provisions specific to ID/IQ construction phase contracts.
(4) Unit pricing or lists of work items specific to ID/IQ construction phase contracts.
Page 4 of 9 CODING:
HLS 26RS-1054 REENGROSSED HB NO.
HB NO.
856 (5) A minimum quantity or dollar value of supplies or services that the department and the OLHC are obligated to order and the contractor is obligated to furnish, if the department and the OLHC opts to set a minimum.
856 ENROLLED specifications or special provisions.
The department and the office of Louisiana highway construction may waive the requirement for bid bonds for procurements under this Section.
(4)(a) The assistant secretary for project delivery, with the concurrence of the secretary or designee, and the executive director of the office of Louisiana highway construction , respectively, shall establish an evaluation committee for evaluation of proposals received in response to the RFP.
The evaluation committee may, in its discretion, be assisted by other departments and office of Louisiana highway construction personnel and external advisors in the evaluation the proposals.
(b) The evaluation committee shall evaluate the proposals and make a recommendation of award to the secretary and executive director.
The secretary, executive director, or their designees, shall make the final determination of award.
(5) Prior to issuing a work order under a multiple-award ID/IQ construction contract, the department and the office of Louisiana highway construction, respectively,shallsolicitcompetitiveresponsesfromthecontractorsawardedID/IQ contracts under the solicitation in accordancewith procedures set forth in the ID/IQ construction contract.
The procurement documents or contract shall state the procedures and selection criteria for issuance of work orders.
Work orders shall be awarded on a competitive low bid basis, or, where permitted byapplicable law and approved for use with federal funds, on a best value basis in which price is a significant evaluation factor.
(6) Proposals received by the department and the office of Louisiana highway construction and the evaluation committee's records, including the evaluation committee's findings, grading, score sheets, and recommendations, shall not be public records until the ID/IQ construction contract has been fully executed ortheprocurementhasbeencancelled.Followingcontractexecutionorcancellation, such records shall be subject to disclosure in accordance with applicable public records laws.
Proprietary, confidential, trade secret, or otherwise protected information will remain exempt to the extent permitted bylaw.
The meetings of the Page 5 of 8 CODING:
Wordsinstruckthroughtypearedeletionsfromexistinglaw;wordsunderscored are additions.
HB NO.
856 ENROLLED evaluationcommitteewillnotbesubjecttotheOpenMeetingsLawinTitle44ofthe Louisiana Revised Statutes.
F.
The department and the office of Louisiana highway construction may include the following items in their procurement documents or contracts:
(1) Themethodfordeterminingpriceescalationorde-escalationprocedures when warranted byparticular circumstances.
(2) Special provisions specific to ID/IQ construction contracts.
(3) Unit pricing or lists of work items specific to the ID/IQ construction contract.
(4) A minimum quantity or dollar value if the department and the office of Louisiana highway construction opts to set a minimum.
(5) A statement of procedures and selection criteria the department and office of Louisiana highway construction shall use in issuing work orders.
(6) Any other information, terms, or requirements the department and the officeofLouisianahighwayconstruction deem necessaryto includein procurement documents or contracts.
ThetermoftheinitialID/IQconstructionphasecontractandanyoptional contract extensions shall not exceed five years.
The term of the initial ID/IQ construction contract and any optional contract extensions shall not exceed five years.
The duration of the initial term and the terms of individual contract extensions shall be determined by the department and the OLHC.
The duration of the initial term and the terms of individual contract extensions shall be determined by the department and the office of Louisiana highway construction, respectiveThe ID/IQ construction contract shall serve as the underlying agreement that establishes the generaltermsandconditionsgoverningtherelationshipbetweenthedepartmentand the office of Louisiana highway construction, respectively, and the selected bidder.
The ID/IQ construction phase contractshall serveas the underlying agreement that establishes the general terms and conditions governing the relationship between the department and the OLHC and the selected bidder.
Execution of the ID/IQ construction contract shall not authorize work or serve as a notice to proceed.
ExecutionoftheID/IQconstructionphasecontractshallnotauthorizeworkorserve as a notice to proceed.
48:251, and the general requirements of Part XIII of Chapter 1 of this Title shall apply to the value and completion of work under an individual work order rather than the value and completion of all work under the ID/IQ construction phase contract unless otherwise specified in the ID/IQ construction phase contract or the individual work order, or otherwise provided in a special provision of the department and the OLHC.
48:251, and the general requirements of Part XIII of Chapter 1 of this Title shall applyto the value and completion of work under an individual work order rather than the value and completion of all work under the ID/IQ construction Page 6 of 8 CODING:
The requirement of issuance of payment, performance, and retainage bonds shall be at the time of execution of an individual work order unless otherwise specified by the ID/IQ construction phase contract, the individual work order, or a special provision developed by the department and the OLHC.
Wordsinstruckthroughtypearedeletionsfromexistinglaw;wordsunderscored are additions.
HB NO.
856 ENROLLED contract unless otherwise specified in the ID/IQ construction contract or the individualworkorder,orotherwiseprovidedinaspecialprovisionofthedepartment and the office of Louisiana highway construction, respectively.
The issuance of payment,performance,andretainagebondsshallberequiredatthetimeofexecution of an individual work order unless otherwise specified by the ID/IQ construction contract, the individual work order, or a special provision developed by the department and the office of Louisiana highway construction, respectively.
Insurance policies and the extent and type of coverage required shall be as determined by the department and the OLHC.
Required insurance policies and the extent and type of coverage required shall be as determined by the department and the office of Louisiana highway construction, respectively.
This Subsection shall also applyto low bid ID/IQ contracts pursuant to R.S.
This Subsection shall also apply to low bid ID/IQ contracts as advertised and awarded pursuant to R.S.
48:252 and R.S.
This Section shall not apply to engineering and design service contracts orotherconsultingcontractsofthedepartmentandtheOLHCauthorizedbythisPart Page 5 of 9 CODING:
This Section shall not apply to engineering and design service contracts or other consulting contracts of the department and the office of Louisiana highway construction, respectively, authorized by this Part or federal aid projects governed by 23 CFR Part 172, except that these services may be included in ID/IQ construction contracts to the extent that they support the construction of projects.
Wordsinstruckthroughtypearedeletionsfromexistinglaw;wordsunderscored are additions.
HLS 26RS-1054 REENGROSSED HB NO.
856 orfederalaidprojectsgovernedby23CFRPart172,exceptthatdesignservicesmay be included in these contracts to the extent that they support the construction phase of projects.
Except as otherwise provided in this Section, the provisions of this Part shall apply to ID/IQ construction phase contracting.
Except as otherwise provided in this Section, the provisions of this Part shall apply to ID/IQ construction contracting.
In the event of a conflict, the provisionsofthis Sectionshallprevailandshallsupersedeanyconflictingprovision of state law.
In the event of a conflict, the provisions ofthisSectionshallprevailandshallsupersedeanyconflictingprovision of state law.
The department and the OLHC may establish guidelines, standard specifications, special provisions, handbooks, or other required documents for elements of ID/IQ construction phase contracting not explicitly provided for in this Section or otherwise subject to the Administrative Procedure Act.
The department and the office of Louisiana highway construction, respectively, may establish guidelines, standard specifications, special provisions, handbooks, or other required documents for elements of ID/IQ construction phase contracting not explicitly provided for in this Section or otherwise subject to the Administrative Procedure Act.
The department and the OLHC may promulgate rules and regulations to implement and enforce the provisions of this Section in accordance with the provisions of the Administrative Procedure Act.
The department and the office of Louisiana highway construction, respectively, may promulgate rules and regulations to implement and enforce the Page 7 of 8 CODING:
Wordsinstruckthroughtypearedeletionsfromexistinglaw;wordsunderscored are additions.
HB NO.
856 ENROLLED provisions of this Section in accordance with the provisions of the Administrative Procedure Act.
If vetoed bythe governor and subsequently approved by the legislature, this act shall become effective on the dayfollowing such approval.
If vetoed bythe governor and subsequentlyapproved bythe legislature, this act shall become effective on the dayfollowing such approval.
DIGEST ThedigestprintedbelowwaspreparedbyHouseLegislative Services.
SPEAKER OF THE HOUSE OF REPRESENTATIVES PRESIDENT OF THE SENATE GOVERNOR OF THE STATE OF LOUISIANA APPROVED:
It constitutes nopart of the legislative instrument.
Page 8 of 8 CODING:
The keyword, one-liner, abstract, and digest do not constitute part of the law or proof or indicia of legislative intent.
[R.S.
1:13(B) and 24:177(E)] HB 856 Reengrossed 2026 Regular Session Fontenot Abstract:
Establishes the use of indefinite delivery, indefinite quantity construction phase contracts by the Department of Transportation and Development and the office of Louisiana Highway Construction.
Provides procedures, definitions, and requirements to govern the contracts while providing flexibility for project-specific needs.
Proposed law declares that improving efficiency in highway and bridge construction and maintenance is in the public interest.
Authorizes the Dept.
of Transportation and Development(DOTD)andtheofficeofLa.Hwy.Construction (OLHC)toawardindefinite delivery, indefinite quantity construction phase contracts for maintenance, repair, Page 6 of 9 CODING:
Wordsinstruckthroughtypearedeletionsfromexistinglaw;wordsunderscored are additions.
HLS 26RS-1054 REENGROSSED HB NO.
856 reconstruction, and construction projects when the secretary and the executive director determines it is in the best interest of taxpayers.
Proposed law provides for definitions of the following:
(1) "Best value" means a selection process in which proposals contain price and qualitative components and award of the indefinite delivery, indefinite quantity construction phase contract based upon a combination of price and qualitative considerations as provided in the solicitation documents.
(2) "Indefinitedelivery, indefinitequantity(ID/IQ)"meansamethodofcontractingthat allows for delivery of an indefinite quantity of services over a fixed duration under which delivery of specific services is authorized by task orders.
(3) "ID/IQ construction phase contract" means the contract awarded to an ID/IQ contractor pursuant to the requirements of this Section.
(4) "Low bid" means a selection process in which proposals are evaluated based on the proposed price from the lowest responsible bidder.
(5) "Multiple award"means an ID/IQ procurement where awards of ID/IQ construction phase contracts for the same scope of services are made to multiple ID/IQ contractors through a single procurement.
(6) "Singleaward"meansanID/IQprocurementwhereawardoftheID/IQconstruction phase contract is made to a single ID/IQ contractor.
(7) "Work order" means a contract document issued for a definite scope of work pursuanttoanID/IQconstructionphasecontractandprovidesthelocation,time,and scope of work required and authorizes the ID/IQ contractor to deliver the scope of servicesdescribedin the workorder.
It alsoprovidesrequiredpayitems, quantities, and unit prices, as applicable.
Proposed law requires the DOTD and the OLHC to comply with all applicable federal regulations forfederal-aidprojectsandprovidesthatfederalregulations controlin theevent of a conflict with state law or rules.
Proposedlawrequiresthatsingle-award,low-bidID/IQconstructionphasecontractsfollow eitheradvertisingproceduresinpresentlawortheadvertisingrequirementsofproposedlaw.
Authorizes the DOTD and the OLHC to award the contract.
Proposed law requires the DOTD and the OLHC, before awarding multiple-award or single-award ID/IQ construction phase contracts not advertised under existing low-bid procedures to issue a “notice of intent” (NOI) on its designated webpage to solicit letters of interest (LOI).
Requires notices to be advertised at least 10 days before the response deadline and include a description of the ID/IQ services.
Further authorizes the DOTD and the OLHC to readvertisethe NOIthrough additional media or publications if the number of responses is deemed insufficient to encourage competition.
ProposedlawrequirestheDOTD and the OLHC to issue a “requestfor proposals”(RFP) to contractors that submitted an LOI.
Further requires that the RFP include instructions for preparingandsubmittingproposals,evaluationcriteria,estimatedquantitiesandunitprices, and indicate whether a single or multiple awards will be made.
Additionally, requires that all procurement documents, including the NOI and RFP, comply with proposed law.
Proposed law requires that bid bonds be specified in the DOTD and the OLHC's standard specifications or special provisions.
Authorizes the DOTD and the OLHC to waive the requirement for bid bonds for procurements under proposed law.
Page 7 of 9 CODING:
Wordsinstruckthroughtypearedeletionsfromexistinglaw;wordsunderscored are additions.
HLS 26RS-1054 REENGROSSED HB NO.
856 Proposed law requires the assistant secretary for project delivery, with the secretary and executive director's concurrence, to establish an evaluation committee to review proposals andauthorizesassistancetothecommitteebyotherDOTDandOLHCpersonnelorexternal advisors.
Requires the committee to evaluate proposals as described in the RFP and recommend an award to the secretary and the executive director, who makes the final determination.
Proposed law authorizes the DOTD and the OLHC to include the following in its procurement documents or contracts:
(1) Payment of mobilization or demobilization costs and the method for determining reimbursement if such costs are awarded separatelyfrom an individual work order.
(2) The method for determining price escalation or de-escalation.
(3) Special provisions specific to ID/IQ construction phase contracts.
(4) Unit pricing or lists of work items specific to ID/IQ construction phase contracts.
(5) A minimum quantity or dollar value of supplies or services the DOTD and the OLHC is obligated to order and the contractor is obligated to furnish, if the department chooses to set a minimum.
Proposed law limits the term of the initial ID/IQ construction phase contract and any extensions to a maximum of five years and provides that the DOTD and the OLHC determines the duration of the initial term and anyindividual extensions.
Requires that the ID/IQ construction phase contract establishes the general terms and conditions governing therelationshipbetweentheDOTD,theOLHC,andtheselectedbidder.
Prohibitsexecution of the ID/IQ construction phase contract from authorizing work or serving as a notice to proceed.
Proposed law requires that payment bonds, performance bonds, retainage bonds, minimum warrantyperiods,andgeneralrequirementsofpresentlawapplytothevalueandcompletion of individual work orders rather than the entire ID/IQ construction phase contract, unless otherwise specified in the contract, work order, or special provisions.
Further requires that payment, performance, and retainage bonds be issued at the time of execution of each individual work order, unless otherwise specified.
Provides that stipulated damages apply toindividualworkordersandarecalculatedbasedoneachworkorder’srequiredcompletion date.
Additionally, authorizes the DOTD and the OLHC to determine insurance policies coverage extent, and type.
Further requires that proposed law also apply to low bid ID/IQ contracts.
Proposedlawexcludesengineeringanddesignservicecontracts,otherauthorizedconsulting contracts, and federal-aid projects, but allows design services to be included in these contracts to the extent that they support the construction phase of projects.
Proposed law provides that the provisions of present law applyto ID/IQ construction phase contracting.
Proposed law provides that, in the event of a conflict, the provisions of proposed law prevail and supersede anyconflicting state law.
Proposed law authorizes the DOTD and the OLHC to establish guidelines, standard specifications,specialprovisions,handbooks,orotherrequirementsdocumentsforelements of ID/IQ construction phase contracting not explicitly provided for in proposed law or present law.
Proposed law authorizes the DOTD and the OLHC to promulgate rules and regulations to implement and enforce proposed law.
Page 8 of 9 CODING:
Wordsinstruckthroughtypearedeletionsfromexistinglaw;wordsunderscored are additions.
HLS 26RS-1054 REENGROSSED HB NO.
856 Effective upon signature of governor or lapse of time for gubernatorial action.
(Adds R.S.
48:250.5) Summary of Amendments Adopted by House The Committee Amendments Proposed by House Committee on Transportation, Highways and Public Works to the original bill:
1.
Change "Indefinite Delivery, Indefinite Quality contracts" to "Indefinite Delivery, Indefinite Quality Construction Phase contracts".
2.
Add the office of Louisiana Highway Construction as authorized to engage in Indefinite Delivery, Indefinite Quality Construction Phase contracting.
3.
Provides certain authority to executive director of the office of Louisiana Highway Construction.
4.
Make technical changes.
The House Floor Amendments to the engrossed bill:
1.
Make technical changes.
2.
Remove "task order" from the list of definitions contained in proposed law.
3.
Add that payment bonds, performance bonds, retainage bonds, the minimum requiredwarrantyperiod, and the general requirements of present law (Part XIII of Chapter 1 of Title 48) also apply to low bid Indefinite Delivery, Indefinite Quantity construction phase contracts.
Page 9 of 9 CODING:
View plain text versions (5)

Amendments

9 amendments

Click Show changes on an amendment above to see how it modifies the bill.

Action History

  1. Signed by the Governor. Becomes Act No. 678.

  2. Effective date: 06/01/2026.

  3. Sent to the Governor for executive approval.

  4. Enrolled and signed by the Speaker of the House.

  5. Signed by the President of the Senate.

  6. Read by title, roll called, yeas 97, nays 0, Senate amendments concurred in.

  7. Scheduled for concurrence on 05/27/2026.

  8. Received from the Senate with amendments.

  9. Rules suspended. Senate floor amendments read and adopted. Read by title, passed by a vote of 36 yeas and 0 nays, and ordered returned to the House. Motion to reconsider tabled.

  10. Reported with Legislative Bureau amendments which were read and adopted. Read by title and passed to third reading and final passage.

  11. Committee amendments read and adopted. Read by title and referred to the Legislative Bureau.

  12. Reported with amendments.

  13. Read second time by title and referred to the Committee on Transportation, Highways and Public Works.

  14. Received in the Senate. Read first time by title and placed on the Calendar for a second reading.

  15. Read third time by title, amended, roll called on final passage, yeas 100, nays 0. Finally passed, title adopted, ordered to the Senate.

  16. Scheduled for floor debate on 03/23/2026.

  17. Read by title, amended, ordered engrossed, passed to 3rd reading.

  18. Reported with amendments (16-0).

  19. Read by title, under the rules, referred to the Committee on Transportation, Highways and Public Works.

  20. Prefiled.

  21. Under the rules, provisionally referred to the Committee on Transportation, Highways and Public Works.

  22. First appeared in the Interim Calendar on 2/27/2026.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 1 co-sponsors · 145 not signed on

Sponsors (1)

Co-sponsors (1)

Not signed on (145)

145 members have not signed on to this bill.

Show all 145 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Passed 97 Yea · 0 Nay · 8 Other
Party YeaNayPresentNot Voting
Democrat 28002
Republican 63005
Unaffiliated 6001
Total 97008
% of votes cast 92%0%0%8%
How each member voted (105)
Member Party Vote
Amedee — Yea
Galle — Yea
Stagni — Yea
Mr. Speaker — Not Voting
Johnson, T. — Yea
Landry, T. — Yea
St. Blanc — Yea
Adrian Fisher Democrat Yea
Aimee Adatto Freeman Democrat Yea
Alonzo L. Knox Democrat Yea
Barbara Carpenter Democrat Yea
C. Denise Marcelle Democrat Yea
Candace N. Newell Democrat Yea
Chasity Martinez Democrat Yea
Dana Henry Democrat Yea
Delisha Boyd Democrat Yea
Ed Murray Democrat Yea
Edmond Jordan Democrat Yea
Gerald Boudreaux Democrat Yea
III, Ed Larvadain Democrat Yea
Joy Walters Democrat Yea
Jr., Kyle M. Green Democrat Yea
Ken Brass Democrat Yea
Mandie Landry Democrat Yea
Marcus Anthony Bryant Democrat Yea
Pat Moore Democrat Yea
Rashid Armand Young Democrat Yea
Robby Carter Democrat Yea
Rodney Lyons Democrat Yea
Roy Daryl Adams Democrat Yea
Shaun Raphael Mena Democrat Yea
Sr., Wilford Carter Democrat Not Voting
Steven Jackson Democrat Yea
Sylvia Elaine Taylor Democrat Yea
Tammy T. Phelps Democrat Yea
Tehmi Jahi Chassion Democrat Not Voting
Vanessa Caston LaFleur Democrat Yea
Annie Spell Republican Yea
Barbara Reich Freiberg Republican Yea
Beth Anne Billings Republican Yea
Brett F. Geymann Republican Yea
Brian Leonard Glorioso Republican Yea
Bryan Fontenot Republican Yea
Chad Michael Boyer Republican Yea
Chance Keith Henry Republican Yea
Christopher Turner Republican Yea
Danny McCormick Republican Yea
Daryl Andrew Deshotel Republican Yea
Debbie Villio Republican Yea
Dixon Wallace McMakin Republican Yea
Dodie Horton Republican Yea
Emily Chenevert Republican Yea
Foy Bryan Gadberry Republican Yea
Francis C. Thompson Republican Yea
Gregory A. Miller Republican Yea
III, Roger William Wilder Republican Yea
III, Vincent E. Cox Republican Yea
IV, Gerald "Beau" Beaullieu Republican Yea
Jack McFarland Republican Yea
Jacob Braud Republican Yea
Jacob Jules Landry Republican Yea
Jason Brian DeWitt Republican Yea
Jeffrey "Jeff" Fons Wiley Republican Yea
Jeremy LaCombe Republican Yea
Jerome Zeringue Republican Yea
Jessica Domangue Republican Yea
John E. Wyble Republican Yea
Joseph A. Orgeron Republican Yea
Josh Carlson Republican Yea
Jr., Dennis Bamburg Republican Not Voting
Jr., John R. Illg Republican Yea
Jr., Michael Robert Bayham Republican Yea
Kathy Edmonston Republican Yea
Kellee Hennessy Dickerson Republican Yea
Kim Carver Republican Yea
Kimberly Landry Coates Republican Yea
Larry A. Bagley Republican Not Voting
Lauren Ventrella Republican Yea
Laurie Schlegel Republican Yea
Les Farnum Republican Yea
Mark Wright Republican Yea
Michael "Gabe" Firment Republican Yea
Michael Charles Echols Republican Yea
Michael Melerine Republican Yea
Mike Johnson Republican Yea
Neil Riser Republican Yea
Nicholas Muscarello Republican Yea
Paul Sawyer Republican Yea
Phillip Eric Tarver Republican Yea
Polly Thomas Republican Yea
R. Dewith Carrier Republican Yea
Raymond J. Crews Republican Not Voting
Reese "Skip" Broussard Republican Yea
Rhonda Gaye Butler Republican Yea
Robert "Bob" Owen Republican Yea
Rodney Schamerhorn Republican Yea
Ryan Bourriaque Republican Yea
Shane Mack Republican Yea
Sr., Peter F. Egan Republican Yea
Stephanie H. Berault Republican Yea
Stephanie Hilferty Republican Not Voting
Timothy P. Kerner Republican Yea
Tony Bacala Republican Not Voting
Troy Jude Hebert Republican Yea
Wayne McMahen Republican Yea

Official roll call →

FINAL PASSAGE (#1123)

Passed 36 Yea · 0 Nay · 3 Other
Party YeaNayPresentNot Voting
Unaffiliated 1000
Republican 25002
Democrat 10001
Total 36003
% of votes cast 92%0%0%8%
How each member voted (39)
Member Party Vote
Mr. President — Yea
Edward J. Price Democrat Yea
Gary Carter Democrat Yea
Gerald Boudreaux Democrat Yea
Jay Luneau Democrat Yea
Jimmy Harris Democrat Yea
Katrina R. Jackson-Andrews Democrat Yea
Larry Selders Democrat Not Voting
Regina Barrow Democrat Yea
Royce Duplessis Democrat Yea
Sam Jenkins Democrat Yea
Sidney Barthelemy II Democrat Yea
Adam Bass Republican Yea
Alan Seabaugh Republican Yea
Beth Mizell Republican Yea
Blake Miguez Republican Yea
Bob Hensgens Republican Yea
Brach Jerad Myers Republican Yea
Caleb Kleinpeter Republican Yea
Eddie J. Lambert Republican Yea
Franklin J. Foil Republican Not Voting
Glen Womack Republican Yea
Gregory A. Miller Republican Yea
Heather Cloud Republican Yea
Jeremy Stine Republican Yea
John C. "Jay" Morris Republican Yea
Jr., William "Bill" Wheat Republican Yea
Kirk Talbot Republican Yea
Mark Abraham Republican Yea
Michael "Big Mike" Fesi Republican Yea
Mike Reese Republican Yea
Patrick Connick Republican Yea
Patrick McMath Republican Not Voting
Rick Edmonds Republican Yea
Robert "Bob" Owen Republican Yea
Robert Allain Republican Yea
Stewart Jr. Cathey Republican Yea
Thomas A. Pressly Republican Yea
Valarie Hodges Republican Yea

Official roll call →

FINAL PASSAGE (#50)

Passed 100 Yea · 0 Nay · 3 Other
Party YeaNayPresentNot Voting
Unaffiliated 8000
Republican 63003
Democrat 29000
Total 100003
% of votes cast 97%0%0%3%
How each member voted (103)
Member Party Vote
Mr. Speaker — Yea
Amedee — Yea
Galle — Yea
Henry — Yea
Stagni — Yea
Johnson, T. — Yea
Landry, T. — Yea
St. Blanc — Yea
Adrian Fisher Democrat Yea
Aimee Adatto Freeman Democrat Yea
Alonzo L. Knox Democrat Yea
Barbara Carpenter Democrat Yea
C. Denise Marcelle Democrat Yea
Candace N. Newell Democrat Yea
Chasity Martinez Democrat Yea
Delisha Boyd Democrat Yea
Ed Murray Democrat Yea
Edmond Jordan Democrat Yea
Gerald Boudreaux Democrat Yea
III, Ed Larvadain Democrat Yea
Joy Walters Democrat Yea
Jr., Kyle M. Green Democrat Yea
Ken Brass Democrat Yea
Mandie Landry Democrat Yea
Marcus Anthony Bryant Democrat Yea
Pat Moore Democrat Yea
Rashid Armand Young Democrat Yea
Robby Carter Democrat Yea
Rodney Lyons Democrat Yea
Roy Daryl Adams Democrat Yea
Shaun Raphael Mena Democrat Yea
Sr., Wilford Carter Democrat Yea
Steven Jackson Democrat Yea
Sylvia Elaine Taylor Democrat Yea
Tammy T. Phelps Democrat Yea
Tehmi Jahi Chassion Democrat Yea
Vanessa Caston LaFleur Democrat Yea
Annie Spell Republican Not Voting
Barbara Reich Freiberg Republican Yea
Beth Anne Billings Republican Yea
Brett F. Geymann Republican Yea
Brian Leonard Glorioso Republican Yea
Bryan Fontenot Republican Yea
Chad Michael Boyer Republican Yea
Christopher Turner Republican Yea
Danny McCormick Republican Yea
Daryl Andrew Deshotel Republican Yea
Debbie Villio Republican Yea
Dixon Wallace McMakin Republican Yea
Dodie Horton Republican Yea
Emily Chenevert Republican Yea
Foy Bryan Gadberry Republican Yea
Francis C. Thompson Republican Yea
Gregory A. Miller Republican Yea
III, Roger William Wilder Republican Yea
III, Vincent E. Cox Republican Yea
IV, Gerald "Beau" Beaullieu Republican Yea
Jack McFarland Republican Yea
Jacob Braud Republican Yea
Jacob Jules Landry Republican Yea
Jason Brian DeWitt Republican Yea
Jeffrey "Jeff" Fons Wiley Republican Yea
Jeremy LaCombe Republican Yea
Jerome Zeringue Republican Yea
Jessica Domangue Republican Yea
John E. Wyble Republican Yea
Joseph A. Orgeron Republican Yea
Josh Carlson Republican Yea
Jr., Dennis Bamburg Republican Yea
Jr., John R. Illg Republican Yea
Jr., Michael Robert Bayham Republican Yea
Kathy Edmonston Republican Yea
Kellee Hennessy Dickerson Republican Yea
Kim Carver Republican Yea
Kimberly Landry Coates Republican Yea
Larry A. Bagley Republican Yea
Lauren Ventrella Republican Yea
Laurie Schlegel Republican Yea
Les Farnum Republican Not Voting
Mark Wright Republican Yea
Michael "Gabe" Firment Republican Yea
Michael Charles Echols Republican Yea
Michael Melerine Republican Yea
Mike Johnson Republican Yea
Neil Riser Republican Yea
Nicholas Muscarello Republican Yea
Phillip Eric Tarver Republican Yea
Polly Thomas Republican Not Voting
R. Dewith Carrier Republican Yea
Raymond J. Crews Republican Yea
Reese "Skip" Broussard Republican Yea
Rhonda Gaye Butler Republican Yea
Robert "Bob" Owen Republican Yea
Rodney Schamerhorn Republican Yea
Ryan Bourriaque Republican Yea
Shane Mack Republican Yea
Sr., Peter F. Egan Republican Yea
Stephanie H. Berault Republican Yea
Stephanie Hilferty Republican Yea
Timothy P. Kerner Republican Yea
Tony Bacala Republican Yea
Troy Jude Hebert Republican Yea
Wayne McMahen Republican Yea

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

Who sponsors HB 856?
HB 856 is sponsored by Francis C. Thompson (Republican) and Bryan Fontenot (Republican).
What is the current status of HB 856?
This bill has been enacted into law. Introduced February 27, 2026. Enacted.
Where can I track HB 856?
Track HB 856 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB 856

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB 856

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →