HB 2148 — Prohibiting the permitting and siting of electric transmission lines within any area designated by the United States department of energy as a national interest electric transmission corridor.
Last action — Died in Committee
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 2025-2026 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Bill Text
- Introduced As Introduced Current pdf
AI-generated reading aid from the bill's amendatory text — verify against the official bill.
The bill prohibits the permitting of electric transmission lines within designated national interest electric transmission corridors and limits the use of eminent domain in those areas.
-
K.S.A. 66-1,178
No electric utility may begin site preparation for or construction of an electric transmission line, or exercise the right of eminent domain to acquire any interest in land in connection with the site preparation for a construction of any such line without first acquiring a siting permit from the commission.→ No electric utility may begin site preparation for or construction of an electric transmission line, or exercise the right of eminent domain to acquire any interest in land in connection with the site preparation for a construction of any such line without first acquiring a siting permit from the commission. Except as provided in section 1, and amendments thereto, whenever any electric utility desires to obtain such a permit, the utility shall file an application with the commission setting forth therein that the utility proposes to construct an electric transmission line and specifying:The amendment clarifies the permitting process by specifying conditions under which permits may be obtained in relation to national interest electric transmission corridors.
-
K.S.A. 66-1,178
This section is repealed.Section K.S.A. 66-1,178 is entirely removed from the statute.
Action History
-
Died in Committee
-
Introduced
-
Referred to House Committee on Energy, Utilities and Telecommunications
Sponsors
- Troy Waymaster · Primary
- Lisa M. Moser · Primary
Sponsorship breakdown
Export CSV (upgrade) →2 sponsors · 0 co-sponsors · 0 not signed on
Sponsors (2)
- Troy Waymaster Republican
- Lisa M. Moser Republican
Co-sponsors (0)
None.
Not signed on (0)
None.
"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
- House Energy, Utilities and Telecommunications Referred January 29, 2025
Frequently asked questions
- Who sponsors HB 2148?
- HB 2148 is sponsored by Troy Waymaster (Republican) and Lisa M. Moser (Republican).
- What is the current status of HB 2148?
- This bill died with 2025-2026 Regular Session. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track HB 2148?
- Track HB 2148 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HB 2148
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HB 2148
Last checked for changes 4 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →