SB 128 — Requires the Public Utility Commission to study electric power.
Last action — In Senate Committee
-
✓Introduced
-
2In Committee
-
3Passed Senate
-
4Passed House
-
5To Executive
-
6Enacted
This bill is in committee in the Senate. Introduced January 17, 2025. It must pass committee before a floor vote.
Next likely step: a committee vote, then a floor vote in the Senate.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
-
In Committee
Current position in the legislative process.
-
1 sponsor
1 primary, 0 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (1 D).
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
Summary
Digest: Makes the PUC do a study on electric power and submit a report. (Flesch Readability Score: 69.9). Requires the Public Utility Commission to study electric power. Directs the commission to submit findings to the interim committees of the Legislative Assembly related to energy not later than September 15, 2026. Sunsets on January 2, 2027.
Bill Text
We don't have the full text on file for this bill yet.
Read SB 128 on the official Oregon source →Action History
-
In Senate Committee
Sponsors
- Jeff Golden · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 89 not signed on
Sponsors (1)
- Jeff Golden Democrat
Co-sponsors (0)
None.
Not signed on (89)
89 members have not signed on to this bill.
Show all 89 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does SB 128 do?
- Digest: Makes the PUC do a study on electric power and submit a report. (Flesch Readability Score: 69.9). Requires the Public Utility Commission to study electric power. Directs the commission to submit findings to the interim committees of the Legislative Assembly related to energy not later than September 15, 2026. Sunsets on January 2, 2027.
- Who sponsors SB 128?
- SB 128 is sponsored by Jeff Golden (Democrat).
- What is the current status of SB 128?
- This bill is in committee in the Senate. Introduced January 17, 2025. It must pass committee before a floor vote.
- Where can I track SB 128?
- Track SB 128 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB 128
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB 128
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →