Oregon 2025R1 Session Status: In Committee Bipartisan · 7 D · 2 R cosponsors

SB 1143 — Directs the Public Utility Commission to establish a pilot program that allows each natural gas company to develop a utility-scale thermal energy network pilot project to provide heating and cooling services to customers.

Last action — In Senate Committee

  1. ✓
    Introduced
  2. 2
    In Committee
  3. 3
    Passed Senate
  4. 4
    Passed House
  5. 5
    To Executive
  6. 6
    Enacted

This bill is in committee in the Senate. Introduced May 09, 2025. It must pass committee before a floor vote.

Next likely step: a committee vote, then a floor vote in the Senate.

Odds of enactment

Low chance

Based on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Likely to advance 62% · high confidence
  • In Committee

    Current position in the legislative process.

  • 9 sponsors

    6 primary, 3 co-sponsors signed on.

  • Bipartisan support

    Sponsored across 2 parties (7 D · 2 R) — cross-party backing.

  • Cleared a recorded vote

    Passed 1 recorded vote so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

<b>Digest: Makes the PUC create a program to have each gas company create a thermal energy network pilot project. Makes each gas company apply to create a pilot project. Makes labor standards for certain covered projects. (Flesch Readability Score: 64.4).</b> [<i>Digest: Makes the PUC create a program to have each gas company create a thermal energy network pilot project. Makes each gas company apply to create a pilot project. (Flesch Readability Score: 65.7).</i>] Directs the Public Utility Commission to establish a pilot program that allows each natural gas company to develop a utility-scale thermal energy network pilot project to provide heating and cooling services to customers. Requires each natural gas company to file a proposal and plan to develop a pilot project or an explanation for why the natural gas company is not submitting a proposal. Identifies criteria the commission shall take into consideration in evaluating a proposal. <b>Establishes labor standards and reporting requirements for certain thermal energy network projects.</b> Takes effect on the 91st day following adjournment sine die.

Bill Text

We don't have the full text on file for this bill yet.

Read SB 1143 on the official Oregon source →

Action History

  1. In Senate Committee

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

6 sponsors · 3 co-sponsors · 81 not signed on · 1 voted No

Sponsors (6)

Co-sponsors (3)

Not signed on (81)

81 members have not signed on to this bill.

Show all 81 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does SB 1143 do?
<b>Digest: Makes the PUC create a program to have each gas company create a thermal energy network pilot project. Makes each gas company apply to create a pilot project. Makes labor standards for certain covered projects. (Flesch Readability Score: 64.4).</b> [<i>Digest: Makes the PUC create a program to have each gas company create a thermal energy network pilot project. Makes each gas company apply to create a pilot project. (Flesch Readability Score: 65.7).</i>] Directs the Public Utility Commission to establish a pilot program that allows each natural gas company to develop a utility-scale thermal energy network pilot project to provide heating and cooling services to customers. Requires each natural gas company to file a proposal and plan to develop a pilot project or an explanation for why the natural gas company is not submitting a proposal. Identifies criteria the commission shall take into consideration in evaluating a proposal. <b>Establishes labor standards and reporting requirements for certain thermal energy network projects.</b> Takes effect on the 91st day following adjournment sine die.
Who sponsors SB 1143?
SB 1143 is sponsored by Kate Lieber (Democrat), Janeen Sollman (Democrat), Bobby Levy (Republican), Tom Andersen (Democrat), Pam Marsh (Democrat), Khanh Pham (Democrat), Ken Helm (Democrat), John Lively (Democrat), and David Brock Smith (Republican).
What is the current status of SB 1143?
This bill is in committee in the Senate. Introduced May 09, 2025. It must pass committee before a floor vote.
Where can I track SB 1143?
Track SB 1143 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on SB 1143

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of SB 1143

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →