New Jersey 222nd Legislature Status: Introduced Sponsors 7 D

A 4801 — Establishes certain protections against demand by large-load addition customers in State.

Last action — R/S REF SEG

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed General Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the General Assembly. Introduced March 23, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

In plain language

The bill establishes protections for large-load customers against demand charges.

This bill provides certain protections to large-load addition customers, likely relating to how they are charged for demand. It aims to ensure fairness in their billing practices.

Summary

Large-load addition costomers-establish certain protections against demand

Bill Text

What changed in the latest version

65 added · 87 removed

Plain-language change summary

The amended bill clarifies the definition of "large-load addition customer" to refer specifically to an individual addition of load at or above 50 MW, and it allows for an alternative megawatt threshold to be set by the New Jersey Board of Public Utilities. Additionally, the amendment has removed the reference to "PJM Interconnection, L.L.C." and "reliability backstop procurement" from the definitions. These changes streamline the definitions and provide flexibility in how large-load additions are determined, which could affect how utilities plan and implement energy solutions in the state.

→
Previous
Latest
A4801 ASSEMBLY, No.
A4801 1R [First Reprint] ASSEMBLY, No.
DEANGELO District 14 (Mercer and Middlesex)         SYNOPSIS      Establishes certain protections against demand by large-load addition customers in State.
DEANGELO District 14 (Mercer and Middlesex)   Co-Sponsored by:
  CURRENT VERSION OF TEXT      As introduced.
Assemblymen Kearney, Bhalla, Assemblywoman Swain and Assemblyman Tully         SYNOPSIS      Establishes certain protections against demand by large-load addition customers in State.
  CURRENT VERSION OF TEXT      As reported by the Assembly Telecommunications and Utilities Committee on June 4, 2026, with amendments.
       1.    As used in P.L.    , c.    (C.        ) (pending before the Legislature as this bill):       “Board” means the New Jersey Board of Public Utilities or a successor agency.
        1.   As used in P.L.    , c.    (C.        ) (pending before the Legislature as this bill):        “Board” means the New Jersey Board of Public Utilities or a successor agency.
     “Electric public utility” means the same as that term is defined in section 3 of P.L.1999, c.23 (C.48:3-51).
      “Electric public utility” means the same as that term is defined in section 3 of P.L.1999, c.23 (C.48:3-51).
     “Large-load addition customer” means individual additions of load at or above 50 MW at a single point of interconnection.
      “Large-load addition customer” means 1an1 individual 1[additions] addition1 of load at or above 50 MW 1[at a single point of interconnection] or an alternative MW threshold set by the board pursuant to section 5 of P.L.    , c.    (C.        ) (pending before the Legislature as this bill)1.
     “Load-serving entity” means an entity, or the duly-designated agent of the entity, including a load aggregator or power marketer, that serves end-users within the State and is authorized to sell electric energy to end-users located within the State.
      “Load-serving entity” means an entity, or the duly-designated agent of the entity, including a load aggregator or power marketer, that serves end-users within the State and is authorized to sell electric energy to end-users located within the State.  1“Load-serving entity” includes a large-load addition customer serving as the large-load addition customer’s own load-serving entity.1       “PJM Interconnection, L.L.C.” or “PJM” means the same as that term is defined in section 3 of P.L.1999, c.23 (C.48:3-51).
     “PJM Interconnection, L.L.C.” or “PJM” means the same as that term is defined in section 3 of P.L.1999, c.23 (C.48:3-51).
      “Reliability 1[backstop]1 procurement” means a PJM-approved mechanism to procure long-term 1[contracts] commitments1 from new capacity resources, however constituted, 1that are1 deemed necessary to ensure electric system reliability 1[during periods when market-based outcomes are insufficient to meet forecasted needs]1.
     “Reliability backstop procurement” means a PJM-approved mechanism to procure long-term contracts from new capacity resources, however constituted, deemed necessary to ensure electric system reliability during periods when market-based outcomes are insufficient to meet forecasted needs.
        2.   When issued a curtailment obligation or directive from PJM due to a load-serving entity’s 1or an electric public utility’s1 provision of service to a large-load addition customer, the load-serving entity 1or electric public utility1 shall impose PJM’s curtailment obligation or directive solely on the load-serving entity’s 1or electric public utility’s1 large-load addition customers 1, as appropriate1.  However, nothing in this section shall be construed to prevent a load-serving entity 1or an electric public utility1 from taking necessary action to maintain system reliability and adopting voluntary load curtailment programs.
       2.    When issued a curtailment obligation or directive from PJM due to a load-serving entity’s provision of service to a large-load addition customer, the load-serving entity shall impose PJM’s curtailment obligation or directive solely on the load-serving entity’s large-load addition customers.  However, nothing in this section shall be construed to prevent a load-serving entity from taking necessary action to maintain system reliability and adopting voluntary load curtailment programs.
        3.   Any financial or other obligation associated with 1[the] a1 reliability 1[backstop]1 procurement, or other comparable assignment of long-term capacity obligations, that is assigned to a load-serving entity 1or an electric public utility1 shall be passed through 1or allocated1 to large-load addition customers under substantially-similar terms as PJM assigns the financial or other obligations to the load-serving entity 1or electric public utility1.
       3.    Any financial or other obligation associated with the reliability backstop procurement, or other comparable assignment of long-term capacity obligations, that is assigned to a load-serving entity shall be passed through to large-load addition customers under substantially-similar terms as PJM assigns the financial or other obligations to the load-serving entity.
        4.   In order to receive electric public utility service from an electric public utility in the State, a large-load addition customer shall:  provide appropriate financial security 1,1 in a manner approved by the board, to 1[either]1 the load serving entity 1[or] , PJM,1 the electric public utility, 1or other entity,1 as appropriate, to ensure that costs associated with 1a1 reliability 1[backstop]1 procurement are not passed through to other New Jersey customers, 1even1 if the large-load addition customer’s demand on the electrical grid 1[necessitates reliability backstop procurement through PJM] does not fully materialize over the term of the reliability procurement commitment1 ;
       4.    In order to receive electric public utility service from an electric public utility in the State, a large-load addition customer shall:  provide appropriate financial security in a manner approved by the board, to either the load serving entity or the electric public utility, as appropriate, to ensure that costs associated with reliability backstop procurement are not passed through to other New Jersey customers, if the large-load addition customer’s demand on the electrical grid necessitates reliability backstop procurement through PJM;
       5.    The board shall, in accordance with the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), adopt rules and regulations as necessary to implement the provisions of this act, including the form of the appropriate financial security pursuant to section 4 of P.L.    , c.     (C.        ) (pending before the Legislature as this bill).
       5.    The board shall, in accordance with the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), adopt rules and regulations as necessary to implement the provisions of 1[this act] P.L.    , c.    (C.        ) (pending before the Legislature as this bill)1, including 1rules and regulations determining an alternative MW threshold for large-load addition customers and1 the form of the appropriate financial security pursuant to section 4 of P.L.    , c.    (C.        ) (pending before the Legislature as this bill).
    STATEMENT        This bill prohibits certain costs and obligations related to the large load addition customers from being passed to non-large load addition customers.
     The regional grid operator for the State, PJM Interconnection, L.L.C.
or PJM, has been developing options for new load customers whose electricity demand can be curtailed in times of system need.  Further, PJM has engaged stakeholders in a proposal for creating a reliability backstop procurement auction that is to procure long-term energy contracts from new capacity resources.
     Under the bill, when issued a curtailment obligation or directive from PJM due to a load-serving entity’s provision of service to a large-load addition customer, the load-serving entity is required to impose PJM’s curtailment obligation or directive solely on the load-serving entity’s large-load addition customers.  However, the bill does not prevent a load-serving entity from taking necessary action to maintain system reliability and adopting voluntary load curtailment programs.
     Additionally, the bill requires any financial or other obligation associated with reliability backstop procurement, or other comparable assignment of long-term capacity obligations, that is assigned to a load-serving entity to be passed through to large-load addition customers under substantially-similar terms as PJM assigns the financial or other obligations to the load-serving entity.
     Finally, under the bill, in order to receive electric public utility service in the State, a large-load addition customer is required to:  (1) provide appropriate financial security to either the load serving entity or the electric public utility, as appropriate, to ensure that costs associated with reliability backstop procurement are not passed through to other New Jersey customers, if the large-load addition customer’s demand on the electrical grid necessitates reliability backstop procurement through PJM;
and (2) submit detailed information to PJM as outlined in the bill.
View plain text versions (2)

Action History

  1. R/S REF SEG

  2. PA

  3. REP/ACA 2RA

  4. INT 1RA REF ATU

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

3 sponsors · 4 co-sponsors · 113 not signed on

Sponsors (3)

Co-sponsors (4)

Not signed on (113)

113 members have not signed on to this bill.

Show all 113 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Floor vote

Passed 79 Yea · 0 Nay · 1 Other
Party YeaNayPresentNot Voting
Democratic 56000
Republican 21001
Party not on file 2000
Total 79001
% of votes cast 99%0%0%1%
How each member voted (80)
Member Party Vote
Azzariti Jr., John V. — Yea
Donlon, Margie — Yea
Al Abdelaziz Democrat Yea
Anthony Angelozzi Democrat Yea
Rosaura Bagolie Democrat Yea
David Bailey Jr. Democrat Yea
Ravi S. Bhalla Democrat Yea
Katie Brennan Democrat Yea
Clinton Calabrese Democrat Yea
Linda S. Carter Democrat Yea
Alixon Collazos-Gill Democrat Yea
Craig J. Coughlin Democrat Yea
Joe Danielsen Democrat Yea
Wayne P. DeAngelo Democrat Yea
Mitchelle Drulis Democrat Yea
Kevin P. Egan Democrat Yea
Roy Freiman Democrat Yea
Louis D. Greenwald Democrat Yea
Shama A. Haider Democrat Yea
Dan Hutchison Democrat Yea
Melinda Kane Democrat Yea
Robert J. Karabinchak Democrat Yea
Andrea Katz Democrat Yea
Vincent M. Kearney Democrat Yea
James J. Kennedy Democrat Yea
Yvonne Lopez Democrat Yea
Andrew Macurdy Democrat Yea
Tennille R. McCoy Democrat Yea
Cody D. Miller Democrat Yea
William F. Moen Jr. Democrat Yea
Carmen Theresa Morales Democrat Yea
Carol A. Murphy Democrat Yea
Chigozie U. Onyema Democrat Yea
Ellen J. Park Democrat Yea
Luanne M. Peterpaul Esq. Democrat Yea
Eliana Pintor Marin Democrat Yea
Annette Quijano Democrat Yea
Verlina Reynolds-Jackson Democrat Yea
Ed Rodriguez Democrat Yea
Gabriel Rodriguez Democrat Yea
Maureen Rowan Democrat Yea
William B. Sampson IV Democrat Yea
Gary S. Schaer Democrat Yea
Alexander Schnall Democrat Yea
Heather Simmons Democrat Yea
Balvir Singh Democrat Yea
William W. Spearman Democrat Yea
Shanique Speight Democrat Yea
Sterley S. Stanley Democrat Yea
Kenyatta Stewart Democrat Yea
Lisa Swain Democrat Yea
Marisa Sweeney Democrat Yea
Cleopatra G. Tucker Democrat Yea
Chris Tully Democrat Yea
Michael Venezia Democrat Yea
Anthony S. Verrelli Democrat Yea
Larry Wainstein Democrat Yea
Jerry Walker Democrat Yea
Robert Auth Republican Yea
Al Barlas Republican Yea
Brian Bergen Republican Yea
Robert D. Clifton Republican Yea
Christopher P. DePhillips Republican Yea
John DiMaio Republican Yea
Aura K. Dunn Republican Yea
Dawn Fantasia Republican Yea
Victoria A. Flynn Republican Yea
Donald A. Guardian Republican Yea
Michael Inganamort Republican Yea
Paul Kanitra Republican Yea
Sean T. Kean Republican Yea
Antwan L. McClellan Republican Yea
Gregory P. McGuckin Republican Yea
Gregory E. Myhre Republican Yea
Erik Peterson Republican Yea
Brian E. Rumpf Republican Yea
Alex Sauickie Republican Not Voting
Gerry Scharfenberger Republican Yea
Erik K. Simonsen Republican Yea
Jay Webber Republican Yea

Official roll call →

Committee ATU

Committee vote — ATU

Passed 9 Yea · 0 Nay · 1 Other
Party YeaNayPresentNot Voting
Democratic 7000
Republican 2001
Total 9001
% of votes cast 90%0%0%10%
How each member voted (10)
Member Party Vote
David Bailey Jr. Democrat Yea
Wayne P. DeAngelo Democrat Yea
Kevin P. Egan Democrat Yea
Robert J. Karabinchak Democrat Yea
Andrea Katz Democrat Yea
William W. Spearman Democrat Yea
Jerry Walker Democrat Yea
Al Barlas Republican Not Voting
Paul Kanitra Republican Yea
Alex Sauickie Republican Yea

Official roll call →

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does A 4801 do?
Large-load addition costomers-establish certain protections against demand
Who sponsors A 4801?
A 4801 is sponsored by David Bailey Jr. (Democrat), Andrea Katz (Democrat), Wayne P. DeAngelo (Democrat), Vincent M. Kearney (Democrat), Ravi S. Bhalla (Democrat), Lisa Swain (Democrat), and Chris Tully (Democrat).
What is the current status of A 4801?
This bill has been introduced in the General Assembly. Introduced March 23, 2026. It must pass committee before a floor vote.
Where can I track A 4801?
Track A 4801 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on A 4801

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of A 4801

Last checked for changes about 2 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →