A 4529 — Modifies certain requirements for transmission-scale energy storage procurement under BPU incentive program.
Last action — APP
-
1Introduced
-
2In Committee
-
3Passed General Assembly
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill has been introduced in the General Assembly. Introduced March 09, 2026. It must pass committee before a floor vote.
Next likely step: a committee referral and hearing.
Odds of enactment
Low chanceBased on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.
Upgrade to see the exact probability and what's driving it.
A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.
Prognosis
-
Introduced
Current position in the legislative process.
-
9 sponsors
5 primary, 4 co-sponsors signed on.
-
Single-party support
Sponsorship is currently within one party (4 D).
-
Cleared a recorded vote
Passed 3 recorded votes so far.
Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.
Summary
Transmission-scale energy storage procurement-modifies cert requirements
Bill Text
What changed in the latest version
43 added · 59 removedPlain-language change summary
The amendment updates the deadline for the Board of Public Utilities to approve incentive awards for transmission-scale energy storage projects, changing it from June 30 to December 31, 2026. It also revises the requirements for projects applying for incentives in Tranche 1, specifically the references to existing agreements and studies required from PJM. These changes clarify and extend the timeline for project development and approval, which may affect how and when projects can secure funding and proceed.
2026, c.002 (A4529) CHAPTER 2 P.L.An Act concerning the procurement of transmission-scale energy storage and amending P.L.2025, c.136.
2026, CHAPTER 2, approved March 24, 2026 Assembly, No.
4529 An Act concerning the procurement of transmission-scale energy storage and amending P.L.2025, c.136.
1. Section 2 of P.L.2025, c.136 (C.48:3-121.3) is amended to read as follows: 2. C.48:3-121.3 a. Transmission-scale (1) The Board of Public Utilities shall establish a program to procure and provide incentive awards for the development of transmission-scale energy storage systems withdevelopment, a reasonable likelihood of successful and timely completion. The board shall solicit applications for the program established pursuant to this section in an initial Tranche 1 and in Tranche 2, pursuant to paragraph (2) of this subsection. The board may place an eligible project that does not receive an incentive awardawards. for Tranche 1 or Tranche 2 on a waiting list and consider the eligible project for an incentive award during a subsequent tranche.
(2) 2. By no later than [June 30] December 31, 2026, the board shall approve incentive awards for eligible projects totaling at least 1,000 MW AC in installed capacity. However, at least 350 MW AC of the 1,000 MW AC procurement goal shall be approved in incentive awards for eligible projects in Tranche 1 by no later than December 31, 2025. If the board is unable to procure all 1,000 MW AC in installed capacity in Tranche 1, the board shall approve incentive awards for eligible projects in Tranche 2, provided that all incentive awards in Tranche 2 are awarded by no later than [June 30] December 31, 2026.
a.
(1) The Board of Public Utilities shall establish a program to procure and provide incentive awards for the development of transmission-scale energy storage systems with a reasonable likelihood of successful and timely completion. The board shall solicit applications for the program established pursuant to this section in an initial Tranche 1 and in Tranche 2, pursuant to paragraph (2) of this subsection. The board may place an eligible project that does not receive an incentive award for Tranche 1 or Tranche on a waiting list and consider the eligible project for an incentive award during a subsequent tranche.
(2) By no later than December 31, 2026, the board shall approve incentive awards for eligible projects totaling at least 1,000 MW AC in installed capacity. However, at least 350 MW AC of the 1,000 MW AC procurement goal shall be approved in incentive awards for eligible projects in Tranche 1 by no later than December 31, 2025. If the board is unable to procure all 1,000 MW AC in installed capacity in Tranche 1, the board shall approve incentive awards for eligible projects in Tranche 2, provided that all incentive awards in Tranche 2 are awarded by no later than December 31, 2026.
(b) a transmission-scale energy storage system applying for an incentive award in Tranche 2 shall have entered the PJM interconnection process and, at the time of applicationapplication; [,] :
have a fully executed Generation Interconnection Agreement or Interconnection Service Agreement through PJMPJM; [,] ;
have a completed Surplus Interconnection Study through PJMPJM; [,] ;
have been studied by PJM in a Phase I System Impact Study [and have paid a Decision Point I Readiness Deposit to PJM,] or be in the process of undergoing a Phase I System Impact Study through PJM;
and (c) if a transmission-scale energy storage system applying for an incentive award in Tranche 1 fulfils the project maturity requirements established pursuant to subparagraph (a) [or subparagraph (b)] of this paragraph by completing a Surplus Interconnection Study or by notifying PJM of intent to transfer existing Capacity Interconnection Rights associated with a deactivating generation station, then the transmission-scale energy storage system shall also have obtained the associated Capacity Interconnection Rights through PJM;
and (8) require a developer to provide additional information to the board during the term of the incentive award, as the board may reasonably require. The board may set additional requirements at its discretion, including, but not limited to, a requirement that the developer report major development and construction milestones to the board, maintain financial security throughout the term of the incentive award, orand any other requirement the board determines necessary to ensure continued progress and operational viability of an eligible project.
g. g. (1) Notwithstanding the provisions of the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), or any other law or rule to the contrary, the board shall permit applications for Tranche 1 without regard to the publication status of the rules and regulations to be issued pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), by no later than September 30, 2025. (2) The board shall accept Tranche 1 applications for a maximum of 60 days after the beginning of the formal application period for Tranche 1. Within 60 days following the closure of the Tranche 1 application period, the board shall: (a) evaluate projects in accordance with this section, any rules or regulations proposed pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), and any application requirements and eligibility criteria approved pursuant to this subsection;
(1) Notwithstanding the provisions of the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), or any other law or rule to the contrary, the board shall permit applications for Tranche 1 without regard to the publication status of the rules and regulations to be issued, pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), by no later than September 30, 2025. (2) The board shall accept Tranche 1 applications for a maximum of 60 days after the beginning of the formal application period for Tranche 1. Within 60 days following the closure of the Tranche 1 application period, the board shall: (a) evaluate projects in accordance with this section, any rules or regulations proposed, pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), and any application requirements and eligibility criteria approved pursuant to this subsection;
(cf: P.L.2025, c.136, s.2) 2. This act shall take effect immediately.
STATEMENT ThisApproved billMarch would24, extend2026. the deadline for the Board of Public Utilities (BPU) to approve Tranche 1 and Tranche 2 incentive awards for eligible transmission-scale energy storage systems under the energy storage program established by N.J.S.A.48:3-121.2 et al.
(program). Under current law, the BPU is required to approve incentive awards for eligible projects totaling at least 1,000 megawatts in installed capacity by June 30, 2026. This bill extends that solicitation deadline to December 31, 2026. The bill also modifies certain project maturity requirements in order to expand the amount of projects eligible to receive incentive awards under Tranche 2 of the program.
Modifies certain requirements for transmission-scale energy storage procurement under BPU incentive program.
Action History
-
APP
-
PS PBH
-
SUB FOR
-
R/S SWR 2RS
-
PA
-
REP 2RA
-
REP REF AAP
-
INT 1RA REF ATU
Sponsors
- Bob Smith · Primary
- John J. Burzichelli · Primary
- Patrick J. Diegnan · Cosponsor
- Angela V. McKnight · Cosponsor
- Linda R. Greenstein · Cosponsor
- Annette Quijano · Cosponsor
- Robert J. Karabinchak · Primary
- Kevin P. Egan · Primary
- Wayne P. DeAngelo · Primary
Sponsorship breakdown
Export CSV (upgrade) →5 sponsors · 4 co-sponsors · 111 not signed on · 8 voted No
Sponsors (5)
- Smith, Bob
- Burzichelli, John J.
- Karabinchak, Robert J. Democrat
- Egan, Kevin P. Democrat
- DeAngelo, Wayne P. Democrat
Co-sponsors (4)
- Diegnan, Patrick J.
- McKnight, Angela V.
- Greenstein, Linda R.
- Quijano, Annette Democrat
Not signed on (111)
111 members have not signed on to this bill.
Show all 111 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Republican | 13 | 2 | 0 | 0 |
| Democrat | 23 | 0 | 0 | 2 |
| Total | 36 | 2 | 0 | 2 |
| % of votes cast | 90% | 5% | 0% | 5% |
How each member voted (40)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 10 | 0 | 0 | 1 |
| Republican | 0 | 4 | 0 | 0 |
| Total | 10 | 4 | 0 | 1 |
| % of votes cast | 67% | 27% | 0% | 7% |
How each member voted (15)
| Member | Party | Vote |
|---|---|---|
| Bailey Jr., David | Democrat | Yea |
| Carter, Linda S. | Democrat | Yea |
| Kane, Melinda | Democrat | Not Voting |
| McCoy, Tennille R. | Democrat | Yea |
| Morales, Carmen Theresa | Democrat | Yea |
| Pintor Marin, Eliana | Democrat | Yea |
| Reynolds-Jackson, Verlina | Democrat | Yea |
| Schaer, Gary S. | Democrat | Yea |
| Singh, Balvir | Democrat | Yea |
| Stewart, Kenyatta | Democrat | Yea |
| Swain, Lisa | Democrat | Yea |
| Auth, Robert | Republican | Nay |
| Flynn, Victoria A. | Republican | Nay |
| McClellan, Antwan L. | Republican | Nay |
| Myhre, Gregory E. | Republican | Nay |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democrat | 7 | 0 | 0 | 0 |
| Republican | 1 | 2 | 0 | 0 |
| Total | 8 | 2 | 0 | 0 |
| % of votes cast | 80% | 20% | 0% | 0% |
How each member voted (10)
| Member | Party | Vote |
|---|---|---|
| Bailey Jr., David | Democrat | Yea |
| DeAngelo, Wayne P. | Democrat | Yea |
| Egan, Kevin P. | Democrat | Yea |
| Karabinchak, Robert J. | Democrat | Yea |
| Katz, Andrea | Democrat | Yea |
| Spearman, William W. | Democrat | Yea |
| Walker, Jerry | Democrat | Yea |
| Barlas, Al | Republican | Nay |
| Myhre, Gregory E. | Republican | Yea |
| Sauickie, Alex | Republican | Nay |
Subjects
Frequently asked questions
- What does A 4529 do?
- Transmission-scale energy storage procurement-modifies cert requirements
- Who sponsors A 4529?
- A 4529 is sponsored by Smith, Bob, Burzichelli, John J., Diegnan, Patrick J., McKnight, Angela V., Greenstein, Linda R., Quijano, Annette (Democrat), Karabinchak, Robert J. (Democrat), Egan, Kevin P. (Democrat), and DeAngelo, Wayne P. (Democrat).
- What is the current status of A 4529?
- This bill has been introduced in the General Assembly. Introduced March 09, 2026. It must pass committee before a floor vote.
- Where can I track A 4529?
- Track A 4529 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on A 4529
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of A 4529
Last checked for changes 3 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →