New Jersey 222nd Legislature Status: Introduced 4 D cosponsors

A 4529 — Modifies certain requirements for transmission-scale energy storage procurement under BPU incentive program.

Last action — APP

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed General Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the General Assembly. Introduced March 09, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Odds of enactment

Low chance

Based on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Advancing 38% · moderate confidence
  • Introduced

    Current position in the legislative process.

  • 9 sponsors

    5 primary, 4 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (4 D).

  • Cleared a recorded vote

    Passed 3 recorded votes so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

Transmission-scale energy storage procurement-modifies cert requirements

Bill Text

What changed in the latest version

43 added · 59 removed

Plain-language change summary

The amendment updates the deadline for the Board of Public Utilities to approve incentive awards for transmission-scale energy storage projects, changing it from June 30 to December 31, 2026. It also revises the requirements for projects applying for incentives in Tranche 1, specifically the references to existing agreements and studies required from PJM. These changes clarify and extend the timeline for project development and approval, which may affect how and when projects can secure funding and proceed.

→
Previous
Latest
2026, c.002 (A4529)     P.L.
2026, c.002 (A4529) CHAPTER 2   An Act concerning the procurement of transmission-scale energy storage and amending P.L.2025, c.136.
2026, CHAPTER 2, approved March 24, 2026 Assembly, No.
4529   An Act concerning the procurement of transmission-scale energy storage and amending P.L.2025, c.136.
       1.    Section 2 of P.L.2025, c.136 (C.48:3-121.3) is amended to read as follows:       2.    a.  (1) The Board of Public Utilities shall establish a program to procure and provide incentive awards for the development of transmission-scale energy storage systems with a reasonable likelihood of successful and timely completion.  The board shall solicit applications for the program established pursuant to this section in an initial Tranche 1 and in Tranche 2, pursuant to paragraph (2) of this subsection.  The board may place an eligible project that does not receive an incentive award for Tranche 1 or Tranche 2 on a waiting list and consider the eligible project for an incentive award during a subsequent tranche.
       1.    Section 2 of P.L.2025, c.136 (C.48:3-121.3) is amended to read as follows:    C.48:3-121.3  Transmission-scale energy storage systems development, incentive awards.
     (2)   By no later than [June 30] December 31, 2026, the board shall approve incentive awards for eligible projects totaling at least 1,000 MW AC in installed capacity.  However, at least 350 MW AC of the 1,000 MW AC procurement goal shall be approved in incentive awards for eligible projects in Tranche 1 by no later than December 31, 2025.  If the board is unable to procure all 1,000 MW AC in installed capacity in Tranche 1, the board shall approve incentive awards for eligible projects in Tranche 2, provided that all incentive awards in Tranche 2 are awarded by no later than [June 30] December 31, 2026.
     2.
a.
(1) The Board of Public Utilities shall establish a program to procure and provide incentive awards for the development of transmission-scale energy storage systems with a reasonable likelihood of successful and timely completion.  The board shall solicit applications for the program established pursuant to this section in an initial Tranche 1 and in Tranche 2, pursuant to paragraph (2) of this subsection.  The board may place an eligible project that does not receive an incentive award for Tranche 1 or Tranche on a waiting list and consider the eligible project for an incentive award during a subsequent tranche.
     (2)   By no later than December 31, 2026, the board shall approve incentive awards for eligible projects totaling at least 1,000 MW AC in installed capacity.  However, at least 350 MW AC of the 1,000 MW AC procurement goal shall be approved in incentive awards for eligible projects in Tranche 1 by no later than December 31, 2025.  If the board is unable to procure all 1,000 MW AC in installed capacity in Tranche 1, the board shall approve incentive awards for eligible projects in Tranche 2, provided that all incentive awards in Tranche 2 are awarded by no later than December 31, 2026.
     (b)   a transmission-scale energy storage system applying for an incentive award in Tranche 2 shall have entered the PJM interconnection process and, at the time of application [,] :
     (b)   a transmission-scale energy storage system applying for an incentive award in Tranche 2 shall have entered the PJM interconnection process and, at the time of application;
have a fully executed Generation Interconnection Agreement or Interconnection Service Agreement through PJM [,] ;
have a fully executed Generation Interconnection Agreement or Interconnection Service Agreement through PJM;
have a completed Surplus Interconnection Study through PJM [,] ;
have a completed Surplus Interconnection Study through PJM;
have been studied by PJM in a Phase I System Impact Study [and have paid a Decision Point I Readiness Deposit to PJM,] or be in the process of undergoing a Phase I System Impact Study through PJM;
have been studied by PJM in a Phase I System Impact Study or be in the process of undergoing a Phase I System Impact Study through PJM;
and      (c)   if a transmission-scale energy storage system applying for an incentive award in Tranche 1 fulfils the project maturity requirements established pursuant to subparagraph (a) [or subparagraph (b)] of this paragraph by completing a Surplus Interconnection Study or by notifying PJM of intent to transfer existing Capacity Interconnection Rights associated with a deactivating generation station, then the transmission-scale energy storage system shall also have obtained the associated Capacity Interconnection Rights through PJM;
and      (c)   if a transmission-scale energy storage system applying for an incentive award in Tranche 1 fulfils the project maturity requirements established pursuant to subparagraph (a) of this paragraph by completing a Surplus Interconnection Study or by notifying PJM of intent to transfer existing Capacity Interconnection Rights associated with a deactivating generation station, then the transmission-scale energy storage system shall also have obtained the associated Capacity Interconnection Rights through PJM;
and      (8)   require a developer to provide additional information to the board during the term of the incentive award, as the board may reasonably require.  The board may set additional requirements at its discretion, including, but not limited to, a requirement that the developer report major development and construction milestones to the board, maintain financial security throughout the term of the incentive award, or any other requirement the board determines necessary to ensure continued progress and operational viability of an eligible project.
and      (8)   require a developer to provide additional information to the board during the term of the incentive award, as the board may reasonably require.  The board may set additional requirements at its discretion, including, but not limited to, a requirement that the developer report major development and construction milestones to the board, maintain financial security throughout the term of the incentive award, and any other requirement the board determines necessary to ensure continued progress and operational viability of an eligible project.
     g.    (1) Notwithstanding the provisions of the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), or any other law or rule to the contrary, the board shall permit applications for Tranche 1 without regard to the publication status of the rules and regulations to be issued pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), by no later than September 30, 2025.       (2)   The board shall accept Tranche 1 applications for a maximum of 60 days after the beginning of the formal application period for Tranche 1.  Within 60 days following the closure of the Tranche 1 application period, the board shall:       (a)   evaluate projects in accordance with this section, any rules or regulations proposed pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), and any application requirements and eligibility criteria approved pursuant to this subsection;
     g.
(1) Notwithstanding the provisions of the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), or any other law or rule to the contrary, the board shall permit applications for Tranche 1 without regard to the publication status of the rules and regulations to be issued, pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), by no later than September 30, 2025.       (2)   The board shall accept Tranche 1 applications for a maximum of 60 days after the beginning of the formal application period for Tranche 1.  Within 60 days following the closure of the Tranche 1 application period, the board shall:       (a)   evaluate projects in accordance with this section, any rules or regulations proposed, pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), and any application requirements and eligibility criteria approved pursuant to this subsection;
(cf:  P.L.2025, c.136, s.2)        2.    This act shall take effect immediately.
       2.    This act shall take effect immediately.
    STATEMENT        This bill would extend the deadline for the Board of Public Utilities (BPU) to approve Tranche 1 and Tranche 2 incentive awards for eligible transmission-scale energy storage systems under the energy storage program established by N.J.S.A.48:3-121.2 et al.
       Approved March 24, 2026.
(program).  Under current law, the BPU is required to approve incentive awards for eligible projects totaling at least 1,000 megawatts in installed capacity by June 30, 2026.  This bill extends that solicitation deadline to December 31, 2026.  The bill also modifies certain project maturity requirements in order to expand the amount of projects eligible to receive incentive awards under Tranche 2 of the program.
                                            Modifies certain requirements for transmission-scale energy storage procurement under BPU incentive program.
View plain text versions (3)

Action History

  1. APP

  2. PS PBH

  3. SUB FOR

  4. R/S SWR 2RS

  5. PA

  6. REP 2RA

  7. REP REF AAP

  8. INT 1RA REF ATU

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

5 sponsors · 4 co-sponsors · 111 not signed on · 8 voted No

Sponsors (5)

Co-sponsors (4)

  • Diegnan, Patrick J.
  • McKnight, Angela V.
  • Greenstein, Linda R.
  • Quijano, Annette Democrat

Not signed on (111)

111 members have not signed on to this bill.

Show all 111 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Floor vote

Passed 36 Yea · 2 Nay · 2 Other
Party YeaNayPresentNot Voting
Republican 13200
Democrat 23002
Total 36202
% of votes cast 90%5%0%5%
How each member voted (40)
Member Party Vote
Beach, James Democrat Yea
Burgess, Renee C. Democrat Yea
Burzichelli, John J. Democrat Yea
Cruz-Perez, Nilsa I. Democrat Not Voting
Cryan, Joseph P. Democrat Yea
Diegnan Jr., Patrick J. Democrat Yea
Gopal, Vin Democrat Yea
Greenstein, Linda R. Democrat Yea
Johnson, Gordon M. Democrat Yea
Lagana, Joseph A. Democrat Yea
McKeon, John F. Democrat Yea
McKnight, Angela V. Democrat Yea
Moriarty, Paul D. Democrat Yea
Mukherji, Raj Democrat Yea
Ruiz, M. Teresa Democrat Yea
Sarlo, Paul A. Democrat Yea
Scutari, Nicholas P. Democrat Yea
Singleton, Troy Democrat Yea
Smith, Bob Democrat Yea
Stack, Brian P. Democrat Yea
Timberlake, Britnee N. Democrat Not Voting
Turner, Shirley K. Democrat Yea
Vitale, Joseph F. Democrat Yea
Wimberly, Benjie E. Democrat Yea
Zwicker, Andrew Democrat Yea
Amato Jr., Carmen F. Republican Yea
Bramnick, Jon M. Republican Yea
Bucco, Anthony M. Republican Yea
Corrado, Kristin M. Republican Yea
Henry, Owen Republican Yea
Holzapfel, James W. Republican Yea
O'Scanlon Jr., Declan J. Republican Yea
Pennacchio, Joseph Republican Nay
Polistina, Vincent J. Republican Yea
Schepisi, Holly T. Republican Yea
Singer, Robert W. Republican Yea
Space, Parker Republican Yea
Steinhardt, Douglas J. Republican Yea
Testa Jr., Michael L. Republican Nay
Tiver, Latham Republican Yea

Official roll call →

Committee vote — AAP

Passed 10 Yea · 4 Nay · 1 Other
Party YeaNayPresentNot Voting
Democrat 10001
Republican 0400
Total 10401
% of votes cast 67%27%0%7%
How each member voted (15)
Member Party Vote
Bailey Jr., David Democrat Yea
Carter, Linda S. Democrat Yea
Kane, Melinda Democrat Not Voting
McCoy, Tennille R. Democrat Yea
Morales, Carmen Theresa Democrat Yea
Pintor Marin, Eliana Democrat Yea
Reynolds-Jackson, Verlina Democrat Yea
Schaer, Gary S. Democrat Yea
Singh, Balvir Democrat Yea
Stewart, Kenyatta Democrat Yea
Swain, Lisa Democrat Yea
Auth, Robert Republican Nay
Flynn, Victoria A. Republican Nay
McClellan, Antwan L. Republican Nay
Myhre, Gregory E. Republican Nay

Official roll call →

Committee vote — ATU

Passed 8 Yea · 2 Nay
Party YeaNayPresentNot Voting
Democrat 7000
Republican 1200
Total 8200
% of votes cast 80%20%0%0%
How each member voted (10)
Member Party Vote
Bailey Jr., David Democrat Yea
DeAngelo, Wayne P. Democrat Yea
Egan, Kevin P. Democrat Yea
Karabinchak, Robert J. Democrat Yea
Katz, Andrea Democrat Yea
Spearman, William W. Democrat Yea
Walker, Jerry Democrat Yea
Barlas, Al Republican Nay
Myhre, Gregory E. Republican Yea
Sauickie, Alex Republican Nay

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does A 4529 do?
Transmission-scale energy storage procurement-modifies cert requirements
Who sponsors A 4529?
A 4529 is sponsored by Smith, Bob, Burzichelli, John J., Diegnan, Patrick J., McKnight, Angela V., Greenstein, Linda R., Quijano, Annette (Democrat), Karabinchak, Robert J. (Democrat), Egan, Kevin P. (Democrat), and DeAngelo, Wayne P. (Democrat).
What is the current status of A 4529?
This bill has been introduced in the General Assembly. Introduced March 09, 2026. It must pass committee before a floor vote.
Where can I track A 4529?
Track A 4529 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on A 4529

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of A 4529

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →