A 4529 — Modifies certain requirements for transmission-scale energy storage procurement under BPU incentive program.

Last action — APP

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed General Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the General Assembly. Introduced March 09, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

In plain language

The bill modifies requirements for procuring transmission-scale energy storage under a state incentive program.

This legislation updates the requirements for incentive awards aimed at developing transmission-scale energy storage systems in New Jersey. The Board of Public Utilities will oversee the program, which includes specific capacity goals and eligibility criteria for award applicants.

What this means for you
  • Workers: This bill could create job opportunities in the energy storage sector during the development of new projects.

Summary

Transmission-scale energy storage procurement-modifies cert requirements

Bill Text

What changed in the latest version

43 added · 59 removed

Plain-language change summary

The amendment updates the deadline for the Board of Public Utilities to approve incentive awards for transmission-scale energy storage projects, changing it from June 30 to December 31, 2026. It also revises the requirements for projects applying for incentives in Tranche 1, specifically the references to existing agreements and studies required from PJM. These changes clarify and extend the timeline for project development and approval, which may affect how and when projects can secure funding and proceed.

→
Previous
Latest
2026, c.002 (A4529)     P.L.
2026, c.002 (A4529) CHAPTER 2   An Act concerning the procurement of transmission-scale energy storage and amending P.L.2025, c.136.
2026, CHAPTER 2, approved March 24, 2026 Assembly, No.
4529   An Act concerning the procurement of transmission-scale energy storage and amending P.L.2025, c.136.
       1.    Section 2 of P.L.2025, c.136 (C.48:3-121.3) is amended to read as follows:       2.    a.  (1) The Board of Public Utilities shall establish a program to procure and provide incentive awards for the development of transmission-scale energy storage systems with a reasonable likelihood of successful and timely completion.  The board shall solicit applications for the program established pursuant to this section in an initial Tranche 1 and in Tranche 2, pursuant to paragraph (2) of this subsection.  The board may place an eligible project that does not receive an incentive award for Tranche 1 or Tranche 2 on a waiting list and consider the eligible project for an incentive award during a subsequent tranche.
       1.    Section 2 of P.L.2025, c.136 (C.48:3-121.3) is amended to read as follows:    C.48:3-121.3  Transmission-scale energy storage systems development, incentive awards.
     (2)   By no later than [June 30] December 31, 2026, the board shall approve incentive awards for eligible projects totaling at least 1,000 MW AC in installed capacity.  However, at least 350 MW AC of the 1,000 MW AC procurement goal shall be approved in incentive awards for eligible projects in Tranche 1 by no later than December 31, 2025.  If the board is unable to procure all 1,000 MW AC in installed capacity in Tranche 1, the board shall approve incentive awards for eligible projects in Tranche 2, provided that all incentive awards in Tranche 2 are awarded by no later than [June 30] December 31, 2026.
     2.
a.
(1) The Board of Public Utilities shall establish a program to procure and provide incentive awards for the development of transmission-scale energy storage systems with a reasonable likelihood of successful and timely completion.  The board shall solicit applications for the program established pursuant to this section in an initial Tranche 1 and in Tranche 2, pursuant to paragraph (2) of this subsection.  The board may place an eligible project that does not receive an incentive award for Tranche 1 or Tranche on a waiting list and consider the eligible project for an incentive award during a subsequent tranche.
     (2)   By no later than December 31, 2026, the board shall approve incentive awards for eligible projects totaling at least 1,000 MW AC in installed capacity.  However, at least 350 MW AC of the 1,000 MW AC procurement goal shall be approved in incentive awards for eligible projects in Tranche 1 by no later than December 31, 2025.  If the board is unable to procure all 1,000 MW AC in installed capacity in Tranche 1, the board shall approve incentive awards for eligible projects in Tranche 2, provided that all incentive awards in Tranche 2 are awarded by no later than December 31, 2026.
     (b)   a transmission-scale energy storage system applying for an incentive award in Tranche 2 shall have entered the PJM interconnection process and, at the time of application [,] :
     (b)   a transmission-scale energy storage system applying for an incentive award in Tranche 2 shall have entered the PJM interconnection process and, at the time of application;
have a fully executed Generation Interconnection Agreement or Interconnection Service Agreement through PJM [,] ;
have a fully executed Generation Interconnection Agreement or Interconnection Service Agreement through PJM;
have a completed Surplus Interconnection Study through PJM [,] ;
have a completed Surplus Interconnection Study through PJM;
have been studied by PJM in a Phase I System Impact Study [and have paid a Decision Point I Readiness Deposit to PJM,] or be in the process of undergoing a Phase I System Impact Study through PJM;
have been studied by PJM in a Phase I System Impact Study or be in the process of undergoing a Phase I System Impact Study through PJM;
and      (c)   if a transmission-scale energy storage system applying for an incentive award in Tranche 1 fulfils the project maturity requirements established pursuant to subparagraph (a) [or subparagraph (b)] of this paragraph by completing a Surplus Interconnection Study or by notifying PJM of intent to transfer existing Capacity Interconnection Rights associated with a deactivating generation station, then the transmission-scale energy storage system shall also have obtained the associated Capacity Interconnection Rights through PJM;
and      (c)   if a transmission-scale energy storage system applying for an incentive award in Tranche 1 fulfils the project maturity requirements established pursuant to subparagraph (a) of this paragraph by completing a Surplus Interconnection Study or by notifying PJM of intent to transfer existing Capacity Interconnection Rights associated with a deactivating generation station, then the transmission-scale energy storage system shall also have obtained the associated Capacity Interconnection Rights through PJM;
and      (8)   require a developer to provide additional information to the board during the term of the incentive award, as the board may reasonably require.  The board may set additional requirements at its discretion, including, but not limited to, a requirement that the developer report major development and construction milestones to the board, maintain financial security throughout the term of the incentive award, or any other requirement the board determines necessary to ensure continued progress and operational viability of an eligible project.
and      (8)   require a developer to provide additional information to the board during the term of the incentive award, as the board may reasonably require.  The board may set additional requirements at its discretion, including, but not limited to, a requirement that the developer report major development and construction milestones to the board, maintain financial security throughout the term of the incentive award, and any other requirement the board determines necessary to ensure continued progress and operational viability of an eligible project.
     g.    (1) Notwithstanding the provisions of the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), or any other law or rule to the contrary, the board shall permit applications for Tranche 1 without regard to the publication status of the rules and regulations to be issued pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), by no later than September 30, 2025.       (2)   The board shall accept Tranche 1 applications for a maximum of 60 days after the beginning of the formal application period for Tranche 1.  Within 60 days following the closure of the Tranche 1 application period, the board shall:       (a)   evaluate projects in accordance with this section, any rules or regulations proposed pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), and any application requirements and eligibility criteria approved pursuant to this subsection;
     g.
(1) Notwithstanding the provisions of the “Administrative Procedure Act,” P.L.1968, c.410 (C.52:14B-1 et seq.), or any other law or rule to the contrary, the board shall permit applications for Tranche 1 without regard to the publication status of the rules and regulations to be issued, pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), by no later than September 30, 2025.       (2)   The board shall accept Tranche 1 applications for a maximum of 60 days after the beginning of the formal application period for Tranche 1.  Within 60 days following the closure of the Tranche 1 application period, the board shall:       (a)   evaluate projects in accordance with this section, any rules or regulations proposed, pursuant to P.L.2025, c.136 (C.48:3-121.2 et al.), and any application requirements and eligibility criteria approved pursuant to this subsection;
(cf:  P.L.2025, c.136, s.2)        2.    This act shall take effect immediately.
       2.    This act shall take effect immediately.
    STATEMENT        This bill would extend the deadline for the Board of Public Utilities (BPU) to approve Tranche 1 and Tranche 2 incentive awards for eligible transmission-scale energy storage systems under the energy storage program established by N.J.S.A.48:3-121.2 et al.
       Approved March 24, 2026.
(program).  Under current law, the BPU is required to approve incentive awards for eligible projects totaling at least 1,000 megawatts in installed capacity by June 30, 2026.  This bill extends that solicitation deadline to December 31, 2026.  The bill also modifies certain project maturity requirements in order to expand the amount of projects eligible to receive incentive awards under Tranche 2 of the program.
                                            Modifies certain requirements for transmission-scale energy storage procurement under BPU incentive program.
View plain text versions (3)

Action History

  1. APP

  2. PS PBH

  3. SUB FOR

  4. R/S SWR 2RS

  5. PA

  6. REP 2RA

  7. REP REF AAP

  8. INT 1RA REF ATU

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

5 sponsors · 4 co-sponsors · 116 not signed on · 8 voted No

Sponsors (5)

Co-sponsors (4)

  • Patrick J. Diegnan
  • Angela V. McKnight
  • Linda R. Greenstein
  • Annette Quijano Democrat

Not signed on (116)

116 members have not signed on to this bill.

Show all 116 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Floor vote

Passed 36 Yea · 2 Nay · 2 Other
Party YeaNayPresentNot Voting
Republican 13200
Democratic 23002
Total 36202
% of votes cast 90%5%0%5%
How each member voted (40)
Member Party Vote
James Beach Democrat Yea
Renee C. Burgess Democrat Yea
John J. Burzichelli Democrat Yea
Nilsa I. Cruz-Perez Democrat Not Voting
Joseph P. Cryan Democrat Yea
Patrick J. Diegnan Jr. Democrat Yea
Vin Gopal Democrat Yea
Linda R. Greenstein Democrat Yea
Gordon M. Johnson Democrat Yea
Joseph A. Lagana Democrat Yea
John F. McKeon Democrat Yea
Angela V. McKnight Democrat Yea
Paul D. Moriarty Democrat Yea
Raj Mukherji Democrat Yea
M. Teresa Ruiz Democrat Yea
Paul A. Sarlo Democrat Yea
Nicholas P. Scutari Democrat Yea
Troy Singleton Democrat Yea
Bob Smith Democrat Yea
Brian P. Stack Democrat Yea
Britnee N. Timberlake Democrat Not Voting
Shirley K. Turner Democrat Yea
Joseph F. Vitale Democrat Yea
Benjie E. Wimberly Democrat Yea
Andrew Zwicker Democrat Yea
Carmen F. Amato Jr. Republican Yea
Jon M. Bramnick Republican Yea
Anthony M. Bucco Republican Yea
Kristin M. Corrado Republican Yea
Owen Henry Republican Yea
James W. Holzapfel Republican Yea
Declan J. O'Scanlon Jr. Republican Yea
Joseph Pennacchio Republican Nay
Vincent J. Polistina Republican Yea
Holly T. Schepisi Republican Yea
Robert W. Singer Republican Yea
Parker Space Republican Yea
Douglas J. Steinhardt Republican Yea
Michael L. Testa Jr. Republican Nay
Latham Tiver Republican Yea

Official roll call →

Committee AAP

Committee vote — AAP

Passed 10 Yea · 4 Nay · 1 Other
Party YeaNayPresentNot Voting
Democratic 10001
Republican 0400
Total 10401
% of votes cast 67%27%0%7%
How each member voted (15)
Member Party Vote
David Bailey Jr. Democrat Yea
Linda S. Carter Democrat Yea
Melinda Kane Democrat Not Voting
Tennille R. McCoy Democrat Yea
Carmen Theresa Morales Democrat Yea
Eliana Pintor Marin Democrat Yea
Verlina Reynolds-Jackson Democrat Yea
Gary S. Schaer Democrat Yea
Balvir Singh Democrat Yea
Kenyatta Stewart Democrat Yea
Lisa Swain Democrat Yea
Robert Auth Republican Nay
Victoria A. Flynn Republican Nay
Antwan L. McClellan Republican Nay
Gregory E. Myhre Republican Nay

Official roll call →

Committee ATU

Committee vote — ATU

Passed 8 Yea · 2 Nay
Party YeaNayPresentNot Voting
Democratic 7000
Republican 1200
Total 8200
% of votes cast 80%20%0%0%
How each member voted (10)
Member Party Vote
David Bailey Jr. Democrat Yea
Wayne P. DeAngelo Democrat Yea
Kevin P. Egan Democrat Yea
Robert J. Karabinchak Democrat Yea
Andrea Katz Democrat Yea
William W. Spearman Democrat Yea
Jerry Walker Democrat Yea
Al Barlas Republican Nay
Gregory E. Myhre Republican Yea
Alex Sauickie Republican Nay

Official roll call →

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does A 4529 do?
Transmission-scale energy storage procurement-modifies cert requirements
Who sponsors A 4529?
A 4529 is sponsored by Smith, Bob, Burzichelli, John J., Diegnan, Patrick J., McKnight, Angela V., Greenstein, Linda R., Annette Quijano (Democrat), Robert J. Karabinchak (Democrat), Kevin P. Egan (Democrat), and Wayne P. DeAngelo (Democrat).
What is the current status of A 4529?
This bill has been introduced in the General Assembly. Introduced March 09, 2026. It must pass committee before a floor vote.
Where can I track A 4529?
Track A 4529 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on A 4529

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of A 4529

Last checked for changes 4 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →