New Jersey 222nd Legislature Status: Introduced 6 D cosponsors

A 3967 — Requires BPU to work with neighboring states to research and recommend certain action concerning electric capacity and transmission.

Last action — REP/ACA REF AAP

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed General Assembly
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the General Assembly. Introduced January 13, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Odds of enactment

Low chance

Based on the sponsor, cosponsors, and committee posture, this bill has a low chance of becoming law.

Upgrade to see the exact probability and what's driving it.

A statistical estimate from our own model of past outcomes — an insight, not a guarantee. Policymaking is volatile.

Prognosis

Advancing 38% · moderate confidence
  • Introduced

    Current position in the legislative process.

  • 6 sponsors

    3 primary, 3 co-sponsors signed on.

  • Single-party support

    Sponsorship is currently within one party (6 D).

  • Cleared a recorded vote

    Passed 1 recorded vote so far.

Based on stage, sponsorship breadth, committee status, recorded votes, and cross-state momentum — a description of the observable signals, not a prediction.

Summary

Electric capacity & transmission-research and recommend certain action

Bill Text

What changed in the latest version

16 added · 46 removed

Plain-language change summary

The amended bill now specifies that the Board of Public Utilities must submit its report to the Governor and the Legislature within one year of the bill's effective date, rather than by December 31, 2025. Additionally, the reference to "PJM Interconnection, L.L.C." has been changed to better reflect its full title. These changes clarify the timeline for reporting and ensure that the entity's name is accurately presented.

→
Previous
Latest
A3967 ASSEMBLY, No.
A3967 1R [First Reprint] ASSEMBLY, No.
  CURRENT VERSION OF TEXT      Introduced Pending Technical Review by Legislative Counsel.
  CURRENT VERSION OF TEXT      As reported by the Assembly Telecommunications and Utilities Committee on March 16, 2026, with amendments.
or      (3)   withdraw from the regional, high-voltage electric transmission grid operated or managed by PJM Interconnection, L.L.C.
or      (3)   withdraw from the regional, high-voltage electric transmission grid operated 1[or] and1 managed by PJM 1[Interconnection, L.L.C.]1 and:       (a)   establish an independent electric transmission grid;
and:       (a)   establish an independent electric transmission grid;
or      (b)   join an existing electric transmission grid that operates within another state or region.       b.    1[No later than December 31, 2025] Within one year of the effective date of P.L.    , c.    (C.        ) (pending before the Legislature as this bill)1, the board shall submit a report to the Governor, and to the Legislature pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1), that includes the board’s findings and recommendations as required pursuant to subsection a.
or      (b)   join an existing electric transmission grid that operates within another state or region.       b.    No later than December 31, 2025, the board shall submit a report to the Governor, and to the Legislature pursuant to section 2 of P.L.1991, c.164 (C.52:14-19.1), that includes the board’s findings and recommendations as required pursuant to subsection a.
    STATEMENT        This bill requires the Board of Public Utilities (board) to work collaboratively with neighboring states to research and recommend collective action to:  (1) require any electric load serving entity in New Jersey to demonstrate to the board that it has contracted for at least 80 percent of the capacity needed to serve its load on a bilateral basis for at least five years into the future;
(2) withdraw from PJM Interconnection, L.L.C.’s (PJM) capacity market and either develop a multi-state compact to engage in the fixed resource requirement alternative to secure electric capacity through contracts with private entities, competitive capacity auctions, or some combination thereof, or (3) withdraw from the regional, high-voltage electric transmission grid operated by or managed by PJM and either establish an independent electric transmission grid or join an existing electric transmission grid.       PJM’s capacity market operates through competitive auctions to procure capacity for future delivery years.  However, issues with PJM’s interconnection process have delayed new energy generation, which reduces competition.  Backlogs to PJM’s interconnection queue undermine one of the goals of the capacity auction, which is to incentivize developers to bring more generation to the electrical grid.       Further, the Organization of PJM States, Inc., of which the New Jersey Board of Public Utilities is a member, and the Independent Market Monitor for PJM have found flaws in the PJM capacity market, which they claim have led to capacity auction clearing prices that fail to reflect supply and demand.       In July 2024, PJM’s capacity auction for the 2025/2026 Delivery Year had clearing prices almost 10 times the prices from the previous auction.  The increase in capacity clearing prices will result in $14.7 billion in costs to consumers, up from $2.2 billion from the prior delivery year.  This result represents the highest capacity prices in the history of PJM’s capacity auction.
     PJM’s actions are resulting in increased costs and decreased affordability for ratepayers.  And, PJM has not adequately addressed concerns about the impact of rate increases on ratepayers or been responsive to State energy policies.  The Legislature therefore determines that it is in the best interest of the residents of New Jersey to work in collaboration with other states to explore alternative options to PJM’s capacity auction for securing the capacity necessary for grid reliability.
View plain text versions (2)
  • Amended View text Current html March 17, 2026
  • Introduced View text html January 08, 2026

Action History

  1. REP/ACA REF AAP

  2. INT 1RA REF ATU

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

3 sponsors · 3 co-sponsors · 114 not signed on · 3 voted No

Sponsors (3)

Co-sponsors (3)

Not signed on (114)

114 members have not signed on to this bill.

Show all 114 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Committee vote — ATU

Passed 7 Yea · 3 Nay
Party YeaNayPresentNot Voting
Democrat 7000
Republican 0300
Total 7300
% of votes cast 70%30%0%0%
How each member voted (10)
Member Party Vote
Bailey Jr., David Democrat Yea
DeAngelo, Wayne P. Democrat Yea
Egan, Kevin P. Democrat Yea
Karabinchak, Robert J. Democrat Yea
Katz, Andrea Democrat Yea
Spearman, William W. Democrat Yea
Walker, Jerry Democrat Yea
Barlas, Al Republican Nay
Myhre, Gregory E. Republican Nay
Sauickie, Alex Republican Nay

Official roll call →

Subjects

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does A 3967 do?
Electric capacity & transmission-research and recommend certain action
Who sponsors A 3967?
A 3967 is sponsored by Tully, Chris (Democrat), Simmons, Heather (Democrat), Sampson IV, William B. (Democrat), Swain, Lisa (Democrat), Bailey Jr., David (Democrat), and Karabinchak, Robert J. (Democrat).
What is the current status of A 3967?
This bill has been introduced in the General Assembly. Introduced January 13, 2026. It must pass committee before a floor vote.
Where can I track A 3967?
Track A 3967 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on A 3967

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of A 3967

Last checked for changes 3 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →