SB327 — Electric utilities; pilot program for electric energy conservation, solar energy generation.
Last action — Acts of Assembly Chapter text (CHAP0728)
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
✓Passed Senate
-
✓Passed House of Delegates
-
✓To Executive
-
6Enacted
This bill has been enacted into law. Introduced January 13, 2026. Enacted.
Signed by Governor Glenn Youngkin (Republican) on March 09, 2026.
In plain language
The bill establishes a pilot program for energy conservation and solar generation for low-income individuals.
This bill requires American Electric Power and Dominion Energy Virginia to petition for a pilot program on energy conservation and solar generation for vulnerable populations by the end of 2026. If approved, the program must aim to assist low-income, elderly, and disabled individuals, and could be implemented by mid-2027.
What this means for you
- Consumers: This bill may provide new energy conservation and solar generation options to low-income and vulnerable consumers.
Summary
Electric utilities; pilot program for electric energy conservation, generation, and storage. Requires American Electric Power and Dominion Energy Virginia to each petition the State Corporation Commission by December 31, 2026, to conduct a pilot program for electric energy conservation, solar energy generation, and energy storage resources for low-income, elderly, and disabled individuals. The bill directs the Commission to convene a technical conference to evaluate the creation of an energy efficiency program meeting certain requirements by November 1, 2026. Under the bill, if the Commission determines that such a program is feasible for implementation by American Electric Power and Dominion Energy Virginia, the Commission shall require such utilities to petition for approval by May 1, 2027, to implement such programs. The bill has an expiration date of July 1, 2034. This bill is identical to HB 1062.
The summary published with the bill.
Bill Text
We don't have the full text on file for this bill yet.
Read SB327 on the official Virginia source →Compared against the Code of Virginia as published AI-generated reading aid — verify against the official bill.
This bill amends 3 section(s) of the Code of Virginia: 56-249.8, 56-596.7, 56-596.8.
-
56-249.8
and→ ;Replaces “and” with “;”.
-
56-249.8
; and (iii) capital investments incurred by an electric utility in an energy upgrade program as required by § 56-596.8
Inserts “; and (iii) capital investments incurred by an electric utility in an energy upgrade program as required by § 56-596.8”.
-
56-596.7
A. As used in this section and §§ 56-596.8, 56-596.9, and 56-596.10:
Inserts “A. As used in this section and §§ 56-596.8, 56-596.9, and 56-596.10:”.
-
56-596.7
"Electric utility" or "utility" means a Phase I or Phase II Utility.
Inserts “"Electric utility" or "utility" means a Phase I or Phase II Utility.”.
-
56-596.7
"Eligible customer" means a customer of an electric utility that (i) owns the property at which the customer receives utility service or (ii) rents the property at which the customer receives utility service, pays all or some of the regular bill for the utility service, and has the written permission of the property owner to participate in a utility's program.
Inserts “"Eligible customer" means a customer of an electric utility that (i) owns the property at which the customer receives utility service or (ii) rents the property at which the customer receives utility service, pays all or some of the regular bill for the utility service, and has the written permission of the property owner to participate in a utility's program.”.
-
56-596.7
"Energy project" means an upgrade of the efficiency of energy usage at a participant's location, including the addition of renewable energy generation systems such as solar projects, energy efficiency improvements, energy storage systems, demand response equipment, and any combination of such upgrades. "Energy project" includes the conversion of fossil fuel-fired appliances to electric.
Inserts “"Energy project" means an upgrade of the efficiency of energy usage at a participant's location, including the addition of renewable energy generation systems such as solar projects, energy efficiency improvements, energy storage systems, demand response equipment, and any combination of such upgrades. "Energy project" includes the conversion of fossil fuel-fired appliances to electric.”.
-
56-596.7
"Participant" means (i) an eligible customer that elects to participate in a utility's program or (ii) a successor customer.
Inserts “"Participant" means (i) an eligible customer that elects to participate in a utility's program or (ii) a successor customer.”.
-
56-596.7
"Phase I Utility" has the same meaning as provided in subdivision A 1 of § 56-585.1.
Inserts “"Phase I Utility" has the same meaning as provided in subdivision A 1 of § 56-585.1.”.
-
56-596.7
"Phase II Utility" has the same meaning as provided in subdivision A 1 of § 56-585.1.
Inserts “"Phase II Utility" has the same meaning as provided in subdivision A 1 of § 56-585.1.”.
-
56-596.7
"Energy upgrade program" or "program" means an energy upgrade program offered by a utility pursuant to this section and §§ 56-596.8, 56-596.9, and 56-596.10.
Inserts “"Energy upgrade program" or "program" means an energy upgrade program offered by a utility pursuant to this section and §§ 56-596.8, 56-596.9, and 56-596.10.”.
-
56-596.7
"Program contractor" means a contractor that is selected by the participant from an approved list facilitated by a program operator to perform an energy project.
Inserts “"Program contractor" means a contractor that is selected by the participant from an approved list facilitated by a program operator to perform an energy project.”.
-
56-596.7
"Program operator" means a state agency or entity responsible for implementing a utility's program pursuant to this section.
Inserts “"Program operator" means a state agency or entity responsible for implementing a utility's program pursuant to this section.”.
-
56-596.7
"Reasonable rate of return" means the utility's Commission-approved return on equity.
Inserts “"Reasonable rate of return" means the utility's Commission-approved return on equity.”.
-
56-596.7
"Special rate" means a rate established in a schedule established by a utility in order to recover its costs incurred in offering one or more energy projects and a reasonable rate of return on those costs.
Inserts “"Special rate" means a rate established in a schedule established by a utility in order to recover its costs incurred in offering one or more energy projects and a reasonable rate of return on those costs.”.
-
56-596.7
"Special rate charge" means a monthly or other regular charge that is associated with one or more energy projects and that a participant or a successor customer at a location pays to a utility pursuant to a special rate, provided that proper notice was given prior to a change in ownership or occupancy in accordance with §§ 55.1-1202 and 55.1-1204.
Inserts “"Special rate charge" means a monthly or other regular charge that is associated with one or more energy projects and that a participant or a successor customer at a location pays to a utility pursuant to a special rate, provided that proper notice was given prior to a change in ownership or occupancy in accordance with §§ 55.1-1202 and 55.1-1204.”.
-
56-596.7
"Successor customer" means a customer of a utility taking occupancy at a location where an energy project has been installed and where a special rate charge is still in effect.
Inserts “"Successor customer" means a customer of a utility taking occupancy at a location where an energy project has been installed and where a special rate charge is still in effect.”.
-
56-596.7
B. Each electric utility shall implement an energy upgrade program by January 1, 2027. Such program shall:
Inserts “B. Each electric utility shall implement an energy upgrade program by January 1, 2027. Such program shall:”.
-
56-596.7
1. Allow a program operator to implement energy projects at an eligible customer's location and recover the costs of such energy project by imposing a special rate charge that is payable directly through the customer's utility bill;
Inserts “1. Allow a program operator to implement energy projects at an eligible customer's location and recover the costs of such energy project by imposing a special rate charge that is payable directly through the customer's utility bill;”.
-
56-596.7
2. Allow an eligible customer of a utility to request and agree to the installation of an energy project at such customer's location;
Inserts “2. Allow an eligible customer of a utility to request and agree to the installation of an energy project at such customer's location;”.
-
56-596.7
3. Set a program participant's special rate charge based on the program operator's cost calculations as described in subsection D of § 56-596.9. A program participant's annual special rate charges shall not exceed 80 percent of the participant's estimated annual cost savings under utility rates in place at the time of installation of the energy project. The term of cost recovery shall be no more than 80 percent of the estimated life span of the installed upgrade. After a project has been operational for one year, a program operator shall evaluate the project to ensure that it is performing as estimated and if needed may adjust the special rate charge to better reflect actual savings. Program participants may request that the program operator perform an additional evaluation halfway through the energy project's useful life to ensure that the project is performing as estimated and, if needed, the program operator may adjust the special rate charge to better reflect actual savings. The Commission may determine and set the percentages for special rate charges and term of cost recovery at a lower percentage if the Commission determines that a lower percentage better serves ratepayers. The Commission may also determine and set different percentages for special rate charges and term of cost recovery for different types of energy upgrade technologies that are part of an energy project;
Inserts “3. Set a program participant's special rate charge based on the program operator's cost calculations as described in subsection D of § 56-596.9. A program participant's annual special rate charges shall not exceed 80 percent of the participant's estimated annual cost savings under utility rates in place at the time of installation of the energy project. The term of cost recovery shall be no more than 80 percent of the estimated life span of the installed upgrade. After a project has been operational for one year, a program operator shall evaluate the project to ensure that it is performing as estimated and if needed may adjust the special rate charge to better reflect actual savings. Program participants may request that the program operator perform an additional evaluation halfway through the energy project's useful life to ensure that the project is performing as estimated and, if needed, the program operator may adjust the special rate charge to better reflect actual savings. The Commission may determine and set the percentages for special rate charges and term of cost recovery at a lower percentage if the Commission determines that a lower percentage better serves ratepayers. The Commission may also determine and set different percentages for special rate charges and term of cost recovery for different types of energy upgrade technologies that are part of an energy project;”.
-
56-596.7
4. Allow eligible customers to voluntarily provide payment to a program contractor to ensure that energy projects meet the requirements described in subsection D of § 56-596.9;
Inserts “4. Allow eligible customers to voluntarily provide payment to a program contractor to ensure that energy projects meet the requirements described in subsection D of § 56-596.9;”.
-
56-596.7
5. Allow eligible customers to make one or more voluntarily additional payments towards the cost of the energy project, in an amount of the customer's choosing, at any time;
Inserts “5. Allow eligible customers to make one or more voluntarily additional payments towards the cost of the energy project, in an amount of the customer's choosing, at any time;”.
-
56-596.7
6. Require participants to permit a utility to recover its costs for investments at individual participants' locations by collecting a special rate charge through the participants' utility bills;
Inserts “6. Require participants to permit a utility to recover its costs for investments at individual participants' locations by collecting a special rate charge through the participants' utility bills;”.
-
56-596.7
7. Be consistent with the essential consumer protections listed on the U.S. Environmental Protection Agency's inclusive utility investment website at the time of program design;
Inserts “7. Be consistent with the essential consumer protections listed on the U.S. Environmental Protection Agency's inclusive utility investment website at the time of program design;”.
-
56-596.7
8. For a program offered by a Phase II Utility, incorporate any eligible energy projects implemented under the program in the virtual power plant pilot program required by § 56-585.1:6 to the extent practicable; and
Inserts “8. For a program offered by a Phase II Utility, incorporate any eligible energy projects implemented under the program in the virtual power plant pilot program required by § 56-585.1:6 to the extent practicable; and”.
-
56-596.7
9. Allow participants to jointly participate in the Percentage Of Income Payment Program established pursuant to § 56-585.6.
Inserts “9. Allow participants to jointly participate in the Percentage Of Income Payment Program established pursuant to § 56-585.6.”.
-
56-596.7
C. In offering a program, a utility shall apply the special rate charge to a participant's bill no sooner than 45 days after an energy project is inspected and approved by a program operator or a program operator's designee.
Inserts “C. In offering a program, a utility shall apply the special rate charge to a participant's bill no sooner than 45 days after an energy project is inspected and approved by a program operator or a program operator's designee.”.
-
56-596.7
D. In offering a program, a utility shall provide each eligible customer with information about all applicable utility and government programs to reduce costs of energy bills through energy efficiency and demand response, including rebates, tax credits, and virtual power plants, as well as utility bill discounts or subsidies and free energy improvements. A program operator shall coordinate with customers and the administrators of relevant no-cost and low-cost programs to ensure that eligible customers have pursued such discounts, subsidies, and improvements before proceeding with energy projects under a program.
Inserts “D. In offering a program, a utility shall provide each eligible customer with information about all applicable utility and government programs to reduce costs of energy bills through energy efficiency and demand response, including rebates, tax credits, and virtual power plants, as well as utility bill discounts or subsidies and free energy improvements. A program operator shall coordinate with customers and the administrators of relevant no-cost and low-cost programs to ensure that eligible customers have pursued such discounts, subsidies, and improvements before proceeding with energy projects under a program.”.
-
56-596.7
E. A utility offering a program shall hire one or more experienced program operators, in accordance with rules promulgated by the Commission, to operate the program.
Inserts “E. A utility offering a program shall hire one or more experienced program operators, in accordance with rules promulgated by the Commission, to operate the program.”.
-
56-596.7
F. In designing a program, a program operator shall, in consultation with the utility, make reasonable efforts to identify eligible customers with a high potential for cost savings. In marketing a program, a program operator may prioritize marketing to high energy users and customers with failed essential equipment such as space and water heating equipment. In implementing a program, a program operator shall (i) prioritize the use of program contractors that have employees who have received training through state-created or state-funded job training programs; (ii) pursue, to the extent practicable, bulk procurement of equipment and may pursue other cost-saving measures such as competitive pricing among program contractors; and (iii) coordinate, whenever structural repairs are deemed to be necessary prior to installation of an energy project and to the extent practicable, with the Department of Housing and Community Development and other relevant agencies to connect eligible customers to available funding for such repairs and, if necessary, to a qualified weatherization provider.
Inserts “F. In designing a program, a program operator shall, in consultation with the utility, make reasonable efforts to identify eligible customers with a high potential for cost savings. In marketing a program, a program operator may prioritize marketing to high energy users and customers with failed essential equipment such as space and water heating equipment. In implementing a program, a program operator shall (i) prioritize the use of program contractors that have employees who have received training through state-created or state-funded job training programs; (ii) pursue, to the extent practicable, bulk procurement of equipment and may pursue other cost-saving measures such as competitive pricing among program contractors; and (iii) coordinate, whenever structural repairs are deemed to be necessary prior to installation of an energy project and to the extent practicable, with the Department of Housing and Community Development and other relevant agencies to connect eligible customers to available funding for such repairs and, if necessary, to a qualified weatherization provider.”.
-
56-596.7
G. No utility shall require an eligible customer to continue paying the special rate charge for any energy project that fails to perform as intended and is not repaired within 21 days after the utility receives notice of the failure, unless the energy project has been damaged or failed to be maintained by the participant or occupants at the location. The program operator or the program operator's designee shall be responsible for verifying any failure and its cost. The program operator or its designee shall also be responsible for repairing the failed project. In the case of such a failure, the utility may resume applying charges after the energy project is repaired and functioning, and the utility may extend the term of payments to recover the utility's costs for missed payments and repairs, provided the repairs were necessary because of actions by the program participant, for as long as the energy project continues to function. If the energy project is not repaired within 21 days, the utility shall bear the costs of repayment until the energy project is repaired. Disputes that arise concerning the assignment of fault for a failed energy project shall be handled using the dispute resolution process established by Commission regulation for disputes arising out of the interconnection process for small electrical generators and storage. For failures that are determined to be caused by the actions of a participant or occupant and such participant or occupant is unable to afford the necessary repairs, the Commission shall establish a procedure to resolve such failures. Such a procedure may include a petition by the utility to write-off the necessary repairs, recalculation of the special rate charge, utilization of energy assistance services, or arrearage management plans.
Inserts “G. No utility shall require an eligible customer to continue paying the special rate charge for any energy project that fails to perform as intended and is not repaired within 21 days after the utility receives notice of the failure, unless the energy project has been damaged or failed to be maintained by the participant or occupants at the location. The program operator or the program operator's designee shall be responsible for verifying any failure and its cost. The program operator or its designee shall also be responsible for repairing the failed project. In the case of such a failure, the utility may resume applying charges after the energy project is repaired and functioning, and the utility may extend the term of payments to recover the utility's costs for missed payments and repairs, provided the repairs were necessary because of actions by the program participant, for as long as the energy project continues to function. If the energy project is not repaired within 21 days, the utility shall bear the costs of repayment until the energy project is repaired. Disputes that arise concerning the assignment of fault for a failed energy project shall be handled using the dispute resolution process established by Commission regulation for disputes arising out of the interconnection process for small electrical generators and storage. For failures that are determined to be caused by the actions of a participant or occupant and such participant or occupant is unable to afford the necessary repairs, the Commission shall establish a procedure to resolve such failures. Such a procedure may include a petition by the utility to write-off the necessary repairs, recalculation of the special rate charge, utilization of energy assistance services, or arrearage management plans.”.
-
56-596.7
H. A customer that damages or fails to maintain an energy project shall be responsible for the full repair of the project and payment of the balance to the utility for cost recovery associated with the damage within the energy project. Notwithstanding any other provision of law, the participant at a location with an energy project shall be responsible for the actions of any occupants at such location.
Inserts “H. A customer that damages or fails to maintain an energy project shall be responsible for the full repair of the project and payment of the balance to the utility for cost recovery associated with the damage within the energy project. Notwithstanding any other provision of law, the participant at a location with an energy project shall be responsible for the actions of any occupants at such location.”.
-
56-596.7
I. Special rate charges shall be binding on successor customers in locations where energy projects have been installed, provided that proper notice was given by the seller or property owner prior to a change in ownership or occupancy. Upon notice to a program operator of a successor customer assuming responsibility for the utility bill at a location where an energy project has been installed, the program operator shall evaluate the project to ensure estimated savings for the successor customer and may adjust the repayment length or special rate charge amount, or both, as necessary. However, in no event shall (i) the repayment term length exceed 90 percent of the energy project's estimated useful life or (ii) the special rate charge amount exceed 90 percent of estimated savings.
Inserts “I. Special rate charges shall be binding on successor customers in locations where energy projects have been installed, provided that proper notice was given by the seller or property owner prior to a change in ownership or occupancy. Upon notice to a program operator of a successor customer assuming responsibility for the utility bill at a location where an energy project has been installed, the program operator shall evaluate the project to ensure estimated savings for the successor customer and may adjust the repayment length or special rate charge amount, or both, as necessary. However, in no event shall (i) the repayment term length exceed 90 percent of the energy project's estimated useful life or (ii) the special rate charge amount exceed 90 percent of estimated savings.”.
-
56-596.7
J. The Commission shall evaluate each program implemented pursuant to this section 18 months after a utility begins offering a program and every five years thereafter. In evaluating the program, the Commission shall consider, among other things, participant net costs, on-site energy usage changes across all relevant fuels, grid benefits, housing characteristics, and demographic data.
Inserts “J. The Commission shall evaluate each program implemented pursuant to this section 18 months after a utility begins offering a program and every five years thereafter. In evaluating the program, the Commission shall consider, among other things, participant net costs, on-site energy usage changes across all relevant fuels, grid benefits, housing characteristics, and demographic data.”.
-
56-596.7
K. Nothing in this section shall exempt an energy project from any other approval process that it would otherwise be subject to, including the approval processes of applicable homeowners associations, condominiums, or cooperatives.
Inserts “K. Nothing in this section shall exempt an energy project from any other approval process that it would otherwise be subject to, including the approval processes of applicable homeowners associations, condominiums, or cooperatives.”.
-
56-596.8
A. The Commission shall establish program guidelines with the schedule of program availability as follows:
Inserts “A. The Commission shall establish program guidelines with the schedule of program availability as follows:”.
-
56-596.8
1. On and after July 1, 2027, and until July 1, 2029:
Inserts “1. On and after July 1, 2027, and until July 1, 2029:”.
-
56-596.8
a. Each Phase I Utility shall invest capital in an amount not less than $150 million for investments in energy projects implemented under the Phase I Utility's program;
Inserts “a. Each Phase I Utility shall invest capital in an amount not less than $150 million for investments in energy projects implemented under the Phase I Utility's program;”.
-
56-596.8
b. Each Phase II Utility shall invest capital in an amount not less than $750 million for investments in energy projects implemented under the Phase II Utility's program; and
Inserts “b. Each Phase II Utility shall invest capital in an amount not less than $750 million for investments in energy projects implemented under the Phase II Utility's program; and”.
-
56-596.8
c. Phase I and Phase II Utilities shall prioritize residential solar and hybrid solar and storage energy projects.
Inserts “c. Phase I and Phase II Utilities shall prioritize residential solar and hybrid solar and storage energy projects.”.
Action History
-
Acts of Assembly Chapter text (CHAP0728)
-
Approved by Governor-Chapter 728 (effective 7/1/2026)
-
S Fiscal Impact Statement from State Corporation Commission (SB327)
-
Governor's Action Deadline 11:59 p.m., April 13, 2026
-
S Enrolled Bill communicated to Governor on March 10, 2026
-
S Signed by President
-
H Signed by Speaker
-
S Bill text as passed Senate and House (SB327ER)
-
S Enrolled
-
S House substitute agreed to by Senate (20-Y 20-N 0-A)
-
S Fiscal Impact Statement from State Corporation Commission (SB327)
-
H Passed House with substitute (67-Y 29-N 0-A)
-
H Engrossed by House - committee substitute
-
H committee substitute agreed to
-
H Read third time
-
H Read second time
-
H Committee substitute printed 26108440D-H1
-
H House committee offered
-
H Reported from Labor and Commerce with substitute (15-Y 6-N)
-
H Placed on Labor and Commerce Agenda
-
H Referred to Committee on Labor and Commerce
-
H Read first time
-
H Placed on Calendar
-
S Fiscal Impact Statement from State Corporation Commission (SB327)
-
S Read third time and passed Senate (21-Y 18-N 0-A)
-
S Engrossed by Senate - committee substitute (Voice Vote)
-
S Committee substitute agreed to (Voice Vote)
-
S Read second time
-
S Passed by for the day Block Vote (Voice Vote)
-
S Constitutional reading dispensed Block Vote (on 1st reading) (40-Y 0-N 0-A)
-
S Rules suspended
-
S Committee substitute printed 26107028D-S1
-
S Reported from Commerce and Labor with substitute (9-Y 6-N)
-
S Senate committee offered
-
S Fiscal Impact Statement from State Corporation Commission (SB327)
-
S Referred to Committee on Commerce and Labor
-
S Prefiled and ordered printed; Offered 01-14-2026 26105259D
Sponsors
- Schuyler T. VanValkenburg · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 147 not signed on · 49 voted No
Sponsors (1)
- Schuyler T. VanValkenburg Democratic
Co-sponsors (0)
None.
Not signed on (147)
147 members have not signed on to this bill.
Show all 147 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Votes
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 17 | 1 | 0 | 0 |
| Republican | 0 | 19 | 0 | 0 |
| Party not on file | 3 | 0 | 0 | 0 |
| Total | 20 | 20 | 0 | 0 |
| % of votes cast | 50% | 50% | 0% | 0% |
How each member voted (40)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Republican | 5 | 29 | 0 | 1 |
| Democratic | 62 | 0 | 0 | 2 |
| Total | 67 | 29 | 0 | 3 |
| % of votes cast | 68% | 29% | 0% | 3% |
How each member voted (99)
| Member | Party | Vote |
|---|---|---|
| Adele Y. McClure | Democratic | Yea |
| Alex Q. Askew | Democratic | Yea |
| Alfonso H. Lopez | Democratic | Yea |
| Amy J. Laufer | Democratic | Yea |
| Atoosa R. Reaser | Democratic | Yea |
| Betsy B. Carr | Democratic | Yea |
| Bonita G. Anthony | Democratic | Yea |
| Briana D. Sewell | Democratic | Yea |
| C.E. Cliff Hayes, Jr. | Democratic | Yea |
| Charlie Schmidt | Democratic | Yea |
| Charniele L. Herring | Democratic | Yea |
| Dan I. Helmer | Democratic | Yea |
| David A. Reid | Democratic | Yea |
| Debra D. Gardner | Democratic | Yea |
| Delores L. McQuinn | Democratic | Yea |
| Destiny LeVere Bolling | Democratic | Yea |
| Don Scott | Democratic | Yea |
| Elizabeth R. Guzman | Democratic | Not Voting |
| Garrett McGuire | Democratic | Yea |
| Gretchen M. Bulova | Democratic | Yea |
| Holly M. Seibold | Democratic | Yea |
| Irene Shin | Democratic | Yea |
| JJ Singh | Democratic | Yea |
| Jackie H. Glass | Democratic | Yea |
| Jeion A. Ward | Democratic | Yea |
| Jessica L. Anderson | Democratic | Yea |
| John Chilton McAuliff | Democratic | Yea |
| Joshua E. Thomas | Democratic | Yea |
| Joshua G. Cole | Democratic | Yea |
| Karen Keys-Gamarra | Democratic | Yea |
| Karen R. "Kacey" Carnegie | Democratic | Yea |
| Karrie K. Delaney | Democratic | Yea |
| Kathy K.L. Tran | Democratic | Yea |
| Katrina Callsen | Democratic | Yea |
| Kelly K. Convirs-Fowler | Democratic | Not Voting |
| Kimberly Pope Adams | Democratic | Yea |
| Kirk McPike | Democratic | Yea |
| Laura Jane Cohen | Democratic | Yea |
| Leslie Chambers Mehta | Democratic | Yea |
| Lily V. Franklin | Democratic | Yea |
| Lindsey Dougherty | Democratic | Yea |
| Luke E. Torian | Democratic | Yea |
| Marcia S. "Cia" Price | Democratic | Yea |
| Marcus B. Simon | Democratic | Yea |
| Margaret A. Franklin | Democratic | Yea |
| Mark C. Downey | Democratic | Yea |
| Marty Martinez | Democratic | Yea |
| May Nivar | Democratic | Yea |
| Michael B. Feggans | Democratic | Yea |
| Michelle Lopes Maldonado | Democratic | Yea |
| Nadarius E. Clark | Democratic | Yea |
| Nicole Cole | Democratic | Yea |
| Patrick A. Hope | Democratic | Yea |
| Paul E. Krizek | Democratic | Yea |
| Phil M. Hernandez | Democratic | Yea |
| Rae Cousins | Democratic | Yea |
| Richard C. "Rip" Sullivan, Jr. | Democratic | Yea |
| Rodney T. Willett | Democratic | Yea |
| Rozia A. Henson, Jr. | Democratic | Yea |
| Sam Rasoul | Democratic | Yea |
| Shelly A. Simonds | Democratic | Yea |
| Stacey Annie Carroll | Democratic | Yea |
| Virgil Thornton | Democratic | Yea |
| Vivian E. Watts | Democratic | Yea |
| Anne Ferrell Tata | Republican | Nay |
| Bill Wiley | Republican | Nay |
| Chris S. Runion | Republican | Nay |
| Delores Oates | Republican | Nay |
| Ellen H. McLaughlin | Republican | Nay |
| Eric Phillips | Republican | Yea |
| Eric R. Zehr | Republican | Nay |
| H. Otto Wachsmann, Jr. | Republican | Yea |
| Hillary Pugh Kent | Republican | Nay |
| Hyland F. "Buddy" Fowler, Jr. | Republican | Nay |
| Israel D. O'Quinn | Republican | Nay |
| James A. "Jay" Leftwich | Republican | Nay |
| James W. Morefield | Republican | Nay |
| Jason S. Ballard | Republican | Nay |
| Joseph P. McNamara | Republican | Nay |
| Justin Pence | Republican | Nay |
| Karen Hamilton | Republican | Nay |
| M. Keith Hodges | Republican | Nay |
| Madison Whittle | Republican | Nay |
| Michael J. Webert | Republican | Nay |
| Mike A. Cherry | Republican | Yea |
| Mitchell Cornett | Republican | Nay |
| Phillip A. Scott | Republican | Nay |
| R. Lee Ware | Republican | Nay |
| Robert S. Bloxom, Jr. | Republican | Yea |
| Scott A. Wyatt | Republican | Nay |
| Terry G. Kilgore | Republican | Nay |
| Terry L. Austin | Republican | Yea |
| Thomas A. Garrett, Jr. | Republican | Not Voting |
| Thomas C. Wright, Jr. | Republican | Nay |
| Timothy P. Griffin | Republican | Nay |
| Tony O. Wilt | Republican | Nay |
| Wendell S. Walker | Republican | Nay |
| Will Davis | Republican | Nay |
| Wren M. Williams | Republican | Nay |
Labor and Commerce Committee
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 15 | 0 | 0 | 0 |
| Republican | 0 | 6 | 0 | 1 |
| Total | 15 | 6 | 0 | 1 |
| % of votes cast | 68% | 27% | 0% | 5% |
How each member voted (22)
| Member | Party | Vote |
|---|---|---|
| Alfonso H. Lopez | Democratic | Yea |
| Bonita G. Anthony | Democratic | Yea |
| Dan I. Helmer | Democratic | Yea |
| Destiny LeVere Bolling | Democratic | Yea |
| Irene Shin | Democratic | Yea |
| JJ Singh | Democratic | Yea |
| Jeion A. Ward | Democratic | Yea |
| Kelly K. Convirs-Fowler | Democratic | Yea |
| Laura Jane Cohen | Democratic | Yea |
| May Nivar | Democratic | Yea |
| Michael B. Feggans | Democratic | Yea |
| Michelle Lopes Maldonado | Democratic | Yea |
| Nadarius E. Clark | Democratic | Yea |
| Rae Cousins | Democratic | Yea |
| Richard C. "Rip" Sullivan, Jr. | Democratic | Yea |
| Chris S. Runion | Republican | Nay |
| Israel D. O'Quinn | Republican | Nay |
| Jason S. Ballard | Republican | Nay |
| Michael J. Webert | Republican | Nay |
| Terry G. Kilgore | Republican | Nay |
| Tony O. Wilt | Republican | Nay |
| Wren M. Williams | Republican | Not Voting |
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 19 | 0 | 0 | 0 |
| Republican | 0 | 18 | 0 | 1 |
| Party not on file | 2 | 0 | 0 | 0 |
| Total | 21 | 18 | 0 | 1 |
| % of votes cast | 53% | 45% | 0% | 3% |
How each member voted (40)
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 19 | 0 | 0 | 0 |
| Republican | 19 | 0 | 0 | 0 |
| Party not on file | 2 | 0 | 0 | 0 |
| Total | 40 | 0 | 0 | 0 |
| % of votes cast | 100% | 0% | 0% | 0% |
How each member voted (40)
Commerce and Labor Committee
| Party | Yea | Nay | Present | Not Voting |
|---|---|---|---|---|
| Democratic | 9 | 0 | 0 | 0 |
| Republican | 0 | 6 | 0 | 0 |
| Total | 9 | 6 | 0 | 0 |
| % of votes cast | 60% | 40% | 0% | 0% |
How each member voted (15)
| Member | Party | Vote |
|---|---|---|
| Aaron R. Rouse | Democratic | Yea |
| Adam P. Ebbin | Democratic | Yea |
| David W. Marsden | Democratic | Yea |
| Jeremy S. McPike | Democratic | Yea |
| L. Louise Lucas | Democratic | Yea |
| Lamont Bagby | Democratic | Yea |
| Mamie E. Locke | Democratic | Yea |
| R. Creigh Deeds | Democratic | Yea |
| Scott A. Surovell | Democratic | Yea |
| Bill DeSteph | Republican | Nay |
| Bryce E. Reeves | Republican | Nay |
| Mark D. Obenshain | Republican | Nay |
| Mark J. Peake | Republican | Nay |
| Ryan T. McDougle | Republican | Nay |
| William M. Stanley, Jr. | Republican | Nay |
Committees
- Senate Commerce and Labor Referred January 13, 2026
- House of Delegates House Labor and Commerce Referred February 18, 2026
Frequently asked questions
- What does SB327 do?
- Electric utilities; pilot program for electric energy conservation, generation, and storage. Requires American Electric Power and Dominion Energy Virginia to each petition the State Corporation Commission by December 31, 2026, to conduct a pilot program for electric energy conservation, solar energy generation, and energy storage resources for low-income, elderly, and disabled individuals. The bill directs the Commission to convene a technical conference to evaluate the creation of an energy efficiency program meeting certain requirements by November 1, 2026. Under the bill, if the Commission determines that such a program is feasible for implementation by American Electric Power and Dominion Energy Virginia, the Commission shall require such utilities to petition for approval by May 1, 2027, to implement such programs. The bill has an expiration date of July 1, 2034. This bill is identical to HB 1062.
- Who sponsors SB327?
- SB327 is sponsored by Schuyler T. VanValkenburg (Democratic).
- What is the current status of SB327?
- This bill has been enacted into law. Introduced January 13, 2026. Enacted.
- Where can I track SB327?
- Track SB327 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on SB327
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of SB327
Last checked for changes 5 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →