H3521 — An Act maximizing and optimizing small-scale assets in communities
No card. One bill, free forever — alerts when it moves.
-
1Introduced
-
2In Committee
-
3Passed House
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill died with 194th General Court. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
An Act maximizing and optimizing small-scale assets in communities
Bill Text
- Full text Current
AI-generated reading aid from the bill's amendatory text — verify against the official bill.
The bill establishes new goals and frameworks for the deployment of distributed energy resources and virtual power plants in Massachusetts, promoting clean energy and grid services.
-
Chapter 21N, Section 3B
Section 3C (a) As used in this section, the following words shall, unless the context clearly requires otherwise, have the following meanings: "distributed energy resource" shall be defined in accordance with Chapter 164 Section 1. (b) The secretary shall establish goals for the deployment of distributed energy resources in the commonwealth, such that distributed energy resources capacity is equal to or greater than 20 per cent of the commonwealth's total electric load by December 31, 2035. (c) The goals to reach this milestone should include but not be limited to: solar photovoltaic systems, energy storage systems, and other clean energy technologies that can be interconnected to the electric distribution system. (d) The secretary shall, at a minimum, consult with the department of public utilities and the department of energy resources in order to: (1) develop a comprehensive plan to achieve the distributed energy resources goal; (2) establish interim targets for distributed energy resource deployment; (3) identify barriers to achieving the goal and recommend policy solutions; (4) track and report annually on progress toward meeting the goal; and (5) ensure the equitable distribution of distributed energy resources across all communities in the commonwealth. (e) Nothing in this section shall preclude the secretary from establishing more ambitious goals for distributed energy resource deployment or achieving the goals ahead of the specified timeline.
This adds a new section establishing deployment goals and frameworks for distributed energy resources in the state.
-
Chapter 164, Section 148
Section 149: (a) As used in this section, the following words shall, unless the context clearly requires otherwise, have the following meanings: "virtual power plant", an aggregation of distributed energy resources operated in coordination to provide one or more grid services. (b) Each electric company shall establish a virtual power plant program to enable coordinated operation of customer-sited distributed energy resources for peak load reduction and other grid services. (c) Each electric company shall: (1) file with the department of public utilities a virtual power plant program proposal within 180 days of the effective date of this section; (2) Implement the program through a standard offer, open access tariff that includes, at a minimum: (i) provisions for both third-party aggregators and direct customer participation; (ii) compensation mechanisms including upfront and performance-based payments; (iii) enhanced incentives for low-to-moderate income persons, as defined in section 38d of chapter 121b, or resides in an environmental justice population, as defined in section 62 of chapter 30, which shall include but not be limited to higher payment or compensation, upfront financial assistance, income-based utility discounts, reduced or no-cost enrollment, targeted outreach and education, and pathways for ownership and local control of virtual power plant resources; (iv) measurement and verification requirements; and (v) consumer protection provisions. (d) The Department shall: (1) review and approve or modify program proposals within 120 days of filing; (2) establish annual procurement targets for peak load reduction and other grid services; (3) determine whether performance incentives for electric distribution companies based on achievement of program targets are appropriate; and (4) ensure programs maximize ratepayer benefits including peak load reduction, renewable energy integration, and avoided infrastructure costs. (e) Electric companies shall not own resources that participate in a virtual power plant program or act as aggregators under the program. The department shall promulgate regulations to implement this section. (f) Municipal light plants may apply to opt in using the process in subsection (c) by submitting an informational filing with the Department of Energy Resources and the Department of Public Utilities accordingly.
This adds a new section requiring electric companies to establish virtual power plant programs for better management of distributed energy resources.
-
Chapter 164, Section 1E
(d) The department shall consider the implementation of financial performance-based incentives and penalties and performance-based metrics to facilitate the interconnection of distributed energy resources. If the department approves such performance-based incentives and penalties for a particular company, the department shall include in such approval a framework for periodic monitoring and review of the company's performance pursuant to metrics developed by the department.
This adds a requirement for the department to consider financial incentives and penalties tied to the performance of companies interconnecting distributed energy resources.
Sponsors
- Jack Patrick Lewis · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 203 not signed on
Sponsors (1)
- Jack Patrick Lewis Democrat
Co-sponsors (0)
None.
Not signed on (203)
203 members have not signed on to this bill.
Show all 203 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Subjects
Frequently asked questions
- What does H3521 do?
- An Act maximizing and optimizing small-scale assets in communities
- Who sponsors H3521?
- H3521 is sponsored by Jack Patrick Lewis (Democrat).
- What is the current status of H3521?
- This bill died with 194th General Court. It reached “Introduced” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track H3521?
- Track H3521 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on H3521
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of H3521
Last checked for changes 4 months ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →