Virginia 2026 Session Status: Failed Sponsors 1 R

HB1090 — Electric utilities; emissions intensity target program.

Last action — Left in Labor and Commerce

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House of Delegates
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the House of Delegates. Introduced January 14, 2026. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Summary

Electric utilities; emissions intensity target program. Requires the State Corporation Commission to develop an emissions intensity target program for Dominion Energy Virginia and Appalachian Power to achieve net-zero emissions. The bill requires the Commission to promulgate regulations to implement its provisions by January 1, 2027. Upon the promulgation of such regulations, the bill repeals certain provisions that require Dominion Energy Virginia and American Electric Power to participate in a renewable energy portfolio standard program, authorize the State Air Pollution Control Board to promulgate certain regulations, and provide that the construction or purchase by a public utility of certain generation facilities is in the public interest.

The summary published with the bill.

Bill Text

We don't have the full text on file for this bill yet.

Read HB1090 on the official Virginia source →

How this bill changes current law

40 changes Share ↗

Compared against the Code of Virginia as published AI-generated reading aid — verify against the official bill.

This bill amends 10 section(s) of the Code of Virginia: 56-585.5, 10.1-1307, 10.1-1308, 10.1-1402.03, 10.1-1402.04, 45.2-1701.1.

  • 56-585.5

    M. Notwithstanding any other provision of law, the Commission shall develop an emissions intensity target program for Phase I and Phase II Utilities to achieve net-zero emissions. The targets established by the Commission under the program shall be time-bound and set to reduce carbon-equivalent emissions per megawatt-hour of generation. The Commission shall establish such targets based on the viable reductions that can be achieved, considering existing technologies and other factors, without causing undue rate increases or threatening the security and reliability of electric service and while ensuring the future baseload power generation necessary for projected electric energy demand. The Commission may reevaluate such targets on an interim basis to reflect evaluations of progress and new considerations, including technological advancements and economic conditions.

    Inserts “M. Notwithstanding any other provision of law, the Commission shall develop an emissions intensity target program for Phase I and Phase II Utilities to achieve net-zero emissions. The targets established by the Commission under the program shall be time-bound and set to reduce carbon-equivalent emissions per megawatt-hour of generation. The Commission shall establish such targets based on the viable reductions that can be achieved, considering existing technologies and other factors, without causing undue rate increases or threatening the security and reliability of electric service and while ensuring the future baseload power generation necessary for projected electric energy demand. The Commission may reevaluate such targets on an interim basis to reflect evaluations of progress and new considerations, including technological advancements and economic conditions.”.

  • 10.1-1307

    related to the requirements of

    Strikes “related to the requirements of”.

  • 10.1-1307

    subsection E of

    Strikes “subsection E of”.

  • 10.1-1307

    § 10.1-1308

    Strikes “§ 10.1-1308”.

  • 10.1-1308

    E. Notwithstanding any other provision of law and no earlier than July 1, 2024, the Board shall adopt regulations to reduce, for the period of 2031 to 2050, the carbon dioxide emissions from any electricity generating unit in the Commonwealth, regardless of fuel type, that serves an electricity generator with a nameplate capacity equal to or greater than 25 megawatts that supplies (i) 10 percent or more of its annual net electrical generation to the electric grid or (ii) more than 15 percent of its annual total useful energy to any entity other than the manufacturing facility to which the generating source is interconnected (covered unit).

    Strikes “E. Notwithstanding any other provision of law and no earlier than July 1, 2024, the Board shall adopt regulations to reduce, for the period of 2031 to 2050, the carbon dioxide emissions from any electricity generating unit in the Commonwealth, regardless of fuel type, that serves an electricity generator with a nameplate capacity equal to or greater than 25 megawatts that supplies (i) 10 percent or more of its annual net electrical generation to the electric grid or (ii) more than 15 percent of its annual total useful energy to any entity other than the manufacturing facility to which the generating source is interconnected (covered unit).”.

  • 10.1-1308

    The Board may establish, implement, and manage an auction program to sell allowances to carry out the purposes of such regulations or may in its discretion utilize an existing multistate trading system.

    Strikes “The Board may establish, implement, and manage an auction program to sell allowances to carry out the purposes of such regulations or may in its discretion utilize an existing multistate trading system.”.

  • 10.1-1308

    The Board may utilize its existing regulations to reduce carbon dioxide emissions from electric power generating facilities; however, the regulations shall provide that no allowances be issued for covered units in 2050 or any year beyond 2050. The Board may establish rules for trading, the use of banked allowances, and other auction or market mechanisms as it may find appropriate to control allowance costs and otherwise carry out the purpose of this subsection.

    Strikes “The Board may utilize its existing regulations to reduce carbon dioxide emissions from electric power generating facilities; however, the regulations shall provide that no allowances be issued for covered units in 2050 or any year beyond 2050. The Board may establish rules for trading, the use of banked allowances, and other auction or market mechanisms as it may find appropriate to control allowance costs and otherwise carry out the purpose of this subsection.”.

  • 10.1-1308

    In adopting such regulations, the Board shall consider only the carbon dioxide emissions from the covered units. The Board shall not provide for emission offsetting or netting based on fuel type.

    Strikes “In adopting such regulations, the Board shall consider only the carbon dioxide emissions from the covered units. The Board shall not provide for emission offsetting or netting based on fuel type.”.

  • 10.1-1308

    Regulations adopted by the Board under this subsection shall be subject to the requirements set out in §§ 2.2-4007.03, 2.2-4007.04, 2.2-4007.05, and 2.2-4026 through 2.2-4030 of the Administrative Process Act (§ 2.2-4000 et seq.) and shall be published in the Virginia Register of Regulations.

    Strikes “Regulations adopted by the Board under this subsection shall be subject to the requirements set out in §§ 2.2-4007.03, 2.2-4007.04, 2.2-4007.05, and 2.2-4026 through 2.2-4030 of the Administrative Process Act (§ 2.2-4000 et seq.) and shall be published in the Virginia Register of Regulations.”.

  • 10.1-1402.03

    e

    Strikes “e”.

  • 10.1-1402.03

    d

    Inserts “d”.

  • 10.1-1402.03

    e

    Strikes “e”.

  • 10.1-1402.03

    d

    Inserts “d”.

  • 10.1-1402.03

    e

    Strikes “e”.

  • 10.1-1402.03

    d

    Inserts “d”.

  • 10.1-1402.04

    e

    Strikes “e”.

  • 10.1-1402.04

    d

    Inserts “d”.

  • 10.1-1402.04

    e

    Strikes “e”.

  • 10.1-1402.04

    d

    Inserts “d”.

  • 10.1-1402.04

    e

    Strikes “e”.

  • 10.1-1402.04

    d

    Inserts “d”.

  • 45.2-1701.1

    subsection E of § 10.1-1308 or

    Strikes “subsection E of § 10.1-1308 or”.

  • 56-585.1

    Projected and actual costs of compliance with renewable energy portfolio standard requirements pursuant to § 56-585.5 that are not recoverable under subdivision 6. The Commission shall approve such a petition allowing the recovery of such costs incurred as required by § 56-585.5, provided that the Commission does not otherwise find such costs were unreasonably or imprudently incurred;

    Strikes “Projected and actual costs of compliance with renewable energy portfolio standard requirements pursuant to § 56-585.5 that are not recoverable under subdivision 6. The Commission shall approve such a petition allowing the recovery of such costs incurred as required by § 56-585.5, provided that the Commission does not otherwise find such costs were unreasonably or imprudently incurred;”.

  • 56-585.1

    e.

    Strikes “e.”.

  • 56-585.1

    , as described in § 56-585.1:11,

    Strikes “, as described in § 56-585.1:11,”.

  • 56-585.1

    f.

    Strikes “f.”.

  • 56-585.1

    e.

    Inserts “e.”.

  • 56-585.1

    g.

    Strikes “g.”.

  • 56-585.1

    f.

    Inserts “f.”.

  • 56-585.1

    The construction or purchase by a utility of one or more generation facilities with at least one megawatt of generating capacity, and with an aggregate rated capacity that does not exceed 16,100 megawatts, including rooftop solar installations with a capacity of not less than 50 kilowatts, and with an aggregate capacity of 100 megawatts, that use energy derived from sunlight or from onshore wind and are located in the Commonwealth or off the Commonwealth's Atlantic shoreline, regardless of whether any of such facilities are located within or without the utility's service territory, is in the public interest, and in determining whether to approve such facility, the Commission shall liberally construe the provisions of this title.

    Strikes “The construction or purchase by a utility of one or more generation facilities with at least one megawatt of generating capacity, and with an aggregate rated capacity that does not exceed 16,100 megawatts, including rooftop solar installations with a capacity of not less than 50 kilowatts, and with an aggregate capacity of 100 megawatts, that use energy derived from sunlight or from onshore wind and are located in the Commonwealth or off the Commonwealth's Atlantic shoreline, regardless of whether any of such facilities are located within or without the utility's service territory, is in the public interest, and in determining whether to approve such facility, the Commission shall liberally construe the provisions of this title.”.

  • 56-585.1

    In connection with planning to meet forecasted demand for electric generation supply and assure the adequate and sufficient reliability of service, consistent with § 56-598, planning and development activities for a new utility-owned and utility-operated generating facility or facilities utilizing energy derived from sunlight or from onshore or offshore wind are in the public interest.

    Strikes “In connection with planning to meet forecasted demand for electric generation supply and assure the adequate and sufficient reliability of service, consistent with § 56-598, planning and development activities for a new utility-owned and utility-operated generating facility or facilities utilizing energy derived from sunlight or from onshore or offshore wind are in the public interest.”.

  • 56-585.1

    Notwithstanding any provision of Chapter 296 of the Acts of Assembly of 2018, construction, purchasing, or leasing activities for a new utility-owned and utility-operated generating facility or facilities utilizing energy derived from sunlight or from onshore wind with an aggregate capacity of 16,100 megawatts, including rooftop solar installations with a capacity of not less than 50 kilowatts, and with an aggregate capacity of 100 megawatts, together with a utility-owned and utility-operated generating facility or facilities utilizing energy derived from offshore wind with an aggregate capacity of not more than 3,000 megawatts, are in the public interest. Additionally, energy storage facilities with an aggregate capacity of 2,700 megawatts are in the public interest. To the extent that a utility elects to recover the costs of any such new generation or energy storage facility or facilities through its rates for generation and distribution services and does not petition and receive approval from the Commission for recovery of such costs through a rate adjustment clause described in clause (ii), the Commission shall, upon the request of the utility in a review proceeding, provide for a customer credit reinvestment offset, as applicable, pursuant to subdivision 8 d with respect to all costs deemed reasonable and prudent by the Commission in a proceeding pursuant to subsection D of § 56-580 or in a review proceeding.

    Strikes “Notwithstanding any provision of Chapter 296 of the Acts of Assembly of 2018, construction, purchasing, or leasing activities for a new utility-owned and utility-operated generating facility or facilities utilizing energy derived from sunlight or from onshore wind with an aggregate capacity of 16,100 megawatts, including rooftop solar installations with a capacity of not less than 50 kilowatts, and with an aggregate capacity of 100 megawatts, together with a utility-owned and utility-operated generating facility or facilities utilizing energy derived from offshore wind with an aggregate capacity of not more than 3,000 megawatts, are in the public interest. Additionally, energy storage facilities with an aggregate capacity of 2,700 megawatts are in the public interest. To the extent that a utility elects to recover the costs of any such new generation or energy storage facility or facilities through its rates for generation and distribution services and does not petition and receive approval from the Commission for recovery of such costs through a rate adjustment clause described in clause (ii), the Commission shall, upon the request of the utility in a review proceeding, provide for a customer credit reinvestment offset, as applicable, pursuant to subdivision 8 d with respect to all costs deemed reasonable and prudent by the Commission in a proceeding pursuant to subsection D of § 56-580 or in a review proceeding.”.

  • 56-585.1

    e

    Strikes “e”.

  • 56-585.1

    d

    Inserts “d”.

  • 56-585.1

    or information from the respective utility's plan filed pursuant to subsection D of § 56-585.5

    Strikes “or information from the respective utility's plan filed pursuant to subsection D of § 56-585.5”.

  • 56-585.3

    e

    Strikes “e”.

  • 56-585.3

    d

    Inserts “d”.

  • 56-585.8

    §§ 56-585.5 and

    Strikes “§§ 56-585.5 and”.

  • 56-585.8

    §

    Inserts “§”.

  • 56-594.3

    , including renewable energy certificates

    Strikes “, including renewable energy certificates”.

Action History

  1. H Left in Labor and Commerce

  2. H Subcommittee recommends laying on the table (9-Y 0-N)

  3. H Fiscal Impact Statement from State Corporation Commission (HB1090)

  4. H Placed on Labor and Commerce Agenda

  5. H Assigned HCL sub: Subcommittee #3

  6. H Referred to Committee on Labor and Commerce

  7. H Prefiled and ordered printed; Offered 01-14-2026 26101878D

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 147 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (147)

147 members have not signed on to this bill.

Show all 147 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Votes

Subcommittee

Passed 9 Yea · 0 Nay
Party YeaNayPresentNot Voting
Republican 3000
Democratic 6000
Total 9000
% of votes cast 100%0%0%0%
How each member voted (9)
Member Party Vote
Bonita G. Anthony Democratic Yea
Irene Shin Democratic Yea
May Nivar Democratic Yea
Michael B. Feggans Democratic Yea
Nadarius E. Clark Democratic Yea
Richard C. "Rip" Sullivan, Jr. Democratic Yea
Terry G. Kilgore Republican Yea
Tony O. Wilt Republican Yea
Wren M. Williams Republican Yea

Official roll call →

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does HB1090 do?
Electric utilities; emissions intensity target program. Requires the State Corporation Commission to develop an emissions intensity target program for Dominion Energy Virginia and Appalachian Power to achieve net-zero emissions. The bill requires the Commission to promulgate regulations to implement its provisions by January 1, 2027. Upon the promulgation of such regulations, the bill repeals certain provisions that require Dominion Energy Virginia and American Electric Power to participate in a renewable energy portfolio standard program, authorize the State Air Pollution Control Board to promulgate certain regulations, and provide that the construction or purchase by a public utility of certain generation facilities is in the public interest.
Who sponsors HB1090?
HB1090 is sponsored by Michael J. Webert (Republican).
What is the current status of HB1090?
This bill has been introduced in the House of Delegates. Introduced January 14, 2026. It must pass committee before a floor vote.
Where can I track HB1090?
Track HB1090 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on HB1090

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of HB1090

Last checked for changes 5 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →