HR 10322 — Data Center Fair Share Act
Last action — Referred to the Committee on Energy and Commerce, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
2In Committee
-
3Passed House
-
4Passed Senate
-
5To Executive
-
6Enacted
This bill is in committee in the House. Introduced September 08, 2026. It must pass committee before a floor vote.
Next likely step: a committee vote, then a floor vote in the House.
In plain language
The bill establishes federal standards for costs associated with large-load electric customers.
The Data Center Fair Share Act amends federal law to ensure large-load electric customers cover the full costs of necessary utility upgrades. States that do not adopt these standards may face withholding of highway funds.
What this means for you
- Small Business: This may affect small businesses needing significant electric power, as they could face higher costs if categorized as large-load customers.
Summary
To amend the Public Utility Regulatory Policies Act of 1978 to establish Federal standards relating to the recovery of the full, incremental costs of upgrades that serve large-load customers, and to withhold highway funds from States that do not implement such standards, and for other purposes.
Bill Text
- Introduced Introduced in House Current html September 08, 2026
Sections of law this bill changes
2 sections in 1 lawFrom the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).
Public utility regulatory policies · 16 U.S.C. ch. 46 2 sections
-
§ 2621 Consideration and determination respecting certain ratemaking standards Amends
16 U.S.C. § 2621 — at 2621(d)
The law today
(a) Consideration and determination Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall consider each standard established by subsection (d) and make a determination concerning whether or not it is appropriate to implement such standard to carry out the purposes of this chapter. For purposes of such consideration and determination in accordance with subsections (b) and (c), and for purposes of any review of such consideration and determination in any court in accordance with section 2633 of this title, the purposes of this chapter supplement otherwise applicable State law. Nothing in this subsection prohibits any State regulatory authority or nonregulated electric utility from making any determination that it is not appropriate to implement any such standard, pursuant to its authority under otherwise applicable State law. (b) Procedural requirements for consideration and determination (1) The consideration referred to in subsection (a) shall be made after public notice and hearing. The determination referred to in subsection (a) shall be— (A) in writing, (B) based upon findings included in such determination and upon the evidence presented at the hearing, and (C) available to the public. (2) Except as otherwise provided in paragraph (1), in the second sentence of section 2622(a) of this title, and in sections 2631 and 2632 of this title, the procedures for the consideration and determination referred to in subsection (a) shall be those established by the State regulatory authority or the nonregulated electric utility. (c) Implementation (1) The State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility may, to the extent consistent with otherwise applicable State law— (A) implement any such standard determined under subsection (a) to be appropriate to carry out the purposes of this chapter, or (B) decline to implement any such standard. (2) If a State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility declines to implement any standard established by subsection (d) which is determined under subsection (a) to be appropriate to carry out the purposes of this chapter, such authority or nonregulated electric utility shall state in writing the reasons therefor. Such statement of reasons shall be available to the public. (3) If a State regulatory authority implements a standard established by subsection (d)(7) or (8), such authority shall— (A) consider the impact that implementation of such standard would have on small businesses engaged in the design, sale, supply, installation or servicing of energy conservation, energy efficiency or other demand side management measures, and (B) implement such standard so as to assure that utility actions would not provide such utilities with unfair competitive advantages over such small businesses. (d) Establishment The following Federal standards are hereby established: (1) Cost of service Rates charged by any electric utility for providing electric service to each class of electric consumers shall be designed, to the maximum extent practicable, to reflect the costs of providing electric service to such class, as determined under section 2625(a) of this title. (2) Declining block rates The energy component of a rate, or the amount attributable to the energy component in a rate, charged by any electric utility for providing electric service during any period to any class of electric consumers may not decrease as kilowatt-hour consumption by such class increases during such period except to the extent that such utility demonstrates that the costs to such utility of providing electric service to such class, which costs are attributable to such energy component, decrease as such consumption increases during such period. (3) Time-of-day r...86 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2622 Obligations to consider and determine Amends
16 U.S.C. § 2622
The law today
(a) Request for consideration and determination Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility may undertake the consideration and make the determination referred to in section 2621 of this title with respect to any standard established by section 2621(d) of this title in any proceeding respecting the rates of the electric utility. Any participant or intervenor (including an intervenor referred to in section 2631 of this title) in such a proceeding may request, and shall obtain, such consideration and determination in such proceeding. In undertaking such consideration and making such determination in any such proceeding with respect to the application to any electric utility of any standard established by section 2621(d) of this title, a State regulatory authority (with respect to an electric utility for which it has ratemaking authority) or nonregulated electric utility may take into account in such proceeding— (1) any appropriate prior determination with respect to such standard— (A) which is made in a proceeding which takes place after November 9, 1978, or (B) which was made before such date (or is made in a proceeding pending on such date) and complies, as provided in section 2634 of this title, with the requirements of this chapter; and (2) the evidence upon which such prior determination was based (if such evidence is referenced in such proceeding). (b) Time limitations (1) Not later than 2 years after November 9, 1978 (or after October 24, 1992, in the case of standards under paragraphs (7), (8), and (9) of section 2621(d) of this title), each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to each standard established by section 2621(d) of this title. (2) Not later than three years after November 9, 1978 (or after October 24, 1992, in the case of standards under paragraphs (7), (8), and (9) of section 2621(d) of this title), each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title. (3) (A) Not later than 2 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to each standard established by paragraphs (11) through (13) of section 2621(d) of this title. (B) Not later than 3 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 2621 of this title with respect to each standard established by paragraphs (11) through (13) of section 2621(d) of this title. (4) (A) Not later than 1 year after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to the standard established by paragraph (14) of section 2621(d) of this title. (B) Not later than 2 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utili...74 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Action History
-
Referred to the Committee on Energy and Commerce, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
-
Introduced in House
Sponsors
- Suhas Subramanyam · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 538 not signed on
Sponsors (1)
- Suhas Subramanyam Democratic
Co-sponsors (0)
None.
Not signed on (538)
538 members have not signed on to this bill.
Show all 538 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Committees
Frequently asked questions
- What does HR 10322 do?
- To amend the Public Utility Regulatory Policies Act of 1978 to establish Federal standards relating to the recovery of the full, incremental costs of upgrades that serve large-load customers, and to withhold highway funds from States that do not implement such standards, and for other purposes.
- Who sponsors HR 10322?
- HR 10322 is sponsored by Suhas Subramanyam (Democratic).
- What is the current status of HR 10322?
- This bill is in committee in the House. Introduced September 08, 2026. It must pass committee before a floor vote.
- Where can I track HR 10322?
- Track HR 10322 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on HR 10322
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of HR 10322
Last checked for changes 12 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →