United States 115th Congress Status: Died Sponsors 1 R

S 3653 — Reinvigorating American Energy Infrastructure Act

Last action — Read twice and referred to the Committee on Energy and Natural Resources.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 115th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Reinvigorating American Energy Infrastructure Act

Bill Text

Sections of law this bill changes

3 sections in 1 law

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

National energy policy and programs · 42 U.S.C. ch. 149 3 sections
  • § 16512 Terms and conditions Amends

    42 U.S.C. § 16512

    The law today

    (a) In general Except for division C of Public Law 108–324 [15 U.S.C. 720 et seq.], the Secretary shall make guarantees under this or any other Act for projects, including projects receiving financial support or credit enhancements from a State energy financing institution, on such terms and conditions as the Secretary determines, after consultation with the Secretary of the Treasury, only in accordance with this section. (b) Specific appropriation or contribution (1) In general Except as provided in paragraph (2), the cost of a guarantee shall be paid by the Secretary using an appropriation made for the cost of the guarantee, subject to the availability of such an appropriation. (2) Insufficient appropriations If sufficient appropriated funds to pay the cost of a guarantee are not available, then the guarantee shall not be made unless— (A) the Secretary has received from the borrower a payment in full for the cost of the guarantee and deposited the payment into the Treasury; or (B) a combination of one or more appropriations and one or more payments from the borrower under this subsection has been made that is sufficient to cover the cost of the guarantee. (3) Source of payments The source of a payment received from a borrower under subparagraph (A) or (B) of paragraph (2) may not be a loan or other debt obligation that is made or guaranteed by the Federal Government. (c) Amount Unless otherwise provided by law, a guarantee by the Secretary shall not exceed an amount equal to 80 percent of the project cost of the facility that is the subject of the guarantee, as estimated at the time at which the guarantee is issued. (d) Repayment (1) Requirement (A) In general No guarantee, including a guarantee for a project receiving financial support or credit enhancements from a State energy financing institution, shall be made unless the Secretary determines that there is reasonable prospect of repayment of the principal and interest on the obligation by the borrower. (B) Reasonable prospect of repayment The Secretary shall base a determination of whether there is reasonable prospect of repayment under subparagraph (A) on a comprehensive evaluation of whether the borrower has a reasonable prospect of repaying the guaranteed obligation for the eligible project, including, as applicable, an evaluation of— (i) the strength of the contractual terms of the eligible project (if commercially reasonably available); (ii) the forecast of noncontractual cash flows supported by market projections from reputable sources, as determined by the Secretary; (iii) cash sweeps and other structure enhancements; (iv) the projected financial strength of the borrower— (I) at the time of loan close; and (II) throughout the loan term after the project is completed; (v) the financial strength of the investors and strategic partners of the borrower, if applicable; and (vi) other financial metrics and analyses that are relied on by the private lending community and nationally recognized credit rating agencies, as determined appropriate by the Secretary. (2) Amount No guarantee shall be made unless the Secretary determines that the amount of the obligation (when combined with amounts available to the borrower from other sources) will be sufficient to carry out the project. (3) Subordination The obligation shall be subject to the condition that the obligation, including any reorganization, restructuring, or termination thereof, shall not at any time be subordinate to other financing. (e) Interest rate An obligation shall bear interest at a rate that does not exceed a level that the Secretary determines appropriate, taking into account the prevailing rate of interest in the private sector for similar loans and risks. (f) Term The term of an obligation shall require full repayment over a period not to exceed the lesser of— (1) 30 years; or (2) 90 percent of the projected useful life of the physical asset to be financed by the obligation (as determined by the Secreta...

    50 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 16513 Eligible projects Amends

    42 U.S.C. § 16513

    The law today

    (a) In general The Secretary may make guarantees under this section only for projects that— (1) avoid, reduce, utilize, or sequester air pollutants or anthropogenic emissions of greenhouse gases; and (2) employ new or significantly improved technologies as compared to commercial technologies in service in the United States at the time the guarantee is issued, including projects that employ elements of commercial technologies in combination with new or significantly improved technologies. (b) Categories Projects from the following categories shall be eligible for a guarantee under this section: (1) Renewable energy systems. (2) Advanced fossil energy technology (including coal gasification meeting the criteria in subsection (d)). (3) Hydrogen fuel cell technology for residential, industrial, or transportation applications. (4) Advanced nuclear energy facilities, including manufacturing of nuclear supply components for advanced nuclear reactors. (5) Carbon capture, utilization, and sequestration practices and technologies, including— (A) agricultural and forestry practices that store and sequester carbon; and (B) synthetic technologies to remove carbon from the air and oceans. (6) Efficient electrical generation, transmission, and distribution technologies. (7) Efficient end-use energy technologies. (8) Production facilities for the manufacture of fuel efficient vehicles or parts of those vehicles, including electric drive vehicles and advanced diesel vehicles. (9) Pollution control equipment. (10) Refineries, meaning facilities at which crude oil is refined into gasoline. (11) Energy storage technologies for residential, industrial, transportation, and power generation applications. (12) Technologies or processes for reducing greenhouse gas emissions from industrial applications, including iron, steel, cement, and ammonia production, hydrogen production, and the generation of high-temperature heat. (13) Projects that increase the domestically produced supply of critical minerals (as defined in section 1606(a) of title 30), including through the production, processing, manufacturing, recycling, or fabrication of mineral alternatives. (c) Gasification projects The Secretary may make guarantees for the following gasification projects: (1) Integrated gasification combined cycle projects Integrated gasification combined cycle plants meeting the emission levels under subsection (d), including— (A) projects for the generation of electricity— (i) for which, during the term of the guarantee— (I) coal, biomass, petroleum coke, or a combination of coal, biomass, and petroleum coke will account for at least 65 percent of annual heat input; and (II) electricity will account for at least 65 percent of net useful annual energy output; (ii) that have a design that is determined by the Secretary to be capable of accommodating the equipment likely to be necessary to capture the carbon dioxide that would otherwise be emitted in flue gas from the plant; (iii) that have an assured revenue stream that covers project capital and operating costs (including servicing all debt obligations covered by the guarantee) that is approved by the Secretary and the relevant State public utility commission; and (iv) on which construction commences not later than the date that is 3 years after the date of the issuance of the guarantee; (B) a project to produce energy from coal (of not more than 13,000 Btu/lb and mined in the western United States) using appropriate advanced integrated gasification combined cycle technology that minimizes and offers the potential to sequester carbon dioxide emissions and that— (i) may include repowering of existing facilities; (ii) may be built in stages; (iii) shall have a combined output of at least 100 megawatts; (iv) shall be located in a western State at an altitude greater than 4,000 feet; and (v) shall demonstrate the ability to use coal with an energy content of not more than 9,000 Btu/lb; (C) a project located in a tacon...

    83 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 16515 Limitation on commitments to guarantee loans Amends

    42 U.S.C. § 16515 — at 16515(a)

    The law today

    (a) Notwithstanding section 101,1 subject to the Federal Credit Reform Act of 1990, as amended [2 U.S.C. 661 et seq.], commitments to guarantee loans under title XVII of the Energy Policy Act of 2005 [42 U.S.C. 16501 et seq.] shall not exceed a total principal amount, any part of which is to be guaranteed, of $4,000,000,000: Provided, That there are appropriated for the cost of the guaranteed loans such sums as are hereafter derived from amounts received from borrowers pursuant to section 16512(b)(2) of this title, to remain available until expended: Provided further, That the source of payments received from borrowers for the subsidy cost shall not be a loan or other debt obligation that is made or guaranteed by the Federal government.2 In addition, fees collected pursuant to section 16512(h) of this title in fiscal year 2007 shall be credited as offsetting collections to the Departmental Administration account for administrative expenses of the Loan Guarantee Program: Provided further, That the sum appropriated for administrative expenses for the Loan Guarantee Program shall be reduced by the amount of fees received during fiscal year 2007: Provided further, That any fees collected under section 16512(h) of this title in excess of the amount appropriated for administrative expenses shall not be available until appropriated. (b) No loan guarantees may be awarded under title XVII of the Energy Policy Act of 2005 [42 U.S.C. 16501 et seq.] until final regulations are issued that include— (1) programmatic, technical, and financial factors the Secretary will use to select projects for loan guarantees; (2) policies and procedures for selecting and monitoring lenders and loan performance; and (3) any other policies, procedures, or information necessary to implement title XVII of the Energy Policy Act of 2005. (c) The Secretary of Energy shall enter into an arrangement with an independent auditor for annual evaluations of the program under title XVII of the Energy Policy Act of 2005 [42 U.S.C. 16501 et seq.]. In addition to the independent audit, the Comptroller General shall conduct a review every three years of the Department’s execution of the program under title XVII of the Energy Policy Act of 2005. The results of the independent audit and the Comptroller General’s review shall be provided directly to the Committees on Appropriations of the House of Representatives and the Senate. (d) The Secretary of Energy shall promulgate final regulations for loan guarantees under title XVII of the Energy Policy Act of 2005 [42 U.S.C. 16501 et seq.] within 6 months of February 15, 2007. (e) Not later than 120 days after February 15, 2007, and annually thereafter, the Secretary of Energy shall transmit to the Committees on Appropriations of the House of Representatives and the Senate a report containing a summary of all activities under title XVII of the Energy Policy Act of 2005 [42 U.S.C. 16511 et seq.], beginning in fiscal year 2007, with a listing of responses to loan guarantee solicitations under such title, describing the technologies, amount of loan guarantee sought, and the applicants’ assessment of risk.

    1 other bill also changes this section · Follow it → Official text at uscode.house.gov ↗

Action History

  1. Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 560 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (560)

560 members have not signed on to this bill.

Show all 560 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 3653 do?
Reinvigorating American Energy Infrastructure Act
Who sponsors S 3653?
S 3653 is sponsored by Todd Young (Republican).
What is the current status of S 3653?
This bill died with 115th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 3653?
Track S 3653 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 3653

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 3653

Last checked for changes 12 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →