United States 118th Congress Status: Died Sponsors 1 D

S 5439 — A bill to provide for water conservation, drought operations, and drought resilience at water resources development projects, and for other purposes.

Last action — Read twice and referred to the Committee on Environment and Public Works.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 118th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

A bill to provide for water conservation, drought operations, and drought resilience at water resources development projects, and for other purposes.

Bill Text

Sections of law this bill changes

3 sections in 2 laws

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Water resources development · 33 U.S.C. ch. 36 2 sections
  • § 2309a Project modifications for improvement of environment or drought resiliency Amends

    33 U.S.C. § 2309a

    The law today

    (a) Determination of need The Secretary is authorized to review water resources projects constructed by the Secretary to determine the need for modifications in the structures and operations of such projects for the purpose of— (1) improving the quality of the environment in the public interest and to determine if the operation of such projects has contributed to the degradation of the quality of the environment; or (2) providing drought resiliency. (b) Authority to make modifications The Secretary is authorized to carry out a program for the purpose of making such modifications in the structures and operations of water resources projects constructed by the Secretary which the Secretary determines (1) are feasible and consistent with the authorized project purposes, and (2) will provide for drought resilience or will improve the quality of the environment in the public interest. (c) Restoration of environmental quality (1) In general If the Secretary determines that construction of a water resources project by the Secretary or operation of a water resources project constructed by the Secretary has contributed to the degradation of the quality of the environment, the Secretary may undertake measures for restoration of environmental quality and measures for enhancement of environmental quality that are associated with the restoration, through modifications either at the project site or at other locations that have been affected by the construction or operation of the project, if such measures do not conflict with the authorized project purposes. (2) Control of sea lamprey Congress finds that— (A) the Great Lakes navigation system has been instrumental in the spread of sea lamprey and the associated impacts on its fishery; and (B) the use of the authority under this subsection for control of sea lamprey at any Great Lakes basin location is appropriate. (d) Non-Federal share; limitation on maximum Federal expenditure The non-Federal share of the cost of any modifications or measures carried out or undertaken pursuant to subsection (b) or (c) shall be 25 percent. The non-Federal share may be provided in kind, including a facility, supply, or service that is necessary to carry out the modification or measure. Not more than $15,000,000 in Federal funds may be expended on any single modification or measure carried out or undertaken pursuant to this section. (e) Coordination of actions The Secretary shall coordinate any actions taken pursuant to this section with appropriate Federal, State, and local agencies. (f) Omitted (g) Nonprofit entities Notwithstanding section 1962d–5b of title 42, a non-Federal sponsor for any project carried out under this section may include a nonprofit entity, with the consent of the affected local government. (h) Authorization of appropriations There is authorized to be appropriated not to exceed $62,000,000 annually to carry out this section. (i) Definition In this section, the term “water resources project constructed by the Secretary” includes a water resources project constructed or funded jointly by the Secretary and the head of any other Federal agency (including the Natural Resources Conservation Service). (j) Drought Resilience Drought resilience measures carried out under this section may include— (1) water conservation measures to mitigate and address drought conditions; (2) removal of sediment captured behind a dam for the purpose of restoring or increasing the authorized storage capacity of the project concerned; (3) the planting of native plant species that will reduce the risk of drought and the incidence of nonnative species; and (4) other actions that increase drought resilience, water conservation, or water availability.

    10 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 2330 Aquatic ecosystem restoration Amends

    33 U.S.C. § 2330

    The law today

    (a) General authority (1) In general The Secretary may carry out a project to restore and protect an aquatic ecosystem or estuary if the Secretary determines that the project— (A) (i) will improve the quality of the environment and is in the public interest; or (ii) will improve the elements and features of an estuary (as defined in section 2902 of this title); and (B) is cost-effective. (2) Dam removal A project under this section may include removal of a dam. (3) Anadromous fish habitat and passage (A) Measures A project under this section may include measures to improve habitat or passage for anadromous fish, including— (i) installing fish bypass structures on small water diversions; (ii) modifying tide gates; and (iii) restoring or reconnecting floodplains and wetlands that are important for anadromous fish habitat or passage. (B) Benefits A project that includes measures under this paragraph shall be formulated to maximize benefits for the anadromous fish species benefitted by the project. (4) Drought resilience A project under this section may include measures that enhance drought resilience through the restoration of wetlands or the removal of invasive species. (b) Cost sharing (1) In general Non-Federal interests shall provide 35 percent of the cost of construction of any project carried out under this section, including provision of all lands, easements, rights-of-way, and necessary relocations. (2) Form Before October 1, 2003, the Federal share of the cost of a project under this section may be provided in the form of reimbursements of project costs. (3) Anadromous fish Notwithstanding paragraph (1), for projects carried out under subsection (a)(3), the non-Federal interest shall provide 15 percent of the cost of construction, including provision of all lands, easements, rights-of-way, and necessary relocations. (c) Agreements (1) In general Construction of a project under this section shall be initiated only after a non-Federal interest has entered into a binding agreement with the Secretary to pay the non-Federal share of the costs of construction required by this section and to pay 100 percent of any operation, maintenance, and replacement and rehabilitation costs with respect to the project in accordance with regulations prescribed by the Secretary. (2) Nonprofit entities Notwithstanding section 1962d–5b of title 42, for any project carried out under this section, a non-Federal interest may include a nonprofit entity, with the consent of the affected local government. (d) Cost limitation Not more than $15,000,000 in Federal funds may be allotted under this section for a project at any single locality. (e) Use of natural and nature-based features In carrying out a project to restore and protect an aquatic ecosystem or estuary under subsection (a), the Secretary shall consider, and may include, with the consent of the non-Federal interest, a natural feature or nature-based feature, as such terms are defined in section 2289a of this title, if the Secretary determines that inclusion of such features is consistent with the requirements of subsection (a). (f) Funding There is authorized to be appropriated to carry out this section $75,000,000 for each fiscal year. (g) Prioritization The Secretary shall give projects that include measures described in subsection (a)(3) equal priority for implementation as other projects under this section.

    12 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Reclamation and irrigation of lands by federal government · 43 U.S.C. ch. 12 1 section
  • § 390b-2 Leveraging Federal infrastructure for increased water supply Amends

    43 U.S.C. § 390b-2 — at 390b-2(i)

    The law today

    (a) In general At the request of a non-Federal interest, the Secretary may review proposals to increase the quantity of available supplies of water at a Federal water resources development project through— (1) modification of the project; (2) modification of how the project is managed; or (3) accessing water released from the project. (b) Proposals included A proposal under subsection (a) may include— (1) increasing the storage capacity of the project; (2) diversion of water released or withdrawn from the project— (A) to recharge groundwater; (B) to aquifer storage and recovery; or (C) to any other storage facility; (3) construction of facilities for delivery of water from pumping stations constructed by the Secretary; (4) construction of facilities to access water; and (5) a combination of the activities described in paragraphs (1) through (4). (c) Exclusions This section shall not apply to a proposal that— (1) reallocates existing water supply or hydropower storage; or (2) reduces water available for any authorized project purpose. (d) Other Federal projects In any case in which a proposal relates to a Federal project that is not operated by the Secretary, this section shall apply only to activities under the authority of the Secretary. (e) Review process (1) Notice On receipt of a proposal submitted under subsection (a), the Secretary shall provide a copy of the proposal to each entity described in paragraph (2) and, if applicable, the Federal agency that operates the project, in the case of a project operated by an agency other than the Department of the Army. (2) Public participation In reviewing proposals submitted under subsection (a), and prior to making any decisions regarding a proposal, the Secretary shall comply with all applicable public participation requirements under law, including consultation with— (A) affected States; (B) power marketing administrations, in the case of reservoirs with Federal hydropower projects; (C) entities responsible for operation and maintenance costs; (D) any entity that has a contractual right from the Federal Government or a State to withdraw water from, or use storage at, the project; (E) entities that the State determines hold rights under State law to the use of water from the project; and (F) units of local government with flood risk reduction responsibilities downstream of the project. (f) Authorities A proposal submitted to the Secretary under subsection (a) may be reviewed and approved, if applicable and appropriate, under— (1) the specific authorization for the water resources development project; (2) section 549a of title 33; (3) section 390b of this title; and (4) section 408 of title 33. (g) Limitations The Secretary shall not approve a proposal submitted under subsection (a) that— (1) is not supported by the Federal agency that operates the project, if that agency is not the Department of the Army; (2) interferes with an authorized purpose of the project; (3) adversely impacts contractual rights to water or storage at the reservoir; (4) adversely impacts legal rights to water under State law, as determined by an affected State; (5) increases costs for any entity other than the entity that submitted the proposal; or (6) if a project is subject to section 390b(e) of this title, makes modifications to the project that do not meet the requirements of that section unless the modification is submitted to and authorized by Congress. (h) Cost share (1) In general Except as provided in paragraph (2), 100 percent of the cost of developing, reviewing, and implementing a proposal submitted under subsection (a) shall be provided by an entity other than the Federal Government. (2) Planning assistance to states In the case of a proposal from an entity authorized to receive assistance under section 1962d–16 of title 42, the Secretary may use funds available under that section to pay 50 percent of the cost of a review of a proposal submitted under subsection (a). (3) Operation and main...

    5 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Also cites: 33 U.S.C. § 709, 33 U.S.C. § 709a, 33 U.S.C. § 2211, 42 U.S.C. § 5134, 43 U.S.C. § 390b

Action History

  1. Read twice and referred to the Committee on Environment and Public Works.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 554 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (554)

554 members have not signed on to this bill.

Show all 554 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Lobbying on this bill

From the reports lobbyists file with Congress. A report shows the bill was lobbied, not that anyone met a member about it.

2 lobbying reports for 2 clients name S 5439, the latest filed January 17, 2025.

Counted from reports filed December 5, 2024 through February 12, 2027: a report names a bill by its number, not its Congress, so we count those filed within about two years of when this bill began.

See who's lobbying on S 5439

The clients and their firms, what they reported spending, the issues and the agencies and chambers they lobbied, and former officials among the lobbyists, on any paid plan.

See plans

Source: U.S. Senate Office of Public Records, LDA.gov, retrieved August 28, 2026. Senate Office of Public Records cannot vouch for the data or analyses derived from these data after the data have been retrieved from LDA.gov.

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 5439 do?
A bill to provide for water conservation, drought operations, and drought resilience at water resources development projects, and for other purposes.
Who sponsors S 5439?
S 5439 is sponsored by Mark Kelly (D).
What is the current status of S 5439?
This bill died with 118th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 5439?
Track S 5439 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 5439

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 5439

Last checked for changes 16 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →