United States 118th Congress Status: Died Sponsors 1 D

S 5259 — Community Solar Consumer Choice Act of 2024

Last action — Read twice and referred to the Committee on Energy and Natural Resources.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 118th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

A bill to require the Secretary of Energy to establish a program to increase participation in community solar programs and the receipt of associated benefits, and for other purposes.

Bill Text

Sections of law this bill changes

4 sections in 2 laws

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Public utility regulatory policies · 16 U.S.C. ch. 46 3 sections
  • § 2621 Consideration and determination respecting certain ratemaking standards Amends

    16 U.S.C. § 2621 — at 2621(d)

    The law today

    (a) Consideration and determination Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall consider each standard established by subsection (d) and make a determination concerning whether or not it is appropriate to implement such standard to carry out the purposes of this chapter. For purposes of such consideration and determination in accordance with subsections (b) and (c), and for purposes of any review of such consideration and determination in any court in accordance with section 2633 of this title, the purposes of this chapter supplement otherwise applicable State law. Nothing in this subsection prohibits any State regulatory authority or nonregulated electric utility from making any determination that it is not appropriate to implement any such standard, pursuant to its authority under otherwise applicable State law. (b) Procedural requirements for consideration and determination (1) The consideration referred to in subsection (a) shall be made after public notice and hearing. The determination referred to in subsection (a) shall be— (A) in writing, (B) based upon findings included in such determination and upon the evidence presented at the hearing, and (C) available to the public. (2) Except as otherwise provided in paragraph (1), in the second sentence of section 2622(a) of this title, and in sections 2631 and 2632 of this title, the procedures for the consideration and determination referred to in subsection (a) shall be those established by the State regulatory authority or the nonregulated electric utility. (c) Implementation (1) The State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility may, to the extent consistent with otherwise applicable State law— (A) implement any such standard determined under subsection (a) to be appropriate to carry out the purposes of this chapter, or (B) decline to implement any such standard. (2) If a State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility declines to implement any standard established by subsection (d) which is determined under subsection (a) to be appropriate to carry out the purposes of this chapter, such authority or nonregulated electric utility shall state in writing the reasons therefor. Such statement of reasons shall be available to the public. (3) If a State regulatory authority implements a standard established by subsection (d)(7) or (8), such authority shall— (A) consider the impact that implementation of such standard would have on small businesses engaged in the design, sale, supply, installation or servicing of energy conservation, energy efficiency or other demand side management measures, and (B) implement such standard so as to assure that utility actions would not provide such utilities with unfair competitive advantages over such small businesses. (d) Establishment The following Federal standards are hereby established: (1) Cost of service Rates charged by any electric utility for providing electric service to each class of electric consumers shall be designed, to the maximum extent practicable, to reflect the costs of providing electric service to such class, as determined under section 2625(a) of this title. (2) Declining block rates The energy component of a rate, or the amount attributable to the energy component in a rate, charged by any electric utility for providing electric service during any period to any class of electric consumers may not decrease as kilowatt-hour consumption by such class increases during such period except to the extent that such utility demonstrates that the costs to such utility of providing electric service to such class, which costs are attributable to such energy component, decrease as such consumption increases during such period. (3) Time-of-day r...

    86 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 2622 Obligations to consider and determine Amends

    16 U.S.C. § 2622 — at 2622(b) and 2622(c)

    The law today

    (a) Request for consideration and determination Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility may undertake the consideration and make the determination referred to in section 2621 of this title with respect to any standard established by section 2621(d) of this title in any proceeding respecting the rates of the electric utility. Any participant or intervenor (including an intervenor referred to in section 2631 of this title) in such a proceeding may request, and shall obtain, such consideration and determination in such proceeding. In undertaking such consideration and making such determination in any such proceeding with respect to the application to any electric utility of any standard established by section 2621(d) of this title, a State regulatory authority (with respect to an electric utility for which it has ratemaking authority) or nonregulated electric utility may take into account in such proceeding— (1) any appropriate prior determination with respect to such standard— (A) which is made in a proceeding which takes place after November 9, 1978, or (B) which was made before such date (or is made in a proceeding pending on such date) and complies, as provided in section 2634 of this title, with the requirements of this chapter; and (2) the evidence upon which such prior determination was based (if such evidence is referenced in such proceeding). (b) Time limitations (1) Not later than 2 years after November 9, 1978 (or after October 24, 1992, in the case of standards under paragraphs (7), (8), and (9) of section 2621(d) of this title), each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to each standard established by section 2621(d) of this title. (2) Not later than three years after November 9, 1978 (or after October 24, 1992, in the case of standards under paragraphs (7), (8), and (9) of section 2621(d) of this title), each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title. (3) (A) Not later than 2 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to each standard established by paragraphs (11) through (13) of section 2621(d) of this title. (B) Not later than 3 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 2621 of this title with respect to each standard established by paragraphs (11) through (13) of section 2621(d) of this title. (4) (A) Not later than 1 year after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to the standard established by paragraph (14) of section 2621(d) of this title. (B) Not later than 2 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utili...

    74 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 2634 Prior and pending proceedings Amends

    16 U.S.C. § 2634

    The law today

    For purposes of subchapters I and II, and this subchapter, proceedings commenced by State regulatory authorities (with respect to electric utilities for which it has ratemaking authority) and nonregulated electric utilities before November 9, 1978, and actions taken before such date in such proceedings shall be treated as complying with the requirements of subchapters I and II, and this subchapter if such proceedings and actions substantially conform to such requirements. For purposes of subchapters I and II, and this subchapter, any such proceeding or action commenced before November 9, 1978, but not completed before such date, shall comply with the requirements of subchapters I and II, and this subchapter, to the maximum extent practicable, with respect to so much of such proceeding or action as takes place after such date, except as otherwise provided in section 2631(c) of this title. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of each standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021.

    50 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Property management · 40 U.S.C. ch. 5 1 section
  • § 501 Services for executive agencies Amends

    40 U.S.C. § 501 — at 501(b)(1)

    The law today

    (a) Authority of Administrator of General Services.— (1) In general.— The Administrator of General Services shall take action under this subchapter for an executive agency— (A) to the extent that the Administrator of General Services determines that the action is advantageous to the Federal Government in terms of economy, efficiency, or service; and (B) with due regard to the program activities of the agency. (2) Exemption for defense.— The Secretary of Defense may exempt the Department of Defense from an action taken by the Administrator of General Services under this subchapter, unless the President directs otherwise, whenever the Secretary determines that an exemption is in the best interests of national security. (b) Procurement and Supply.— (1) Functions.— (A) In general.— The Administrator of General Services shall procure and supply personal property and nonpersonal services for executive agencies to use in the proper discharge of their responsibilities, and perform functions related to procurement and supply including contracting, inspection, storage, issue, property identification and classification, transportation and traffic management, management of public utility services, and repairing and converting. (B) Public utility contracts.— A contract for public utility services may be made for a period of not more than 10 years. (2) Policies and methods.— (A) In general.— The Administrator of General Services shall prescribe policies and methods for executive agencies regarding the procurement and supply of personal property and nonpersonal services and related functions. (B) Controlling regulation.— Policies and methods prescribed by the Administrator of General Services under this paragraph are subject to regulations prescribed by the Administrator for Federal Procurement Policy under division B (except sections 1704 and 2303) of subtitle I of title 41. (c) Representation.— (1) For transportation and other public utility services used by executive agencies, the Administrator of General Services shall represent the agencies— (A) in negotiations with carriers and other public utilities; and (B) in proceedings involving carriers or other public utilities before federal and state regulatory bodies. (2) Prior to representing any installation of the Department of Defense in any proceeding under this subsection, the Administrator or any persons or entities acting on behalf of the Administrator shall— (A) notify the senior mission commander of the installation; and (B) solicit and represent the interests of the installation as determined by the installation’s senior mission commander. (d) Facilities.— The Administrator of General Services shall operate, for executive agencies, warehouses, supply centers, repair shops, fuel yards, and other similar facilities. After consultation with the executive agencies affected, the Administrator of General Services shall consolidate, take over, or arrange for executive agencies to operate the facilities.

    25 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Also cites: 42 U.S.C. § 15801

Action History

  1. Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 554 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (554)

554 members have not signed on to this bill.

Show all 554 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 5259 do?
A bill to require the Secretary of Energy to establish a program to increase participation in community solar programs and the receipt of associated benefits, and for other purposes.
Who sponsors S 5259?
S 5259 is sponsored by Ben Lujan (D).
What is the current status of S 5259?
This bill died with 118th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 5259?
Track S 5259 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 5259

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 5259

Last checked for changes 16 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →