United States 118th Congress Status: Died Sponsors 1 R

S 4348 — Protecting Our Farmers from the Green New Deal Act

Last action — Read twice and referred to the Committee on Energy and Natural Resources.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 118th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

In plain language

This bill restricts federal permits for electric transmission facilities against state objections.

The bill amends the Federal Power Act to prevent the Federal Energy Regulatory Commission from issuing permits for electric transmission facilities if a state opposes it. This aims to protect farmers and landowners by ensuring their concerns are considered.

What this means for you
  • Farmers: This bill aims to protect farmers from having electric transmission facilities sited on their land without state approval.

Summary

A bill to amend the Federal Power Act to prohibit the Federal Energy Regulatory Commission from issuing permits for the construction or modification of electric transmission facilities in a State over the objection of the State, and for other purposes.

Bill Text

Sections of law this bill changes

1 section in 1 law

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Federal regulation and development of power · 16 U.S.C. ch. 12 1 section
  • § 824p Siting of interstate electric transmission facilities Amends

    16 U.S.C. § 824p — at 824p(b) and 824p(i)(4)

    The law today

    (a) Designation of national interest electric transmission corridors (1) Not later than 1 year after August 8, 2005, and every 3 years thereafter, the Secretary of Energy (referred to in this section as the “Secretary”), in consultation with affected States and Indian Tribes, shall conduct a study of electric transmission capacity constraints and congestion. (2) Not less frequently than once every 3 years, the Secretary, after considering alternatives and recommendations from interested parties (including an opportunity for comment from affected States and Indian Tribes), shall issue a report, based on the study under paragraph (1) or other information relating to electric transmission capacity constraints and congestion, which may designate as a national interest electric transmission corridor any geographic area that— (i)  1 is experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers; or (ii)  2 is expected to experience such energy transmission capacity constraints or congestion. (3) Not less frequently than once every 3 years, the Secretary, in conducting the study under paragraph (1) and issuing the report under paragraph (2), shall consult with any appropriate regional entity referred to in section 824o of this title. (4) In determining whether to designate a national interest electric transmission corridor under paragraph (2), the Secretary may consider whether— (A) the economic vitality and development of the corridor, or the end markets served by the corridor, may be constrained by lack of adequate or reasonably priced electricity; (B) (i) economic growth in the corridor, or the end markets served by the corridor, may be jeopardized by reliance on limited sources of energy; and (ii) a diversification of supply is warranted; (C) the energy independence or energy security of the United States would be served by the designation; (D) the designation would be in the interest of national energy policy; (E) the designation would enhance national defense and homeland security; (F) the designation would enhance the ability of facilities that generate or transmit firm or intermittent energy to connect to the electric grid; (G) the designation— (i) maximizes existing rights-of-way; and (ii) avoids and minimizes, to the maximum extent practicable, and offsets to the extent appropriate and practicable, sensitive environmental areas and cultural heritage sites; and (H) the designation would result in a reduction in the cost to purchase electric energy for consumers. (b) Construction permit Except as provided in subsection (i), the Commission may, after notice and an opportunity for hearing, issue one or more permits for the construction or modification of electric transmission facilities in a national interest electric transmission corridor designated by the Secretary under subsection (a) if the Commission finds that— (1) (A) a State in which the transmission facilities are to be constructed or modified does not have authority to— (i) approve the siting of the facilities; or (ii) consider the interstate benefits or interregional benefits expected to be achieved by the proposed construction or modification of transmission facilities in the State; (B) the applicant for a permit is a transmitting utility under this chapter but does not qualify to apply for a permit or siting approval for the proposed project in a State because the applicant does not serve end-use customers in the State; or (C) a State commission or other entity that has authority to approve the siting of the facilities— (i) has not made a determination on an application seeking approval pursuant to applicable law by the date that is 1 year after the later of— (I) the date on which the application was filed; and (II) the date on which the relevant national interest electric transmission corridor was designated by the Secretary under subsection (a); (ii) has conditioned its approval in such a manner that the propos...

    37 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

How this bill changes current law

9 changes Share ↗

Compared against current U.S. Code AI-generated reading aid — verify against the official bill.

The bill amends the Federal Power Act to restrict the Federal Energy Regulatory Commission's authority to issue permits for electric transmission facilities in a State if the State objects.

  • 16 U.S.C. 824p(b)

    (1) (A) a State in which the transmission facilities are to be constructed or modified does not have authority to— → (A) a State in which the transmission facilities are to be constructed or modified does not have authority to approve the siting of the facilities;

    This change clarifies that a State must have the authority to approve the siting of facilities.

  • 16 U.S.C. 824p(b)

    Except as provided in subsection (i), the Commission may, after notice and an opportunity for hearing, issue one or more permits for the construction or modification of electric transmission facilities in a national interest electric transmission corridor designated by the Secretary under subsection (a) if the Commission finds that— → (1) In general.--Except

    This change adjusts the introductory language to clearly designate the beginning of conditions for issuing permits.

  • 16 U.S.C. 824p(b)

    and → and

    This change modifies the conjunction usage for clarity in the listing of conditions.

  • 16 U.S.C. 824p(b)

    . → ; and

    This change indicates that additional conditions follow by changing the end punctuation to a semicolon.

  • 16 U.S.C. 824p(b)

    (G) the proposed construction or modification minimizes any adverse effects on landowners and agriculture, adequately compensates landowners and agricultural producers for any harms, and provides benefits to consumers in the State that exceed the harms to landowners and agricultural producers.

    This addition specifies new criteria for permit approval, considering the impact on landowners and agricultural producers.

  • 16 U.S.C. 824p(b)

    (2) Prohibition.--Under no circumstances may the Commission review an application or issue a permit for the construction or modification of transmission facilities if a State entity with authority to approve the siting of the facilities—

    This addition establishes a prohibition against issuing permits when a State with siting authority objects.

  • 16 U.S.C. 824p(b)

    (A) has previously denied an identical or substantially similar application; or

    This addition specifies conditions under which the Commission cannot act on a permit application.

  • 16 U.S.C. 824p(b)

    (B) is currently reviewing an identical or substantially similar application.

    This addition reinforces the prohibition against permit action during ongoing State reviews.

  • 16 U.S.C. 824p(i)(4)

    , unless

    This change removes unnecessary wording, clarifying the conditions under which subsections apply.

Action History

  1. Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 554 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (554)

554 members have not signed on to this bill.

Show all 554 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Lobbying on this bill

From the reports lobbyists file with Congress. A report shows the bill was lobbied, not that anyone met a member about it.

6 lobbying reports for 4 clients name S 4348, the latest filed July 20, 2026.

Counted from reports filed May 15, 2024 through July 23, 2026: a report names a bill by its number, not its Congress, so we count those filed within about two years of when this bill began.

See who's lobbying on S 4348

The clients and their firms, what they reported spending, the issues and the agencies and chambers they lobbied, and former officials among the lobbyists, on any paid plan.

See plans

Source: U.S. Senate Office of Public Records, LDA.gov, retrieved August 29, 2026. Senate Office of Public Records cannot vouch for the data or analyses derived from these data after the data have been retrieved from LDA.gov.

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 4348 do?
A bill to amend the Federal Power Act to prohibit the Federal Energy Regulatory Commission from issuing permits for the construction or modification of electric transmission facilities in a State over the objection of the State, and for other purposes.
Who sponsors S 4348?
S 4348 is sponsored by Josh Hawley (R).
What is the current status of S 4348?
This bill died with 118th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 4348?
Track S 4348 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 4348

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 4348

Last checked for changes 16 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →