S 2882 — Ozone Standards Implementation Act of 2016
Last action — Committee on Environment and Public Works Subcommittee on Clean Air and Nuclear Safety. Hearings held.
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Ozone Standards Implementation Act of 2016
Bill Text
- Introduced Introduced in Senate Current html April 28, 2016
Sections of law this bill changes
5 sections in 1 lawFrom the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).
Air pollution prevention and control · 42 U.S.C. ch. 85 5 sections
-
§ 7409 National primary and secondary ambient air quality standards Amends
42 U.S.C. § 7409 — at 7409(b), 7409(d), and 7409(d)(2)
The law today
(a) Promulgation (1) The Administrator— (A) within 30 days after December 31, 1970, shall publish proposed regulations prescribing a national primary ambient air quality standard and a national secondary ambient air quality standard for each air pollutant for which air quality criteria have been issued prior to such date; and (B) after a reasonable time for interested persons to submit written comments thereon (but no later than 90 days after the initial publication of such proposed standards) shall by regulation promulgate such proposed national primary and secondary ambient air quality standards with such modifications as he deems appropriate. (2) With respect to any air pollutant for which air quality criteria are issued after December 31, 1970, the Administrator shall publish, simultaneously with the issuance of such criteria and information, proposed national primary and secondary ambient air quality standards for any such pollutant. The procedure provided for in paragraph (1)(B) of this subsection shall apply to the promulgation of such standards. (b) Protection of public health and welfare (1) National primary ambient air quality standards, prescribed under subsection (a) shall be ambient air quality standards the attainment and maintenance of which in the judgment of the Administrator, based on such criteria and allowing an adequate margin of safety, are requisite to protect the public health. Such primary standards may be revised in the same manner as promulgated. (2) Any national secondary ambient air quality standard prescribed under subsection (a) shall specify a level of air quality the attainment and maintenance of which in the judgment of the Administrator, based on such criteria, is requisite to protect the public welfare from any known or anticipated adverse effects associated with the presence of such air pollutant in the ambient air. Such secondary standards may be revised in the same manner as promulgated. (c) National primary ambient air quality standard for nitrogen dioxide The Administrator shall, not later than one year after August 7, 1977, promulgate a national primary ambient air quality standard for NO2 concentrations over a period of not more than 3 hours unless, based on the criteria issued under section 7408(c) of this title, he finds that there is no significant evidence that such a standard for such a period is requisite to protect public health. (d) Review and revision of criteria and standards; independent scientific review committee; appointment; advisory functions (1) Not later than December 31, 1980, and at five-year intervals thereafter, the Administrator shall complete a thorough review of the criteria published under section 7408 of this title and the national ambient air quality standards promulgated under this section and shall make such revisions in such criteria and standards and promulgate such new standards as may be appropriate in accordance with section 7408 of this title and subsection (b) of this section. The Administrator may review and revise criteria or promulgate new standards earlier or more frequently than required under this paragraph. (2) (A) The Administrator shall appoint an independent scientific review committee composed of seven members including at least one member of the National Academy of Sciences, one physician, and one person representing State air pollution control agencies. (B) Not later than January 1, 1980, and at five-year intervals thereafter, the committee referred to in subparagraph (A) shall complete a review of the criteria published under section 7408 of this title and the national primary and secondary ambient air quality standards promulgated under this section and shall recommend to the Administrator any new national ambient air quality standards and revisions of existing criteria and standards as may be appropriate under section 7408 of this title and subsection (b) of this section. (C) Such committee shall also (i) advise the Administrator...16 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 7502 Nonattainment plan provisions in general Amends
42 U.S.C. § 7502 — at 7502(c)(9)
The law today
(a) Classifications and attainment dates (1) Classifications (A) On or after the date the Administrator promulgates the designation of an area as a nonattainment area pursuant to section 7407(d) of this title with respect to any national ambient air quality standard (or any revised standard, including a revision of any standard in effect on November 15, 1990), the Administrator may classify the area for the purpose of applying an attainment date pursuant to paragraph (2), and for other purposes. In determining the appropriate classification, if any, for a nonattainment area, the Administrator may consider such factors as the severity of nonattainment in such area and the availability and feasibility of the pollution control measures that the Administrator believes may be necessary to provide for attainment of such standard in such area. (B) The Administrator shall publish a notice in the Federal Register announcing each classification under subparagraph (A), except the Administrator shall provide an opportunity for at least 30 days for written comment. Such classification shall not be subject to the provisions of sections 553 through 557 of title 5 (concerning notice and comment) and shall not be subject to judicial review until the Administrator takes final action under subsection (k) or (l) of section 7410 of this title (concerning action on plan submissions) or section 7509 of this title (concerning sanctions) with respect to any plan submissions required by virtue of such classification. (C) This paragraph shall not apply with respect to nonattainment areas for which classifications are specifically provided under other provisions of this part. (2) Attainment dates for nonattainment areas (A) The attainment date for an area designated nonattainment with respect to a national primary ambient air quality standard shall be the date by which attainment can be achieved as expeditiously as practicable, but no later than 5 years from the date such area was designated nonattainment under section 7407(d) of this title, except that the Administrator may extend the attainment date to the extent the Administrator determines appropriate, for a period no greater than 10 years from the date of designation as nonattainment, considering the severity of nonattainment and the availability and feasibility of pollution control measures. (B) The attainment date for an area designated nonattainment with respect to a secondary national ambient air quality standard shall be the date by which attainment can be achieved as expeditiously as practicable after the date such area was designated nonattainment under section 7407(d) of this title. (C) Upon application by any State, the Administrator may extend for 1 additional year (hereinafter referred to as the “Extension Year”) the attainment date determined by the Administrator under subparagraph (A) or (B) if— (i) the State has complied with all requirements and commitments pertaining to the area in the applicable implementation plan, and (ii) in accordance with guidance published by the Administrator, no more than a minimal number of exceedances of the relevant national ambient air quality standard has occurred in the area in the year preceding the Extension Year. No more than 2 one-year extensions may be issued under this subparagraph for a single nonattainment area. (D) This paragraph shall not apply with respect to nonattainment areas for which attainment dates are specifically provided under other provisions of this part. (b) Schedule for plan submissions At the time the Administrator promulgates the designation of an area as nonattainment with respect to a national ambient air quality standard under section 7407(d) of this title, the Administrator shall establish a schedule according to which the State containing such area shall submit a plan or plan revision (including the plan items) meeting the applicable requirements of subsection (c) and section 7410(a)(2) of this title. Such schedule sh...9 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 7511a Plan submissions and requirements Amends
42 U.S.C. § 7511a
The law today
(a) Marginal Areas Each State in which all or part of a Marginal Area is located shall, with respect to the Marginal Area (or portion thereof, to the extent specified in this subsection), submit to the Administrator the State implementation plan revisions (including the plan items) described under this subsection except to the extent the State has made such submissions as of November 15, 1990. (1) Inventory Within 2 years after November 15, 1990, the State shall submit a comprehensive, accurate, current inventory of actual emissions from all sources, as described in section 7502(c)(3) of this title, in accordance with guidance provided by the Administrator. (2) Corrections to the State implementation plan Within the periods prescribed in this paragraph, the State shall submit a revision to the State implementation plan that meets the following requirements— (A) Reasonably available control technology corrections For any Marginal Area (or, within the Administrator’s discretion, portion thereof) the State shall submit, within 6 months of the date of classification under section 7511(a) of this title, a revision that includes such provisions to correct requirements in (or add requirements to) the plan concerning reasonably available control technology as were required under section 7502(b) of this title (as in effect immediately before November 15, 1990), as interpreted in guidance issued by the Administrator under section 7408 of this title before November 15, 1990. (B) Savings clause for vehicle inspection and maintenance (i) For any Marginal Area (or, within the Administrator’s discretion, portion thereof), the plan for which already includes, or was required by section 7502(b)(11)(B) of this title (as in effect immediately before November 15, 1990) to have included, a specific schedule for implementation of a vehicle emission control inspection and maintenance program, the State shall submit, immediately after November 15, 1990, a revision that includes any provisions necessary to provide for a vehicle inspection and maintenance program of no less stringency than that of either the program defined in House Report Numbered 95–294, 95th Congress, 1st Session, 281–291 (1977) as interpreted in guidance of the Administrator issued pursuant to section 7502(b)(11)(B) of this title (as in effect immediately before November 15, 1990) or the program already included in the plan, whichever is more stringent. (ii) Within 12 months after November 15, 1990, the Administrator shall review, revise, update, and republish in the Federal Register the guidance for the States for motor vehicle inspection and maintenance programs required by this chapter, taking into consideration the Administrator’s investigations and audits of such program. The guidance shall, at a minimum, cover the frequency of inspections, the types of vehicles to be inspected (which shall include leased vehicles that are registered in the nonattainment area), vehicle maintenance by owners and operators, audits by the State, the test method and measures, including whether centralized or decentralized, inspection methods and procedures, quality of inspection, components covered, assurance that a vehicle subject to a recall notice from a manufacturer has complied with that notice, and effective implementation and enforcement, including ensuring that any retesting of a vehicle after a failure shall include proof of corrective action and providing for denial of vehicle registration in the case of tampering or misfueling. The guidance which shall be incorporated in the applicable State implementation plans by the States shall provide the States with continued reasonable flexibility to fashion effective, reasonable, and fair programs for the affected consumer. No later than 2 years after the Administrator promulgates regulations under section 7521(m)(3) of this title (relating to emission control diagnostics), the State shall submit a revision to such program to meet any require...11 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 7513a Plan provisions and schedules for plan submissions Amends
42 U.S.C. § 7513a — at 7513a(c)(1)
The law today
(a) Moderate Areas (1) Plan provisions Each State in which all or part of a Moderate Area is located shall submit, according to the applicable schedule under paragraph (2), an implementation plan that includes each of the following: (A) For the purpose of meeting the requirements of section 7502(c)(5) of this title, a permit program providing that permits meeting the requirements of section 7503 of this title are required for the construction and operation of new and modified major stationary sources of PM–10. (B) Either (i) a demonstration (including air quality modeling) that the plan will provide for attainment by the applicable attainment date; or (ii) a demonstration that attainment by such date is impracticable. (C) Provisions to assure that reasonably available control measures for the control of PM–10 shall be implemented no later than December 10, 1993, or 4 years after designation in the case of an area classified as moderate after November 15, 1990. (2) Schedule for plan submissions A State shall submit the plan required under subparagraph (1) no later than the following: (A) Within 1 year of November 15, 1990, for areas designated nonattainment under section 7407(d)(4) of this title, except that the provision required under subparagraph (1)(A) shall be submitted no later than June 30, 1992. (B) 18 months after the designation as nonattainment, for those areas designated nonattainment after the designations prescribed under section 7407(d)(4) of this title. (b) Serious Areas (1) Plan provisions In addition to the provisions submitted to meet the requirements of paragraph 1 (a)(1) (relating to Moderate Areas), each State in which all or part of a Serious Area is located shall submit an implementation plan for such area that includes each of the following: (A) A demonstration (including air quality modeling)— (i) that the plan provides for attainment of the PM–10 national ambient air quality standard by the applicable attainment date, or (ii) for any area for which the State is seeking, pursuant to section 7513(e) of this title, an extension of the attainment date beyond the date set forth in section 7513(c) of this title, that attainment by that date would be impracticable, and that the plan provides for attainment by the most expeditious alternative date practicable. (B) Provisions to assure that the best available control measures for the control of PM–10 shall be implemented no later than 4 years after the date the area is classified (or reclassified) as a Serious Area. (2) Schedule for plan submissions A State shall submit the demonstration required for an area under paragraph (1)(A) no later than 4 years after reclassification of the area to Serious, except that for areas reclassified under section 7513(b)(2) of this title, the State shall submit the attainment demonstration within 18 months after reclassification to Serious. A State shall submit the provisions described under paragraph (1)(B) no later than 18 months after reclassification of the area as a Serious Area. (3) Major sources For any Serious Area, the terms “major source” and “major stationary source” include any stationary source or group of stationary sources located within a contiguous area and under common control that emits, or has the potential to emit, at least 70 tons per year of PM–10. (c) Milestones (1) Plan revisions demonstrating attainment submitted to the Administrator for approval under this subpart shall contain quantitative milestones which are to be achieved every 3 years until the area is redesignated attainment and which demonstrate reasonable further progress, as defined in section 7501(1) of this title, toward attainment by the applicable date. (2) Not later than 90 days after the date on which a milestone applicable to the area occurs, each State in which all or part of such area is located shall submit to the Administrator a demonstration that all measures in the plan approved under this section have been implemented and th...6 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 7619 Air quality monitoring Amends
42 U.S.C. § 7619 — at 7619(b)(1)
The law today
(a) In general After notice and opportunity for public hearing, the Administrator shall promulgate regulations establishing an air quality monitoring system throughout the United States which— (1) utilizes uniform air quality monitoring criteria and methodology and measures such air quality according to a uniform air quality index, (2) provides for air quality monitoring stations in major urban areas and other appropriate areas throughout the United States to provide monitoring such as will supplement (but not duplicate) air quality monitoring carried out by the States required under any applicable implementation plan, (3) provides for daily analysis and reporting of air quality based upon such uniform air quality index, and (4) provides for recordkeeping with respect to such monitoring data and for periodic analysis and reporting to the general public by the Administrator with respect to air quality based upon such data. The operation of such air quality monitoring system may be carried out by the Administrator or by such other departments, agencies, or entities of the Federal Government (including the National Weather Service) as the President may deem appropriate. Any air quality monitoring system required under any applicable implementation plan under section 7410 of this title shall, as soon as practicable following promulgation of regulations under this section, utilize the standard criteria and methodology, and measure air quality according to the standard index, established under such regulations. (b) Air quality monitoring data influenced by exceptional events (1) Definition of exceptional event In this section: (A) In general The term “exceptional event” means an event that— (i) affects air quality; (ii) is not reasonably controllable or preventable; (iii) is an event caused by human activity that is unlikely to recur at a particular location or a natural event; and (iv) is determined by the Administrator through the process established in the regulations promulgated under paragraph (2) to be an exceptional event. (B) Exclusions In this subsection, the term “exceptional event” does not include— (i) stagnation of air masses or meteorological inversions; (ii) a meteorological event involving high temperatures or lack of precipitation; or (iii) air pollution relating to source noncompliance. (2) Regulations (A) Proposed regulations Not later than March 1, 2006, after consultation with Federal land managers and State air pollution control agencies, the Administrator shall publish in the Federal Register proposed regulations governing the review and handling of air quality monitoring data influenced by exceptional events. (B) Final regulations Not later than 1 year after the date on which the Administrator publishes proposed regulations under subparagraph (A), and after providing an opportunity for interested persons to make oral presentations of views, data, and arguments regarding the proposed regulations, the Administrator shall promulgate final regulations governing the review and handling or 1 air quality monitoring data influenced by an exceptional event that are consistent with paragraph (3). (3) Principles and requirements (A) Principles In promulgating regulations under this section, the Administrator shall follow— (i) the principle that protection of public health is the highest priority; (ii) the principle that timely information should be provided to the public in any case in which the air quality is unhealthy; (iii) the principle that all ambient air quality data should be included in a timely manner,2 an appropriate Federal air quality database that is accessible to the public; (iv) the principle that each State must take necessary measures to safeguard public health regardless of the source of the air pollution; and (v) the principle that air quality data should be carefully screened to ensure that events not likely to recur are represented accurately in all monitoring data and analyses. (B) Requirements...16 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Also cites: 42 U.S.C. § 7407, 42 U.S.C. § 7408, 42 U.S.C. § 7410, 42 U.S.C. § 7479, 42 U.S.C. § 7501, 42 U.S.C. § 7509, 42 U.S.C. § 7509a
Action History
-
Committee on Environment and Public Works Subcommittee on Clean Air and Nuclear Safety. Hearings held.
-
Read twice and referred to the Committee on Environment and Public Works.
Sponsors
- Shelley Capito · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 547 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (547)
547 members have not signed on to this bill.
Show all 547 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Frequently asked questions
- What does S 2882 do?
- Ozone Standards Implementation Act of 2016
- Who sponsors S 2882?
- S 2882 is sponsored by Shelley Capito (R).
- What is the current status of S 2882?
- This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track S 2882?
- Track S 2882 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 2882
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 2882
Last checked for changes 16 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →