United States 114th Congress Status: Died Sponsors 1 I

S 2003 — Free Market Energy Act

Last action — Read twice and referred to the Committee on Energy and Natural Resources.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Free Market Energy Act This bill amends: (1) the Federal Power Act to define "distributed energy resource" as a resource, technology, or service interconnected to the electricity distribution system that generates, manages, or reduces energy use; and (2) the Public Utility Regulatory Policies Act of 1978 to provide that distributed energy resources shall have a general right of interconnection under such Act. States must ensure that electric distribution grid operators adopt requirements for interconnection rates and fees that are just and reasonable, that provide for the two-way benefit for the distributed energy resource and the electricity grid, and that are not punitive. Time frames for interconnection shall be well-defined, expeditious, and not unduly protracted. An interconnection may not be delayed or denied unless the electric utility demonstrates that the interconnection is unsafe or impracticable. A state regulatory authority that considers modifying the treatment of net energy metering customers must consider requiring that distributed energy resources be eligible to receive just and reasonable energy and rate treatment using dynamic pricing, which may account for locational benefit, to be provided on an unbundled basis, after accounting for the two-way valuation of dynamic rates, for services provided to or by the grid. Dynamic pricing considerations shall include: pricing for energy sold to, and pricing for energy purchased from, an electric utility, capacity, the provision of ancillary services, the societal value of distributed energy resources, and transmission and distribution losses. A state regulatory authority or applicable Regional Transmission Organization or Independent System Operator must consider nontransmission alternatives in instances in which an entity proposes transmission projects seeking cost-of-service rate recovery. To reduce the cost to the ratepayer of a potential transmission upgrade, the cost of the nontransmission alternative shall be recovered from the ratebase or regional recovery mechanism in the same manner as the transmission upgrade otherwise would have been.

Bill Text

Sections of law this bill changes

4 sections in 2 laws

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Federal regulation and development of power · 16 U.S.C. ch. 12 1 section
  • § 796 Definitions Amends

    16 U.S.C. § 796

    The law today

    The words defined in this section shall have the following meanings for purposes of this chapter, to wit: (1) “public lands” means such lands and interest in lands owned by the United States as are subject to private appropriation and disposal under public land laws. It shall not include “reservations”, as hereinafter defined; (2) “reservations” means national forests, tribal lands embraced within Indian reservations, military reservations, and other lands and interests in lands owned by the United States, and withdrawn, reserved, or withheld from private appropriation and disposal under the public land laws; also lands and interests in lands acquired and held for any public purposes; but shall not include national monuments or national parks; (3) “corporation” means any corporation, joint-stock company, partnership, association, business trust, organized group of persons, whether incorporated or not, or a receiver or receivers, trustee or trustees of any of the foregoing. It shall not include “municipalities” as hereinafter defined; (4) “person” means an individual or a corporation; (5) “licensee” means any person, State, or municipality licensed under the provisions of section 797 of this title, and any assignee or successor in interest thereof; (6) “State” means a State admitted to the Union, the District of Columbia, and any organized Territory of the United States; (7) “municipality” means a city, county, irrigation district, drainage district, or other political subdivision or agency of a State competent under the laws thereof to carry on the business of developing, transmitting, utilizing, or distributing power; (8) “navigable waters” means those parts of streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, and which either in their natural or improved condition notwithstanding interruptions between the navigable parts of such streams or waters by falls, shallows, or rapids compelling land carriage, are used or suitable for use for the transportation of persons or property in interstate or foreign commerce, including therein all such interrupting falls, shallows, or rapids, together with such other parts of streams as shall have been authorized by Congress for improvement by the United States or shall have been recommended to Congress for such improvement after investigation under its authority; (9) “municipal purposes” means and includes all purposes within municipal powers as defined by the constitution or laws of the State or by the charter of the municipality; (10) “Government dam” means a dam or other work constructed or owned by the United States for Government purposes with or without contribution from others; (11) “project” means complete unit of improvement or development, consisting of a power house, all water conduits, all dams and appurtenant works and structures (including navigation structures) which are a part of said unit, and all storage, diverting, or forebay reservoirs directly connected therewith, the primary line or lines transmitting power therefrom to the point of junction with the distribution system or with the interconnected primary transmission system, all miscellaneous structures used and useful in connection with said unit or any part thereof, and all water-rights, rights-of-way, ditches, dams, reservoirs, lands, or interest in lands the use and occupancy of which are necessary or appropriate in the maintenance and operation of such unit; (12) “project works” means the physical structures of a project; (13) “net investment” in a project means the actual legitimate original cost thereof as defined and interpreted in the “classification of investment in road and equipment of steam roads, issue of 1914, Interstate Commerce Commission”, plus similar costs of additions thereto and betterments thereof, minus the sum of the following items properly allocated thereto, if and to the extent ...

    8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Public utility regulatory policies · 16 U.S.C. ch. 46 3 sections
  • § 2621 Consideration and determination respecting certain ratemaking standards Amends

    16 U.S.C. § 2621 — at 2621(d)

    The law today

    (a) Consideration and determination Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall consider each standard established by subsection (d) and make a determination concerning whether or not it is appropriate to implement such standard to carry out the purposes of this chapter. For purposes of such consideration and determination in accordance with subsections (b) and (c), and for purposes of any review of such consideration and determination in any court in accordance with section 2633 of this title, the purposes of this chapter supplement otherwise applicable State law. Nothing in this subsection prohibits any State regulatory authority or nonregulated electric utility from making any determination that it is not appropriate to implement any such standard, pursuant to its authority under otherwise applicable State law. (b) Procedural requirements for consideration and determination (1) The consideration referred to in subsection (a) shall be made after public notice and hearing. The determination referred to in subsection (a) shall be— (A) in writing, (B) based upon findings included in such determination and upon the evidence presented at the hearing, and (C) available to the public. (2) Except as otherwise provided in paragraph (1), in the second sentence of section 2622(a) of this title, and in sections 2631 and 2632 of this title, the procedures for the consideration and determination referred to in subsection (a) shall be those established by the State regulatory authority or the nonregulated electric utility. (c) Implementation (1) The State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility may, to the extent consistent with otherwise applicable State law— (A) implement any such standard determined under subsection (a) to be appropriate to carry out the purposes of this chapter, or (B) decline to implement any such standard. (2) If a State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility declines to implement any standard established by subsection (d) which is determined under subsection (a) to be appropriate to carry out the purposes of this chapter, such authority or nonregulated electric utility shall state in writing the reasons therefor. Such statement of reasons shall be available to the public. (3) If a State regulatory authority implements a standard established by subsection (d)(7) or (8), such authority shall— (A) consider the impact that implementation of such standard would have on small businesses engaged in the design, sale, supply, installation or servicing of energy conservation, energy efficiency or other demand side management measures, and (B) implement such standard so as to assure that utility actions would not provide such utilities with unfair competitive advantages over such small businesses. (d) Establishment The following Federal standards are hereby established: (1) Cost of service Rates charged by any electric utility for providing electric service to each class of electric consumers shall be designed, to the maximum extent practicable, to reflect the costs of providing electric service to such class, as determined under section 2625(a) of this title. (2) Declining block rates The energy component of a rate, or the amount attributable to the energy component in a rate, charged by any electric utility for providing electric service during any period to any class of electric consumers may not decrease as kilowatt-hour consumption by such class increases during such period except to the extent that such utility demonstrates that the costs to such utility of providing electric service to such class, which costs are attributable to such energy component, decrease as such consumption increases during such period. (3) Time-of-day r...

    86 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 2622 Obligations to consider and determine Amends

    16 U.S.C. § 2622

    The law today

    (a) Request for consideration and determination Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility may undertake the consideration and make the determination referred to in section 2621 of this title with respect to any standard established by section 2621(d) of this title in any proceeding respecting the rates of the electric utility. Any participant or intervenor (including an intervenor referred to in section 2631 of this title) in such a proceeding may request, and shall obtain, such consideration and determination in such proceeding. In undertaking such consideration and making such determination in any such proceeding with respect to the application to any electric utility of any standard established by section 2621(d) of this title, a State regulatory authority (with respect to an electric utility for which it has ratemaking authority) or nonregulated electric utility may take into account in such proceeding— (1) any appropriate prior determination with respect to such standard— (A) which is made in a proceeding which takes place after November 9, 1978, or (B) which was made before such date (or is made in a proceeding pending on such date) and complies, as provided in section 2634 of this title, with the requirements of this chapter; and (2) the evidence upon which such prior determination was based (if such evidence is referenced in such proceeding). (b) Time limitations (1) Not later than 2 years after November 9, 1978 (or after October 24, 1992, in the case of standards under paragraphs (7), (8), and (9) of section 2621(d) of this title), each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to each standard established by section 2621(d) of this title. (2) Not later than three years after November 9, 1978 (or after October 24, 1992, in the case of standards under paragraphs (7), (8), and (9) of section 2621(d) of this title), each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title. (3) (A) Not later than 2 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to each standard established by paragraphs (11) through (13) of section 2621(d) of this title. (B) Not later than 3 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 2621 of this title with respect to each standard established by paragraphs (11) through (13) of section 2621(d) of this title. (4) (A) Not later than 1 year after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to the standard established by paragraph (14) of section 2621(d) of this title. (B) Not later than 2 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utili...

    74 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 2634 Prior and pending proceedings Amends

    16 U.S.C. § 2634

    The law today

    For purposes of subchapters I and II, and this subchapter, proceedings commenced by State regulatory authorities (with respect to electric utilities for which it has ratemaking authority) and nonregulated electric utilities before November 9, 1978, and actions taken before such date in such proceedings shall be treated as complying with the requirements of subchapters I and II, and this subchapter if such proceedings and actions substantially conform to such requirements. For purposes of subchapters I and II, and this subchapter, any such proceeding or action commenced before November 9, 1978, but not completed before such date, shall comply with the requirements of subchapters I and II, and this subchapter, to the maximum extent practicable, with respect to so much of such proceeding or action as takes place after such date, except as otherwise provided in section 2631(c) of this title. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of each standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021.

    50 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Also cites: 16 U.S.C. § 2603

Action History

  1. Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 547 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (547)

547 members have not signed on to this bill.

Show all 547 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 2003 do?
Free Market Energy Act This bill amends: (1) the Federal Power Act to define "distributed energy resource" as a resource, technology, or service interconnected to the electricity distribution system that generates, manages, or reduces energy use; and (2) the Public Utility Regulatory Policies Act of 1978 to provide that distributed energy resources shall have a general right of interconnection under such Act. States must ensure that electric distribution grid operators adopt requirements for interconnection rates and fees that are just and reasonable, that provide for the two-way benefit for the distributed energy resource and the electricity grid, and that are not punitive. Time frames for interconnection shall be well-defined, expeditious, and not unduly protracted. An interconnection may not be delayed or denied unless the electric utility demonstrates that the interconnection is unsafe or impracticable. A state regulatory authority that considers modifying the treatment of net energy metering customers must consider requiring that distributed energy resources be eligible to receive just and reasonable energy and rate treatment using dynamic pricing, which may account for locational benefit, to be provided on an unbundled basis, after accounting for the two-way valuation of dynamic rates, for services provided to or by the grid. Dynamic pricing considerations shall include: pricing for energy sold to, and pricing for energy purchased from, an electric utility, capacity, the provision of ancillary services, the societal value of distributed energy resources, and transmission and distribution losses. A state regulatory authority or applicable Regional Transmission Organization or Independent System Operator must consider nontransmission alternatives in instances in which an entity proposes transmission projects seeking cost-of-service rate recovery. To reduce the cost to the ratepayer of a potential transmission upgrade, the cost of the nontransmission alternative shall be recovered from the ratebase or regional recovery mechanism in the same manner as the transmission upgrade otherwise would have been.
Who sponsors S 2003?
S 2003 is sponsored by Angus King (I).
What is the current status of S 2003?
This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 2003?
Track S 2003 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 2003

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 2003

Last checked for changes 16 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →