United States 114th Congress Status: Died Sponsors 1 D

S 1232 — Smart Grid Act of 2015

Last action — Committee on Energy and Natural Resources. Hearings held.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Smart Grid Act of 2015 This bill amends the Energy Independence and Security Act of 2007 to direct the Department of Energy (DOE), in collaboration with the National Institute of Standards and Technology of the Department of Commerce, the Institute of Electrical and Electronics Engineers, and the Smart Grid Interoperability Panel, to establish the Smart Grid Interoperability Working Group. The purpose of the Group is to: identify additional efforts the federal government can take to better promote the establishment and adoption of open standards that enhance connectivity and interoperability on the electric grid, study the market and policy barriers to deploying responsive appliances at scale, and develop a plan for establishing and promoting the widespread adoption of interoperability standards. The Smart Grid Regional Demonstration Initiative shall identify best practices for the implementation of the Fair Information Practice Principles (FIPPS) of the Federal Trade Commission for the collection, use, disclosure, and retention of individual customer information. When selecting smart grid demonstration projects to receive assistance, DOE shall ensure: (1) geographical diversity, and (2) diversity among types of electricity markets and regulatory environments. Additionally, DOE must make grants, on a competitive basis, for demonstration projects in any of seven designated program areas, including: transactive energy, innovation in valuation of new technology grid services and efficiency, rate design-distribution system, and rate design-consumer acceptance of time-based pricing. As a prerequisite for financial assistance, a participant in a smart grid demonstration project must provide information required by DOE, which shall become available through the smart grid information clearinghouse and for purposes of producing certain reports. DOE must also establish a working group composed of representatives of each project selected to receive assistance within a program area.

Bill Text

Sections of law this bill changes

3 sections in 1 law

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Energy independence and security · 42 U.S.C. ch. 152 3 sections
  • § 17383 Smart Grid Advisory Committee and Smart Grid Task Force Amends

    42 U.S.C. § 17383

    The law today

    (a) Smart Grid Advisory Committee (1) Establishment The Secretary shall establish, within 90 days of December 19, 2007, a Smart Grid Advisory Committee (either as an independent entity or as a designated sub-part of a larger advisory committee on electricity matters). The Smart Grid Advisory Committee shall include eight or more members appointed by the Secretary who have sufficient experience and expertise to represent the full range of smart grid technologies and services, to represent both private and non-Federal public sector stakeholders. One member shall be appointed by the Secretary to Chair the Smart Grid Advisory Committee. (2) Mission The mission of the Smart Grid Advisory Committee shall be to advise the Secretary, the Assistant Secretary, and other relevant Federal officials concerning the development of smart grid technologies, the progress of a national transition to the use of smart-grid technologies and services, the evolution of widely-accepted technical and practical standards and protocols to allow interoperability and inter-communication among smart-grid capable devices, and the optimum means of using Federal incentive authority to encourage such progress. (3) Applicability of chapter 10 of title 5 Chapter 10 of title 5 shall apply to the Smart Grid Advisory Committee. (b) Smart Grid Task Force (1) Establishment The Assistant Secretary of the Office of Electricity Delivery and Energy Reliability shall establish, within 90 days of December 19, 2007, a Smart Grid Task Force composed of designated employees from the various divisions of that office who have responsibilities related to the transition to smart-grid technologies and practices. The Assistant Secretary or his designee shall be identified as the Director of the Smart Grid Task Force. The Chairman of the Federal Energy Regulatory Commission and the Director of the National Institute of Standards and Technology shall each designate at least one employee to participate on the Smart Grid Task Force. Other members may come from other agencies at the invitation of the Assistant Secretary or the nomination of the head of such other agency. The Smart Grid Task Force shall, without disrupting the work of the Divisions or Offices from which its members are drawn, provide an identifiable Federal entity to embody the Federal role in the national transition toward development and use of smart grid technologies. (2) Mission The mission of the Smart Grid Task Force shall be to insure awareness, coordination and integration of the diverse activities of the Office and elsewhere in the Federal Government related to smart-grid technologies and practices, including but not limited to: smart grid research and development; development of widely accepted smart-grid standards and protocols; the relationship of smart-grid technologies and practices to electric utility regulation; the relationship of smart-grid technologies and practices to infrastructure development, system reliability and security; and the relationship of smart-grid technologies and practices to other facets of electricity supply, demand, transmission, distribution, and policy. The Smart Grid Task Force shall collaborate with the Smart Grid Advisory Committee and other Federal agencies and offices. The Smart Grid Task Force shall meet at the call of its Director as necessary to accomplish its mission. (c) Authorization There are authorized to be appropriated for the purposes of this section such sums as are necessary to the Secretary to support the operations of the Smart Grid Advisory Committee and Smart Grid Task Force for each of fiscal years 2008 through 2020.

    1 other bill also changes this section · Follow it → Official text at uscode.house.gov ↗

  • § 17384 Smart grid technology research, development, and demonstration Amends

    42 U.S.C. § 17384

    The law today

    (a) Power grid digital information technology The Secretary, in consultation with the Federal Energy Regulatory Commission and other appropriate agencies, electric utilities, the States, and other stakeholders, shall carry out a research, development, and demonstration program— (1) to develop advanced techniques for measuring peak load reductions and energy-efficiency savings from smart metering, demand response, distributed generation, and electricity storage systems; (2) to investigate means for demand response, distributed generation, and storage to provide ancillary services; (3) to conduct research to advance the use of wide-area measurement and control networks, including data mining, visualization, advanced computing, and secure and dependable communications in a highly-distributed environment; (4) to test new reliability technologies, including those concerning communications network capabilities, in a grid control room environment against a representative set of local outage and wide area blackout scenarios; (5) to identify communications network capacity needed to implement advanced technologies.1 (6) to investigate the feasibility of a transition to time-of-use and real-time electricity pricing; (7) to develop algorithms for use in electric transmission system software applications; (8) to promote the use of underutilized electricity generation capacity in any substitution of electricity for liquid fuels in the transportation system of the United States; and (9) in consultation with the Federal Energy Regulatory Commission, to propose interconnection protocols to enable electric utilities to access electricity stored in vehicles to help meet peak demand loads. (b) Smart grid regional demonstration initiative (1) In general The Secretary shall establish a smart grid regional demonstration initiative (referred to in this subsection as the “Initiative”) composed of demonstration projects focused on cost-effective, advanced technologies for use in power grid sensing, communications, analysis, power flow control, visualization, distribution automation, industrial control systems, dynamic line rating systems, grid redesign, and the integration of distributed energy resources. (2) Goals The goals of the Initiative shall be— (A) to demonstrate the potential benefits of concentrated investments in advanced grid technologies on a regional grid; (B) to facilitate the commercial transition from the current power transmission and distribution system technologies to advanced technologies; (C) to facilitate the integration of advanced technologies in existing electric networks to improve system performance, power flow control, and reliability; (D) to demonstrate protocols and standards that allow for the measurement and validation of the energy savings and fossil fuel emission reductions associated with the installation and use of energy efficiency and demand response technologies and practices; (E) to investigate differences in each region and regulatory environment regarding best practices in implementing smart grid technologies; and (F) to encourage the commercial application of advanced distribution automation technologies that exert intelligent control over electrical grid functions at the distribution level to improve system resilience. (3) Demonstration projects (A) In general In carrying out the initiative,2 the Secretary shall provide financial support to smart grid demonstration projects in urban, suburban, tribal, and rural areas, including areas where electric system assets are controlled by nonprofit entities and areas where electric system assets are controlled by investor-owned utilities. (B) Cooperation A demonstration project under subparagraph (A) shall be carried out in cooperation with the electric utility that owns the grid facilities in the electricity control area in which the demonstration project is carried out. (C) Federal share of cost of technology investments The Secretary shall provide to an electr...

    3 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 17386 Federal matching fund for smart grid investment costs Amends

    42 U.S.C. § 17386 — at 17386(f)

    The law today

    (a) Matching fund The Secretary shall establish a Smart Grid Investment Matching Grant Program to provide grants of up to one-half (50 percent) of qualifying Smart Grid investments. (b) Qualifying investments Qualifying Smart Grid investments may include any of the following made on or after November 15, 2021: (1) In the case of appliances covered for purposes of establishing energy conservation standards under part B of title III of the Energy Policy and Conservation Act of 1975 (42 U.S.C. 6291 et seq.), the documented expenditures incurred by a manufacturer of such appliances associated with purchasing or designing, creating the ability to manufacture, and manufacturing and installing for one calendar year, internal devices that allow the appliance to engage in Smart Grid functions. (2) In the case of specialized electricity-using equipment, including motors and drivers, installed in industrial or commercial applications, the documented expenditures incurred by its owner or its manufacturer of installing devices or modifying that equipment to engage in Smart Grid functions. (3) In the case of transmission and distribution equipment fitted with monitoring and communications devices to enable smart grid functions, the documented expenditures incurred by the electric utility to purchase and install such monitoring and communications devices. (4) In the case of metering devices, sensors, control devices, and other devices integrated with and attached to an electric utility system or retail distributor or marketer of electricity that are capable of engaging in Smart Grid functions, the documented expenditures incurred by the electric utility, distributor, or marketer and its customers to purchase and install such devices. (5) In the case of software that enables devices or computers to engage in Smart Grid functions, the documented purchase costs of the software. (6) In the case of entities that operate or coordinate operations of regional electric grids, the documented expenditures for purchasing and installing such equipment that allows Smart Grid functions to operate and be combined or coordinated among multiple electric utilities and between that region and other regions. (7) In the case of persons or entities other than electric utilities owning and operating a distributed electricity generator, the documented expenditures of enabling that generator to be monitored, controlled, or otherwise integrated into grid operations and electricity flows on the grid utilizing Smart Grid functions. (8) In the case of electric or hybrid-electric vehicles, the documented expenses for devices that allow the vehicle to engage in Smart Grid functions (but not the costs of electricity storage for the vehicle). (9) In the case of data analytics that enable software to engage in Smart Grid functions, the documented purchase costs of the data analytics. (10) In the case of buildings, the documented expenses for devices and software, including for installation, that allow buildings to engage in demand flexibility or Smart Grid functions. (11) In the case of utility communications, operational fiber and wireless broadband communications networks to enable data flow between distribution system components. (12) In the case of advanced transmission technologies such as dynamic line rating, flow control devices, advanced conductors, network topology optimization, or other hardware, software, and associated protocols applied to existing transmission facilities that increase the operational transfer capacity of a transmission network, the documented expenditures to purchase and install those advanced transmission technologies. (13) In the case of extreme weather or natural disasters, the ability to redirect or shut off power to minimize blackouts and avoid further damage. (14) The documented expenditures related to purchasing and implementing Smart Grid functions in such other cases as the Secretary shall identify. (c) Investments not included Qualif...

    8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Action History

  1. Committee on Energy and Natural Resources. Hearings held.

  2. Read twice and referred to the Committee on Energy and Natural Resources. (Sponsor introductory remarks on measure: CR S2690; text of measure as introduced: CR S2690-2691)

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 547 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (547)

547 members have not signed on to this bill.

Show all 547 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 1232 do?
Smart Grid Act of 2015 This bill amends the Energy Independence and Security Act of 2007 to direct the Department of Energy (DOE), in collaboration with the National Institute of Standards and Technology of the Department of Commerce, the Institute of Electrical and Electronics Engineers, and the Smart Grid Interoperability Panel, to establish the Smart Grid Interoperability Working Group. The purpose of the Group is to: identify additional efforts the federal government can take to better promote the establishment and adoption of open standards that enhance connectivity and interoperability on the electric grid, study the market and policy barriers to deploying responsive appliances at scale, and develop a plan for establishing and promoting the widespread adoption of interoperability standards. The Smart Grid Regional Demonstration Initiative shall identify best practices for the implementation of the Fair Information Practice Principles (FIPPS) of the Federal Trade Commission for the collection, use, disclosure, and retention of individual customer information. When selecting smart grid demonstration projects to receive assistance, DOE shall ensure: (1) geographical diversity, and (2) diversity among types of electricity markets and regulatory environments. Additionally, DOE must make grants, on a competitive basis, for demonstration projects in any of seven designated program areas, including: transactive energy, innovation in valuation of new technology grid services and efficiency, rate design-distribution system, and rate design-consumer acceptance of time-based pricing. As a prerequisite for financial assistance, a participant in a smart grid demonstration project must provide information required by DOE, which shall become available through the smart grid information clearinghouse and for purposes of producing certain reports. DOE must also establish a working group composed of representatives of each project selected to receive assistance within a program area.
Who sponsors S 1232?
S 1232 is sponsored by Ron Wyden (D).
What is the current status of S 1232?
This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 1232?
Track S 1232 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 1232

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 1232

Last checked for changes 16 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →