S 1213 — Free Market Energy Act of 2015
Last action — Committee on Energy and Natural Resources. Hearings held.
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
Free Market Energy Act of 2015 This bill amends the Federal Power Act to identify the elements of a distributed energy resource, including fuel cells, microgrids, and combined heat and power systems. Distributed energy resources shall have a general right of interconnection under the Public Utility Regulatory Policies Act of 1978 (PURPA), and all rates and fees for interconnection shall provide for the two-way benefit for the distributed energy resource and the electricity grid. Each state regulatory authority shall consider requiring that distributed energy resources be eligible to receive just and reasonable energy and rate treatment for time-of-use pricing and other specified features and values. A state regulatory authority or nonregulated electric utility acting under state authority must consider specified interconnections standards that include: setting rates that exceed the incremental cost of alternative electric energy for purchases from any distributed energy resource that is a qualifying facility for electricity generated, demand reduced, or service provided by the qualifying facility interconnected under this Act; and making any distributed energy resource project exempt from filing requirements with the Federal Energy Regulatory Commission (FERC). A state regulatory authority must also consider: designation, through a competitive process, of a regulated utility, other party, or a combination of regulated utilities and other parties to be a smart grid coordinator or distribution system operator for the state; and nontransmission alternatives when a regulated utility proposes transmission projects.
Bill Text
- Introduced Introduced in Senate Current html May 06, 2015
Sections of law this bill changes
4 sections in 2 lawsFrom the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).
Federal regulation and development of power · 16 U.S.C. ch. 12 1 section
-
§ 796 Definitions Amends
16 U.S.C. § 796
The law today
The words defined in this section shall have the following meanings for purposes of this chapter, to wit: (1) “public lands” means such lands and interest in lands owned by the United States as are subject to private appropriation and disposal under public land laws. It shall not include “reservations”, as hereinafter defined; (2) “reservations” means national forests, tribal lands embraced within Indian reservations, military reservations, and other lands and interests in lands owned by the United States, and withdrawn, reserved, or withheld from private appropriation and disposal under the public land laws; also lands and interests in lands acquired and held for any public purposes; but shall not include national monuments or national parks; (3) “corporation” means any corporation, joint-stock company, partnership, association, business trust, organized group of persons, whether incorporated or not, or a receiver or receivers, trustee or trustees of any of the foregoing. It shall not include “municipalities” as hereinafter defined; (4) “person” means an individual or a corporation; (5) “licensee” means any person, State, or municipality licensed under the provisions of section 797 of this title, and any assignee or successor in interest thereof; (6) “State” means a State admitted to the Union, the District of Columbia, and any organized Territory of the United States; (7) “municipality” means a city, county, irrigation district, drainage district, or other political subdivision or agency of a State competent under the laws thereof to carry on the business of developing, transmitting, utilizing, or distributing power; (8) “navigable waters” means those parts of streams or other bodies of water over which Congress has jurisdiction under its authority to regulate commerce with foreign nations and among the several States, and which either in their natural or improved condition notwithstanding interruptions between the navigable parts of such streams or waters by falls, shallows, or rapids compelling land carriage, are used or suitable for use for the transportation of persons or property in interstate or foreign commerce, including therein all such interrupting falls, shallows, or rapids, together with such other parts of streams as shall have been authorized by Congress for improvement by the United States or shall have been recommended to Congress for such improvement after investigation under its authority; (9) “municipal purposes” means and includes all purposes within municipal powers as defined by the constitution or laws of the State or by the charter of the municipality; (10) “Government dam” means a dam or other work constructed or owned by the United States for Government purposes with or without contribution from others; (11) “project” means complete unit of improvement or development, consisting of a power house, all water conduits, all dams and appurtenant works and structures (including navigation structures) which are a part of said unit, and all storage, diverting, or forebay reservoirs directly connected therewith, the primary line or lines transmitting power therefrom to the point of junction with the distribution system or with the interconnected primary transmission system, all miscellaneous structures used and useful in connection with said unit or any part thereof, and all water-rights, rights-of-way, ditches, dams, reservoirs, lands, or interest in lands the use and occupancy of which are necessary or appropriate in the maintenance and operation of such unit; (12) “project works” means the physical structures of a project; (13) “net investment” in a project means the actual legitimate original cost thereof as defined and interpreted in the “classification of investment in road and equipment of steam roads, issue of 1914, Interstate Commerce Commission”, plus similar costs of additions thereto and betterments thereof, minus the sum of the following items properly allocated thereto, if and to the extent ...8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Public utility regulatory policies · 16 U.S.C. ch. 46 3 sections
-
§ 2621 Consideration and determination respecting certain ratemaking standards Amends
16 U.S.C. § 2621 — at 2621(d)
The law today
(a) Consideration and determination Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall consider each standard established by subsection (d) and make a determination concerning whether or not it is appropriate to implement such standard to carry out the purposes of this chapter. For purposes of such consideration and determination in accordance with subsections (b) and (c), and for purposes of any review of such consideration and determination in any court in accordance with section 2633 of this title, the purposes of this chapter supplement otherwise applicable State law. Nothing in this subsection prohibits any State regulatory authority or nonregulated electric utility from making any determination that it is not appropriate to implement any such standard, pursuant to its authority under otherwise applicable State law. (b) Procedural requirements for consideration and determination (1) The consideration referred to in subsection (a) shall be made after public notice and hearing. The determination referred to in subsection (a) shall be— (A) in writing, (B) based upon findings included in such determination and upon the evidence presented at the hearing, and (C) available to the public. (2) Except as otherwise provided in paragraph (1), in the second sentence of section 2622(a) of this title, and in sections 2631 and 2632 of this title, the procedures for the consideration and determination referred to in subsection (a) shall be those established by the State regulatory authority or the nonregulated electric utility. (c) Implementation (1) The State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility may, to the extent consistent with otherwise applicable State law— (A) implement any such standard determined under subsection (a) to be appropriate to carry out the purposes of this chapter, or (B) decline to implement any such standard. (2) If a State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility declines to implement any standard established by subsection (d) which is determined under subsection (a) to be appropriate to carry out the purposes of this chapter, such authority or nonregulated electric utility shall state in writing the reasons therefor. Such statement of reasons shall be available to the public. (3) If a State regulatory authority implements a standard established by subsection (d)(7) or (8), such authority shall— (A) consider the impact that implementation of such standard would have on small businesses engaged in the design, sale, supply, installation or servicing of energy conservation, energy efficiency or other demand side management measures, and (B) implement such standard so as to assure that utility actions would not provide such utilities with unfair competitive advantages over such small businesses. (d) Establishment The following Federal standards are hereby established: (1) Cost of service Rates charged by any electric utility for providing electric service to each class of electric consumers shall be designed, to the maximum extent practicable, to reflect the costs of providing electric service to such class, as determined under section 2625(a) of this title. (2) Declining block rates The energy component of a rate, or the amount attributable to the energy component in a rate, charged by any electric utility for providing electric service during any period to any class of electric consumers may not decrease as kilowatt-hour consumption by such class increases during such period except to the extent that such utility demonstrates that the costs to such utility of providing electric service to such class, which costs are attributable to such energy component, decrease as such consumption increases during such period. (3) Time-of-day r...86 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2622 Obligations to consider and determine Amends
16 U.S.C. § 2622 — at 2622(b) and 2622(c)
The law today
(a) Request for consideration and determination Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility may undertake the consideration and make the determination referred to in section 2621 of this title with respect to any standard established by section 2621(d) of this title in any proceeding respecting the rates of the electric utility. Any participant or intervenor (including an intervenor referred to in section 2631 of this title) in such a proceeding may request, and shall obtain, such consideration and determination in such proceeding. In undertaking such consideration and making such determination in any such proceeding with respect to the application to any electric utility of any standard established by section 2621(d) of this title, a State regulatory authority (with respect to an electric utility for which it has ratemaking authority) or nonregulated electric utility may take into account in such proceeding— (1) any appropriate prior determination with respect to such standard— (A) which is made in a proceeding which takes place after November 9, 1978, or (B) which was made before such date (or is made in a proceeding pending on such date) and complies, as provided in section 2634 of this title, with the requirements of this chapter; and (2) the evidence upon which such prior determination was based (if such evidence is referenced in such proceeding). (b) Time limitations (1) Not later than 2 years after November 9, 1978 (or after October 24, 1992, in the case of standards under paragraphs (7), (8), and (9) of section 2621(d) of this title), each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to each standard established by section 2621(d) of this title. (2) Not later than three years after November 9, 1978 (or after October 24, 1992, in the case of standards under paragraphs (7), (8), and (9) of section 2621(d) of this title), each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title. (3) (A) Not later than 2 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to each standard established by paragraphs (11) through (13) of section 2621(d) of this title. (B) Not later than 3 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 2621 of this title with respect to each standard established by paragraphs (11) through (13) of section 2621(d) of this title. (4) (A) Not later than 1 year after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to the standard established by paragraph (14) of section 2621(d) of this title. (B) Not later than 2 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utili...74 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2634 Prior and pending proceedings Amends
16 U.S.C. § 2634
The law today
For purposes of subchapters I and II, and this subchapter, proceedings commenced by State regulatory authorities (with respect to electric utilities for which it has ratemaking authority) and nonregulated electric utilities before November 9, 1978, and actions taken before such date in such proceedings shall be treated as complying with the requirements of subchapters I and II, and this subchapter if such proceedings and actions substantially conform to such requirements. For purposes of subchapters I and II, and this subchapter, any such proceeding or action commenced before November 9, 1978, but not completed before such date, shall comply with the requirements of subchapters I and II, and this subchapter, to the maximum extent practicable, with respect to so much of such proceeding or action as takes place after such date, except as otherwise provided in section 2631(c) of this title. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of each standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021.50 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Also cites: 16 U.S.C. § 2603
Action History
-
Committee on Energy and Natural Resources. Hearings held.
-
Read twice and referred to the Committee on Energy and Natural Resources.
Sponsors
- Angus King · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 547 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (547)
547 members have not signed on to this bill.
Show all 547 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Frequently asked questions
- What does S 1213 do?
- Free Market Energy Act of 2015 This bill amends the Federal Power Act to identify the elements of a distributed energy resource, including fuel cells, microgrids, and combined heat and power systems. Distributed energy resources shall have a general right of interconnection under the Public Utility Regulatory Policies Act of 1978 (PURPA), and all rates and fees for interconnection shall provide for the two-way benefit for the distributed energy resource and the electricity grid. Each state regulatory authority shall consider requiring that distributed energy resources be eligible to receive just and reasonable energy and rate treatment for time-of-use pricing and other specified features and values. A state regulatory authority or nonregulated electric utility acting under state authority must consider specified interconnections standards that include: setting rates that exceed the incremental cost of alternative electric energy for purchases from any distributed energy resource that is a qualifying facility for electricity generated, demand reduced, or service provided by the qualifying facility interconnected under this Act; and making any distributed energy resource project exempt from filing requirements with the Federal Energy Regulatory Commission (FERC). A state regulatory authority must also consider: designation, through a competitive process, of a regulated utility, other party, or a combination of regulated utilities and other parties to be a smart grid coordinator or distribution system operator for the state; and nontransmission alternatives when a regulated utility proposes transmission projects.
- Who sponsors S 1213?
- S 1213 is sponsored by Angus King (I).
- What is the current status of S 1213?
- This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track S 1213?
- Track S 1213 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 1213
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 1213
Last checked for changes 16 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.