S 1202 — HEAT Act Heat Efficiency through Applied Technology Act
Last action — Committee on Energy and Natural Resources. Hearings held.
Write to your legislator about it: a free email template →
No card. One bill, free forever — alerts when it moves.
-
✓Introduced
-
✓In Committee
-
Died in session
This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.
Summary
HEAT Act Heat Efficiency through Applied Technology Act This bill amends the Public Utility Regulatory Policies Act of 1978, with respect to electric utilities ratemaking standards, to direct the Department of Energy (DOE) to establish: guidance for technical interconnection standards that ensure interoperability with federal rules for interconnection between electric utilities and electric consumers; model interconnection procedures, including appropriate fast track procedures; and model rules for determining and assigning interconnection costs. Such standards must reflect current best practices to encourage the use of distributed generation (such as combined heat and power technology and waste heat to power technology) while ensuring the safety and reliability of the interconnected units and the distribution and transmission networks to which the units connect. Combined heat and power technology is the generation of electric energy and heat in a single, integrated system meeting specified efficiency criteria under which heat that is conventionally rejected is recovered and used to meet thermal energy requirements. Qualified waste heat resource does not include a heat resource from a process whose primary purpose is electricity generation using a fossil fuel, but does mean: exhaust heat or flared gas from any industrial process; waste gas or industrial tail gas that would otherwise be flared, incinerated, or vented; a pressure drop in any gas for an industrial or commercial process; or any other form of waste heat resource as the Secretary may determine. Waste heat to power technology is any system generating electricity through the recovery of a qualified waste heat resource. State regulatory authorities and each nonregulated electric utility must: (1) complete consideration of these model standards within two years after DOE has completed them, (2) determine whether or not it is appropriate to implement each standard, and (3) report updated plans for interconnection procedures and tariff schedules that reflect best practices to encourage the use of distributed generation. Specified prior state actions shall shield a technical interconnection standard in the case of any electric utility in a state from certain statutory time limitations and administrative consequences of noncompliance. DOE must establish model rules and procedures for determining fees or rates for supplementary power, backup or standby power, maintenance power, and interruptible power supplied to facilities that operate combined heat and power technology and waste heat to power technology that appropriately allow for adequate cost recovery by an electric utility but are not excessive. Each state regulatory authority and each nonregulated electric utility must update their plans for supplemental, backup, and standby power fees within certain time limitations, and subject to certain administrative consequences for failure to comply, unless specified prior state actions have been undertaken. The Administrator of the Environmental Protection Agency must establish a grant program to: (1) update any applicable state or local air permitting regulations to incorporate environmental regulations relating to output-based emissions, or (2) expedite the processing of relevant power generation permit applications if the state has already the permitting regulations to incorporate those output-based emissions environmental regulations.
Bill Text
- Introduced Introduced in Senate Current html May 06, 2015
Sections of law this bill changes
4 sections in 1 lawFrom the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).
Public utility regulatory policies · 16 U.S.C. ch. 46 4 sections
-
§ 2602 Definitions Amends
16 U.S.C. § 2602
The law today
As used in this Act, except as otherwise specifically provided— (1) The term “antitrust laws” includes the Sherman Antitrust Act (15 U.S.C. 1 and following), the Clayton Act (15 U.S.C. 12 and following), the Federal Trade Commission Act (15 U.S.C. 14[41] and following), the Wilson Tariff Act (15 U.S.C. 8 and 9), and the Act of June 19, 1936, chapter 592 (15 U.S.C. 13, 13a, 13b, and 21A). (2) The term “class” means, with respect to electric consumers, any group of such consumers who have similar characteristics of electric energy use. (3) The term “Commission” means the Federal Energy Regulatory Commission. (4) The term “electric utility” means any person, State agency, or Federal agency, which sells electric energy. (5) The term “electric consumer” means any person, State agency, or Federal agency, to which electric energy is sold other than for purposes of resale. (6) The term “evidentiary hearing” means— (A) in the case of a State agency, a proceeding which (i) is open to the public, (ii) includes notice to participants and an opportunity for such participants to present direct and rebuttal evidence and to cross-examine witnesses, (iii) includes a written decision, based upon evidence appearing in a written record of the proceeding, and (iv) is subject to judicial review; (B) in the case of a Federal agency, a proceeding conducted as provided in sections 554, 556, and 557 of title 5; and (C) in the case of a proceeding conducted by any entity other than a State or Federal agency, a proceeding which conforms, to the extent appropriate, with the requirements of subparagraph (A). (7) The term “Federal agency” means an executive agency (as defined in section 105 of title 5). (8) The term “load management technique” means any technique (other than a time-of-day or seasonal rate) to reduce the maximum kilowatt demand on the electric utility, including ripple or radio control mechanisms, and other types of interruptible electric service, energy storage devices, and load-limiting devices. (9) The term “nonregulated electric utility” means any electric utility other than a State regulated electric utility. (10) The term “rate” means (A) any price, rate, charge, or classification made, demanded, observed, or received with respect to sale of electric energy by an electric utility to an electric consumer, (B) any rule, regulation, or practice respecting any such rate, charge, or classification, and (C) any contract pertaining to the sale of electric energy to an electric consumer. (11) The term “ratemaking authority” means authority to fix, modify, approve, or disapprove rates. (12) The term “rate schedule” means the designation of the rates which an electric utility charges for electric energy. (13) The term “sale” when used with respect to electric energy includes any exchange of electric energy. (14) The term “Secretary” means the Secretary of Energy. (15) The term “State” means a State, the District of Columbia, and Puerto Rico. (16) The term “State agency” means a State, political subdivision thereof, and any agency or instrumentality of either. (17) The term “State regulatory authority” means any State agency which has ratemaking authority with respect to the sale of electric energy by any electric utility (other than such State agency), and in the case of an electric utility with respect to which the Tennessee Valley Authority has ratemaking authority, such term means the Tennessee Valley Authority. (18) The term “State regulated electric utility” means any electric utility with respect to which a State regulatory authority has ratemaking authority. (19) The term “integrated resource planning” means, in the case of an electric utility, a planning and selection process for new energy resources that evaluates the full range of alternatives, including new generating capacity, power purchases, energy conservation and efficiency, cogeneration and district heating and cooling applications, and renewable energy resources, in order to...3 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2621 Consideration and determination respecting certain ratemaking standards Amends
16 U.S.C. § 2621 — at 2621(d)
The law today
(a) Consideration and determination Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall consider each standard established by subsection (d) and make a determination concerning whether or not it is appropriate to implement such standard to carry out the purposes of this chapter. For purposes of such consideration and determination in accordance with subsections (b) and (c), and for purposes of any review of such consideration and determination in any court in accordance with section 2633 of this title, the purposes of this chapter supplement otherwise applicable State law. Nothing in this subsection prohibits any State regulatory authority or nonregulated electric utility from making any determination that it is not appropriate to implement any such standard, pursuant to its authority under otherwise applicable State law. (b) Procedural requirements for consideration and determination (1) The consideration referred to in subsection (a) shall be made after public notice and hearing. The determination referred to in subsection (a) shall be— (A) in writing, (B) based upon findings included in such determination and upon the evidence presented at the hearing, and (C) available to the public. (2) Except as otherwise provided in paragraph (1), in the second sentence of section 2622(a) of this title, and in sections 2631 and 2632 of this title, the procedures for the consideration and determination referred to in subsection (a) shall be those established by the State regulatory authority or the nonregulated electric utility. (c) Implementation (1) The State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility may, to the extent consistent with otherwise applicable State law— (A) implement any such standard determined under subsection (a) to be appropriate to carry out the purposes of this chapter, or (B) decline to implement any such standard. (2) If a State regulatory authority (with respect to each electric utility for which it has ratemaking authority) or nonregulated electric utility declines to implement any standard established by subsection (d) which is determined under subsection (a) to be appropriate to carry out the purposes of this chapter, such authority or nonregulated electric utility shall state in writing the reasons therefor. Such statement of reasons shall be available to the public. (3) If a State regulatory authority implements a standard established by subsection (d)(7) or (8), such authority shall— (A) consider the impact that implementation of such standard would have on small businesses engaged in the design, sale, supply, installation or servicing of energy conservation, energy efficiency or other demand side management measures, and (B) implement such standard so as to assure that utility actions would not provide such utilities with unfair competitive advantages over such small businesses. (d) Establishment The following Federal standards are hereby established: (1) Cost of service Rates charged by any electric utility for providing electric service to each class of electric consumers shall be designed, to the maximum extent practicable, to reflect the costs of providing electric service to such class, as determined under section 2625(a) of this title. (2) Declining block rates The energy component of a rate, or the amount attributable to the energy component in a rate, charged by any electric utility for providing electric service during any period to any class of electric consumers may not decrease as kilowatt-hour consumption by such class increases during such period except to the extent that such utility demonstrates that the costs to such utility of providing electric service to such class, which costs are attributable to such energy component, decrease as such consumption increases during such period. (3) Time-of-day r...86 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2622 Obligations to consider and determine Amends
16 U.S.C. § 2622 — at 2622(b) and 2622(c)
The law today
(a) Request for consideration and determination Each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility may undertake the consideration and make the determination referred to in section 2621 of this title with respect to any standard established by section 2621(d) of this title in any proceeding respecting the rates of the electric utility. Any participant or intervenor (including an intervenor referred to in section 2631 of this title) in such a proceeding may request, and shall obtain, such consideration and determination in such proceeding. In undertaking such consideration and making such determination in any such proceeding with respect to the application to any electric utility of any standard established by section 2621(d) of this title, a State regulatory authority (with respect to an electric utility for which it has ratemaking authority) or nonregulated electric utility may take into account in such proceeding— (1) any appropriate prior determination with respect to such standard— (A) which is made in a proceeding which takes place after November 9, 1978, or (B) which was made before such date (or is made in a proceeding pending on such date) and complies, as provided in section 2634 of this title, with the requirements of this chapter; and (2) the evidence upon which such prior determination was based (if such evidence is referenced in such proceeding). (b) Time limitations (1) Not later than 2 years after November 9, 1978 (or after October 24, 1992, in the case of standards under paragraphs (7), (8), and (9) of section 2621(d) of this title), each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to each standard established by section 2621(d) of this title. (2) Not later than three years after November 9, 1978 (or after October 24, 1992, in the case of standards under paragraphs (7), (8), and (9) of section 2621(d) of this title), each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 2621 of this title with respect to each standard established by section 2621(d) of this title. (3) (A) Not later than 2 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to each standard established by paragraphs (11) through (13) of section 2621(d) of this title. (B) Not later than 3 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utility, shall complete the consideration, and shall make the determination, referred to in section 2621 of this title with respect to each standard established by paragraphs (11) through (13) of section 2621(d) of this title. (4) (A) Not later than 1 year after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority) and each nonregulated electric utility shall commence the consideration referred to in section 2621 of this title, or set a hearing date for such consideration, with respect to the standard established by paragraph (14) of section 2621(d) of this title. (B) Not later than 2 years after August 8, 2005, each State regulatory authority (with respect to each electric utility for which it has ratemaking authority), and each nonregulated electric utili...74 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
-
§ 2634 Prior and pending proceedings Amends
16 U.S.C. § 2634
The law today
For purposes of subchapters I and II, and this subchapter, proceedings commenced by State regulatory authorities (with respect to electric utilities for which it has ratemaking authority) and nonregulated electric utilities before November 9, 1978, and actions taken before such date in such proceedings shall be treated as complying with the requirements of subchapters I and II, and this subchapter if such proceedings and actions substantially conform to such requirements. For purposes of subchapters I and II, and this subchapter, any such proceeding or action commenced before November 9, 1978, but not completed before such date, shall comply with the requirements of subchapters I and II, and this subchapter, to the maximum extent practicable, with respect to so much of such proceeding or action as takes place after such date, except as otherwise provided in section 2631(c) of this title. In the case of each standard established by paragraphs (11) through (13) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (14) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of each standard established by paragraph (15) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to August 8, 2005. In the case of the standard established by paragraph (20) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021. In the case of the standard established by paragraph (21) of section 2621(d) of this title, the reference contained in this section to November 9, 1978, shall be deemed to be a reference to November 15, 2021.50 other bills also change this section · Follow it → Official text at uscode.house.gov ↗
Also cites: 26 U.S.C. § 48, 42 U.S.C. § 7602
Action History
-
Committee on Energy and Natural Resources. Hearings held.
-
Read twice and referred to the Committee on Energy and Natural Resources.
Sponsors
- Jeanne Shaheen · Primary
Sponsorship breakdown
Export CSV (upgrade) →1 sponsors · 0 co-sponsors · 547 not signed on
Sponsors (1)
Co-sponsors (0)
None.
Not signed on (547)
547 members have not signed on to this bill.
Show all 547 →"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.
Frequently asked questions
- What does S 1202 do?
- HEAT Act Heat Efficiency through Applied Technology Act This bill amends the Public Utility Regulatory Policies Act of 1978, with respect to electric utilities ratemaking standards, to direct the Department of Energy (DOE) to establish: guidance for technical interconnection standards that ensure interoperability with federal rules for interconnection between electric utilities and electric consumers; model interconnection procedures, including appropriate fast track procedures; and model rules for determining and assigning interconnection costs. Such standards must reflect current best practices to encourage the use of distributed generation (such as combined heat and power technology and waste heat to power technology) while ensuring the safety and reliability of the interconnected units and the distribution and transmission networks to which the units connect. Combined heat and power technology is the generation of electric energy and heat in a single, integrated system meeting specified efficiency criteria under which heat that is conventionally rejected is recovered and used to meet thermal energy requirements. Qualified waste heat resource does not include a heat resource from a process whose primary purpose is electricity generation using a fossil fuel, but does mean: exhaust heat or flared gas from any industrial process; waste gas or industrial tail gas that would otherwise be flared, incinerated, or vented; a pressure drop in any gas for an industrial or commercial process; or any other form of waste heat resource as the Secretary may determine. Waste heat to power technology is any system generating electricity through the recovery of a qualified waste heat resource. State regulatory authorities and each nonregulated electric utility must: (1) complete consideration of these model standards within two years after DOE has completed them, (2) determine whether or not it is appropriate to implement each standard, and (3) report updated plans for interconnection procedures and tariff schedules that reflect best practices to encourage the use of distributed generation. Specified prior state actions shall shield a technical interconnection standard in the case of any electric utility in a state from certain statutory time limitations and administrative consequences of noncompliance. DOE must establish model rules and procedures for determining fees or rates for supplementary power, backup or standby power, maintenance power, and interruptible power supplied to facilities that operate combined heat and power technology and waste heat to power technology that appropriately allow for adequate cost recovery by an electric utility but are not excessive. Each state regulatory authority and each nonregulated electric utility must update their plans for supplemental, backup, and standby power fees within certain time limitations, and subject to certain administrative consequences for failure to comply, unless specified prior state actions have been undertaken. The Administrator of the Environmental Protection Agency must establish a grant program to: (1) update any applicable state or local air permitting regulations to incorporate environmental regulations relating to output-based emissions, or (2) expedite the processing of relevant power generation permit applications if the state has already the permitting regulations to incorporate those output-based emissions environmental regulations.
- Who sponsors S 1202?
- S 1202 is sponsored by Jeanne Shaheen (D).
- What is the current status of S 1202?
- This bill died with 114th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
- Where can I track S 1202?
- Track S 1202 free on One Click Politics — get push/email alerts when it moves.
Make your voice heard on S 1202
Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.
Stay ahead of S 1202
Last checked for changes 16 days ago · updated continuously
One Click Politics tracks every bill in Congress and all 50 states.
Track this bill →