Massachusetts 194th General Court Status: Introduced Sponsors 1 D

H3493 — An Act increasing opportunities for peak energy storage

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. 1
    Introduced
  2. 2
    In Committee
  3. 3
    Passed House
  4. 4
    Passed Senate
  5. 5
    To Executive
  6. 6
    Enacted

This bill has been introduced in the House. It must pass committee before a floor vote.

Next likely step: a committee referral and hearing.

Summary

By Representatives Garballey of Arlington and Cahill of Lynn, a petition (accompanied by bill, House, No. 3493) of Sean Garballey and Daniel Cahill relative to peak energy storage. Telecommunications, Utilities and Energy.

The summary published with the bill.

Bill Text

  • Full text Current

How this bill changes current law

1 change Share ↗

AI-generated reading aid from the bill's amendatory text — verify against the official bill.

The bill revises the definition of 'Qualified RPS resource' to include specific conditions related to energy storage systems and operational dates.

  • Section 3 of Chapter 25A

    “Qualified RPS resources” → “Qualified RPS resource”, a renewable energy generating source, as defined in subsection (c) or subsection (d) of section 11F, that has: (i) installed a qualified energy storage system at its facility; or (ii) commenced operation on or after January 1, 2019, provided, however, that a qualified RPS resource that commenced operation prior to January 1, 2019 shall be considered to have the commercial operation date of when the resource is co-located with a qualified energy storage system that commenced operation after January 1, 2019 and having a minimum nominal useful energy capacity of not less than 25 per cent of the nameplate power rating of the qualified RPS resource, or when the qualified RPS resource is contractually paired with a qualified energy storage system that commenced operation after January 1, 2019 and having a minimum nominal useful energy capacity of not less than 25 per cent of the nameplate power rating of the qualified RPS resource for 4 hours.

    Updates the criteria for what constitutes a 'Qualified RPS resource' to include requirements for energy storage systems and specific operational timelines.

Sponsors

Sponsorship breakdown

Export CSV (upgrade) →

1 sponsors · 0 co-sponsors · 203 not signed on

Sponsors (1)

Co-sponsors (0)

None.

Not signed on (203)

203 members have not signed on to this bill.

Show all 203 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing

Committees

Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does H3493 do?
By Representatives Garballey of Arlington and Cahill of Lynn, a petition (accompanied by bill, House, No. 3493) of Sean Garballey and Daniel Cahill relative to peak energy storage. Telecommunications, Utilities and Energy.
Who sponsors H3493?
H3493 is sponsored by Sean Garballey (Democrat).
What is the current status of H3493?
This bill has been introduced in the House. It must pass committee before a floor vote.
Where can I track H3493?
Track H3493 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on H3493

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of H3493

Last checked for changes 5 months ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →