United States 111th Congress Status: Died

S 3305 — Big Oil Bailout Prevention Unlimited Liability Act of 2010

Last action — Placed on Senate Legislative Calendar under General Orders. Calendar No. 518.

Write to your legislator about it: a free email template →

No card. One bill, free forever — alerts when it moves.

  1. ✓
    Introduced
  2. ✓
    In Committee
  3. Died in session

This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.

This bill is no longer active — its legislative session has ended, so there is no live prognosis. It would have to be reintroduced in the current session to move again.

Summary

Big Oil Bailout Prevention Unlimited Liability Act of 2010 - Amends the Oil Pollution Act of 1990 to remove the $75 million limit on the liability of the party responsible for an offshore facility from which oil is discharged into or upon navigable waters or adjoining shorelines. Makes this Act effective on April 15, 2010. Authorizes a claimant to commence an action in court against the responsible party or guarantor or to present the claim to the Oil Spill Liability Trust Fund if the claim is not settled in whole by payment within 30 (currently 90) days of the claim being presented. Amends the Federal Water Pollution Control Act (commonly known as the Clean Water Act) to require the President to ensure that tank vessel, nontank vessel, and facility response plans under the National Response System are designed to prevent injury to the economy, jobs, and the environment. Requires the President to promulgate regulations that revise the requirements that govern oil spill response plans, including requiring such plans to: (1) ensure the availability of private personnel and equipment in the quantities necessary and in the appropriate region to respond immediately to and sustain the response effort for as long as necessary to remove a worst-case discharge and to mitigate damage from a discharge; (2) demonstrate the financial capability to pay for removal costs and damages; (3) describe the environmental effects of the plan methodologies and equipment; (4) describe the process for communication and coordination with federal, state, and local agencies before, during, and after a response to a discharge; (5) identify performance standards for the quantity of oil or hazardous substance that will be removed under the response plan; (6) in the case of oil production, drilling, and workover facilities, describe the specific measures to be used in response to a blowout or other event involving loss of well control; and (7) identify potential economic and ecological impacts of a worst-case discharge and response activities to prevent or mitigate those impacts in the event of a discharge. Allows the President to approve a plan only if: (1) it meets the plan response requirements; (2) field tests of the plan have been conducted in the area in which the tank vessel, nontank vessel, or facility is proposed to operate; (3) the methods and equipment proposed to be used under the response plan are demonstrated to be technologically feasible in the area and under the conditions (including the depth of a well, in the case of an offshore facility) in which the vessel or facility is proposed to operate; (4) the available scientific information about the area allows for identification of potential impacts to ecological areas and protection of those areas in the event of a discharge, including adequate surveys of wildlife; and (5) it describes the quantity of oil likely to be removed in the event of a worst-case discharge. Requires the President to require notice of the proposed response plan to be published in the Federal Register and provide for a public comment period for the plan of at least 30 days. Includes within the definition of "worst case discharge" the largest foreseeable discharge from an unanticipated and uncontrolled blowout or other loss of well control. Requires the Administrator of the fund established by British Petroleum Company to pay claims resulting from the blowout and explosion of the mobile offshore drilling unit Deepwater Horizon that occurred April 20, 2010, to report to Congress on the status of such fund and claims that have been paid from the fund.

Bill Text

What changed in the latest version

204 added · 14 removed

Plain-language change summary

The bill's title was changed from the "Big Oil Bailout Prevention Liability Act of 2010" to the "Big Oil Bailout Prevention Unlimited Liability Act of 2010." Additionally, it removed a section that specified the effective date of the bill as April 15, 2010. This means that the bill now emphasizes unlimited liability for offshore facilities without a specified start date for its provisions.

→
Previous
Latest
3305 Introduced in Senate (IS)] 111th CONGRESS 2d Session S.
3305 Reported in Senate (RS)] Calendar No.
3305 To amend the Oil Pollution Act of 1990 to require oil polluters to pay the full cost of oil spills, and for other purposes.
518 111th CONGRESS 2d Session S.
3305 [Report No.
111-249] To amend the Oil Pollution Act of 1990 to require oil polluters to pay the full cost of oil spills, and for other purposes.
Whitehouse, and Mr.
Whitehouse, Mr.
Sanders) introduced the following bill;
Sanders, Mr.
which was read twice and referred to the Committee on Environment and Public Works _______________________________________________________________________ A BILL To amend the Oil Pollution Act of 1990 to require oil polluters to pay the full cost of oil spills, and for other purposes.
Brown of Ohio, Mrs.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1.
Gillibrand, Mr.
Kaufman, Mrs.
Murray, Mr.
Reed, Ms.
Klobuchar, Mrs.
Feinstein, Mr.
Merkley, Ms.
Stabenow, Mr.
Feingold, Mr.
Durbin, Mrs.
Shaheen, Mr.
Casey, Mr.
Leahy, Mr.
Harkin, Mr.
Franken, and Ms.
Mikulski) introduced the following bill;
which was read twice and referred to the Committee on Environment and Public Works August 5, 2010 Reported by Mrs.
Boxer, with an amendment [Strike out all after the enacting clause and insert the part printed in italic] _______________________________________________________________________ A BILL To amend the Oil Pollution Act of 1990 to require oil polluters to pay the full cost of oil spills, and for other purposes.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, <DELETED>SECTION 1.
SHORT TITLE.</DELETED> <DELETED> This Act may be cited as the ``Big Oil Bailout Prevention Liability Act of 2010''.</DELETED> <DELETED>SEC.
2.
LIMITS ON LIABILITY FOR OFFSHORE FACILITIES.</DELETED> <DELETED> Section 1004(a)(3) of the Oil Pollution Act of 1990 (33 U.S.C.
2704(a)(3)) is amended by striking ``$75,000,000'' and inserting ``$10,000,000,000''.</DELETED> <DELETED>SEC.
3.
EFFECTIVE DATE.</DELETED> <DELETED> This Act and the amendments made by this Act take effect on April 15, 2010.</DELETED> SECTION 1.
This Act may be cited as the ``Big Oil Bailout Prevention Liability Act of 2010''.
This Act may be cited as the ``Big Oil Bailout Prevention Unlimited Liability Act of 2010''.
LIMITS ON LIABILITY FOR OFFSHORE FACILITIES.
REMOVAL OF LIMITS ON LIABILITY FOR OFFSHORE FACILITIES.
Section 1004(a)(3) of the Oil Pollution Act of 1990 (33 U.S.C.
(a) In General.--Section 1004(a)(3) of the Oil Pollution Act of (33 U.S.C.
2704(a)(3)) is amended by striking ``$75,000,000'' and inserting ``$10,000,000,000''.
2704(a)(3)) is amended by striking ``plus $75,000,000'' and inserting ``and the liability of the responsible party under section 1002''.
(b) Effective Date.--The amendment made by this section takes effect on April 15, 2010.
EFFECTIVE DATE.
CLAIMS PROCEDURE.
This Act and the amendments made by this Act take effect on April 15, 2010.
Section 1013(c)(2) of the Oil Pollution Act of 1990 (33 U.S.C.
<all>
2713(c)(2)) is amended by striking ``settled by any person by payment within 90 days'' and inserting ``settled in whole by any person by payment within 30 days''.
Show all 93 changed rows (53 more)
Previous
Latest
SEC.
4.
OIL AND HAZARDOUS SUBSTANCE RESPONSE PLANNING.
(a) National Response System.--Section 311(j)(5) of the Federal Water Pollution Control Act (33 U.S.C.
1321(j)(5)) is amended-- (1) in subparagraph (A), by adding at the end the following:
``(iii) The President shall ensure that the regulations promulgated pursuant to this paragraph are designed to prevent, to the maximum extent practicable, injury to the economy, jobs, and the environment, including to prevent-- ``(I) loss of, destruction of, or injury to, real or personal property;
``(II) loss of subsistence use of natural resources;
``(III) loss of revenue;
``(IV) loss of profits or earning capacity;
``(V) an increase in the cost of providing public services to remove a discharge;
and ``(VI) loss of, destruction of, or injury to, natural resources.
``(iv) The President shall promulgate regulations that clarify the requirements of a response plan in accordance with subparagraph (D).'';
(2) by striking subparagraph (D) and inserting the following:
``(D) A response plan required under this paragraph shall-- ``(i) be consistent with the requirements of the National Contingency Plan and Area Contingency Plans;
``(ii) identify the qualified individual having full authority to implement removal actions, and require immediate communications between that individual and the appropriate Federal official and the persons providing personnel and equipment pursuant to clause (iii);
``(iii) identify, and ensure by contract or other means approved by the President the availability of, private personnel and equipment in the quantities necessary, staged and available in the appropriate region to respond immediately to and sustain the response effort for as long as necessary-- ``(I) to remove, to the maximum extent practicable, a worst-case discharge (including a discharge resulting from fire or an explosion);
``(II) to mitigate damage from a discharge;
and ``(III) to prevent or reduce a substantial threat of such a discharge;
``(iv) demonstrate the financial capability to pay for removal costs and damages;
``(v) describe the training, equipment testing, periodic unannounced drills, and response actions of persons on the vessel or at the facility, to be carried out under the plan to ensure the safety of the vessel or facility and to meet the requirements of this subparagraph;
``(vi) describe the environmental effects of the response plan methodologies and equipment;
``(vii) describe the process for communication and coordination with Federal, State, and local agencies before, during, and after a response to a discharge;
``(viii) identify performance standards for the quantity of oil or hazardous substance that will be removed under the response plan immediately following the discharge and at regular, identified periods, including provisions for reporting the degree to which actual removal meets the required performance standards;
``(ix) in the case of oil production, drilling, and workover facilities, describe the specific measures to be used in response to a blowout or other event involving loss of well control;
``(x) identify potential economic and ecological impacts of a worst-case discharge and response activities to prevent or mitigate, to the maximum extent practicable, those impacts in the event of a discharge;
``(xi) be updated periodically;
and ``(xii) be resubmitted for approval of each significant change.'';
and (3) in subparagraph (E), by striking clauses (i) through (v) and inserting the following:
``(i) require notice of the proposed response plan to be published in the Federal Register and provide for a public comment period for the plan of at least 30 days;
``(ii) promptly review the response plan;
``(iii) require amendments to any plan that does not meet the requirements of this paragraph;
``(iv) approve any plan only after finding, based on evidence in the record, that-- ``(I) the response plan meets the requirements of subparagraph (D);
``(II) there have been 1 or more field tests of the plan in the area in which the tank vessel, nontank vessel, or facility is proposed to operate, and the results of that field testing are publicly available;
``(III) the methods and equipment proposed to be used under the response plan are demonstrated to be technologically feasible in the area and under the conditions (including the depth of a well, in the case of an offshore facility) in which the tank vessel, nontank vessel, or facility is proposed to operate;
``(IV) the available scientific information about the area allows for identification of potential impacts to ecological areas and protection of those areas in the event of a discharge, including adequate surveys of wildlife;
and ``(V) the response plan describes the quantity of oil likely to be removed in the event of a worst-case discharge;
``(v) obtain the written concurrence of such other agencies as the President determines to be appropriate;
``(vi) review each plan periodically thereafter;
and ``(vii) in the case of a plan for a nontank vessel, consider any applicable State-mandated response plan in effect on August 9, 2004, and ensure consistency to the maximum extent practicable.''.
(b) Definitions.--Section 311(a)(24)(B) of the Federal Water Pollution Control Act (33 U.S.C.
1321(a)(24)(B)) is amended by inserting ``, including from an unanticipated and uncontrolled blowout or other loss of well control,'' after ``foreseeable discharge''.
SEC.
5.
REPORTS.
Not later than 180 days after the date of enactment of this Act and every 90 days thereafter until all claims resulting from the blowout and explosion of the mobile offshore drilling unit Deepwater Horizon that occurred April 20, 2010, and resulting hydrocarbon releases into the environment, have been paid, the administrator of the fund described in paragraph (1) shall submit to Congress a report that describes-- (1) the status of the compensation fund established by British Petroleum Company to pay claims resulting from the blowout and explosion;
and (2) each claim that has been paid from that fund.
Amend the title so as to read:
``A bill to amend the Oil Pollution Act of 1990 and the Federal Water Pollution Control Act to require oil polluters to pay the full cost of oil spills, and for other purposes.''.
Calendar No.
518 111th CONGRESS 2d Session S.
3305 [Report No.
111-249] _______________________________________________________________________ A BILL To amend the Oil Pollution Act of 1990 to require oil polluters to pay the full cost of oil spills, and for other purposes.
_______________________________________________________________________ August 5, 2010 Reported with an amendment
View plain text versions (2)

Sections of law this bill changes

3 sections in 2 laws

From the bill's own amending language, matched to the official United States Code (current through Public Law 119-142).

Water pollution prevention and control · 33 U.S.C. ch. 26 1 section
  • § 1321 Oil and hazardous substance liability Amends

    33 U.S.C. § 1321 — at 1321(j)(5) and 1321(a)(24)(B)

    The law today

    (a) Definitions For the purpose of this section, the term— (1) “oil” means oil of any kind or in any form, including, but not limited to, petroleum, fuel oil, sludge, oil refuse, and oil mixed with wastes other than dredged spoil; (2) “discharge” includes, but is not limited to, any spilling, leaking, pumping, pouring, emitting, emptying or dumping, but excludes (A) discharges in compliance with a permit under section 1342 of this title, (B) discharges resulting from circumstances identified and reviewed and made a part of the public record with respect to a permit issued or modified under section 1342 of this title, and subject to a condition in such permit,,1 (C) continuous or anticipated intermittent discharges from a point source, identified in a permit or permit application under section 1342 of this title, which are caused by events occurring within the scope of relevant operating or treatment systems, and (D) discharges incidental to mechanical removal authorized by the President under subsection (c) of this section; (3) “vessel” means every description of watercraft or other artificial contrivance used, or capable of being used, as a means of transportation on water other than a public vessel; (4) “public vessel” means a vessel owned or bareboat-chartered and operated by the United States, or by a State or political subdivision thereof, or by a foreign nation, except when such vessel is engaged in commerce; (5) “United States” means the States, the District of Columbia, the Commonwealth of Puerto Rico, the Commonwealth of the Northern Mariana Islands, Guam, American Samoa, the Virgin Islands, and the Trust Territory of the Pacific Islands; (6) “owner or operator” means (A) in the case of a vessel, any person owning, operating, or chartering by demise, such vessel, and (B) in the case of an onshore facility, and an offshore facility, any person owning or operating such onshore facility or offshore facility, and (C) in the case of any abandoned offshore facility, the person who owned or operated such facility immediately prior to such abandonment; (7) “person” includes an individual, firm, corporation, association, and a partnership; (8) “remove” or “removal” refers to containment and removal of the oil or hazardous substances from the water and shorelines or the taking of such other actions as may be necessary to prevent, minimize, or mitigate damage to the public health or welfare, including, but not limited to, fish, shellfish, wildlife, and public and private property, shorelines, and beaches; (9) “contiguous zone” means the entire zone established or to be established by the United States under article 24 of the Convention on the Territorial Sea and the Contiguous Zone; (10) “onshore facility” means any facility (including, but not limited to, motor vehicles and rolling stock) of any kind located in, on, or under, any land within the United States other than submerged land; (11) “offshore facility” means any facility of any kind located in, on, or under, any of the navigable waters of the United States, any facility of any kind which is subject to the jurisdiction of the United States and is located in, on, or under any other waters, other than a vessel or a public vessel, and, for the purposes of applying subsections (b), (c), (e), and (o), any foreign offshore unit (as defined in section 1001 of the Oil Pollution Act 2) or any other facility located seaward of the exclusive economic zone; (12) “act of God” means an act occasioned by an unanticipated grave natural disaster; (13) “barrel” means 42 United States gallons at 60 degrees Fahrenheit; (14) “hazardous substance” means any substance designated pursuant to subsection (b)(2) of this section; (15) “inland oil barge” means a non-self-propelled vessel carrying oil in bulk as cargo and certificated to operate only in the inland waters of the United States, while operating in such waters; (16) “inland waters of the United States” means those waters of the United...

    62 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Oil pollution · 33 U.S.C. ch. 40 2 sections
  • § 2704 Limits on liability Amends

    33 U.S.C. § 2704 — at 2704(a)(3)

    The law today

    (a) General rule Except as otherwise provided in this section, the total of the liability of a responsible party under section 2702 of this title and any removal costs incurred by, or on behalf of, the responsible party, with respect to each incident shall not exceed— (1) for a tank vessel the greater of— (A) with respect to a single-hull vessel, including a single-hull vessel fitted with double sides only or a double bottom only, $3,000 per gross ton; (B) with respect to a vessel other than a vessel referred to in subparagraph (A), $1,900 per gross ton; or (C) (i) with respect to a vessel greater than 3,000 gross tons that is— (I) a vessel described in subparagraph (A), $22,000,000; or (II) a vessel described in subparagraph (B), $16,000,000; or (ii) with respect to a vessel of 3,000 gross tons or less that is— (I) a vessel described in subparagraph (A), $6,000,000; or (II) a vessel described in subparagraph (B), $4,000,000; (2) for any other vessel, $950 per gross ton or $800,000, whichever is greater; (3) for an offshore facility except a deepwater port, the total of all removal costs plus $75,000,000; and (4) for any onshore facility and a deepwater port, $350,000,000. (b) Division of liability for mobile offshore drilling units (1) Treated first as tank vessel For purposes of determining the responsible party and applying this Act and except as provided in paragraph (2), a mobile offshore drilling unit which is being used as an offshore facility is deemed to be a tank vessel with respect to the discharge, or the substantial threat of a discharge, of oil on or above the surface of the water. (2) Treated as facility for excess liability To the extent that removal costs and damages from any incident described in paragraph (1) exceed the amount for which a responsible party is liable (as that amount may be limited under subsection (a)(1)), the mobile offshore drilling unit is deemed to be an offshore facility. For purposes of applying subsection (a)(3), the amount specified in that subsection shall be reduced by the amount for which the responsible party is liable under paragraph (1). (c) Exceptions (1) Acts of responsible party Subsection (a) does not apply if the incident was proximately caused by— (A) gross negligence or willful misconduct of, or (B) the violation of an applicable Federal safety, construction, or operating regulation by, the responsible party, an agent or employee of the responsible party, or a person acting pursuant to a contractual relationship with the responsible party (except where the sole contractual arrangement arises in connection with carriage by a common carrier by rail). (2) Failure or refusal of responsible party Subsection (a) does not apply if the responsible party fails or refuses— (A) to report the incident as required by law and the responsible party knows or has reason to know of the incident; (B) to provide all reasonable cooperation and assistance requested by a responsible official in connection with removal activities; or (C) without sufficient cause, to comply with an order issued under subsection (c) or (e) of section 1321 of this title or the Intervention on the High Seas Act (33 U.S.C. 1471 et seq.). (3) OCS facility or vessel Notwithstanding the limitations established under subsection (a) and the defenses of section 2703 of this title, all removal costs incurred by the United States Government or any State or local official or agency in connection with a discharge or substantial threat of a discharge of oil from any Outer Continental Shelf facility or a vessel carrying oil as cargo from such a facility shall be borne by the owner or operator of such facility or vessel. (4) Certain tank vessels Subsection (a)(1) shall not apply to— (A) a tank vessel on which the only oil carried as cargo is an animal fat or vegetable oil, as those terms are used in section 2720 of this title; and (B) a tank vessel that is designated in its certificate of inspection as an oil spill response ve...

    51 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

  • § 2713 Claims procedure Amends

    33 U.S.C. § 2713 — at 2713(c)(2)

    The law today

    (a) Presentation Except as provided in subsection (b), all claims for removal costs or damages shall be presented first to the responsible party or guarantor of the source designated under section 2714(a) of this title. (b) Presentation to Fund (1) In general Claims for removal costs or damages may be presented first to the Fund— (A) if the President has advertised or otherwise notified claimants in accordance with section 2714(c) of this title; (B) by a responsible party who may assert a claim under section 2708 of this title; (C) by the Governor of a State for removal costs incurred by that State; or (D) by a United States claimant in a case where a foreign offshore unit has discharged oil causing damage for which the Fund is liable under section 2712(a) of this title. (2) Limitation on presenting claim No claim of a person against the Fund may be approved or certified during the pendency of an action by the person in court to recover costs which are the subject of the claim. (c) Election If a claim is presented in accordance with subsection (a) and— (1) each person to whom the claim is presented denies all liability for the claim, or (2) the claim is not settled by any person by payment within 90 days after the date upon which (A) the claim was presented, or (B) advertising was begun pursuant to section 2714(b) of this title, whichever is later, the claimant may elect to commence an action in court against the responsible party or guarantor or to present the claim to the Fund. (d) Uncompensated damages If a claim is presented in accordance with this section, including a claim for interim, short-term damages representing less than the full amount of damages to which the claimant ultimately may be entitled, and full and adequate compensation is unavailable, a claim for the uncompensated damages and removal costs may be presented to the Fund. (e) Procedure for claims against Fund The President shall promulgate, and may from time to time amend, regulations for the presentation, filing, processing, settlement, and adjudication of claims under this Act against the Fund.

    8 other bills also change this section · Follow it → Official text at uscode.house.gov ↗

Action History

  1. Placed on Senate Legislative Calendar under General Orders. Calendar No. 518.

  2. Committee on Environment and Public Works. Reported by Senator Boxer with an amendment in the nature of a substitute. With written report No. 111-249. Minority views filed.

  3. Committee on Environment and Public Works. Ordered to be reported with an amendment in the nature of a substitute favorably.

  4. Committee on Environment and Public Works. Hearings held.

  5. Read twice and referred to the Committee on Environment and Public Works.

Sponsorship breakdown

Export CSV (upgrade) →

0 sponsors · 0 co-sponsors · 303 not signed on

Sponsors (0)

None.

Co-sponsors (0)

None.

Not signed on (303)

303 members have not signed on to this bill.

Show all 303 →

"Not signed on" means a member has not sponsored or co-sponsored this bill — it does not imply opposition. Members flagged Voted No have a recorded No vote on this bill.

Whip count is in markup. Polling the chamber and every recorded vote this session. Only the first open is slow. It’s instant for you after this. Calling the roll · Tallying · Engrossing
Cross-referencing the record. Reading this bill against every other bill in the corpus by meaning, not keywords. Only the first open is slow. It’s instant for you after this. Matching · Ranking · Engrossing

Frequently asked questions

What does S 3305 do?
Big Oil Bailout Prevention Unlimited Liability Act of 2010 - Amends the Oil Pollution Act of 1990 to remove the $75 million limit on the liability of the party responsible for an offshore facility from which oil is discharged into or upon navigable waters or adjoining shorelines. Makes this Act effective on April 15, 2010. Authorizes a claimant to commence an action in court against the responsible party or guarantor or to present the claim to the Oil Spill Liability Trust Fund if the claim is not settled in whole by payment within 30 (currently 90) days of the claim being presented. Amends the Federal Water Pollution Control Act (commonly known as the Clean Water Act) to require the President to ensure that tank vessel, nontank vessel, and facility response plans under the National Response System are designed to prevent injury to the economy, jobs, and the environment. Requires the President to promulgate regulations that revise the requirements that govern oil spill response plans, including requiring such plans to: (1) ensure the availability of private personnel and equipment in the quantities necessary and in the appropriate region to respond immediately to and sustain the response effort for as long as necessary to remove a worst-case discharge and to mitigate damage from a discharge; (2) demonstrate the financial capability to pay for removal costs and damages; (3) describe the environmental effects of the plan methodologies and equipment; (4) describe the process for communication and coordination with federal, state, and local agencies before, during, and after a response to a discharge; (5) identify performance standards for the quantity of oil or hazardous substance that will be removed under the response plan; (6) in the case of oil production, drilling, and workover facilities, describe the specific measures to be used in response to a blowout or other event involving loss of well control; and (7) identify potential economic and ecological impacts of a worst-case discharge and response activities to prevent or mitigate those impacts in the event of a discharge. Allows the President to approve a plan only if: (1) it meets the plan response requirements; (2) field tests of the plan have been conducted in the area in which the tank vessel, nontank vessel, or facility is proposed to operate; (3) the methods and equipment proposed to be used under the response plan are demonstrated to be technologically feasible in the area and under the conditions (including the depth of a well, in the case of an offshore facility) in which the vessel or facility is proposed to operate; (4) the available scientific information about the area allows for identification of potential impacts to ecological areas and protection of those areas in the event of a discharge, including adequate surveys of wildlife; and (5) it describes the quantity of oil likely to be removed in the event of a worst-case discharge. Requires the President to require notice of the proposed response plan to be published in the Federal Register and provide for a public comment period for the plan of at least 30 days. Includes within the definition of "worst case discharge" the largest foreseeable discharge from an unanticipated and uncontrolled blowout or other loss of well control. Requires the Administrator of the fund established by British Petroleum Company to pay claims resulting from the blowout and explosion of the mobile offshore drilling unit Deepwater Horizon that occurred April 20, 2010, to report to Congress on the status of such fund and claims that have been paid from the fund.
What is the current status of S 3305?
This bill died with 111th Congress. It reached “In Committee” and never advanced before the session ended, so it can no longer move — a new version would have to be reintroduced in the current session.
Where can I track S 3305?
Track S 3305 free on One Click Politics — get push/email alerts when it moves.

Make your voice heard on S 3305

Find the representatives who decide this bill and tell them where you stand — for yourself, or mobilize your whole list in one click with One Click Politics advocacy software.

Stay ahead of S 3305

Last checked for changes 20 days ago · updated continuously

One Click Politics tracks every bill in Congress and all 50 states.

Track this bill →